Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

DETAILS OF PLINTH BEAMS AT PLINTH LVL.

-
TYP.DETAILS OF SUNSHADES
Ld OR 0.25 x L1 Ld OR 0.25 x L1 Ld OR 0.25 x L2
(WHICH EVER IS MORE) (WHICH EVER IS MORE) (WHICH EVER IS MORE)
P.LVL
Ast1 (Thro.) Ast1 (Thro.) Ast1 (Thro.) Ast1 (Thro.) Ast1 (Thro.) As per arch. dwg.
Ast2(Extra) Ast2(Extra) 5#8 (Both face)
LINTEL 4#8 (Both face) LINTEL

Ld+10Ø
Ld+10Ø

100

120
D
STIRRUPS

Asb2(Extra) Asb2(Extra)Asb1 (Thro.) #8@150 , #8@125 ,


0.1xL1 Asb1 (Thro.) 0.15xL1 0.15xL2 'U' shape bar
'U' shape bar

STPS. IN END ZONE STPS. IN MIDDLE ZONE STPS. IN END ZONE STPS. IN END ZONE 230 450-600MM. 230 601-750MM.
END COL. 2D MIDDLE ZONE 2D 2D
INTERMEDIATE COLUMN SUNSHADES/CHAJJAS SUNSHADES/CHAJJAS
L1 L2
(PROJECTION UPTO 451-600 MM.) (PROJECTION UPTO 601-750 MM.)
TYP.REINF. DETAILS IN THE PLINTH BEAMS AT PLINTH LVL SPANNING BETWEEN SUPPORT TO SUPPORT
FOR DETAILS REFER TABLE [2] BELOW
NOTE : AT THE JUNCTION OF TWO DIFF. NUMBER OF BEAMS THE HEIGHER REINFORCEMENT AT THE SUPPORT SHALL BE ADDOPTED.

TABLE -2 DETAILS OF PLINTH BEAMS


BEAM LONGITUDINAL REINFORCEMENT STIRRUPS
BEAM NO.

SIDE FACE
SR. NO.

SIZE TOP FACE REINFORCEMENT BOTTOM FACE REINFORCEMENT REINF.


PLINTH

END MIDDLE (ON EACH FACE)


W D Ast1 Ast2 Asb1 Asb2 ZONE ZONE
mm mm (Thro.at Top.) (Extra at support) (Thro.at Bottom.) (Extra at middle) '2L'STPS '2L'STPS
1 PB1 230 350 2#16 - 2#16 - #8@100 #8@150 -
2 PB2 115 350 2#12 - 2#12 - #8@100 #8@150 -
3 PB3 230 350 3#16 2#16 3#16 2#16 #8@100 #8@150 -
4 PB4 230 350 3#16 2#12 3#16 2#12 #8@100 #8@150 -
5 PB5 230 350 2#16 1#12 2#16 1#12 #8@100 #8@150 -
6 PB6 230 350 2#12 - 2#12 - #8@100 #8@150 -

P. lvl.
P. lvl. (as per arch. dwg.)
(as per arch. dwg.) P. lvl.
(as per arch. dwg.)
Plinth beam
Plinth beam
Plinth beam
Column reinf. Existing Column reinf.
(for details refer col. sec.) Column reinf. Ground lvl. (for details refer col. sec.)
(for details refer col. sec.)
Existing 75 #10@200 c/c
Existing (both ways)

150
Ground lvl.
Ground lvl.

150
75
#10@150c/c #12@150 c/c
75
#10@150c/c (Forming close link)

700
150

#10@150 c/c 5#12

600
150 5#12
150

(Forming close link) #10@150 c/c Cut off lvl. 300

150
REFERENCES: IS 456 - 2016, IS 13920 - 2016, IS 1893 PART (1) : 2016, IS 4326,SP-16,SP-34
550

(Forming close link) ARCH. DRG. NO. - ALL ARCH. DRGS


700

100
450

Cut off lvl.

50
300 REVISION

600
Cut off lvl. 300
100

#12@150c/c
100
P.C.C
50

(both ways)
50

S.N. DATE DESCRIPTIONS INITIAL


5#16 P.C.C Pile reinf.
#10@150 c/c 5#16 P.C.C (for details refer pile sec.) PROJECT

Pile reinf. #12@150 c/c 300Ø 300Ø


(for details refer pile sec.) Pile reinf. PROPOSED VIVECHANA ROOM FOR 4 NOS. S.I.
(for details refer pile sec.) IN THANA COMPLEX, ELIYA, DISTT. - CHANDAULI, U.P.
300Ø 300Ø
300Ø 300Ø SEC. OF PILE GP3 (3P1) AT X3-X3
SEC. OF PILE GP1 (2P1) AT X1 - X1 SEC. OF PILE GP2 (2P1) AT X2 - X2
DRG. TITLE:

1475 DETAIL OF PLINTH BEAMS & PILE CAPS

300 100
DATE JAN - 2020 CONSTRUCTION AGENCY : SHEET

250
DRN. NO.
CKD. Er.S.B.Chaudhary U. P. P. W. D.
(b+150)
TCD.
SCALE N.T.S. DRG. NO.
ST-02
250 1125 250
250 1125 250 Column

100 300 100


ARCHITECT:
150

250 250
b Column X3 X3
(a+150)
150
300

1625
1125

b Column
825

500
VASTUVID VARG
(a+150)

a
300

X1 X1
(a+150)
600
150 300

X2 X2 KARYALAYA PRAMUKH ABHIYANTA


a

600
150 300

LOK NIRMAN VIBHAG , U.P. LUCKNOW


300

Column pedestal
300

(b+150) Column pedestal b


(b+150) Column pedestal
100 300 825 300 100
100 300

100 300 825 300 100 Structural Consultants:


250

1625
1625 SILHOUETTE ILLUSION
PLAN OF PILE GP1 (2P1) PLAN OF PILE GP2 (2P1) 100 300 675 300 100 ARCHITECTS & ENGINEERS
250 325 650 250
D-217, VIBHUTI KHAND, GOMTI NAGAR
PLAN OF PILE GP3 (3P1) LUCKNOW. Ph.-7752944777,9795499036.

You might also like