SUMMARY TEST RESULT OF MIX FOR : AC - BC

SPEC
No TEST DESCRIPTION UNIT TRIAL LAB REMARK
1 Kekekalan Bentuk 12% - Max
2 Abration Test By Los Angeles (%) 17.58 30% - Max
3 Kelekatan Agregat Terhadap Aspal (%) 95 * 95% - Min
4 Angularitas Agregat Kasar (%) 98.21 / 97.30 95/90 - Min
4 Partikel Pipih (%) 7.92 10% - Max
5 Partikel Lonjong (%) 9.93 10% - Max
6 Lolos Saringan No 200 Agregat Kasar (%) 0.500 2% - Max
7 Lolos Saringan No 200 Agregat Halus (%) 5.300 8% - Max
8 Kadar Lempung (%) 1% - Max
9 Specific Gravity of Bitument (60/70) 1.0353 - -
10 Bulk Spesific Gravity of Aggregate 2.601 - -
11 Max Specific Gravity of Total Mix (Vacum Pump) 2.411 - -
12 Effective Spesific Gravity of Aggregate 2.634 - -

TRIAL MIX LABORATORIUM


13 Bulk Density (Gr/cc) 2.312 - - -
14 Asphalt Content By Weight of Mix (%) 6.050 - - -
15 Absorbed Asphalt By Total Aggregate (%) 0.510 1.2 - Max
16 Voids in Mix Aggregate (VMA) (%) 15.84 14.0 - Min
17 Air Voids Content (VIM) (%) 3.66 3 - 5
18 Voids Filled With Bitument (VFB) (%) 76.91 65 - Min
19 Marshall Stability Kg 1,020 800 - Min
20 Flow (mm) 2.55 2 - 4
21 Marshall Quotient Kg/mm 321.08 300 - Min
22 Retained Marshall Stability After Soaking 24 Hours at 60 0 C (%) 92.43 90 - Min
23 Voids in Mix at Refusal Density (%) 4.36 2 - Min

JOB MIX DESIGN GRADATION TEST % PASSING OF SIEVE SIZE


MIX AGGREGATE = TOTAL MIX 100 % 11/2" 100.00 100 - 100
Asphalt - = 6.05% 1" 100.00 100 - 100
CA 15.00% = 14.13% 3/4" 98.51 90 - 100
MA 10.00% = 9.42% 1/2" 82.24 75 - 90
FA 25.00% = 23.55% 3/8" 75.29 66 - 82
Cr 45.00% = 42.38% #4 54.01 46 - 64
Sand 5.00% = 4.71% #8 37.87 30 - 49
Filler 4.00% = 3.77% # 16 27.85 18 - 38
Total 104.00% = 104.00% # 30 20.94 12 - 28
FA #REF! # 50 9.36 7 - 20
Filler 8.28 # 100 8.28 5 - 13
Filler #REF! # 200 6.04 4 - 8

KONTRAKTOR KONSULTAN PROYEK


ABRATION TEST
(SNI 2417 - 2008)

GRADASI YANG DIUJI A

BERAT CONTOH YANG DIUJI Gr A 5,000


BERAT CONTOH TERTAHAN
Gr B 4,067
SARINGAN No. 12
A−B
KEAUSAN CONTOH % x 100 18.66
A
SAND EQUIVALENT TEST
(AASTHO T 176 - 86)
Cr Dust
TEST No I II Rata-rata

CLAY READING A 3.69 3.59

SAND READING B 3.380 3.290


B
SAND EQUIVALENT x 100 91.59 91.64 91.62
A

Sand
TEST No I II Rata-rata

CLAY READING A 3.69 3.59

SAND READING B 3.620 3.490


B
SAND EQUIVALENT x 100 98.10 97.21 97.66
A

KELEKATAN AGREGAT TERHADAP ASPAL


(SNI 03 - 2439 - 1991)

Berat Contoh Kering Oven (Lolos 3/8" terhadap 1/4") (Gr) 500

Berat Aspal (Gr) 30.12

Kelekatan (Gr) 95 *

KONTRAKTOR KONSULTAN PROYEK


PERCOBAAN ANGULARITAS AGREGAT KASAR
(DoT"s Pensylvania Test Method. PTM No. 621)

Percobaan No I II

Berat mula - mula Gr 1050.8 619.2

Agregat pecah 1 atau lebih Gr 1037.5 604.9

Agregat pecah 2 atau lebih Gr 1026.6 600.0

Angularitas % 98.73 / 97.70 97.69 96.90

98.21 97.30

PERCOBAAN ANGULARITAS AGREGAT HALUS


(AASHTO TP-33, ASTM Standart Method of Test C 1252)

Abu Batu Pasir


Percobaan No
I II I II

Berat contoh + tabung Gr 463.70 463.30 467.70 466.40

Berat tabung Gr 325.20 325.20 325.00 325.00

Berat contoh (w) Gr 138.50 138.10 142.70 141.40

Volume tabung (V1) cc 99.00 99.00 99.00 99.00

Berat jenis kering oven Gsb 2646.0 2646.0 2.612 2.612

V − ( w / Gsb )
Angularitas X 100 % 47.13 47.28 44.81 45.31
V
Rata - rata % 47.21 45.06

KONTRAKTOR KONSULTAN PROYEK


GULARITAS AGREGAT KASAR
vania Test Method. PTM No. 621)

GULARITAS AGREGAT HALUS


STM Standart Method of Test C 1252)
PEMERIKSAAN AGREGAT PIPIH DAN AGREGAT LONJONG
(SNI 03 - 1758 - 1990)
Berat Contoh Uji (Wt) = 3,500 gr
Berat Tertahan Setelah Butiran yang Pipih (f ) Rasio Butiran yang Lonjong (f1) Tidak Pipih dan Tidak
Ukuran Gradasi % Tertahan Berat Tertahan Pengurangan  10% 1
Lonjong (NfNe1)
(P1) (W1) gram (W1) gram 1.5 Rasio 1.5
Saringan Agregat
gram 1) gram 1) % gram 1) % gram 1) %
a b c d = c * Wt/Pt e f g = f/e * 100 h I = h/e * 100 j k = j/e * 100
1" 1,645.70 47.02 310,626.65 0.00 0.00 0.00 0.00 0.000 0 0.000
3/4" 1,219.30 34.84 2,301.43 163.70 20.90 12.77 0.00 0.000 142.800 87.233
1/2" 480.57 13.73 907.08 623.02 18.67 3.00 19.95 3.202 584.4 93.801
3/8" 154.43 4.41 291.49 352.14 17.06 4.84 17.78 5.049 317.30 90.106

Total % Tertahan (Pt = P1 + P2 + P3 + …..) = 52.98% Rata rata 6.87 Rata rata 2.75 Rata rata 90.38

Catatan :
1)
selain dalam berat (gram) dapat juga dinyatakan dalam jumlah butir
2)
Nilai rata - rata %

- Kepipihan ( P1 x f 1 + P 2 x f 2 + . . . + Pn x f n ) - Kelonjongan
( P1 x e 1 + P 2 x e2 + . .. + Pn x e n)
F= E=
Pt Pt

- Tidak pipih dan tidak lonjong ( P1 x NfNe1 + P2 x NfNe2 + . . . + P n x NfNen )


NFNE =
Pt

KONTRAKTOR KONSULTAN PROYEK


PENGUJIAN JUMLAH BAHAN DALAM AGREGAT KASAR YANG LOLOS SARINGAN NO 200 (0,075 mm)

(SNI 03 - 4142 - 1996)

UKURAN MAKSIMUM
AGREGAT
NO CONTOH SATUAN
NO. 4 (4,75 mm)
I II
BERAT KERING BENDA UJI + WADAH (W1) 622.8 621.9 Gram

BERAT KERING BENDA UJI + WADAH (W2) 116.3 113.5 Gram

BERAT KERING BENDA UJI + WADAH (W3 = (W1 - W2) 506.5 508.4 Gram

BERAT KERING BENDA UJI + WADAH (W4) 620.2 617.3 Gram

BERAT KERING BENDA UJI + WADAH (W5 = (W4 - W2) 503.9 503.8 Gram

PERSEN BAHAN LOLOS SARINGAN (W3 − W5) 0.51 0.90 %


NOMOR 200 (0,075 mm) W6 = x 100 %
W3
RATA - RATA =
I + II 0.71 %
2

PENGUJIAN JUMLAH BAHAN DALAM AGREGAT HALUS YANG LOLOS SARINGAN NO 200 (0,075 mm)
(SNI 03 - 4428 - 1997)

UKURAN MAKSIMUM
AGREGAT
NO CONTOH SATUAN
NO. 4 (4,75 mm)
I II
BERAT KERING BENDA UJI + WADAH (W1) 4,720.0 4,680.0 Gram

BERAT KERING BENDA UJI + WADAH (W2) 511.7 485.4 Gram

BERAT KERING BENDA UJI + WADAH (W3 = (W1 - W2) 4,208.3 4,194.6 Gram

BERAT KERING BENDA UJI + WADAH (W4) 4,695.0 4,643.3 Gram

BERAT KERING BENDA UJI + WADAH (W5 = (W4 - W2) 4,183.3 4,157.9 Gram

PERSEN BAHAN LOLOS SARINGAN (W3 − W5)


W6 = x 100 % 0.59 0.87 %
NOMOR 200 (0,075 mm)
W3
RATA - RATA =
I + II 0.73 %
2
KONTRAKTOR KONSULTAN PROYEK
LABORATORIUM JALAN RAYA
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYA SUMATERA UTARA
PROGRAM STUDI TEKNIK SIPIL
Jl. Kapten Mucktar Basti No. 3 Medan Telp (061) 6622401

