UPGRADE OF CONNECTION POINTS BETWEEN PRODUCTION AND

TRANSMISSION TO MEET THE REQUIREMENTS OF THE SEAWATER BILL OF QUANTITIES


ITEM DESALINATION CODE
ITEM DESCRIPTION UNIT

A GENERAL ITEMS CONTRACTUAL REQUIREMENTS


1 Establishment of office equipment sum
Store for material sum
concrete batching plant sum
Maintanence sum
Removal sum

B SURVEY

Site Survey to investigations and all necessary civil, Hydraulic, mechanical,


1 electrical and ICT works & to check the existing equipment and utilities in lot
the connection point, including location of existing assets, power sources,
communication connections, etc.
2 Geotechnical survey & Investication lot
3 Topographical analysis lot
4 pre-construction and postconstruction lot
condition surveys
5 Assessment and Management of Existing Utilities lot
6 identify, protect or divert/relocate temporarily as necessary including trial lot
pits & divert

Obstacles shall include, but not be limited to existing


7 buildings, walls, fences, gates, wells, septic tanks, manholes, pits, culverts, lot
roadways, pavements, signs and rubbish dumps, whether or not shown on
any drawings provided as part of this Tender process.

C Specified Temporary Works


1 House Keeping for Site sum
2 Cover and barricade open excavations and other hazards including provision sum
& maintenance of warning lamps and signs

D Allow for coordinate with service authorities and obtain all Permits to
Work (landowners & local authorities) sum

E Accommodation and buildings for the Contractor


Establishment (Fixed) sum
Maintanence sum
Removal sum

F Management,Supervision
Establishment (Progress related) sum

G Project Signboard
Provision of project Signboard sum
Maintanence sum
Removal sum

H Design & Engineering

Submit detailed design complying with all obligations and liabilities in


regards to the design work in accordance with the Conditions of Contract
and Specifications. All design works shall be approved by the Engineer and
concerned authorities.Including the submission of the following:-
Detailed Design Works sum
Detailed Design of Temporary Works sum
Construction Documents sum

I GENERAL CLEARANCE
General site clearance in accordance to the specifications and drawings sum
prior handover to the Employer

J Signage & lable


Signage & lable sum

J.1 Dismantling Exsiting Units & connections in exsiting site units and prepatre
for installation including all neassesry works
Flow Meter EA
Valves EA
Pipes M
differential pressure meter EA

K Flow Meter System

Installation, testing, commissioning, calibration and other


required tests of Electromagnetic Flow Meter complete with all
accessories including grounding, communication to SWCC and
NWC control centres as per the drawings and specifications.
Installation Flow Meter Works - New DN1500 & DN1300 EA
calibration for flow meter DN1500 & DN1300 EA
Testing & commissioning DN1500 & DN1300 EA
Instrumentation work for flow meter EA

K.1 Chambers Work

In-situ concrete; sized as per standard drawings; including heavy duty


lockable cast iron cover and frame, step irons, blinding concrete,
reinforcement and concrete as per drawings and specifications
Chamber CIVIL Works for flow meter including all neassesry works EA
4200x3900x5000

L Isolation Valves Works


L.1 Chambers Work
In-situ concrete; sized as per standard drawings; including heavy duty
lockable cast iron cover and frame, step irons, blinding concrete,
reinforcement and concrete as per drawings and specifications
Chambers CIVIL for isolation valves EA
3400x3800x5000
L.2 Valves Supply & Installation

Supply, installation, testing, and commissioning of valves including all


fittings, couplings and any connection to adjacent network, bolts, nuts,
gaskets, all accessories,SCADA works and equipment, and all required works
as per NWC/SWCC standards and specifications. Installation of the isolation
Butterfly Valves in chambers or open ground, complete with all accessories
as specified in the dtrawings and specifications. Valve size shall match with
the Flow Meter size in the site.
Supply of Isolation Valves DN 1500 EA
Supply of Isolation Valves DN 1300 EA
Supply of valve actuators EA
callibration of Isolation Valves EA
installation of Isolation Valves & actuators EA
Testing & commissioning valves EA
Instrumentation work actuators EA

