This document outlines the procedure for concreting work during Phase 2 of a construction project. It details checking the shuttering and reinforcement before pouring, mixing concrete using a batching plant, transporting it via transit mixer to the work area, manually pouring the concrete using scaffolding and staging, and using an electrical vibrator to compact it. Safety measures like PPE, safety harnesses, vehicle access areas, ladders, supervision, and certified equipment are also described.
This document outlines the procedure for concreting work during Phase 2 of a construction project. It details checking the shuttering and reinforcement before pouring, mixing concrete using a batching plant, transporting it via transit mixer to the work area, manually pouring the concrete using scaffolding and staging, and using an electrical vibrator to compact it. Safety measures like PPE, safety harnesses, vehicle access areas, ladders, supervision, and certified equipment are also described.
This document outlines the procedure for concreting work during Phase 2 of a construction project. It details checking the shuttering and reinforcement before pouring, mixing concrete using a batching plant, transporting it via transit mixer to the work area, manually pouring the concrete using scaffolding and staging, and using an electrical vibrator to compact it. Safety measures like PPE, safety harnesses, vehicle access areas, ladders, supervision, and certified equipment are also described.
Shuttering / Reinforcement work Pour card to be signed by consultant
Procedure
Concrete Mixing by Batching Plant.
Concrete Transported By Transit Mixer ( Batching Plant To Work Area) Concrete Pouring Manually (Using Scaffolding, Staging Tappa Platform). Electrical vibrator will be used for compaction of concrete.
Full body Safety Harness to be provided for those who are working at height above 2mtrs. Proper access for vehicle movements. ladder for entry & exit Purpose. Continuous supervision. All Machinery, Equipments Are to Certified by relevant authorized person All Tappas should be well Clamp led & Fixing Handrail , Midrail