Kelompok : 13 (pagi)
ANALISA SARINGAN

CUMMULATIVE
SIEVE INDIVIDU SIEVE
SPEC LIMIT 1" 3/4" 1/2" Cr Sand AVG
SIZE WT. RET SIZE
WT. RET % RET % PASS

15% 10% 25% 45% 5% 100%


11/2" 100 100 37.50 15.00 10.00 25.00 45.00 5.00 100.00
1" 100 100 25.40 15.00 10.00 25.00 45.00 5.00 100.00
3/4" 90 100 19.00 13.51 10.00 25.00 45.00 5.00 98.51
1/2" 75 90 12.50 3.00 4.24 25.00 45.00 5.00 82.24
3/8" 66 82 9.50 0.72 1.31 23.27 45.00 5.00 75.29
#4 46 64 4.75 0.00 0.00 4.01 45.00 5.00 54.01
#8 30 49 2.36 0.00 0.00 1.44 31.64 4.80 37.87
# 16 18 38 1.18 0.00 0.00 0.95 22.41 4.50 27.85
# 30 12 28 0.60 0.00 0.00 0.72 16.07 4.15 20.94
# 50 7 20 0.30 0.00 0.00 0.67 8.28 0.41 9.36
# 100 5 13 0.150 0.00 0.00 0.59 7.34 0.36 8.28
# 200 4 8 0.075 0.00 0.00 0.48 5.45 0.11 6.04

GRADING CURVE
100

90

80
%
70
P
A
60
S
S
I 50
N
G 40

30

20

10

0
# 200 # 100 # 50 # 30 # 16 #8 #4 3/8" 1/2" 3/4" 1"
No. OF SIEVE

Diperiksa Oleh : Medan,


Asisten Laboratorium Jalan Raya Dikerjakan Oleh :

( Muhammad Sukron Sitorus, S.T ) Kelompok 13 ( Pagi )


LABORATORIUM JALAN RAYA
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYA SUMATERA UTARA
PROGRAM STUDI TEKNIK SIPIL
Jl. Kapten Mucktar Basti No. 3 Medan Telp (061) 6622401

Kelompok : 13 (pagi)
ANALISA SARINGAN 1"
TOTAL = 10,000.0 Gr TOTAL = 10,000.0 Gr
CUMMULATIVE CUMMULATIVE
SIEVE INDIVIDU SPEC SIEVE INDIVIDU
AVG
SIZE WT. RET WT. RET % RET % PASS LIMIT SIZE WT. RET WT. RET % RET % PASS

11/2" 0.00 0.00 100.00 11/2" 0.00 0.00 100.00 100.00


1" 0.0 0.00 0.00 100.00 1" 0.0 0.00 0.00 100.00 100.00
3/4" 921.0 921.0 9.21 90.79 3/4" 1,068.0 1,068.0 10.68 89.32 90.06
1/2" 6,923.0 7,844.0 69.23 21.56 1/2" 7,092.0 8,160.0 70.92 18.40 19.98
3/8" 1,659.0 9,503.0 16.59 4.97 3/8" 1,380.0 9,540.0 13.80 4.60 4.79
#4 497.0 10,000.0 4.97 0.00 #4 460.0 10,000.0 4.60 0.00 0.00
#8 10,000.0 0.00 0.00 #8 10,000.0 0.00 0.00 0.00
# 16 10,000.0 0.00 0.00 # 16 10,000.0 0.00 0.00 0.00
# 30 10,000.0 0.00 0.00 # 30 10,000.0 0.00 0.00 0.00
# 50 10,000.0 0.00 0.00 # 50 10,000.0 0.00 0.00 0.00
# 100 10,000.0 0.00 0.00 # 100 10,000.0 0.00 0.00 0.00
# 200 10,000.0 0.00 0.00 # 200 10,000.0 0.00 0.00 0.00
pan pan
Total 10,000 Total 10,000

GRADING CURVE
100

90

% 80

P 70
A
S 60
S
I 50
N
G 40

30

20

10

0
#4 3/8" 1/2" 3/4" 1"
No. OF SIEVE

Diperiksa Oleh : Medan,


Asisten Laboratorium Jalan Raya Dikerjakan Oleh :

( Muhammad Sukron Sitorus, S.T ) Kelompok 13 ( Pagi )


LABORATORIUM JALAN RAYA
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYA SUMATERA UTARA
PROGRAM STUDI TEKNIK SIPIL
Jl. Kapten Mucktar Basti No. 3 Medan Telp (061) 6622401

Kelompok : 13 (pagi)
ANALISA SARINGAN 3/4"
TOTAL = 5,000.0 Gr TOTAL = 5,000.0 Gr
CUMMULATIVE CUMMULATIVE
SIEVE INDIVIDU SPEC SIEVE INDIVIDU
AVG
SIZE WT. RET WT. RET % RET % PASS LIMIT SIZE WT. RET WT. RET % RET % PASS

11/2" 0.00 0.00 100.00 11/2" 0.0 0.00 100.00 100.00


1" 0.00 0.00 100.00 1" 0.0 0.00 100.00 100.00
3/4" 0.0 0.00 100.00 3/4" 0.0 0.00 100.00 100.00
1/2" 2,748.0 2,748.0 54.96 45.04 1/2" 3,009.0 3,009.0 60.18 39.82 42.43
3/8" 1559.00 4,307.0 31.18 13.86 3/8" 1,378.0 4,387.0 27.56 12.26 13.06
#4 693.00 5,000.0 13.86 0.00 #4 613.0 5,000.0 12.26 0.00 0.00
#8 5,000.0 0.00 0.00 #8 5,000.0 0.00 0.00 0.00
# 16 5,000.0 0.00 0.00 # 16 5,000.0 0.00 0.00 0.00
# 30 5,000.0 0.00 0.00 # 30 5,000.0 0.00 0.00 0.00
# 50 5,000.0 0.00 0.00 # 50 5,000.0 0.00 0.00 0.00
# 100 5,000.0 0.00 0.00 # 100 5,000.0 0.00 0.00 0.00
# 200 5,000.0 0.00 0.00 # 200 5,000.0 0.00 0.00 0.00
pan pan
Total 5000 Total 5000

GRADING CURVE
100

90

%80

P 70
A
S 60
S
I 50
N
G 40

30

20

10

0
#4 3/8" 1/2" 3/4" 1"
No. OF SIEVE

Diperiksa Oleh : Medan,


Asisten Laboratorium Jalan Raya Dikerjakan Oleh :

( Muhammad Sukron Sitorus, S.T ) Kelompok 13 ( Pagi )


LABORATORIUM JALAN RAYA
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYA SUMATERA UTARA
PROGRAM STUDI TEKNIK SIPIL
Jl. Kapten Mucktar Basti No. 3 Medan Telp (061) 6622401

Kelompok : 13 (pagi)
ANALISA SARINGAN 1/2"
TOTAL = 2,500.0 Gr TOTAL = 2,500.0 Gr
CUMMULATIVE CUMMULATIVE
SIEVE INDIVIDU SPEC SIEVE INDIVIDU
AVG
SIZE WT. RET WT. RET % RET % PASS LIMIT SIZE WT. RET WT. RET % RET % PASS

11/2" 0.00 0.00 100.00 11/2" 0.00 0.00 100.00 100.00


1" 0.00 0.00 100.00 1" 0.00 0.00 100.00 100.00
3/4" 0.00 0.00 100.00 3/4" 0.00 0.00 100.00 100.00
1/2" 0.00 0.00 100.00 1/2" 0.00 0.00 100.00 100.00
3/8" 179.0 179.0 7.16 92.84 3/8" 168.0 168.0 6.72 93.28 93.06
#4 2012.0 2,191.0 80.48 12.36 #4 1,839.0 2,007.0 73.56 19.72 16.04
#8 251.0 2,442.0 10.04 2.32 #8 264.0 2,271.0 10.56 9.16 5.74
# 16 18.0 2,460.0 0.72 1.60 # 16 80.0 2,351.0 3.20 5.96 3.78
# 30 5.0 2,465.0 0.20 1.40 # 30 40.0 2,391.0 1.60 4.36 2.88
# 50 4.0 2,469.0 0.16 1.24 # 50 6.0 2,397.0 0.24 4.12 2.68
# 100 9.0 2,478.0 0.36 0.88 # 100 8.0 2,405.0 0.32 3.80 2.34
# 200 10.0 2,488.0 0.40 0.48 # 200 11.0 2,416.0 0.44 3.36 1.92
pan 3.0 2,491.0 0.12 0.36 pan 52.0 2,468.0 2.08 1.28 0.82
Total 2491 Total 2468

GRADING CURVE

100

90

% 80

P 70
A
S 60
S
I 50
N
G 40

30

20

10

0
#4 3/8" 1/2" 3/4" 1"
No. OF SIEVE

Diperiksa Oleh : Medan,


Asisten Laboratorium Jalan Raya Dikerjakan Oleh :

( Muhammad Sukron Sitorus, S.T ) Kelompok 13 ( Pagi )


LABORATORIUM JALAN RAYA
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYA SUMATERA UTARA
PROGRAM STUDI TEKNIK SIPIL
Jl. Kapten Mucktar Basti No. 3 Medan Telp (061) 6622401

Kelompok : 13 (pagi)
ANALISA SARINGAN Cr
TOTAL = 500.0 Gr TOTAL = 500.0 Gr
CUMMULATIVE CUMMULATIVE
SIEVE INDIVIDU SPEC SIEVE INDIVIDU
AVG
SIZE WT. RET WT. RET % RET % PASS LIMIT SIZE WT. RET WT. RET % RET % PASS

11/2" 0.00 0.00 100.00 11/2" 0.00 0.00 100.00 100.00


1" 0.00 0.00 100.00 1" 0.00 0.00 100.00 100.00
3/4" 0.00 0.00 100.00 3/4" 0.00 0.00 100.00 100.00
1/2" 0.00 0.00 100.00 1/2" 0.00 0.00 100.00 100.00
3/8" 0.00 0.00 100.00 3/8" 0.00 0.00 100.00 100.00
#4 - - 0.00 100.00 #4 0 0.00 0.00 100.00 100.00
#8 142.00 142.00 28.40 71.60 #8 155.0 155.00 31.00 69.00 70.30
# 16 105.00 247.00 21.00 50.60 # 16 100.0 255.00 20.00 49.00 49.80
# 30 79.00 326.00 15.80 34.80 # 30 62.0 317.00 12.40 36.60 35.70
# 50 82.00 408.00 16.40 18.40 # 50 91.0 408.00 18.20 18.40 18.40
# 100 11.00 419.00 2.20 16.20 # 100 10.0 418.00 2.00 16.40 16.30
# 200 22.00 441.00 4.40 11.80 # 200 20.0 438.00 4.00 12.40 12.10
pan 23 464.00 4.60 7.20 pan 27.0 465.00 5.40 7.00 7.10
Total 464 Total 465

