3 D View of Slip Form Structure

3 D View of ONE ARM of Slip Form


with Loading and Support Details

Tie Members
MS Angle 75 x75 x 6 mm b/b
Top & Bottom Chord
ISMC 100 BOX

Truss

Spider Beam
( 16 Nos)
ISMC 200 b/b

Inner Yoke Beam


RHS 150 x 100 x 6 mm

Jack Rod with


Pinned Support
Concrete Load
400 mm Pour

Triangular Concrete Load


0 kg/m
Square Ring 2 m x 2 m
ISMC 150 BOX
400 mm

2500 kg/m

The Triangular
Concrete load = 3075 kg/m
Working Platform on Yoke arm
Manual Live load = 100 kg/m

The Triangular RCC load on the Either Yoke arm is derived as :

The RCC load at bottom


= 0.4 m ( height of Pour) x 2500 kg/m3 ( Specific Weight of Concrete)
= 1000 kg/m2
The Triangular UDL acting on Inner side of EACH Yoke Arm= 2.5 m x 1000 kg/m2 = 2500 kg/m
(the distance between yoke arm to yoke arm = 2.5 m )
The Wind Pressure ( IS 875) @ 50 meter = 230 kg/m2 )
Transferring this ( 230 kg/m2) as a UDL on Yoke arm =
2.5 m ( panel length ) x 1 m ( Panel height) = 575 kg/m
Total Load on Yoke Arm = 2500 kg/m + 575 kg/m = 3075 kg/m
Side Elevation of Slip Form Structure