M Water Quality On-Line Monitoring Equipment

Installation of GRP Kiosk as near as possible to SWCC metering chamber,


including the communication system and assocaited required software and
a programming as per the drawings and specifications. Water Quality Online
Monitoring System shall contain equipment capable of measuring: (i) the
temperature; (ii) the pH value; (iii) the conductivity; (iv) the alkalinity (quasi-
continuously); and (v) the residual chlorine and calculate the TDS.
Moreover, this shall be communicated to a Central SCADA or Monitoring
centre through GSM.
CIVIL Works for Monitoring Room Minimum dimension 1200 x 1300 x 400 EA
(WxHxD);
Supply of kiosk EA
Installation of GRP Kiosk EA

b
Supply and installation of GRP Kiosk as near as possible to NWC metering
chamber. including the manual sampling line and components as per the
drawings and specifications
KIOSK & CIVIL Works for Monitoring Room
Minimum dimension 1200 x 1300 x 400 (WxHxD);
Supply of kiosk
Installation of GRP Kiosk

M.1 Water Quality On-Line Monitoring Equipment


Civil & Installation of Monitoring Equipment EA
Instrumentation work of Monitoring Equipment EA
N Pressure transmitter

installation, testing and commissioning and other required tests of pressure


indicator, complete with all accessories as per the drawings and
specifications
Installation of Pressure transmitter EA
Instrumentation work of Pressure transmitter EA

O Manual Sampling Point


Supply and installation of manual sampling point/drain in chambers ,
complete with all accessories all as per the drawings and specifications
Supply of materials for Sampling Point related Works pipe fittings & sink EA
installation & civil works for Sampling Point related Works EA

P Other Civil Engineering Activities


Design for Civil Works & hydraulic & sterss design, structural designs SUM
collection of water released during the line de-watering process SUM
safe disposal of water released during the line de-watering process SUM
P.1 Pipe Design Works

Work to lay new pipeline complete as per NWC/SWCC and International Standards requirements and as instructed
including: Supply of steel pipes; Excavate; Install by open cut and NDM if needed, instrumentation and control equi
whole pipes lengths; Joint; Tie-In; Protect; Lining; Testing; Bedding & Surrounding; backfilling with selected excavat
off site of surplus excavated material; Disinfection along the running length of pipe in trenches or beneath services
works include all Accessories; Ancillaries; Fittings; Joints; reinstatement, and connection with existing network; and
internal lining where required, SCADA works and equipment. This includes equipment mobilization and demobiliza
site investigations, dewatering, protection of existing services and utilities rerouting /modifications of exisiting utiliti
trench protection, bidding, foot path diversion, minor & major crossing becks & streams, lateral connections, exces
removal off site off rock, removal or control of running water or running sands which affect pipelining, major crossi
motor ways, railways which necessitate other methods of pipe laying other than open cut, coordination with utility
security, traffic diversions management & all signage to suit works location etc. as per the drawings and specificatio
Supply of steel pipes
DN1500 M
DN1300 M
Excavation M
Beveling & supports M
Trench preparation M
Sand bedding & Surrounding M
compaction works- 5 times M
backfilling M
Exsiting finishing reinstatement M
Ancillaries & supports works SUM
piping installation Works M
P.2 Supply and installations of pipe fittings

Supply and installations of pipe fittings as per NWC/SWCC and international


standards and as instructed by the Engineer as per the drawings and
specifications (following SWD-Code), such as Double socket reducer, Double
socket sleeve (collar), Flanged spigot with anchor flange, Puddle flange,
Dismantling joint, Double flange pipe.
supply of Double socket reducer DN1500 EA
supply of Double socket sleeve (collar) EA
supply of Flanged spigot with anchor flange EA
supply of Puddle flange EA
supply of Double flange pipe EA
supply of Dismantling joint EA
P.3 installation of fittings & Joints
installation of Double socket reducer EA
installation of Double socket sleeve (collar) EA
installation of Flanged spigot with anchor flange EA
installation of Puddle flange EA
installation of Double flange pipe EA
installation of Dismantling joint EA
connection with existing network EA

