Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

Datos:

kgf kgf
luz entre columnas entre caras interiores: ml ≔ 5 m σs ≔ 4 ―― Hf ≔ 2 m fc ≔ 280 ―― Pz ≔ 1.05 Φ≔
cm 2 cm 2
Para zapatas con
Datos de columna: Para zapatas ais
Columna 1: Columna 2:
bc1 ≔ 40 cm Direccion transversal (Y) bc2 ≔ 40 cm Direccion transversal (Y)
lc1 ≔ 60 cm Direccion longitudinal (X) lc2 ≔ 80 cm Direccion longitudinal (X)

Cargas:
Pm1 ≔ 120 tonnef Pm2 ≔ 200 tonnef
Pv1 ≔ 70 tonnef Pv2 ≔ 115 tonnef
Psl1 ≔ 20 tonnef Psl2 ≔ 15 tonnef
Pst1 ≔ 12 tonnef Pst2 ≔ 13 tonnef

Pt1 ≔ Pm1 + Pv1 = 190 tonnef Pt2 ≔ Pm2 + Pv2 = 315 tonnef
Pts1 ≔ Pm1 + Pv1 + Psl1 = 210 tonnef Pts2 ≔ Pm2 + Pv2 + Psl2 = 330 tonnef

Dirección longitudial:
Mml1 ≔ 8 tonnef ⋅ m Mml2 ≔ 3 tonnef ⋅ m
Mvl1 ≔ 6 tonnef ⋅ m Mvl2 ≔ 1.5 tonnef ⋅ m
Msl1 ≔ 9 tonnef ⋅ m Msl2 ≔ 10 tonnef ⋅ m

Dirección transversal:
Mmt1 ≔ 6 tonnef ⋅ m Mmt2 ≔ 7 tonnef ⋅ m
Mvt1 ≔ 4 tonnef ⋅ m Mvt2 ≔ 5 tonnef ⋅ m
Mst1 ≔ 6 tonnef ⋅ m Mst2 ≔ 7 tonnef ⋅ m

Area tentativa zapata 1


Usada para zapatas laterales
(Por 1.2 para considerar
1.2
At1 ≔ Pt1 ⋅ ―――――― = 6.162 m 2
efectos de excentricidad),
⎛ tonnef ⎞ por aumento de presion
⎜σs - 3 ――― 2 ⎟
⎝ m ⎠
Datos:
tonnef
Pt1 = 190 tonnef σs = 40 ―――
m2
Valores de la zapata 1
L1 ≔ 1.8 m B1 ≔ 3.7 m Guardar una relacion 1.5
y2
Az1 ≔ L1 ⋅ B1 = 6.66 m 2

Valor de la excentricidad
e=centro de la columna al
((L1 - lc1))
e1 ≔ ―――― = 0.6 m centro de la zapata
2
Datos:
L1 = 1.8 m lc1 = 0.6 m

Calculo de las reacciones R1 y R2

Columna 1 Columna 2
bc1 = 0.4 m bc2 = 0.4 m
lc1 = 0.6 m lc2 = 0.8 m

ml = 5 m
Cargas de gravedad longitudinal
Datos:
Pm1 = 120 tonnef Mml1 = 8 m ⋅ tonnef Pm2 = 200 tonnef Mml2 = 3 m ⋅ tonnef
Pv1 = 70 tonnef Mvl1 = 6 m ⋅ tonnef Pv2 = 115 tonnef Mvl2 = 1.5 m ⋅ tonnef

Resultado:
Pt1 ≔ Pm1 + Pv1 = 190 tonnef Pt2 ≔ Pm2 + Pv2 = 315 tonnef
lc2 lc1
M1 ≔ Mml1 + Mvl1 = 14 m ⋅ tonnef M2 ≔ Mml2 + Mvl2 = 4.5 m ⋅ tonnef Lv ≔ ml + ―― + ―― - e1 = 5.1 m
2 2
M1 + M2 + Pt2 ⋅ Lv - Pt1 ⋅ e1
R2 ≔ ―――――――――= 296.275 tonnef R1 ≔ Pt1 + Pt2 - R2 = 208.725 tonnef ml = 5 m
Lv lc2 = 0.8 m
lc1 = 0.6 m
e1 = 0.6 m
Pt1 = 190 tonnef Pt2 = 315 tonnef

