Lab 7 - Field Book

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Surveying Laboratory 0401225 Spring 2017-2018

Field Book No. 7- PROFILE LEVELING

Section # Date:

Student’s Name Student’s ID


1
2
3
4
5

Sketch:

Table 1 (Centerline Data Sheet and Calculations):


Distance RL
BS IS FS HPC
Point Station from 0 (Elevation)
(m) (m) (m) (m)
(m) (m)
BM - -
1 St 0+0 0
2 St 0+10 10
3 St 0+20 20

Note: every group will perform two set-ups (one at the beginning and one midway).
Surveying Laboratory 0401225 Spring 2017-2018

Table 2 (Right Edge Data Sheet and Calculations):

Distance RL
BS IS FS HPC
Point Station from 0 (Elevation)
(m) (m) (m) (m)
(m) (m)
BM St 0+0 0
1 St 0+10 10
2 St 0+20 20
3

Note: every groups will perform two set-ups (one at the beginning and one midway).

Table 3 ( Left Edge Data Sheet and Calculations):

Distance RL
BS IS FS HPC
Point Station from 0 (Elevation)
(m) (m) (m) (m)
(m) (m)
BM St 0+0 0
1 St 0+10 10
2 St 0+20 20
3

Note: every group will perform two set-ups (one at the beginning and one midway).