Professional Documents
Culture Documents
Male Toilet-2 Toilet-2: E.M. Cuerpo, Inc./Dynamic Builders & Construction Co. (Phil.) Inc
Male Toilet-2 Toilet-2: E.M. Cuerpo, Inc./Dynamic Builders & Construction Co. (Phil.) Inc
CERTIFIED BY:
Y4
3700
RFI-01 980 180 MF
B1 PLACE:
A
WB
540 ACTUAL OPENING LOWER 6TH FFL 3A
FFL 20.000
WB3A
MFB1A
3700
RICARDO V. YANSON, JR.
980
MF
B1
AUTHORIZED MANAGING OFFICER
880 280 WB
3
5TH FLOOR FFL
FFL 16.300 PROJECT TITLE:
P.C. WB3
MFB1
3700
PIPE CHASE MF
B1 ADMINISTRATION BUILDING (PAC),
WB COMPLETE WITH GENERATOR SET
5610
880 280 3
4TH FLOOR FFL AND FURNITURE (DESIGN AND BUILD
Y4 MALE FFL 12.600
WB3
SCHEME)
MFB1A
23700
MF
B1
LOCATION:
P.C. 880 280
WB
3
3RD FLOOR FFL AGUINALDO ST.,BACOLOD CITY
FFL 8.900
WB3
30
OWNER:
130
MFB1
MF
3700
B1
A
WF-4 WB
3
ACTUAL OPENING 980 130
2ND FLOOR FFL
FFL 5.200
PROVINCE OF NEGROS
WB3 OCCIDENTAL
1 GROUND FLOOR PIPE CHASE 1 MFB1A
RFI-01 SCALE 1 : 50 MF LOCATION:
3700
B1
A
WB
3
AGUINALDO ST.,BACOLOD CITY
980 130
GROUND FLOOR FFL
FFL 1.500 RECOMENDING APPROVAL
WB3
1500
APPROVED BY:
2 PIPE CHASE SECTION 1 3 RF1-001 3D OF PIPE CHASE
RFI-01 SCALE 1 : 100 RFI-01
SHEET CONTENT:
10/03/2020 8:50:04 AM