`
GRADING CURVE
100

90

%80

P 70
A
S 60
S
I 50
N
G
40

30

20

10

0
# 200 # 100 # 50 # 30 # 16 #8 #4 3/8" 1/2" 3/4" 1"
No. OF SIEVE

Diperiksa Oleh : Medan,


Asisten Laboratorium Jalan Raya Dikerjakan Oleh :

( Muhammad Sukron Sitorus, S.T ) Kelompok 13 ( Pagi )


LABORATORIUM JALAN RAYA
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYA SUMATERA UTARA
PROGRAM STUDI TEKNIK SIPIL
Jl. Kapten Mucktar Basti No. 3 Medan Telp (061) 6622401

Kelompok : 13 (pagi)
ANALISA SARINGAN Sand
TOTAL = 500.0 Gr TOTAL = 500.0 Gr
CUMMULATIVE CUMMULATIVE
SIEVE INDIVIDU SPEC SIEVE INDIVIDU
AVG
SIZE WT. RET WT. RET % RET % PASS LIMIT SIZE WT. RET WT. RET % RET % PASS

11/2" 0.00 0.00 100.00 11/2" 0.00 0.00 100.00 100.00


1" 0.00 0.00 100.00 1" 0.00 0.00 100.00 100.00
3/4" 0.00 0.00 100.00 3/4" 0.00 0.00 100.00 100.00
1/2" 0.00 0.00 100.00 1/2" 0.00 0.00 100.00 100.00
3/8" 0.00 0.00 100.00 3/8" 0.00 0.00 100.00 100.00
#4 0.0 0.00 0.00 100.00 #4 0.0 0.00 0.00 100.00 100.00
#8 22.0 22.00 4.40 95.60 #8 18.0 18.00 3.60 96.40 96.00
# 16 28.0 50.00 5.60 90.00 # 16 33.0 51.00 6.60 89.80 89.90
# 30 14.0 64.00 2.80 87.20 # 30 55.0 106.00 11.00 78.80 83.00
# 50 390.0 454.00 78.00 9.20 # 50 358.0 464.00 71.60 7.20 8.20
# 100 5.0 459.00 1.00 8.20 # 100 6.0 470.00 1.20 6.00 7.10
# 200 26.0 485.00 5.20 3.00 # 200 23.0 493.00 4.60 1.40 2.20
pan 11.0 496.00 2.20 0.80 pan 7.0 500.00 1.40 0.00 0.40
Total 496 Total 500

GRADING CURVE
100

90

%80

P 70
A
S 60
S
I 50
N
G 40

30

20

10

0
# 200 # 100 # 50 # 30 # 16 #8 #4 3/8" 1/2" 3/4" 1"
No. OF SIEVE

Diperiksa Oleh : Medan,


Asisten Laboratorium Jalan Raya Dikerjakan Oleh :

( Muhammad Sukron Sitorus, S.T ) Kelompok 13 ( Pagi )


ANALISA DATA

Ꚛ AGREGAT 1" SAMPLE 1 ( 10,000 Gr )

RUMUS
- CUMMULATIVE RETAINED CUMMULATIVE RETAINED
= X 100 %
(PERSENTASE BERAT TERTAHAN) WEIGHT SAMPLE

- PASSING SLOVE = 100 % - (CUMMULATIVE RETAINED)


(PERSENTASE LOLOS SARINGAN)

a. Menghitung Agregat Tertahan


1" = 0.0 + 0.0 = 0.0 Gr
3/4" = 921.0 + 0.0 = 921.0 Gr
1/2" = 6,923.0 + 921 = 7,844.0 Gr
3/8" = 1,659.0 + 7,844 = 9,503.0 Gr
#4 = 497.0 + 9,503 = 10,000.0 Gr

b. Menghitung Persentase Berat Tertahan (Cummulatve Retained)


0.0
1" = x 100% = 0.00 %
10,000
921.0
3/4" = x 100% = 9.21 %
10,000
7,844.0
1/2" = x 100% = 78.44 %
10,000
9,503.0
3/8" = x 100% = 95.03 %
10,000
10,000
#4 = x 100% = 100.00 %
10,000

c. Menghitung Persentase Lolos Saringan (Passing Slove)

1" = 100 % - 0.00 % = 100.00 %

3/4" = 100 % - 9.21 % = 90.79 %

1/2" = 100 % - 78.44 % = 21.56 %

3/8" = 100 % - 95.03 % = 4.97 %

#4 = 100 % - 100.00 % = 0.00 %

Ꚛ AGREGAT 1" SAMPLE 2 ( 10,000 Gr )

a. Menghitung Agregat Tertahan


1" = 0.0 = 0.0 Gr
3/4" = 1,068.0 + 0.0 = 1,068.0 Gr
1/2" = 7,092.0 1,068 = 8,160.0 Gr
3/8" = 1,380.0 8,160 = 9,540.0 Gr
#4 = 460.0 9,540 = 10,000.0 Gr

b. Menghitung Persentase Berat Tertahan (Cummulatve Retained)


0.0
1" = x 100% = 0.00 %
10,000
1,068.0
3/4" = x 100% = 10.68 %
10,000
8,160.0
1/2" = x 100% = 81.60 %
10,000
9,540.0
3/8" = x 100% = 95.40 %
10,000
10,000
#4 = x 100% = 100.00 %
10,000

c. Menghitung Persentase Lolos Saringan (Passing Slove)

1" = 100 % - 0.00 % = 100.00 %

3/4" = 100 % - 10.68 % = 89.32 %

1/2" = 100 % - 81.60 % = 18.40 %

3/8" = 100 % - 95.40 % = 4.60 %

#4 = 100 % - 100.00 % = 0.00 %


ANALISA DATA

Ꚛ AGREGAT 3/4" SAMPLE 1 ( 5,000 Gr )

RUMUS
- CUMMULATIVE RETAINED CUMMULATIVE RETAINED
= X 100 %
(PERSENTASE BERAT TERTAHAN) WEIGHT SAMPLE

- PASSING SLOVE = 100 % - (CUMMULATIVE RETAINED)


(PERSENTASE LOLOS SARINGAN)

a. Menghitung Agregat Tertahan


3/4" = 0.0 + 0.0 = 0.0 Gr
1/2" = 2,748.0 + 0.0 = 2,748.0 Gr
3/8" = 1,559.0 + 2,748.0 = 4,307.0 Gr
#4 = 693.0 + 4,307.0 = 5,000.0 Gr

b. Menghitung Persentase Berat Tertahan (Cummulatve Retained)


= 0.0
3/4" x 100% = 0.00 %
5,000
= 2,748.0
1/2" x 100% = 54.96 %
5,000
= 4,307.0
3/8" x 100% = 86.14 %
5,000
= 5,000.0
#4 x 100% = 100.00 %
5,000

c. Menghitung Persentase Lolos Saringan (Passing Slove)


3/4" = 100 % - 0.00 % = 100.00 %
1/2" = 100 % - 54.96 % = 45.04 %
3/8" = 100 % - 86.14 % = 13.86 %
#4 = 100 % - 100.00 % = 0.00 %

Ꚛ AGREGAT 3/4" SAMPLE 2 ( 5,000 Gr )

a. Menghitung Agregat Tertahan


3/4" = 0.0 + 0.0 = 0.0 Gr
1/2" = 3,009.0 + 0.0 = 3,009.0 Gr
3/8" = 1,378.0 + 3,009.0 = 4,387.0 Gr
#4 = 613.0 + 4,387.0 = 5,000.0 Gr

b. Menghitung Persentase Berat Tertahan (Cummulatve Retained)


0.0
3/4" = x 100% = 0.00 %
5,000
3,009.0
1/2" = x 100% = 60.18 %
5,000
4,387.0
3/8" = x 100% = 87.74 %
5,000
5,000.0
#4 = x 100% = 100.00 %
5,000

c. Menghitung Persentase Lolos Saringan (Passing Slove)


3/4" = 100 % - 0.00 % = 100.00 %
1/2" = 100 % - 60.18 % = 39.82 %
3/8" = 100 % - 87.74 % = 12.26 %
#4 = 100 % - 100.00 % = 0.00 %
ANALISA DATA

Ꚛ AGREGAT 1/2" SAMPLE 1 ( 2,500 Gr )

RUMUS
- CUMMULATIVE RETAINED CUMMULATIVE RETAINED
= X 100 %
(PERSENTASE BERAT TERTAHAN) WEIGHT SAMPLE

- PASSING SLOVE = 100 % - (CUMMULATIVE RETAINED)


(PERSENTASE LOLOS SARINGAN)

a. Menghitung Agregat Tertahan


1/2" = 0.0 + 0.0 = 0.0 Gr
3/8" = 179.0 + 0.0 = 179.0 Gr
#4 = 2,012.0 + 179.0 = 2,191.0 Gr
#8 = 251.0 + 2,191.0 = 2,442.0 Gr
# 16 = 18.0 + 2,442.0 = 2,460.0 Gr
# 30 = 5.0 + 2,460.0 = 2,465.0 Gr
# 50 = 4.0 + 2,465.0 = 2,469.0 Gr
# 100 = 9.0 + 2,469.0 = 2,478.0 Gr
# 200 = 10.0 + 2,478.0 = 2,488.0 Gr
pan = 3.0 + 2,488.0 = 2,491.0 Gr

b. Menghitung Persentase Berat Tertahan (Cummulatve Retained)