Control systems and data communication works sum


ladders, scaffolding for work sum
Electrical works- general sum
Instrumentation works- general sum
related MEP works sum
Existing Bend

Installation of existing bend from existing network as per the


drawings and specifications, including inspection of the condition sum
to verify the operational condition of the value; recommend the
owner to reuse/replace the value. If reusable, contractor to get
approval from owner

Supply and installation of conduit in trench as per SWCC/NWC and


A international standards;HDPE 50mm diameter;as per the drawings and m
specifications, including :
Incoming power supply conduit;
Instrument cable conduit;
Spare conduit;

Supply and installation of conduit in trench as per SWCC/NCW


B and international standards;HDPE 20mm diameter as per the
drawings and specifications, including:
Sample in m

Supply and installation of conduit in trench as per NWC and


C international standards;HDPE 20mm diameter as per the
drawings and specifications, icluding:
Drain to deep soakaway; m

Supply and installation of cable in HDPE conduit as per


D SWCC/NWC and international standards, including m
splicing/jointing, commissioning & testing, including:
Incoming power supply cable;
Instrument cable;

E Feeder pillar

Supply and installation of feeder pillar; including connection to


main power supply and all associated works, including earthing &
bonding, civils and ancillary works, as per standard specification
and drawings
Supply of feeder pillar EA
installation of feeder pillar EA
main power supply and all associated works M

F Service Turret
Supply and installation of service turret; including connection to
power supply and all associated works, as per specification and EA
drawings

P.5 cable works

supply of cables m
installation of cables m
supply of cables tray m
installation of cables tray m

AC Uninterruptable Power Supply (UPS) EA


Battery Bank EA

Q Access to Site
q.1 Gate with fenceing

Supply, fabrication and erection of fence with gates, including all


required steel members, galvanizing, welding, joints, fittings,
fixing, including gates, all accessories complete as detailed on
Contract drawings and recommended by manufacturer and
approved by the Client.
Gate EA
fenceing sum
Steel structural
Mono pitched to roof shelter
Columns support for shelter

q.2 Site Work


protection of the existing surfaces, sum
road kerbs sum
soft landscaping sum
comply with all security regulations and requirements in operation at the sum
site
temporary access points with existing surfaces, kerbs, soft landscaping sum

R Construction Plant, Tools and Vehicles


Vehicles sum
Tools sum
lifting equipment sum
hoists sum
transport facilities sum
consumables sum

S Temporary Works
temporary detour roads sum
temporary bridges & culverts sum
other facilities for their Works or for maintenance of traffic in locations sum
affected by their Works

T QA/QC , Safty & Documentation works


daily/weekly/monthly progress reports including photographs sum
office related sum
test reports sum
commissioning tests sum

U Utilities for the Works


clean water and fresh water sum
u.1 drainage facility
Soakaway as per NWC Kiosk drawing and specification;
500x500x500 deep soakaway filled with 20mm nominal size wadi EA
gravel wrapped in geotextile fabric (non woven 200gmc/m2)

temporary plumbing receptacles for storage sum


supply of all electrical power and all lighting sum
make provision to store electrical equipment and distribute electrical power sum
on Site.

V Site clearing & waste dispostal sum


Removal off site of surplus excavated material sum

W ADDITIONAL ITEMS
The Tenderer is to detail below any additional items with quantities and
rates not previously included to complete the build up of the Lump Sum
price for this section of the works. Should the tenderer fail to insert any
items here, it will be deemed that his Lump Sum price for the Tender
includes all items and no subsequent claim for any additional item will be
entertained

Marker Post sum


BILL OF QUANTITIES PART NO.
QUANTITY RATE

1
1
1
1
1

1
1
1
1
1

1
1

1
1
1

4
4
4

1
1
1

4
4
200
2

7
7
7
7

7
6

2
4
6
6
6
6
6

4
4
4

4
4
4
4

4
4

1
4
4

andards requirements and as instructed by the Engineer,


eeded, instrumentation and control equipment along the
unding; backfilling with selected excavated material; Removal
h of pipe in trenches or beneath services or across roads. Pipe
nd connection with existing network; and the provision with
equipment mobilization and demobilization, all necessary
rerouting /modifications of exisiting utilities if required,
cks & streams, lateral connections, excessive excavation and
nds which affect pipelining, major crossings includes roads,
r than open cut, coordination with utility suppliers, safety,
n etc. as per the drawings and specifications

