Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

Project: PROPOSED DEVELOPMENT AT

SKYCITY SITE A2 L894,


PORTION OF CHEK LAP KOK
LOT NO. 3
Wah Tung Facade Company Limited Prepared: Date: 31-Aug-20
Checked: File: Page: 18

Joint no.

Frame no.
Project: PROPOSED DEVELOPMENT AT
SKYCITY SITE A2 L894,
PORTION OF CHEK LAP KOK
LOT NO. 3
Wah Tung Facade Company Limited Prepared: Date: 31-Aug-20
Checked: File: Page: 19

Frame section

Load case - WIND


Project: PROPOSED DEVELOPMENT AT
SKYCITY SITE A2 L894,
PORTION OF CHEK LAP KOK
LOT NO. 3
Wah Tung Facade Company Limited Prepared: Date: 31-Aug-20
Checked: File: Page: 20

Bending moment diagram (WIND, kNm)

Reaction (WIND, kN)


Project: PROPOSED DEVELOPMENT AT
SKYCITY SITE A2 L894,
PORTION OF CHEK LAP KOK
LOT NO. 3
Wah Tung Facade Company Limited Prepared: Date: 31-Aug-20
Checked: File: Page: 21

2.4.1 Check for 40 x 40 x 3 mm thk. aluminium stiffener (@320c/c)


(Refer to drawing no. AD-05, detail 1)

Span, L= 575.0 mm

You might also like