0.0
1/2" = x 100% = 0.00 %
2,500
179.0
3/8" = x 100% = 7.16 %
2,500
2,191.0
#4 = x 100% = 87.64 %
2,500
2,442.0
#8 = x 100% = 97.68 %
2,500
2,460.0
# 16 = x 100% = 98.40 %
2,500
2,465.0
# 30 = x 100% = 98.60 %
2,500
2,469.0
# 50 = x 100% = 98.76 %
2,500
2,478.0
# 100 = x 200% = 99.12 %
2,500
2,488.0
# 200 = x 300% = 99.52 %
2,500
2,491.0
pan = x 400% = 99.64 %
2,500

c. Menghitung Persentase Lolos Saringan (Passing Slove)


1/2" = 100 % - 0.00 % = 100.00 %
3/8" = 100 % - 7.16 % = 92.84 %
#4 = 100 % - 87.64 % = 12.36 %
#8 = 100 % - 97.68 % = 2.32 %
# 16 = 100 % - 98.40 % = 1.60 %
# 30 = 100 % - 98.60 % = 1.40 %
# 50 = 100 % - 98.76 % = 1.24 %
# 100 = 100 % - 99.12 % = 0.88 %
# 200 = 100 % - 99.52 % = 0.48 %
pan = 100 % - 99.64 % = 0.36 %

Ꚛ AGREGAT 1/2" SAMPLE 2 ( 2,500 Gr )

a. Menghitung Agregat Tertahan


1/2" = 0.0 + 0.0 = 0.0 Gr
3/8" = 168.0 + 0.0 = 168.0 Gr
#4 = 1,839.0 + 168.0 = 2,007.0 Gr
#8 = 264.0 + 2,007.0 = 2,271.0 Gr
# 16 = 80.0 + 2,271.0 = 2,351.0 Gr
# 30 = 40.0 + 2,351.0 = 2,391.0 Gr
# 50 = 6.0 + 2,391.0 = 2,397.0 Gr
# 100 = 8.0 + 2,397.0 = 2,405.0 Gr
# 200 = 11.0 + 2,405.0 = 2,416.0 Gr
pan = 52.0 + 2,416.0 = 2,468.0 Gr

b. Menghitung Persentase Berat Tertahan (Cummulatve Retained)


0.0
1/2" = x 100% = 0.00 %
2,500
168.0
3/8" = x 100% = 6.72 %
2,500
2,007.0
#4 = x 100% = 80.28 %
2,500
2,271.0
#8 = x 100% = 90.84 %
2,500
2,351.0
# 16 = x 100% = 94.04 %
2,500
2,391.0
# 30 = x 100% = 95.64 %
2,500
2,397.0
# 50 = x 100% = 95.88 %
2,500
2,405.0
# 100 = x 200% = 96.20 %
2,500
2,416.0
# 200 = x 300% = 96.64 %
2,500
2,468.0
pan = x 400% = 98.72 %
2,500

c. Menghitung Persentase Lolos Saringan (Passing Slove)


1/2" = 100 % - 0.00 % = 100.00 %
3/8" = 100 % - 6.72 % = 93.28 %
#4 = 100 % - 80.28 % = 19.72 %
#8 = 100 % - 90.84 % = 9.16 %
# 16 = 100 % - 94.04 % = 5.96 %
# 30 = 100 % - 95.64 % = 4.36 %
# 50 = 100 % - 95.88 % = 4.12 %
# 100 = 100 % - 96.20 % = 3.80 %
# 200 = 100 % - 96.64 % = 3.36 %
pan = 100 % - 98.72 % = 1.28 %
ANALISA DATA

Ꚛ AGREGAT CR SAMPLE 1 ( 500 Gr )

RUMUS
- CUMMULATIVE RETAINED CUMMULATIVE RETAINED
= X 100 %
(PERSENTASE BERAT TERTAHAN) WEIGHT SAMPLE

- PASSING SLOVE = 100 % - (CUMMULATIVE RETAINED)


(PERSENTASE LOLOS SARINGAN)

a. Menghitung Agregat Tertahan


#4 = 0.0 + 0.0 = 0.0 Gr
# 8 = 142.0 + 0.0 = 142.0 Gr
# 16 = 105.0 + 142.0 = 247.0 Gr
# 30 = 79.0 + 247.0 = 326.0 Gr
# 50 = 82.0 + 326.0 = 408.0 Gr
# 100 = 11.0 + 408.0 = 419.0 Gr
# 200 = 22.0 + 419.0 = 441.0 Gr
pan = 23.0 + 441.0 = 464.0 Gr

b. Menghitung Persentase Berat Tertahan (Cummulatve Retained)


0.0
#4 = x 100% = 0.00 %
500
142.0
#8 = x 100% = 28.40 %
500
247.0 =
# 16 = x 100% 49.40 %
500
326.0 =
# 30 = x 100% 65.20 %
500
408.0 =
# 50 = x 100% 81.60 %
500
419.0 =
# 100 = x 100% 83.80 %
500
441.0 =
# 200 = x 100% 88.20 %
500
464.0 x =
pan = 100% 92.80 %
500

c. Menghitung Persentase Lolos Saringan (Passing Slove)


#4 = 100 % - 0.00 % = 100.00 %
#8 = 100 % - 28.40 % = 71.60 %
# 16 = 100 % - 49.40 % = 50.60 %
# 30 = 100 % - 65.20 % = 34.80 %
# 50 = 100 % - 81.60 % = 18.40 %
# 100 = 100 % - 83.80 % = 16.20 %
# 200 = 100 % - 88.20 % = 11.80 %
pan = 100 % - 92.80 % = 7.20 %

Ꚛ AGREGAT CR SAMPLE 2 ( 500 Gr )

a. Menghitung Agregat Tertahan


#4 = 0.0 + 0.0 = 0.0 Gr
# 8 = 155.0 + 0.0 = 155.0 Gr
# 16 = 100.0 + 155.0 = 255.0 Gr
# 30 = 62.0 + 255.0 = 317.0 Gr
# 50 = 91.0 + 317.0 = 408.0 Gr
# 100 = 10.0 + 408.0 = 418.0 Gr
# 200 = 20.0 + 418.0 = 438.0 Gr
pan = 27.0 + 438.0 = 465.0 Gr

b. Menghitung Persentase Berat Tertahan (Cummulatve Retained)


#4 = 0.0 = 0.00 %
x 100%
500
#8 = 155.0 = 31.00 %
x 100%
500
# 16 = 255.0 = 51.00 %
x 100%
500
# 30 = 317.0 = 63.40 %
x 100%
500
# 50 = 408.0 = 81.60 %
x 100%
500
# 100 = 418.0 = 83.60 %
x 100%
500
# 200 = 438.0 = 87.60 %
x 100%
500
pan = 465.0 = 93.00 %
x 100%
500

c. Menghitung Persentase Lolos Saringan (Passing Slove)


#4 = 100 % - 0.00 % = 100.00 %
#8 = 100 % - 31.00 % = 69.00 %
# 16 = 100 % - 51.00 % = 49.00 %
# 30 = 100 % - 63.40 % = 36.60 %
# 50 = 100 % - 81.60 % = 18.40 %
# 100 = 100 % - 83.60 % = 16.40 %
# 200 = 100 % - 87.60 % = 12.40 %
pan = 100 % - 93.00 % = 7.00 %
ANALISA DATA

Ꚛ AGREGAT SAND SAMPLE 1 ( 500 Gr )

RUMUS
- CUMMULATIVE RETAINED CUMMULATIVE RETAINED
= X 100 %
(PERSENTASE BERAT TERTAHAN) WEIGHT SAMPLE

- PASSING SLOVE = 100 % - (CUMMULATIVE RETAINED)


(PERSENTASE LOLOS SARINGAN)

a. Menghitung Agregat Tertahan


#4 = 0.0 + 0.0 = 0.0 Gr
#8 = 22.0 + 0.0 = 22.0 Gr
# 16 = 28.0 + 22.0 = 50.0 Gr
# 30 = 14.0 + 50.0 = 64.0 Gr
# 50 = 390.0 + 64.0 = 454.0 Gr
# 100 = 5.0 + 454.0 = 459.0 Gr
# 200 = 26.0 + 459.0 = 485.0 Gr
pan = 11.0 + 485.0 = 496.0 Gr

b. Menghitung Persentase Berat Tertahan (Cummulatve Retained)


0.0
#4 = x 100% = 0.00 %
500
22.0
#8 = x 100% = 4.40 %
500
50.0 =
# 16 = x 100% 10.00 %
500
64.0 =
# 30 = x 100% 12.80 %
500
454.0 =
# 50 = x 100% 90.80 %
500
459.0 =
# 100 = x 100% 91.80 %
500
485.0 =
# 200 = x 100% 97.00 %
500
496.0 x =
pan = 100% 99.20 %
500

c. Menghitung Persentase Lolos Saringan (Passing Slove)


#4 = 100 % - 0.00 % = 100.00 %
#8 = 100 % - 4.40 % = 95.60 %
# 16 = 100 % - 10.00 % = 90.00 %
# 30 = 100 % - 12.80 % = 87.20 %
# 50 = 100 % - 90.80 % = 9.20 %
# 100 = 100 % - 91.80 % = 8.20 %
# 200 = 100 % - 97.00 % = 3.00 %
pan = 100 % - 99.20 % = 0.80 %

Ꚛ AGREGAT SAND SAMPLE 2 ( 500 Gr )

a. Menghitung Agregat Tertahan


#4 = 0.0 + 0.0 = 0.0 Gr
#8 = 18.0 + 0.0 = 18.0 Gr
# 16 = 33.0 + 18.0 = 51.0 Gr
# 30 = 55.0 + 51.0 = 106.0 Gr
# 50 = 358.0 + 106.0 = 464.0 Gr
# 100 = 6.0 + 464.0 = 470.0 Gr
# 200 = 23.0 + 470.0 = 493.0 Gr
pan = 7.0 + 493.0 = 500.0 Gr

b. Menghitung Persentase Berat Tertahan (Cummulatve Retained)