100
100
200
200
200
200
200
200
200
1
200

8
32
16
32
16
16

8
32
16
32
16
16
8

4
4
4
4
4

3000

3000
4
4
700

3000
3000
50
50

4
4

4
4
4
4
4

4
4
4
4
4
4

4
4
4

4
1
4
4

4
4
4

4
4
4
UPGRADE OF CONNECTION POINTS BETWEEN PRODUCTION AND
TRANSMISSION TO MEET THE REQUIREMENTS OF THE SEAWATER BILL OF QUANTITIES
ITEM DESALINATION CODE
ITEM DESCRIPTION UNIT

A GENERAL ITEMS CONTRACTUAL REQUIREMENTS


1 Establishment of office equipment sum
Store for material sum
concrete batching plant sum
Maintanence sum
Removal sum

B SURVEY

Site Survey to investigations and all necessary civil, Hydraulic, mechanical,


1 electrical and ICT works & to check the existing equipment and utilities in lot
the connection point, including location of existing assets, power sources,
communication connections, etc.
2 Geotechnical survey & Investication lot
3 Topographical analysis lot
4 pre-construction and postconstruction lot
condition surveys
5 Assessment and Management of Existing Utilities lot
6 identify, protect or divert/relocate temporarily as necessary including trial lot
pits & divert

Obstacles shall include, but not be limited to existing


7 buildings, walls, fences, gates, wells, septic tanks, manholes, pits, culverts, lot
roadways, pavements, signs and rubbish dumps, whether or not shown on
any drawings provided as part of this Tender process.

C Specified Temporary Works


1 House Keeping for Site sum
2 Cover and barricade open excavations and other hazards including provision sum
& maintenance of warning lamps and signs

D Allow for coordinate with service authorities and obtain all Permits to
Work (landowners & local authorities) sum

E Accommodation and buildings for the Contractor


Establishment (Fixed) sum
Maintanence sum
Removal sum

F Management,Supervision
Establishment (Progress related) sum

G Project Signboard
Provision of project Signboard sum
Maintanence sum
Removal sum

H Design & Engineering

Submit detailed design complying with all obligations and liabilities in


regards to the design work in accordance with the Conditions of Contract
and Specifications. All design works shall be approved by the Engineer and
concerned authorities.Including the submission of the following:-
Detailed Design Works sum
Detailed Design of Temporary Works sum
Construction Documents sum

I GENERAL CLEARANCE
General site clearance in accordance to the specifications and drawings sum
prior handover to the Employer

J Signage & lable


Signage & lable sum

J.1 Dismantling Exsiting Units & connections in exsiting site units and prepatre
for installation including all neassesry works
Flow Meter EA
Valves EA
Pipes M
differential pressure meter EA

K Flow Meter System

Installation, testing, commissioning, calibration and other


required tests of Electromagnetic Flow Meter complete with all
accessories including grounding, communication to SWCC and
NWC control centres as per the drawings and specifications.
Installation Flow Meter Works - New DN2400 EA
calibration for flow meter DN2400 EA
Testing & commissioning DN2400 EA
Installation Flow Meter Works - New DN1500 EA
calibration for flow meter DN1500 EA
Testing & commissioning DN1500 EA
Instrumentation work for flow meter EA

K.1 Chambers Work

In-situ concrete; sized as per standard drawings; including heavy duty


lockable cast iron cover and frame, step irons, blinding concrete,
reinforcement and concrete as per drawings and specifications
Chamber CIVIL Works for flow meter including all neassesry works EA
7200x5900x4000
Chamber CIVIL Works for flow meter including all neassesry works EA
4200x3900x5000
L Isolation Valves Works
L.1 Chambers Work

In-situ concrete; sized as per standard drawings; including heavy duty


lockable cast iron cover and frame, step irons, blinding concrete,
reinforcement and concrete as per drawings and specifications
Chambers CIVIL for isolation valves EA
6200x4900x4000
Chambers CIVIL for isolation valves EA
3400x3800x4000
L.2 Valves Supply & Installation