M1 = 14 m ⋅ tonnef M2 = 4.5 tonnef ⋅ m


R1 = 208.725 tonnef R2 = 296.275 tonnef

e1 = 0.6 m Lv = 5.1 m

Por cargas de sismo en sentido horario


Datos:

Pm1 = 120 tonnef Mml1 = 8 m ⋅ tonnef Pm2 = 200 tonnef Mml2 = 3 m ⋅ tonnef
Pv1 = 70 tonnef Mvl1 = 6 m ⋅ tonnef Pv2 = 115 tonnef Mvl2 = 1.5 m ⋅ tonnef
Psl1 = 20 tonnef Msl1 = 9 m ⋅ tonnef Psl2 = 15 tonnef Msl2 = 10 m ⋅ tonnef

Resultado:
Pt1sp ≔ Pm1 + Pv1 + Psl1 = 210 tonnef Pt2sp ≔ Pm2 + Pv2 + Psl2 = 330 tonnef
M1sp ≔ Mml1 + Mvl1 + Msl1 = 23 m ⋅ tonnef M2sp ≔ Mml2 + Mvl2 + Msl2 = 14.5 m ⋅ tonnef

M1sp + M2sp + Pt2sp ⋅ Lv - Pt1sp ⋅ e1


R2sp ≔ ―――――――――――― = 312.647 tonnef R1sp ≔ Pt1sp + Pt2sp - R2sp = 227.353 tonnef
Lv

Pt1sp = 210 tonnef Pt2sp = 330 tonnef

M1sp = 23 m ⋅ tonnef M2sp = 14.5 m ⋅ tonnef

R1sp = 227.353 tonnef R2sp = 312.647 tonnef

e1 = 0.6 m Lv = 5.1 m

Por cargas de sismo en sentido antihorario

Datos:
Pm1 = 120 tonnef Mml1 = 8 m ⋅ tonnef Pm2 = 200 tonnef Mml2 = 3 m ⋅ tonnef
Pv1 = 70 tonnef Mvl1 = 6 m ⋅ tonnef Pv2 = 115 tonnef Mvl2 = 1.5 m ⋅ tonnef
Psl1 = 20 tonnef Msl1 = 9 m ⋅ tonnef Psl2 = 15 tonnef Msl2 = 10 m ⋅ tonnef

Resultado:
Pt1sn ≔ Pm1 + Pv1 - Psl1 = 170 tonnef Pt2sn ≔ Pm2 + Pv2 - Psl2 = 300 tonnef
M1sn ≔ Mml1 + Mvl1 - Msl1 = 5 tonnef ⋅ m M2sn ≔ Mml2 + Mvl2 - Msl2 = -5.5 m ⋅ tonnef

M1sn + M2sn + Pt2sn ⋅ Lv - Pt1sn ⋅ e1


R2sn ≔ ――――――――――――= 279.902 tonnef R1sn ≔ Pt1sn + Pt2sn - R2sn = 190.098 tonnef
Lv

Pt1sn = 170 tonnef Pt2sn = 300 tonnef

M1sn = 5 m ⋅ tonnef M2sn = -5.5 tonnef ⋅ m

R1sn = 190.098 tonnef R2sn = 279.902 tonnef

e1 = 0.6 m Lv = 5.1 m

Reacciones halladas

R1 = 208.725 tonnef R2 = 296.275 tonnef


R1sp = 227.353 tonnef R2sp = 312.647 tonnef
R1sn = 190.098 tonnef R2sn = 279.902 tonnef
Verificacion de esfuerzos en la zapata
Por cargas de gravedad direccion longitudinal
Datos:
R1 = 208.725 tonnef M1 = 14 m ⋅ tonnef
Pz = 1.05 L1 = 1.8 m
2
Az1 = 6.66 m B1 = 3.7 m
Resultado:
⎛ ((R1 ⋅ Pz)) ⎞ ((6 ⋅ M1)) tonnef
σactz1 ≔ ⎜―――⎟ + ―――= 39.914 ―――
σactz1 ⎜ ⎟+ 39.914
⎝ Az1 ⎠ L1 2 ⋅ B1 m2