0.0
#4 = x 100% = 0.00 %
500
18.0
#8 = x 100% = 3.60 %
500
51.0 =
# 16 = x 100% 10.20 %
500
106.0 =
# 30 = x 100% 21.20 %
500
464.0 =
# 50 = x 100% 92.80 %
500
470.0 =
# 100 = x 100% 94.00 %
500
493.0 =
# 200 = x 100% 98.60 %
500
500.0 x =
pan = 100% 100.00 %
500

c. Menghitung Persentase Lolos Saringan (Passing Slove)


#4 = 100 % - 0.00 % = 100.00 %
#8 = 100 % - 3.60 % = 96.40 %
# 16 = 100 % - 10.20 % = 89.80 %
# 30 = 100 % - 21.20 % = 78.80 %
# 50 = 100 % - 92.80 % = 7.20 %
# 100 = 100 % - 94.00 % = 6.00 %
# 200 = 100 % - 98.60 % = 1.40 %
pan = 100 % - ### % = 0.00 %
ANALISA SARINGAN
TOTAL = 1000 Gr TOTAL = 1000 Gr
SIEVE INDIVIDU CUMMULATIVE SIEVE COMBINE GRADING
SPEC LIMIT AVG
SIZE WT. RET WT. RET % RET % PASS SIZE 1 2 3 4 5
15% 34% 41% 10% 100%
11/2" 100 100 37.50 15.00 34.00 41.00 10.00 100.00
1" 100 100 25.40 15.00 34.00 41.00 10.00 100.00
3/4" 90 100 19.00 10.71 34.00 41.00 10.00 95.71
1/2" 74 90 12.50 4.74 34.00 41.00 10.00 89.74
3/8" 0 0 100 64 82 9.50 1.64 24.17 41.00 10.00 76.81
#4 106.3 2.70828 97.2917197 47 64 4.75 0.30 7.26 31.49 8.86 47.91
#8 380.6 9.69682 90.3031847 34.6 49 2.36 0.14 3.03 28.61 7.94 39.71
# 16 488.4 12.4433 87.5566879 28.3 38 1.18 0.00 2.27 23.86 7.41 33.54
# 30 728.3 18.5554 81.444586 20.7 28 0.60 0.00 1.86 14.95 5.16 21.97
# 50 821.2 20.9223 79.077707 13.7 20 0.30 0.00 1.53 12.35 2.95 16.83
# 100 9 15 0.150 0.00 1.41 7.38 1.23 10.02
# 200 4 8 0.075 0.00 0.44 3.73 0.31 4.48

GRADING CURVE
100

90

80
%
70
P
A
60
S
S
I 50
N
G 40

30

20

10

0
# 200 # 100 # 50 # 30 # 16 No. OF#SIEVE
8 #4 3/8" 1/2" 3/4" 1"
NOTES

KONTRAKTOR KONSULTAN PROYEK


ANALISA SARINGAN CA
TOTAL = 3,925.0 Gr TOTAL = 4,140.0 Gr
CUMMULATIVE INDIVID CUMMULATIVE
SIEVE INDIVIDU SPEC SIEVE
U WT. AVG
SIZE WT. RET WT. RET % RET % PASS LIMIT SIZE WT. RET % RET % PASS
RET

11/2" 0.00 0.00 100.00 11/2" 0.00 0.00 100.00 100.00


1" 0.00 0.00 100.00 1" 0.00 0.00 100.00 100.00
3/4" 3,925.0 1,146.0 29.20 70.80 3/4" 1,162.0 28.07 71.93 71.37
1/2" 2,779.0 2,711.0 69.07 30.93 1/2" 2,805.0 67.75 32.25 31.59
3/8" 68.0 3,530.0 89.94 10.06 3/8" 3,650.0 88.16 11.84 10.95
#4 3,843.0 97.91 2.09 #4 4,061.0 98.09 1.91 2.00
#8 3,886.0 99.01 0.99 #8 4,105.0 99.15 0.85 0.92
# 16 3,925.0 100.00 0.00 # 16 4,140.0 100.00 0.00 0.00
# 30 3,925.0 100.00 0.00 # 30 4,140.0 100.00 0.00 0.00
# 50 3,925.0 100.00 0.00 # 50 4,140.0 100.00 0.00 0.00
# 100 3,925.0 100.00 0.00 # 100 4,140.0 100.00 0.00 0.00
# 200 3,925.0 100.00 0.00 # 200 4,140.0 100.00 0.00 0.00

GRADING CURVE
100

90

% 80

P 70
A
S 60
S
I 50
N
G 40

30

20

10

0
# 200 # 100 # 50 # 30 # 16 #8 #4 3/8" 1/2" 3/4" 1" 11/2"
No. OF SIEVE
NOTES

KONTRAKTOR KONSULTAN PROYEK


ANALISA SARINGAN MA
TOTAL = 2,260.0 Gr TOTAL = 2,355.0 Gr
CUMMULATIVE INDIVID CUMMULATIVE
SIEVE INDIVIDU SPEC SIEVE
U WT. AVG
SIZE WT. RET WT. RET % RET % PASS LIMIT SIZE WT. RET % RET % PASS
RET

11/2" 0.00 0.00 100.00 11/2" 0.00 0.00 100.00 100.00


1" 0.00 0.00 100.00 1" 0.00 0.00 100.00 100.00
3/4" 0.00 0.00 100.00 3/4" 0.00 0.00 100.00 100.00
1/2" 0.00 0.00 100.00 1/2" 0.00 0.00 100.00 100.00
3/8" 664.00 29.38 70.62 3/8" 670.00 28.45 71.55 71.08
#4 1790.00 79.20 20.80 #4 1839.00 78.09 21.91 21.35
#8 2040.00 90.27 9.73 #8 2165.00 91.93 8.07 8.90
# 16 2124.00 93.98 6.02 # 16 2182.00 92.65 7.35 6.68
# 30 2151.00 95.18 4.82 # 30 2211.00 93.89 6.11 5.47
# 50 2177.00 96.33 3.67 # 50 2229.00 94.65 5.35 4.51
# 100 2190.00 96.90 3.10 # 100 2232.00 94.78 5.22 4.16
# 200 2236.00 98.94 1.06 # 200 2319.00 98.47 1.53 1.30

GRADING CURVE
100

90

% 80

P 70
A
S 60
S
I 50
N
G 40

30

20

10

0
# 200 # 100 # 50 # 30 # 16 #8 #4 3/8" 1/2" 3/4" 1" 11/2"
No. OF SIEVE
NOTES

KONTRAKTOR KONSULTAN PROYEK


ANALISA SARINGAN Cr
TOTAL = 1134.6 Gr TOTAL = 1186.2 Gr
CUMMULATIVE INDIVID CUMMULATIVE
SIEVE INDIVIDU SPEC SIEVE
U WT. AVG
SIZE WT. RET WT. RET % RET % PASS LIMIT SIZE WT. RET % RET % PASS
RET

11/2" 0.00 0.00 100.00 11/2" 0.00 0.00 100.00 100.00


1" 0.00 0.00 100.00 1" 0.00 0.00 100.00 100.00
3/4" 0.00 0.00 100.00 3/4" 0.00 0.00 100.00 100.00
1/2" 0.00 0.00 100.00 1/2" 0.00 0.00 100.00 100.00
3/8" 0.00 0.00 100.00 3/8" 0.00 0.00 100.00 100.00
#4 246.10 21.69 78.31 #4 293.20 24.72 75.28 76.80
#8 337.90 29.78 70.22 #8 363.80 30.67 69.33 69.77
# 16 596.30 52.56 47.44 # 16 368.50 31.07 68.93 58.19
# 30 713.50 62.89 37.11 # 30 761.50 64.20 35.80 36.46
# 50 766.80 67.58 32.42 # 50 856.30 72.19 27.81 30.11
# 100 935.50 82.45 17.55 # 100 967.60 81.57 18.43 17.99
# 200 1024.00 90.25 9.75 # 200 1085.80 91.54 8.46 9.11

GRADING CURVE
100

90

% 80

P 70
A
S 60
S
I 50
N
G 40

30

20

10

0
# 200 # 100 # 50 # 30 # 16 #8 #4 3/8" 1/2" 3/4" 1" 11/2"
No. OF SIEVE
NOTES

KONTRAKTOR KONSULTAN PROYEK


ANALISA SARINGAN Sand
TOTAL = 1,214.7 Gr TOTAL = 1,126.8 Gr
CUMMULATIVE INDIVID CUMMULATIVE
SIEVE INDIVIDU SPEC SIEVE
U WT. AVG
SIZE WT. RET WT. RET % RET % PASS LIMIT SIZE WT. RET % RET % PASS
RET

11/2" 0.00 0.00 100.00 11/2" 0.00 0.00 100.00 100.00


1" 0.00 0.00 100.00 1" 0.00 0.00 100.00 100.00
3/4" 0.00 0.00 100.00 3/4" 0.00 0.00 100.00 100.00
1/2" 0.00 0.00 100.00 1/2" 0.00 0.00 100.00 100.00
3/8" 0.00 0.00 100.00 3/8" 0.00 0.00 100.00 100.00
#4 128.00 10.54 89.46 #4 137.80 12.23 87.77 88.62
#8 231.90 19.09 80.91 #8 249.60 22.15 77.85 79.38
# 16 300.30 24.72 75.28 # 16 304.80 27.05 72.95 74.11
# 30 579.70 47.72 52.28 # 30 552.50 49.03 50.97 51.62
# 50 833.50 68.62 31.38 # 50 815.30 72.36 27.64 29.51
# 100 1,054.70 86.83 13.17 # 100 998.20 88.59 11.41 12.29
# 200 1,179.70 97.12 2.88 # 200 1,090.10 96.74 3.26 3.07