Supply, installation, testing, and commissioning of valves including all


fittings, couplings and any connection to adjacent network, bolts, nuts,
gaskets, all accessories,SCADA works and equipment, and all required works
as per NWC/SWCC standards and specifications. Installation of the isolation
Butterfly Valves in chambers or open ground, complete with all accessories
as specified in the dtrawings and specifications. Valve size shall match with
the Flow Meter size in the site.
Supply of Isolation Valves DN 1500 EA
Supply of Isolation Valves DN 2400 EA
Supply of valve actuators EA
callibration of Isolation Valves EA
installation of Isolation Valves & actuators EA
Testing & commissioning valves EA
Instrumentation work actuators EA

M Water Quality On-Line Monitoring Equipment

Installation of GRP Kiosk as near as possible to SWCC metering chamber,


including the communication system and assocaited required software and
a programming as per the drawings and specifications. Water Quality Online
Monitoring System shall contain equipment capable of measuring: (i) the
temperature; (ii) the pH value; (iii) the conductivity; (iv) the alkalinity (quasi-
continuously); and (v) the residual chlorine and calculate the TDS.
Moreover, this shall be communicated to a Central SCADA or Monitoring
centre through GSM.
CIVIL Works for Monitoring Room Minimum dimension 1200 x 1300 x 400 EA
(WxHxD);
Supply of kiosk EA
Installation of GRP Kiosk EA

b
Supply and installation of GRP Kiosk as near as possible to NWC metering
chamber. including the manual sampling line and components as per the
drawings and specifications
KIOSK & CIVIL Works for Monitoring Room
Minimum dimension 1200 x 1300 x 400 (WxHxD);
Supply of kiosk
Installation of GRP Kiosk
M.1 Water Quality On-Line Monitoring Equipment
Civil & Installation of Monitoring Equipment EA
Instrumentation work of Monitoring Equipment EA

N Pressure transmitter

installation, testing and commissioning and other required tests of pressure


indicator, complete with all accessories as per the drawings and
specifications
Installation of Pressure transmitter EA
Instrumentation work of Pressure transmitter EA

O Manual Sampling Point


Supply and installation of manual sampling point/drain in chambers ,
complete with all accessories all as per the drawings and specifications
Supply of materials for Sampling Point related Works pipe fittings & sink EA
installation & civil works for Sampling Point related Works EA

P Other Civil Engineering Activities


Design for Civil Works & hydraulic & sterss design, structural designs SUM
collection of water released during the line de-watering process SUM
safe disposal of water released during the line de-watering process SUM
P.1 Pipe Design Works

Work to lay new pipeline complete as per NWC/SWCC and International Standards requirements and as instructed
including: Supply of steel pipes; Excavate; Install by open cut and NDM if needed, instrumentation and control equi
whole pipes lengths; Joint; Tie-In; Protect; Lining; Testing; Bedding & Surrounding; backfilling with selected excavat
Removal off site of surplus excavated material; Disinfection along the running length of pipe in trenches or beneath
roads. Pipe works include all Accessories; Ancillaries; Fittings; Joints; reinstatement, and connection with existing n
provision with internal lining where required, SCADA works and equipment. This includes equipment mobilization a
all necessary site investigations, dewatering, protection of existing services and utilities rerouting /modifications of
required, trench protection, bidding, foot path diversion, minor & major crossing becks & streams, lateral connectio
excavation and removal off site off rock, removal or control of running water or running sands which affect pipelini
includes roads, motor ways, railways which necessitate other methods of pipe laying other than open cut, coordina
suppliers, safety, security, traffic diversions management & all signage to suit works location etc. as per the drawing
specifications
Supply of steel pipes M
Excavation M
Beveling & supports M
Trench preparation M
Sand bedding & Surrounding M
compaction works M
backfilling M
Exsiting finishing reinstatement M
Ancillaries & supports works sum
piping installation Works M
P.2 Supply and installations of pipe fittings
Supply and installations of pipe fittings as per NWC/SWCC and international
standards and as instructed by the Engineer as per the drawings and
specifications (following SWD-Code), such as Double socket reducer, Double
socket sleeve (collar), Flanged spigot with anchor flange, Puddle flange,
Dismantling joint, Double flange pipe.
supply of Double socket reducer EA
supply of Double socket sleeve (collar) EA
supply of Flanged spigot with anchor flange EA
supply of Puddle flange EA
supply of Double flange pipe EA
supply of Dismantling joint EA
P.3 installation of fittings & Joints
installation of Double socket reducer EA
installation of Double socket sleeve (collar) EA
installation of Flanged spigot with anchor flange EA
installation of Puddle flange EA
installation of Double flange pipe EA
installation of Dismantling joint EA
connection with existing network EA