⎛ ((R1 ⋅ Pz)) ⎞ ((6 ⋅ M1)) tonnef


σactz1.1 ≔ ⎜―――⎟ - ――― 2
= 25.9 ―――
⎝ Az1 ⎠ L1 ⋅ B1 m2

if σs ≥ σactz1 = “aceptable”
‖ “aceptable” tonnef tonnef tonnef
σs = 40 ――― σactz1 = 39.914 ――― σrestz1 ≔ σs - σactz1 = 0.086 ―――
‖ m2 m2 m2
else tonnef
‖ “rechazado” σactz1.1 = 25.9 ―――
‖ m2

Por cargas de gravedad direccion tansversal


Datos:
R1 = 208.725 tonnef Mmt1 = 6 m ⋅ tonnef L1 = 1.8 m
Pz = 1.05 Mvt1 = 4 m ⋅ tonnef B1 = 3.7 m
2
Az1 = 6.66 m
Resultado:
⎛ ((R1 ⋅ Pz)) ⎞ 6 ⋅ ((Mmt1 + Mvt1)) tonnef
σactz2 ≔ ⎜―――⎟ + ―――――― 2
= 35.342 ―――
⎝ Az1 ⎠ B1 ⋅ L1 m2

⎛ ((R1 ⋅ Pz)) ⎞ 6 ⋅ ((Mmt1 + Mvt1)) tonnef


σactz2.1 ≔ ⎜―――⎟ - ―――――― = 30.472 ―――
⎝ Az1 ⎠ B1 2 ⋅ L1 m2

if σs ≥ σactz2 = “aceptable”
‖ “aceptable” tonnef tonnef tonnef
σs = 40 ――― σactz2 = 35.342 ――― σrestz2 ≔ σs - σactz2 = 4.658 ―――
‖ m2 m2 m2
else tonnef
‖ “rechazado” σactz2.1 = 30.472 ―――
‖ m2

Por cargas de sismo sentido horario direccion longitudinal


Datos:
R1sp = 227.353 tonnef M1sp = 23 m ⋅ tonnef L1 = 1.8 m
Pz = 1.05 B1 = 3.7 m
Az1 = 6.66 m 2
Resultado:
⎛ ((R1sp ⋅ Pz)) ⎞ 6 ⋅ ((M1sp)) tonnef
σactz3 ≔ ⎜―――― ⎟ + ――――2
= 47.355 ―――
⎝ Az1 ⎠ L1 ⋅ B1 m2

⎛ ((R1sp ⋅ Pz)) ⎞ 6 ⋅ ((M1sp)) tonnef


σactz3.1 ≔ ⎜―――― ⎟ - ――――2
= 24.332 ―――
⎝ Az1 ⎠ L1 ⋅ B1 m2

if 1.3 ⋅ σs ≥ σactz3 = “aceptable”


‖ “aceptable” tonnef tonnef ton
1.3 ⋅ σs = 52 ――― σactz3 = 47.355 ――― σrestz3 ≔ 1.3 ⋅ σs - σactz3 = 4.645 ―
‖ m2 m2 m
else tonnef
‖ “rechazado” σactz3.1 = 24.332 ―――
‖ m2
Por cargas de sismo sentido antihorario direccion longitudinal
Datos:
R1sn = 190.098 tonnef M1sn = 5 m ⋅ tonnef L1 = 1.8 m
Pz = 1.05 B1 = 3.7 m
Az1 = 6.66 m 2
Resultado:
⎛ ((R1sn ⋅ Pz)) ⎞ 6 ⋅ ((M1sn)) tonnef
σactz4 ≔ ⎜―――― ⎟ + ――――2
= 32.473 ―――
⎝ Az1 ⎠ L1 ⋅ B1 m2

⎛ ((R1sn ⋅ Pz)) ⎞ 6 ⋅ ((M1sn)) tonnef


σactz4.1 ≔ ⎜―――― ⎟ - ―――― = 27.468 ―――
⎝ Az1 ⎠ L1 2 ⋅ B1 m2

if 1.3 ⋅ σs ≥ σactz4 = “aceptable”