GRADING CURVE
100

90

% 80

P 70
A
S 60
S
I 50
N
G 40

30

20

10

0
# 200 # 100 # 50 # 30 # 16 #8 #4 3/8" 1/2" 3/4" 1" 11/2"
No. OF SIEVE
NOTES

KONTRAKTOR KONSULTAN PROYEK


0 Sand
TOTAL = 957.2 Gr TOTAL = 957.2 Gr
CUMMULATIVE INDIVID CUMMULATIVE
SIEVE INDIVIDU SPEC SIEVE
U WT. AVG
SIZE WT. RET WT. RET % RET % PASS LIMIT SIZE WT. RET % RET % PASS
RET

11/2" 0.00 0.00 100.00 11/2" 0.00 0.00 100.00 100.00


1" 0.00 0.00 100.00 1" 0.00 0.00 100.00 100.00
3/4" 0.00 0.00 100.00 3/4" 0.00 0.00 100.00 100.00
1/2" 0.00 0.00 100.00 1/2" 0.00 0.00 100.00 100.00
3/8" 0.00 0.00 100.00 3/8" 0.00 0.00 100.00 100.00
#4 78.30 6.45 91.82 #4 78.30 6.95 91.82 91.82
#8 183.20 15.08 80.86 #8 183.20 16.26 80.86 80.86
# 16 283.20 23.31 70.41 # 16 283.20 25.13 70.41 70.41
# 30 331.20 27.27 65.40 # 30 331.20 29.39 65.40 65.40
# 50 371.00 30.54 61.24 # 50 371.00 32.93 61.24 61.24
# 100 421.00 34.66 56.02 # 100 421.00 37.36 56.02 56.02
# 200 555.10 45.70 42.01 # 200 555.10 49.26 42.01 42.01

GRADING CURVE
100

90

% 80

P 70
A
S 60
S
I 50
N
G 40

30

20

10

0
# 200 # 100 # 50 # 30 # 16 #8 #4 3/8" 1/2" 3/4" 1" 11/2"
No. OF SIEVE
NOTES

- 0 0
PENGUJIAN BERAT JENIS ASPAL
(SPECIFIC GRAVITY TEST)
SNI - 06 - 2441 - 1991

Contoh dipanaskan Mulai Suhu oven = 1300C


: Pukul 830
Heat the sample Start Oven temperature
Selesai
: Pukul 930
Finish
Didiamkan pada suhu ruang Mulai
: Pukul 1000
Allow sample at room temperature Start
Selesai
: Pukul 1100
Finish
Direndam pada 250C Mulai Suhu waterbath = 250C
: Pukul 1130
Immersion at 250C Start Waterbath temperature
Selesai
: Pukul 1230
Finish
Pemeriksaan berat jenis Mulai
: Pukul 1300
Spacific gravity test Start
Selesai
: Pukul 1400
Finish

Berat piknometer + aspal 36.4140 gr 41.6906 gr


Weight of picnometer + asphalt
Berat piknometer kosong 32.5155 gr 37.6844 gr
Weight of picnometer
Berat aspal (a) 3.8985 gr 4.0062 gr
Weight of asphalt
Berat piknometer + air 82.5152 gr 87.4724 gr
Weight of picnometer + water
Berat piknometer 32.5165 gr 37.6834 gr
Weight of picnometer
Berat air (b) 49.9987 gr 49.789 gr
Weight of water
Berat piknometer + aspal + air 82.6000 gr 87.5667 gr
Weight of picnometer + asphalt + water
Berat piknometer + aspal 36.4140 gr 41.6906 gr
Weight of picnometer + asphalt
Berat air (c) 46.1860 gr 45.8761 gr
Weight of water
Isi aspal (b - c) 3.8127 gr 3.9129 gr
Volume of asphalt

Berat jenis I= Berat aspal / Isi aspal = 1.0225 gr/ml


Specific Gravity Weight of asphalt / Volume of asphalt

Berat jenis II = Berat aspal / Isi aspal = 1.0238 gr/ml


Specific Gravity Weight of asphalt / Volume of asphalt

Rata - rata = 1.0232 gr/ml


Average
SPECIFIC GRAFITY AND ABSORBTION TEST

1. COARSE AGGREGATE (RETAINED No. # 4 SIEVE) / SNI 03 - 1969 - 1990 Ca 1"


WT. OF SAMPLE OVEN DRY Gr 4,947 4,953
WT. OF SAMPLE IN WATER Gr 3,110 3,116
WT. OF SATURATED SURFACE DRY Gr 5,000 5,000
2.617 2.646
BULK SPGR 2.623 SSD SPGR 2.650
2.629 2.654
2.693 1.071
APPARENT SPGR 2.695 ABSORPTION (%) 1.010
2.696 0.949

2. FINE AGGREGATE (PASSING NO. # 4 SIEVE)


WT. OF SATURATED SURFACE DRY Gr
WT. OF SAMPLE OVEN DRY Gr
WT. OF PICKNOMETER + WATER Gr
WT. OF PICKNOMETER + WATER + SAMPLE Gr

BULK SPGR SSD SPGR

APPARENT SPGR ABSORPTION (%)

3. AVERAGE SPECIFIC GRAFITY


PERCENT SAMPLE RETAIN No. 4 =
PERCENT SAMPLE PASSING =
BULK SPGR SSD SPGR .
APPARENT SPGR
ABSORPTION (%)

KONTRAKTOR KONSULTAN PROYEK


SPECIFIC GRAFITY AND ABSORBTION TEST

1. COARSE AGGREGATE (RETAINED No. # 4 SIEVE) Ma 3/4"


WT. OF SAMPLE OVEN DRY Gr 2,966 2,971
WT. OF SAMPLE IN WATER Gr 1,859 1,865
WT. OF SATURATED SURFACE DRY Gr 3,000 3,000
2.599 2.629
BULK SPGR 2.609 SSD SPGR 2.636
2.618 2.643
2.679 1.146
APPARENT SPGR 2.683 ABSORPTION (%) 1.061
2.686 0.976

2. FINE AGGREGATE (PASSING NO. # 4 SIEVE) Natural Sand


WT. OF SATURATED SURFACE DRY Gr 500 500
WT. OF SAMPLE OVEN DRY Gr 495 496
WT. OF PICKNOMETER + WATER Gr 667 668
WT. OF PICKNOMETER + WATER + SAMPLE Gr 977 976
2.605 2.632
BULK SPGR 2.594 SSD SPGR 2.618
2.583 2.604
2.676 1.010
APPARENT SPGR 2.657 ABSORPTION (%) 0.908
2.638 0.806

3. AVERAGE SPECIFIC GRAFITY


PERCENT SAMPLE RETAIN No. 4 = 19.86%
PERCENT SAMPLE PASSING = 80.14%
BULK SPGR 2.601 SSD SPGR 2.627
APPARENT SPGR 2.670
ABSORPTION (%) 0.985

KONTRAKTOR KONSULTAN PROYEK


SPECIFIC GRAFITY AND ABSORBTION TEST

1. COARSE AGGREGATE (RETAINED No. # 4 SIEVE) Fa 1/2"


WT. OF SAMPLE OVEN DRY Gr 1,958 1,963
WT. OF SAMPLE IN WATER Gr 1,242 1,245
WT. OF SATURATED SURFACE DRY Gr 2,000 2,000
2.583 2.639
BULK SPGR 2.592 SSD SPGR 2.644
2.600 2.649
2.735 2.145
APPARENT SPGR 2.734 ABSORPTION (%) 2.015
2.734 1.885

2. FINE AGGREGATE (PASSING NO. # 4 SIEVE) Crusher Dust


WT. OF SATURATED SURFACE DRY Gr 500 500
WT. OF SAMPLE OVEN DRY Gr 492 494
WT. OF PICKNOMETER + WATER Gr 666 666
WT. OF PICKNOMETER + WATER + SAMPLE Gr 980 980
2.645 2.809
BULK SPGR 2.651 SSD SPGR 2.793
2.656 2.778
2.764 1.626
APPARENT SPGR 2.754 ABSORPTION (%) 1.420
2.744 1.215

3. AVERAGE SPECIFIC GRAFITY


PERCENT SAMPLE RETAIN No. 4 =
PERCENT SAMPLE PASSING =
BULK SPGR SSD SPGR .
APPARENT SPGR
ABSORPTION (%)

KONTRAKTOR KONSULTAN PROYEK


Sample 1 Sample 2
CA (Course Agregat) 1" 10000 gr 10000
Ukuran Nomor Berat Berat Berat Nomor Berat Berat
Saringan (mm) Saringan Awal Tertahan Lolos Saringan Awal Tertahan
37.5 1 1/2" 1 1/2"
25 1" 10000 895 9105 1" 10000 125
19 3/4" 9105 3578 5527 3/4" 9875 6925
12.5 1/2" 5527 4353 1174 1/2" 2950 2571
9.5 3/8" 1174 1004 170 3/8" 379 290
4.75 #4 170 170 0 #4 89 89
2.36 #8 #8
1.18 #16 #16
0.600 #30 #30
0.300 #50 #50
0.150 #100 #100
0.075 #200 #200
0.000 Pan Pan
Total 10000 10000

Sample 1 Sample 2
MA (Medium Agregat) 3/4" 5000 gr 5000
Ukuran Nomor Berat Berat Berat Nomor Berat Berat
Saringan (mm) Saringan Awal Tertahan Lolos Saringan Awal Tertahan
37.5 1 1/2" 1 1/2"
25 1" 1"
19 3/4" 5000 693 4307 3/4" 5000 255
12.5 1/2" 4307 3822 485 1/2" 4745 4370
9.5 3/8" 485 345 140 3/8" 375 327
4.75 #4 140 140 0 #4 48 48
2.36 #8 #8
1.18 #16 #16
0.600 #30 #30
0.300 #50 #50
0.150 #100 #100
0.075 #200 #200
0.000 Pan Pan
Total 5000 5000