Control systems and data communication works sum


ladders, scaffolding for work sum
Electrical works- general sum
Instrumentation works- general sum
related MEP works sum
Existing Bend

Installation of existing bend from existing network as per the


drawings and specifications, including inspection of the condition sum
to verify the operational condition of the value; recommend the
owner to reuse/replace the value. If reusable, contractor to get
approval from owner

Supply and installation of conduit in trench as per SWCC/NWC and


A international standards;HDPE 50mm diameter;as per the drawings and m
specifications, including :
Incoming power supply conduit;
Instrument cable conduit;
Spare conduit;

Supply and installation of conduit in trench as per SWCC/NCW


B and international standards;HDPE 20mm diameter as per the
drawings and specifications, including:
Sample in m

Supply and installation of conduit in trench as per NWC and


C international standards;HDPE 20mm diameter as per the
drawings and specifications, icluding:
Drain to deep soakaway; m

Supply and installation of cable in HDPE conduit as per


D SWCC/NWC and international standards, including m
splicing/jointing, commissioning & testing, including:
Incoming power supply cable;
Instrument cable;

E Feeder pillar

Supply and installation of feeder pillar; including connection to


main power supply and all associated works, including earthing &
bonding, civils and ancillary works, as per standard specification
and drawings
Supply of feeder pillar EA
installation of feeder pillar EA
main power supply and all associated works m

F Service Turret
Supply and installation of service turret; including connection to
power supply and all associated works, as per specification and EA
drawings

P.5 Electrical works

supply of cables m
installation of cables m
supply of cables tray m
installation of cables tray m

AC Uninterruptable Power Supply (UPS) EA


Battery Bank EA

Q Access to Site
q.1 Gate with fenceing

Supply, fabrication and erection of fence with gates, including all


required steel members, galvanizing, welding, joints, fittings,
fixing, including gates, all accessories complete as detailed on
Contract drawings and recommended by manufacturer and
approved by the Client.
Gate EA
fenceing sum
Steel structural
Mono pitched to roof shelter
Columns support for shelter
q.2 Site Work
protection of the existing surfaces, sum
road kerbs sum
soft landscaping sum
comply with all security regulations and requirements in operation at the sum
site
temporary access points with existing surfaces, kerbs, soft landscaping sum

R Construction Plant, Tools and Vehicles


Vehicles sum
Tools sum
lifting equipment sum
hoists sum
transport facilities sum
consumables sum

S Temporary Works
temporary detour roads sum
temporary bridges & culverts sum
other facilities for their Works or for maintenance of traffic in locations sum
affected by their Works

T QA/QC , Safty & Documentation works


daily/weekly/monthly progress reports including photographs sum
office related sum
test reports sum
commissioning tests sum

U Utilities for the Works


clean water and fresh water sum
u.1 drainage facility
Soakaway as per NWC Kiosk drawing and specification;
500x500x500 deep soakaway filled with 20mm nominal size wadi ea
gravel wrapped in geotextile fabric (non woven 200gmc/m2)

temporary plumbing receptacles for storage sum


supply of all electrical power and all lighting sum
make provision to store electrical equipment and distribute electrical power sum
on Site.