‖ “aceptable” tonnef tonnef to
1.3 ⋅ σs = 52 ――― σactz4 = 32.473 ――― σrestz4 ≔ 1.3 ⋅ σs - σactz4 = 19.527 ―
‖ m2 m2
else tonnef
‖ “rechazado” σactz4.1 = 27.468 ―――
‖ m2

Por cargas de sismo sentido horario direccion transversal


Datos:
R1 = 208.725 tonnef Mmt1 = 6 tonnef ⋅ m L1 = 1.8 m
Pst1 = 12 tonnef Mvt1 = 4 tonnef ⋅ m B1 = 3.7 m
Pz = 1.05 Mst1 = 6 tonnef ⋅ m
2
Az1 = 6.66 m
Resultado:
Resultado:
⎛ ((R1 + Pst1)) ⋅ Pz ⎞ 6 ⋅ ((Mmt1 + Mvt1 + Mst1)) tonnef
σactz5 ≔ ⎜―――――⎟ + ――――――――― = 38.695 ―――
⎝ Az1 ⎠ B1 2 ⋅ L1 m2

⎛ ((R1 + Pst1)) ⋅ Pz ⎞ 6 ⋅ ((Mmt1 + Mvt1 + Mst1)) tonnef


σactz5.1 ≔ ⎜―――――⎟ - ――――――――― 2
= 30.903 ―――
⎝ Az1 ⎠ B1 ⋅ L1 m2

tonnef tonnef to
if 1.3 ⋅ σs ≥ σactz5 = “aceptable” 1.3 ⋅ σs = 52 ――― σactz5 = 38.695 ――― σrestz5 ≔ 1.3 ⋅ σs - σactz5 = 13.305 ―
‖ “aceptable” m2 m2
‖ tonnef
else σactz5.1 = 30.903 ―――
‖ “rechazado” m2

Por cargas de sismo sentido antihorario direccion transversal
Datos:
R1 = 208.725 tonnef Mmt1 = 6 tonnef ⋅ m L1 = 1.8 m
Pst1 = 12 tonnef Mvt1 = 4 tonnef ⋅ m B1 = 3.7 m
Pz = 1.05 Mst1 = 6 tonnef ⋅ m
Az1 = 6.66 m 2
Resultado:
⎛ ((R1 - Pst1)) ⋅ Pz ⎞ 6 ⋅ ((Mmt1 + Mvt1 - Mst1)) tonnef
σactz6 ≔ ⎜―――――⎟ + ――――――――― 2
= 31.989 ―――
⎝ Az1 ⎠ B1 ⋅ L1 m2

⎛ ((R1 - Pst1)) ⋅ Pz ⎞ 6 ⋅ ((Mmt1 + Mvt1 - Mst1)) tonnef


σactz6.1 ≔ ⎜―――――⎟ - ――――――――― = 30.041 ―――
⎝ Az1 ⎠ B1 2 ⋅ L1 m2

tonnef tonnef to
if 1.3 ⋅ σs ≥ σactz6 = “aceptable” 1.3 ⋅ σs = 52 ――― σactz6 = 31.989 ――― σrestz6 ≔ 1.3 ⋅ σs - σactz6 = 20.011 ―
‖ “aceptable” m2 m2
‖ tonnef
else σactz6.1 = 30.041 ―――
‖ “rechazado” m2

Esfuerzo crítico actuante


tonnef tonnef tonnef
σrestz1 = 0.086 ――― σrestz4 = 19.527 ――― σcritz1 ≔ σactz1 = 39.914 ―――
m2 m2 m2

tonnef tonnef tonnef


σrestz2 = 4.658 ――― σrestz5 = 13.305 ――― σuz1 ≔ 1.55 ⋅ σcritz1 = 61.867 ―――
m2 m2 m2

tonnef tonnef
σrestz3 = 4.645 ――― σrestz6 = 20.011 ―――
m2 m2
Diseño de zapata-1
Diseño por corte direccional longitudinal Diseño por corte direccional transversal