Sample 1 Sample 2
FA (Fans Agregat) 1/2" 2500 gr 2500
Ukuran Nomor Berat Berat Berat Nomor Berat Berat
Saringan (mm) Saringan Awal Tertahan Lolos Saringan Awal Tertahan
37.5 1 1/2" 1 1/2"
25 1" 1"
19 3/4" 3/4"
12.5 1/2" 2500 37 2463 1/2" 2500 416
9.5 3/8" 2463 539 1924 3/8" 2084 1649
4.75 #4 1924 1465 459 #4 435 359
2.36 #8 459 335 124 #8 76 19
1.18 #16 124 88 36 #16 57 1
0.600 #30 36 19 17 #30 56 3
0.300 #50 17 17 0 #50 53 40
0.150 #100 0 0 #100 13 13
0.075 #200 0 0 #200
0.000 Pan Pan
Total 2500 2500

Sample 1 Sample 2
Sand (Pasir) 1000 gr 1000
Ukuran Nomor Berat Berat Berat Nomor Berat Berat
Saringan (mm) Saringan Awal Tertahan Lolos Saringan Awal Tertahan
37.5 1 1/2" 1 1/2"
25 1" 1"
19 3/4" 3/4"
12.5 1/2" 1/2"
9.5 3/8" 3/8"
4.75 #4 1000 79 921 #4 1000 18
2.36 #8 921 154 767 #8 982 8
1.18 #16 767 210 557 #16 974 55
0.600 #30 557 256 301 #30 919 229
0.300 #50 301 228 73 #50 690 435
0.150 #100 73 27 46 #100 255 227
0.075 #200 46 19 27 #200 28 28
0.000 Pan 27 27 0 Pan
Total 1000 1000

Sample 1 Sample 2
Cr 500 gr 500
Ukuran Nomor Berat Berat Berat Nomor Berat Berat
Saringan (mm) Saringan Awal Tertahan Lolos Saringan Awal Tertahan
37.5 1 1/2" 1 1/2"
25 1" 1"
19 3/4" 3/4"
12.5 1/2" 1/2"
9.5 3/8" 3/8"
4.75 #4 500 31 469 #4
2.36 #8 469 120 349 #8 500 145
1.18 #16 349 88 261 #16 355 120
0.600 #30 261 96 165 #30 235 64
0.300 #50 165 72 93 #50 171 54
0.150 #100 93 32 61 #100 117 58
0.075 #200 61 22 39 #200 59 37
0.000 Pan 39 39 0 Pan 22 22
Total 500 500
gr
Berat
Lolos

9875
2950
379
89
0

gr
Berat
Lolos

4745
375
48
0

gr
Berat
Lolos
2084
435
76
57
56
53
13
0

gr
Berat
Lolos

982
974
919
690
255
28
0

gr
Berat
Lolos

355
235
171
117
59
22
0
DICKY ALAMSYAH
1307210057

ANALISA SARINGAN
TOTAL = 1000 Gr TOTAL = 1000 Gr
SIEVE INDIVIDU CUMMULATIVE SIEVE 1" 3/4" 1/2" Cr Sand
SPEC LIMIT
SIZE WT. RET WT. RET % RET % PASS SIZE 1 2 3 4 5
15% 10% 25% 43% 5%
11/2" 100 100 37.50 15.00 10.00 25.00 43.00 5.00
1" 100 100 25.40 15.00 10.00 25.00 43.00 5.00
3/4" 90 100 19.00 15.00 10.00 25.00 43.00 5.00
1/2" 75 90 12.50 15.00 3.65 25.00 43.00 5.00
3/8" 0 0 100 66 82 9.50 15.00 1.80 24.45 43.00 5.00
#4 106.3 1.063 98.937 46 64 4.75 15.00 0.00 10.69 43.00 5.00
#8 380.6 3.806 96.194 30 49 2.36 15.00 0.00 2.57 27.69 4.91
# 16 488.4 4.884 95.116 18 38 1.18 15.00 0.00 0.39 16.81 4.64
# 30 728.3 7.283 92.717 12 28 0.60 15.00 0.00 0.37 12.08 4.21
# 50 821.2 8.212 91.788 7 20 0.30 15.00 0.00 0.36 10.75 3.29
# 100 5 13 0.150 15.00 0.00 0.32 6.67 0.94
# 200 4 8 0.075 15.00 0.00 0.08 3.91 0.14

GRADING CURVE
100
99 100
90

80 82
% 75
70
P
A
60
S
S 54
I 50
N
G 40
38
30
28
20 21
10
6 8 9
0
# 200 # 100 # 50 # 30 # 16 No. OF #SIEVE
8 #4 3/8" 1/2" 3/4" 1"
S 54
I 50
N
G 40
38
30
28
20 21
10
6 8 9
` 0
# 200 # 100 # 50 # 30 # 16 No. OF #SIEVE
8 #4 3/8" 1/2" 3/4" 1"
NOTES

Kadar Aspal Aspal Ca Ma Fa Cr Sand Total Berat


5.0% 60.0 171.0 114.0 285.0 490.2 57.0 1,177.2
5.5% 66.0 170.1 113.4 283.5 487.6 56.7 1,177.3
6.0% 72.0 169.2 112.8 282.0 485.0 56.4 1,177.4
6.5% 78.0 168.3 112.2 280.5 482.5 56.1 1,177.6
7.0% 84.0 167.4 111.6 279.0 479.9 55.8 1,177.7

Kadar Aspal Aspal Ca Ma Fa Cr Sand Total Berat


5.0% 60.0 17,100.0 2.3 421.8 ### ### 36,161.0
5.5% 66.0 17,010.0 2.3 419.6 ### ### 35,976.9
6.0% 72.0 16,920.0 2.3 417.4 ### ### 35,792.9
6.5% 78.0 16,830.0 2.2 415.1 ### ### 35,608.9
7.0% 84.0 16,740.0 2.2 412.9 ### ### 35,424.9
DICKY ALAMSYAH
1307210057

ANALISA SARINGAN
TOTAL = 10,000.0 Gr TOTAL = 10,000.0 Gr
fly ash SIEVE INDIVIDU CUMMULATIVE SPEC SIEVE INDIVIDU CUMMULATIVE
AVG
6 SIZE WT. RET WT. RET % RET % PASS LIMIT SIZE WT. RET WT. RET % RET
2% 100%
2.00 100.00 11/2" 0.00 0.00 100.00 11/2" 0.00 0.00
2.00 100.00 1" 0.00 0.00 100.00 1" 0.00 0.00
2.00 100.00 3/4" 0.0 0.0 0.00 100.00 3/4" 0.0 0.0 0.00
2.00 93.65 1/2" 0.0 0.0 0.00 100.00 1/2" 0.0 0.0 0.00
2.00 91.25 3/8" 0.0 0.0 0.00 100.00 3/8" 0.0 0.0 0.00
2.00 75.69 #4 0.0 0.0 0.00 100.00 #4 0.0 0.0 0.00
2.00 52.17 #8 0.0 0.00 100.00 #8 0.0 0.0 0.00
2.00 38.84 # 16 0.0 0.00 100.00 # 16 0.0 0.0 0.00
2.00 33.67 # 30 0.0 0.00 100.00 # 30 0.0 0.0 0.00
1.99 31.38 # 50 0.0 0.00 100.00 # 50 0.0 0.0 0.00
1.91 24.83 # 100 0.0 0.00 100.00 # 100 0.0 0.0 0.00
1.67 20.79 # 200 0.0 0.00 100.00 # 200 0.0 0.0 0.00
pan pan
Total 0 Total 0

GRADING CURVE
99 100 100

90
82 % 80

P 70
A
S 60
S
I 50
N
G 40

30

20

10

0
# 200 # 100 # 50 # 30 # 16 #8 #4 3/8" 1/2" 3/4" 1" 11
No. OF SIEVE
3/4" 1"
S
I 50
N
G 40

30

20

10

0
# 200 # 100 # 50 # 30 # 16 #8 #4 3/8" 1/2" 3/4" 1" 11
No. OF SIEVE
3/4" 1"
NOTES
DICKY ALAMSYAH
1307210057

1" ANALISA SARINGAN


TOTAL = 5,000.0 Gr TOTAL =
CUMMULATIVE SIEVE INDIVIDU CUMMULATIVE SIEVE INDIVIDU
AVG SPEC LIMIT
% PASS SIZE WT. RET WT. RET % RET % PASS SIZE WT. RET

100.00 100.00 11/2" 0.00 0.00 100.00 11/2"


100.00 100.00 1" 0.00 0.00 100.00 1"
100.00 100.00 3/4" 0.0 0.00 100.00 3/4"
100.00 100.00 1/2" 3,149.0 3,149.0 62.98 37.02 1/2" 3,200.0
100.00 100.00 3/8" 920.00 4,069.0 81.38 18.62 3/8" 934.0
100.00 100.00 #4 929.00 4,998.0 99.96 0.04 #4 864.0
100.00 100.00 #8 5,000.0 100.00 0.00 #8
100.00 100.00 # 16 5,000.0 100.00 0.00 # 16
100.00 100.00 # 30 5,000.0 100.00 0.00 # 30
100.00 100.00 # 50 5,000.0 100.00 0.00 # 50
100.00 100.00 # 100 5,000.0 100.00 0.00 # 100
100.00 100.00 # 200 5,000.0 100.00 0.00 # 200
pan pan
Total 4998 Total 4998

GRADING CURVE
100

90

% 80

P 70
A
S 60
S
I 50
N
G 40

30

20

10

0
2" 3/4" 1" 11/2" # 200 # 100 # 50 # 30 # 16 #8 #4 3/8" 1/2" 3/4"
No. OF SIEVE
S
I 50
N
G 40

30

20

10

0
2" 3/4" 1" 11/2" # 200 # 100 # 50 # 30 # 16 #8 #4 3/8" 1/2" 3/4"
No. OF SIEVE
NOTES
DICKY ALAMSYAH
1307210057

3/4" ANALISA SARINGAN


5,000.0 Gr TOTAL = 2,500.0 Gr TOTAL
CUMMULATIVE SIEVE INDIVIDU CUMMULATIVE SPEC SIEVE
AVG
WT. RET % RET % PASS SIZE WT. RET WT. RET % RET % PASS LIMIT SIZE