V Site clearing & waste dispostal sum


Removal off site of surplus excavated material sum

W ADDITIONAL ITEMS
The Tenderer is to detail below any additional items with quantities and
rates not previously included to complete the build up of the Lump Sum
price for this section of the works. Should the tenderer fail to insert any
items here, it will be deemed that his Lump Sum price for the Tender
includes all items and no subsequent claim for any additional item will be
entertained

Marker Post sum


BILL OF QUANTITIES PART NO.
QUANTITY RATE

1
1
1
1
1

1
1
1
1
1

1
1

1
1
1

3
3
3

1
1
1

0
4
200
0

4
4
4
2
2
2
6

2
4

2
4
6
6
6
6
6

3
3
3
3
3

3
3

3
3

1
3
3

Standards requirements and as instructed by the Engineer,


needed, instrumentation and control equipment along the
rounding; backfilling with selected excavated material;
nning length of pipe in trenches or beneath services or across
statement, and connection with existing network; and the
ent. This includes equipment mobilization and demobilization,
ces and utilities rerouting /modifications of exisiting utilities if
crossing becks & streams, lateral connections, excessive
ater or running sands which affect pipelining, major crossings
f pipe laying other than open cut, coordination with utility
o suit works location etc. as per the drawings and

200
200
200
200
200
200
200
200
1
200
6
24
14
24
14
14

6
24
14
14
14
14
6

1
1
1
1
1

6100
6100

3
3
1200

6100
6100
75
75

3
3
3
3
3
3
3

3
3
3
3
3
3

3
3
3

3
3
3
3

3
3
3

3
3
3
UPGRADE OF CONNECTION POINTS BETWEEN PRODUCTION AND
TRANSMISSION TO MEET THE REQUIREMENTS OF THE SEAWATER BILL OF QUANTITIES
ITEM DESALINATION CODE
ITEM DESCRIPTION UNIT

A GENERAL ITEMS CONTRACTUAL REQUIREMENTS


1 Establishment of office equipment sum
Store for material sum
concrete batching plant sum
Maintanence sum
Removal sum

B SURVEY

Site Survey to investigations and all necessary civil, Hydraulic, mechanical,


1 electrical and ICT works & to check the existing equipment and utilities in lot
the connection point, including location of existing assets, power sources,
communication connections, etc.
2 Geotechnical survey & Investication lot
3 Topographical analysis lot
4 pre-construction and postconstruction lot
condition surveys
5 Assessment and Management of Existing Utilities lot
6 identify, protect or divert/relocate temporarily as necessary including trial lot
pits & divert

Obstacles shall include, but not be limited to existing


7 buildings, walls, fences, gates, wells, septic tanks, manholes, pits, culverts, lot
roadways, pavements, signs and rubbish dumps, whether or not shown on
any drawings provided as part of this Tender process.

C Specified Temporary Works


1 House Keeping for Site sum
2 Cover and barricade open excavations and other hazards including provision sum
& maintenance of warning lamps and signs

D Allow for coordinate with service authorities and obtain all Permits to
Work (landowners & local authorities) sum

E Accommodation and buildings for the Contractor


Establishment (Fixed) sum
Maintanence sum
Removal sum

F Management,Supervision
Establishment (Progress related) sum

G Project Signboard
Provision of project Signboard sum
Maintanence sum
Removal sum

H Design & Engineering

Submit detailed design complying with all obligations and liabilities in


regards to the design work in accordance with the Conditions of Contract
and Specifications. All design works shall be approved by the Engineer and
concerned authorities.Including the submission of the following:-
Detailed Design Works sum
Detailed Design of Temporary Works sum
Construction Documents sum

I GENERAL CLEARANCE
General site clearance in accordance to the specifications and drawings sum
prior handover to the Employer

J Signage & lable


Signage & lable sum

J.1 Dismantling Exsiting Units & connections in exsiting site units and prepatre
for installation including all neassesry works
Flow Meter EA
Valves EA
Pipes M
differential pressure meter EA

K Flow Meter System

Installation, testing, commissioning, calibration and other


required tests of Electromagnetic Flow Meter complete with all
accessories including grounding, communication to SWCC and
NWC control centres as per the drawings and specifications.
Installation Flow Meter Works - New DN2400 EA
calibration for flow meter DN2400 EA
Testing & commissioning DN2400 EA
Installation Flow Meter Works - New DN1500 EA
calibration for flow meter DN1500 EA
Testing & commissioning DN1500 EA
Instrumentation work for flow meter EA