Asumimos un peralte H H1 ≔ 0.9 m Asumimos un peralte H H1 = 0.9 m


Peralte efectivo d d1 ≔ H1 - 0.1 m = 0.8 m Peralte efectivo d d1 ≔ H1 - 0.1 m = 0.8 m
((L1 - lc1 - d1)) ((B1 - bc1 - 2 d1))
Xl1 ≔ ――――― = 0.4 m Xt1 ≔ ―――――― = 0.85 m
1 2
Datos: Datos:
L1 = 1.8 m lc1 = 0.6 m d1 = 0.8 m B1 = 3.7 m bc1 = 0.4 m d1 = 0.8 m

Vul1 ≔ σuz1 ⋅ B1 ⋅ Xl1 = 91.563 tonnef Vut1 ≔ σuz1 ⋅ L1 ⋅ Xt1 = 94.656 tonnef

Cortante proporcionada por el concreto


1 1
― ―
2 2
kgf ‾‾ kgf
Vcl1 ≔ 0.53 ――⋅ fc ⋅ B1 ⋅ d1 = 262.51 tonnef Vct1 ≔ 0.53 ――⋅ ‾‾
fc ⋅ L1 ⋅ d1 = 127.708 tonnef
cm cm
Datos: Datos:
kgf kgf
fc = 280 ―― B1 = 3.7 m d1 = 0.8 m fc = 280 ―― L1 = 1.8 m d1 = 0.8 m
cm 2 cm 2

ΦVnl1 ≔ Φ ⋅ Vcl1 = 223.134 tonnef ΦVnt1 ≔ Φ ⋅ Vct1 = 108.552 tonnef

if Vul1 < ΦVnl1 = “aceptable” if Vut1 < ΦVnt1 = “aceptable”


‖ “aceptable” ΦVnl1 = 223.134 tonnef ‖ “aceptable” ΦVnt1 = 108.552 tonnef
‖ ‖
else Vul1 = 91.563 tonnef else Vut1 = 94.656 tonnef
‖ “rechazado” ‖ “rechazado”
‖ ‖
Diseño por punzonamiento
Asumimos un peralte H H1 = 0.9 m
Peralte efectivo d d1 ≔ H1 - 0.1 m = 0.8 m

⎛ d1 ⎞
bo1 ≔ 2 ⋅ ⎜lc1 + ―⎟ + bc1 + d1 = 3.2 m
⎝ 2 ⎠
Datos:
lc1 = 0.6 m d1 = 0.8 m bc1 = 0.4 m
⎛ d1 ⎞
Ao1 ≔ ⎜lc1 + ―⎟ ⋅ ((bc1 + d1)) = 1.2 m 2
⎝ 2 ⎠
Datos:
lc1 = 0.6 m d1 = 0.8 m bc1 = 0.4 m

AT1 ≔ Az1 = 6.66 m 2

Vup1 ≔ σuz1 ⋅ ((((AT1)) - Ao1)) = 337.794 tonnef

Cortante proporcionada por el concreto


lc1
βc1 ≔ ―― = 1.5
bc1
Datos:
lc1 = 0.6 m bc1 = 0.4 m
1

2
⎛ 1.1 ⎞ ‾‾ kgf
Vcp1 ≔ ⎜0.53 + ―― ⎟ ⋅ fc ⋅ bo1 ⋅ d1 ⋅ ――= 541.174 tonnef
⎝ βc1 ⎠ cm
1

2
kgf
Vcpl1 ≔ ((1.1)) ⋅ ‾‾
fc ⋅ bo1 ⋅ d1 ⋅ ――= 471.207 tonnef Seleccionamos el menor
cm

Φ ⋅ Vcpl1 = 400.526 tonnef Φ ≔ 0.85

if Vup1 < Φ ⋅ Vcpl1 = “aceptable” Φ ⋅ Vcpl1 = 400.526 tonnef


‖ “aceptable” Vup1 = 337.794 tonnef

else
‖ “rechazado”

Diseño por flexion longitudinal


Diseño por flexion direccional longitudinal Diseño por flexion direccional transversal
((L1 - lc1)) ((B1 - bc1))
Xfl1 ≔ ―――― = 0.6 m Xft1 ≔ ―――― = 1.65 m
2 2
Datos: Datos:
L1 = 1.8 m lc1 = 0.6 m B1 = 3.7 m bc1 = 0.4 m
Xfl1 2 Xft1 2
Mul1 ≔ σuz1 ⋅ B1 ⋅ ――― = 41.203 m ⋅ tonnef Mut1 ≔ σuz1 ⋅ L1 ⋅ ――― = 151.59 m ⋅ tonnef
2 2
Datos: Datos:
tonnef tonnef
σuz1 = 61.867 ――― B1 = 3.7 m σuz1 = 61.867 ――― L1 = 1.8 m
m2 m2

