Article 9 Inspection: HW-900 Inspection During Fabrication

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

ARTICLE 9

INSPECTION

HW-900 INSPECTION DURING it is not mandatory that he witness the test welding
FABRICATION and the testing unless he so desires.
The manufacturer shall submit the boiler or other
pressure part for inspection at such stages of the work HW-911 CHECK OF WELDER AND
as may be designated by the Inspector. WELDING OPERATOR
PERFORMANCE QUALIFICATIONS
(a) It is the duty of the Inspector to assure himself
HW-910 CHECK OF WELDING that all welding is done by welders or welding operators
PROCEDURE QUALIFICATIONS qualified under the provisions of Section IX. The manu-
facturer shall make available to the Inspector a certified
(a) It is the duty of the Inspector to assure himself copy of the record of performance qualification tests
that the welding procedures employed in construction of each welder and welding operator as evidence that
have been qualified under the provisions of Section these requirements have been met.
IX. The manufacturer shall submit evidence to the (b) The Inspector has the right at any time to call
Inspector that those requirements have been met. for and witness the test welding and testing, although
(b) The Inspector has the right at any time to call it is not mandatory that he witness the test welding
for and witness the test welding and testing, although and the testing unless he so desires.