0.0 0.00 100.00 100.00 11/2" 0.00 0.00 100.00 11/2"


0.0 0.00 100.00 100.00 1" 0.00 0.00 100.00 1"
0.0 0.00 100.00 100.00 3/4" 0.00 0.00 100.00 3/4"
3,200.0 64.00 36.00 36.51 1/2" 0.00 0.00 100.00 1/2"
4,134.0 82.68 17.32 17.97 3/8" 44.0 44.0 1.76 98.24 3/8"
4,998.0 99.96 0.04 0.04 #4 1,386.0 1,430.0 57.20 42.80 #4
4,998.0 99.96 0.04 0.02 #8 819.0 2,249.0 89.96 10.04 #8
4,998.0 99.96 0.04 0.02 # 16 207.0 2,456.0 98.24 1.76 # 16
4,998.0 99.96 0.04 0.02 # 30 2.0 2,458.0 98.32 1.68 # 30
4,998.0 99.96 0.04 0.02 # 50 1.0 2,459.0 98.36 1.64 # 50
4,998.0 99.96 0.04 0.02 # 100 3.0 2,462.0 98.48 1.52 # 100
4,998.0 99.96 0.04 0.02 # 200 30.0 2,492.0 99.68 0.32 # 200
pan 4.0 2,496.0 99.84 0.16 pan
Total 2496 Total

GRADING CURVE
100

90

%80

P 70
A
S 60
S
I 50
N
G 40

30

20

10

0
3/8" 1/2" 3/4" 1" 11/2" # 200 # 100 # 50 # 30 # 16 #8 #4 3/8" 1/2"
No. OF SIEVE
S
I 50
N
G 40

30

20

10

0
3/8" 1/2" 3/4" 1" 11/2" # 200 # 100 # 50 # 30 # 16 #8 #4 3/8" 1/2"
No. OF SIEVE
NOTES
LAMSYAH DICKY ALAMS

NGAN 1/2" ANALISA SARINGAN


= 2,500.0 Gr TOTAL = 500 Gr
INDIVIDU CUMMULATIVE SIEVE INDIVIDU CUMMULATIVE SPEC
AVG
WT. RET WT. RET % RET % PASS SIZE WT. RET WT. RET % RET % PASS LIMIT

0.00 0.00 100.00 100.00 11/2" 0.00 0.00 100.00


0.00 0.00 100.00 100.00 1" 0.00 0.00 100.00
0.00 0.00 100.00 100.00 3/4" 0.00 0.00 100.00
0.00 0.00 100.00 100.00 1/2" 0.00 0.00 100.00
66.0 66.0 2.64 97.36 97.80 3/8" 0.00 0.00 100.00
1,367.0 1,433.0 57.32 42.68 42.74 #4 - - 0.00 100.00
805.0 2,238.0 89.52 10.48 10.26 #8 167.00 167.00 33.40 66.60
228.0 2,466.0 98.64 1.36 1.56 # 16 128.00 295.00 59.00 41.00
2.0 2,468.0 98.72 1.28 1.48 # 30 57.00 352.00 70.40 29.60
2.0 2,470.0 98.80 1.20 1.42 # 50 20.00 372.00 74.40 25.60
4.0 2,474.0 98.96 1.04 1.28 # 100 52.00 424.00 84.80 15.20
19.0 2,493.0 99.72 0.28 0.30 # 200 28.00 452.00 90.40 9.60
5.0 2,498.0 99.92 0.08 0.12 pan 40 492.00 98.40 1.60
2498.0 Total 492

pan 49

541
700

RADING CURVE GRADING CURVE


100

90

%80

P 70
A
S 60
S
I 50
N
G 40

30

20

10

0
#8 #4 3/8" 1/2" 3/4" 1" 11/2" # 200 # 100 # 50 # 30 # 16 #8 #4 3/8"
No. OF SIEVE No. OF SIEVE
S
I 50
N
G 40

30

20

10

0
#8 #4 3/8" 1/2" 3/4" 1" 11/2" # 200 # 100 # 50 # 30 # 16 #8 #4 3/8"
No. OF SIEVE No. OF SIEVE
NOTES
DICKY ALAMSYAH DICKY ALAMSYAH
1307210057 1307210057

SA SARINGAN Cr ANALISA SARINGAN


TOTAL = 500 Gr TOTAL = 1,000.0 Gr
SIEVE INDIVIDU CUMMULATIVE SIEVE INDIVIDU CUMMULATIVE
AVG
SIZE WT. RET WT. RET % RET % PASS SIZE WT. RET WT. RET % RET % PASS

11/2" 0.00 0.00 100.00 100.00 11/2" 0.00 0.00 100.00


1" 0.00 0.00 100.00 100.00 1" 0.00 0.00 100.00
3/4" 0.00 0.00 100.00 100.00 3/4" 0.00 0.00 100.00
1/2" 0.00 0.00 100.00 100.00 1/2" 0.00 0.00 100.00
3/8" 0.00 0.00 100.00 100.00 3/8" 0.00 0.00 100.00
#4 0 0.00 0.00 100.00 100.00 #4 0.0 0.00 0.00 100.00
#8 189.0 189.00 37.80 62.20 64.40 #8 17.0 17.00 1.70 98.30
# 16 125.0 314.00 62.80 37.20 39.10 # 16 54.0 71.00 7.10 92.90
# 30 53.0 367.00 73.40 26.60 28.10 # 30 82.0 153.00 15.30 84.70
# 50 11.0 378.00 75.60 24.40 25.00 # 50 167.0 320.00 32.00 68.00
# 100 43.0 421.00 84.20 15.80 15.50 # 100 472.0 792.00 79.20 20.80
# 200 36.0 457.00 91.40 8.60 9.10 # 200 177.0 969.00 96.90 3.10
pan 38.0 pan 10.0 979.00 97.90 2.10
Total 495 Total 979

pan 54 pan 27

549 1006
700

GRADING CURVE GRADING CURVE


100

90

%80

P 70
A
S 60
S
I 50
N
G 40

30

20

10

0
16 #8 #4 3/8" 1/2" 3/4" 1" 11/2" # 200 # 100 # 50 # 30 # 16 #8 #4
No. OF SIEVE No. OF SIEVE
S
I 50
N
G 40

30

20

10

0
16 #8 #4 3/8" 1/2" 3/4" 1" 11/2" # 200 # 100 # 50 # 30 # 16 #8 #4
No. OF SIEVE No. OF SIEVE
NOTES
DICKY ALAMSYAH
1307210057

ANALISA SARINGAN Sand


TOTAL = 1,000.0 Gr TOTAL = 500.0
INDIVIDU WT.
SPEC SIEVE INDIVIDU CUMMULATIVE CUMMULATIVE
AVG SIEVE SIZE RET
LIMIT SIZE WT. RET WT. RET % RET % PASS WT. RET

11/2" 0.00 0.00 100.00 100.00 11/2" 0.00


1" 0.00 0.00 100.00 100.00 1" 0.00
3/4" 0.00 0.00 100.00 100.00 3/4" 0.00
1/2" 0.00 0.00 100.00 100.00 1/2" 0.00
3/8" 0.00 0.00 100.00 100.00 3/8" 0.00
#4 0.0 0.00 0.00 100.00 100.00 #4 0.00
#8 19.0 19.00 1.90 98.10 98.20 #8 0.00
# 16 56.0 75.00 7.50 92.50 92.70 # 16 0.00
# 30 87.0 162.00 16.20 83.80 84.25 # 30 1.0 1.00
# 50 204.0 366.00 36.60 63.40 65.70 # 50 2.0 3.00
# 100 468.0 834.00 83.40 16.60 18.70 # 100 33.0 36.00
# 200 143.0 977.00 97.70 2.30 2.70 # 200 123.0 159.00
pan 12.0 989.00 98.90 1.10 1.60 pan 89.0 248.00
Total 989 Total 248

pan 34 pan 27

1023 275

GRADING CURVE
100

90

% 80

P 70
A
S 60
S
I 50
N
G 40

30

20

10

0
30 # 16 #8 #4 3/8" 1/2" 3/4" 1" 11/2" # 200 # 100 # 50 # 30 # 16
No. OF SIEVE
S
I 50
N
G 40

30

20

10

0
30 # 16 #8 #4 3/8" 1/2" 3/4" 1" 11/2" # 200 # 100 # 50 # 30 # 16
No. OF SIEVE
NOTES
DICKY ALAMSYAH
1307210057

fly ash boiler


Gr TOTAL = 500.0 Gr
SPEC SIEVE INDIVIDU WT.
CUMMULATIVE AVG
LIMIT SIZE RET
% RET % PASS WT. RET % RET % PASS

0.00 100.00 11/2" 0.00 0.00 100.00 100.00


0.00 100.00 1" 0.00 0.00 100.00 100.00
0.00 100.00 3/4" 0.00 0.00 100.00 100.00
0.00 100.00 1/2" 0.00 0.00 100.00 100.00
0.00 100.00 3/8" 0.00 0.00 100.00 100.00
0.00 100.00 #4 0.00 0.00 100.00 100.00
0.00 100.00 #8 0.00 0.00 100.00 100.00
0.00 100.00 # 16 0.00 0.00 100.00 100.00
0.10 99.90 # 30 1.0 1.00 0.10 99.90 99.90
0.30 99.70 # 50 11.0 12.00 1.20 98.80 99.25
3.60 96.40 # 100 43.0 55.00 5.50 94.50 95.45
15.90 84.10 # 200 119.0 174.00 17.40 82.60 83.35
24.80 75.20 pan 74.0 248.00 24.80 75.20 75.20
Total 248

pan 34

282

GRADING CURVE

50 # 30 # 16 #8 #4 3/8" 1/2" 3/4" 1" 11/2"


No. OF SIEVE
50 # 30 # 16 #8 #4 3/8" 1/2" 3/4" 1" 11/2"
No. OF SIEVE

You might also like