Mul1 kgf Mut1 kgf


Kul1 ≔ ――― 2
= 1.74 ―― Kut1 ≔ ――― = 13.159 ――
B1 ⋅ d1 cm 2 L1 ⋅ d1 2
cm 2

ρl1 ≔ 0.0005 ρt1 ≔ 0.0035

Asminl1 ≔ ρl1 ⋅ B1 ⋅ d1 = 14.8 cm 2 Asmint1 ≔ ρt1 ⋅ L1 ⋅ d1 = 50.4 cm 2

Distribucion de acero para la longitudinal


B1 B1
Acero6mm ≔ 0.28 cm 2 S6mml1 ≔ Acero6mm ⋅ ―――= 7 cm ―――= 52.857
Asminl1 S6mml1
B1 B1
Acero8mm ≔ 0.5 cm 2 S8mml1 ≔ Acero8mm ⋅ ―――= 12.5 cm ―――= 29.6
Asminl1 S8mml1
B1 B1
Acero3.8´ ≔ 0.71 cm 2 S3.8´l1 ≔ Acero3.8´ ⋅ ―――= 17.75 cm ――― = 20.845
Asminl1 S3.8´l1
B1 B1
Acero12mm ≔ 1.13 cm 2 S12mml1 ≔ Acero12mm ⋅ ―――= 28.25 cm ―――― = 13.097
Asminl1 S12mml1
B1 B1
Acero1.2´ ≔ 1.29 cm 2 S1.2´l1 ≔ Acero1.2´ ⋅ ―――= 32.25 cm ――― = 11.473
Asminl1 S1.2´l1
B1 B1
B1 B1
Acero5.8´ ≔ 1.99 cm 2 S5.8´l1 ≔ Acero5.8´ ⋅ ―――= 49.75 cm ――― = 7.437
Asminl1 S5.8´l1
B1 B1
Acero3.4´ ≔ 2.84 cm 2 S3.4´l1 ≔ Acero3.4´ ⋅ ―――= 71 cm ――― = 5.211
Asminl1 S3.4´l1
B1 B1
Acero1´ ≔ 5.1 cm 2 S1l1 ≔ Acero1´ ⋅ ―――= 127.5 cm ―― = 2.902
Asminl1 S1l1
B1 B1
Acero1.3.8´ ≔ 10.06 cm 2 S1.3.8´l1 ≔ Acero1.3.8´ ⋅ ―――= 251.5 cm ―――― = 1.471
Asminl1 S1.3.8´l1
Distribucion de acero para la transversal
L1 L1
Acero6mm ≔ 0.28 cm 2 S6mmt1 ≔ Acero6mm ⋅ ―――= 1 cm ―――= 180
Asmint1 S6mmt1
L1 L1
Acero8mm ≔ 0.5 cm 2 S8mmt1 ≔ Acero8mm ⋅ ―――= 1.786 cm ―――= 100.8
Asmint1 S8mmt1
L1 L1
Acero3.8´ ≔ 0.71 cm 2 S3.8´t1 ≔ Acero3.8´ ⋅ ―――= 2.536 cm ――― = 70.986
Asmint1 S3.8´t1
L1 L1
Acero12mm ≔ 1.13 cm 2 S12mmt1 ≔ Acero12mm ⋅ ―――= 4.036 cm ―――― = 44.602
Asmint1 S12mmt1
L1 L1
Acero1.2´ ≔ 1.29 cm 2 S1.2´t1 ≔ Acero1.2´ ⋅ ―――= 4.607 cm ――― = 39.07
Asmint1 S1.2´t1
L1 L1
Acero5.8´ ≔ 1.99 cm 2 S5.8´t1 ≔ Acero5.8´ ⋅ ―――= 24.203 cm ――― = 7.437
Asminl1 S5.8´t1
L1 L1
Acero3.4´ ≔ 2.84 cm 2 S3.4´t1 ≔ Acero3.4´ ⋅ ―――= 10.143 cm ――― = 17.746
Asmint1 S3.4´t1
L1 L1
Acero1´ ≔ 5.1 cm 2 S1t1 ≔ Acero1´ ⋅ ―――= 18.214 cm ――= 9.882
Asmint1 S1t1
B1 L1
Acero1.3.8´ ≔ 10.06 cm 2 S1.3.8´t1 ≔ Acero1.3.8´ ⋅ ―――= 73.853 cm ―――― = 2.437
Asmint1 S1.3.8´t1

