METHOD STATEMENT

PHASE - 2
Purpose: Concreting Work

Checking; Before Concreting


 Shuttering / Reinforcement work
 Pour card to be signed by consultant

Procedure

 Concrete Mixing by Batching Plant.


 Concrete Transported By Transit Mixer ( Batching Plant To Work
Area)
 Concrete Pouring Manually (Using Scaffolding, Staging Tappa
Platform).
 Electrical vibrator will be used for compaction of concrete.

Equipment Used

Batching Plant, Transit Mixer, Electrical Vibrator.Etc.


Safety Measures

 PPE’S will be provided to all work men.


 Full body Safety Harness to be provided for those who are working at
height above 2mtrs.
 Proper access for vehicle movements.
 ladder for entry & exit Purpose.
 Continuous supervision.
 All Machinery, Equipments Are to Certified by relevant authorized
person
 All Tappas should be well Clamp led & Fixing Handrail , Midrail

Prepared By; -