Diseño de viga de cimentacion


Lv
hvv ≔ 1.2 m dvv ≔ hvv - 0.1 m = 1.1 m Hvc ≔ ―― = 0.729 m
7
bvv ≔ 0.4 m

Gravedad
Pt1 = 190 tonnef Pt2 = 315 tonnef

M1 = 14 m ⋅ tonnef M2 = 4.5 m ⋅ tonnef

R1 = 208.725 tonnef R2 = 296.275 tonnef

e1 = 0.6 m Lv = 5.1 m

Sismo horario

Pt1sp = 210 tonnef Pt2sp = 330 tonnef

M1sp = 23 m ⋅ tonnef M2sp = 14.5 m ⋅ tonnef

R1sp = 227.353 tonnef R2sp = 312.647 tonnef

e1 = 0.6 m Lv = 5.1 m

Sismo antihorario

Pt1sn = 170 tonnef Pt2sn = 300 tonnef

M1sn = 5 m ⋅ tonnef M2sn = -5.5 m ⋅ tonnef

R1sn = 190.098 tonnef R2sn = 279.902 tonnef

e1 = 0.6 m Lv = 5.1 m
Diseño por corte

V1sn ≔ R1sn - Pt1sn = 20.098 tonnef Sismo


V1t ≔ R1 - Pt1 = 18.725 tonnef Grave
Vt1sp ≔ R1sp - Pt1sp = 17.353 tonnef Sismo
Pt1sn = 170 tonnef
Pt1 = 190 tonnef
Pt1sp = 210 tonnef

Vumax ≔ V1tgu = 29.025 tonnef Seleccionamos el mayor

Cortante proporcionada por el concreto


1

2
kgf ‾‾
Vcvig1 ≔ 0.53 ――⋅ fc ⋅ bvv ⋅ ((dvv)) = 39.022 tonnef
cm
Datos:
kgf
bvv = 0.4 m dvv = 1.1 m fc = 280 ――
cm 2

ΦVnvv ≔ Φ ⋅ Vcvig1 = 33.169 tonnef Φ ≔ 0.85

Resultados:

if Vumax < ΦVnvv = “aceptable”


‖ “aceptable” ΦVnvv = 33.169 tonnef

else Vumax = 29.025 tonnef
‖ “rechazado”
‖ Solo de 3/8" cada 30 cm max

Diseño por flexion

Mu1sp ≔ Pt1sp ⋅ e1 - M1sp = 103 m ⋅ tonnef Sismo *1.25


M1sn = 5 m ⋅ tonnef Mu1sn ≔ Pt1sn ⋅ e1 - M1sn = 97 m ⋅ tonnef Sismo *1.25
M1 = 14 m ⋅ tonnef Mu1 ≔ Pt1 ⋅ e1 - M1 = 100 m ⋅ tonnef Gravedad * 1.
M1sp = 23 m ⋅ tonnef

Mmax1 ≔ Mu1ug = 155 m ⋅ tonnef


Mmax1 kgf
Ku1 ≔ ―――― 2
= 32.025 ――
bvv ⋅ dvv cm 2

Datos:
Mmax1 = 155 m ⋅ tonnef bvv = 0.4 m dvv = 1.1 m

ρvig ≔ 0.0094

Asminvig ≔ ρvig ⋅ bvv ⋅ dvv = 41.36 cm 2 buscar aceros normales

lc1 = 0.6 m lc2 = 0.8 m

hvv = 1.2 m hvv = 1.2 m

H1 = 0.9 m H2 = 0.8 m

L1 = 1.8 m L2 = 3.2 m

You might also like