K.1 Chambers Work

In-situ concrete; sized as per standard drawings; including heavy duty


lockable cast iron cover and frame, step irons, blinding concrete,
reinforcement and concrete as per drawings and specifications
Chamber CIVIL Works for flow meter including all neassesry works EA
7200x5900x4000

L Isolation Valves Works


L.1 Chambers Work

In-situ concrete; sized as per standard drawings; including heavy duty


lockable cast iron cover and frame, step irons, blinding concrete,
reinforcement and concrete as per drawings and specifications
Chambers CIVIL for isolation valves EA
6200x4900x5000
Chambers CIVIL for isolation valves EA
3400x3800x4000
L.2 Valves Supply & Installation

Supply, installation, testing, and commissioning of valves including all


fittings, couplings and any connection to adjacent network, bolts, nuts,
gaskets, all accessories,SCADA works and equipment, and all required works
as per NWC/SWCC standards and specifications. Installation of the isolation
Butterfly Valves in chambers or open ground, complete with all accessories
as specified in the dtrawings and specifications. Valve size shall match with
the Flow Meter size in the site.
Supply of Isolation Valves DN 1500 EA
Supply of Isolation Valves DN 2400 EA
Supply of valve actuators EA
callibration of Isolation Valves EA
installation of Isolation Valves & actuators EA
Testing & commissioning valves EA
Instrumentation work actuators EA

M Water Quality On-Line Monitoring Equipment

Installation of GRP Kiosk as near as possible to SWCC metering chamber,


including the communication system and assocaited required software and
a programming as per the drawings and specifications. Water Quality Online
Monitoring System shall contain equipment capable of measuring: (i) the
temperature; (ii) the pH value; (iii) the conductivity; (iv) the alkalinity (quasi-
continuously); and (v) the residual chlorine and calculate the TDS.
Moreover, this shall be communicated to a Central SCADA or Monitoring
centre through GSM.
CIVIL Works for Monitoring Room Minimum dimension 1200 x 1300 x 400 EA
(WxHxD);
Supply of kiosk EA
Installation of GRP Kiosk EA

b
Supply and installation of GRP Kiosk as near as possible to NWC metering
chamber. including the manual sampling line and components as per the
drawings and specifications
KIOSK & CIVIL Works for Monitoring Room
Minimum dimension 1200 x 1300 x 400 (WxHxD);
Supply of kiosk
Installation of GRP Kiosk

M.1 Water Quality On-Line Monitoring Equipment


Civil & Installation of Monitoring Equipment EA
Instrumentation work of Monitoring Equipment EA

N Pressure transmitter

installation, testing and commissioning and other required tests of pressure


indicator, complete with all accessories as per the drawings and
specifications
Installation of Pressure transmitter EA
Instrumentation work of Pressure transmitter EA

O Manual Sampling Point


Supply and installation of manual sampling point/drain in chambers ,
complete with all accessories all as per the drawings and specifications
Supply of materials for Sampling Point related Works EA
installation & civil works for Sampling Point related Works EA

P Other Civil Engineering Activities


Design for Civil Works & hydraulic & sterss design, structural designs SUM
collection of water released during the line de-watering process SUM
safe disposal of water released during the line de-watering process SUM
P.1 Pipe Design Works

Work to lay new pipeline complete as per NWC/SWCC and International Standards requirements and as instructed
including: Supply of steel pipes; Excavate; Install by open cut and NDM if needed, instrumentation and control equi
whole pipes lengths; Joint; Tie-In; Protect; Lining; Testing; Bedding & Surrounding; backfilling with selected excavat
off site of surplus excavated material; Disinfection along the running length of pipe in trenches or beneath services
works include all Accessories; Ancillaries; Fittings; Joints; reinstatement, and connection with existing network; and
internal lining where required, SCADA works and equipment. This includes equipment mobilization and demobiliza
site investigations, dewatering, protection of existing services and utilities rerouting /modifications of exisiting utiliti
trench protection, bidding, foot path diversion, minor & major crossing becks & streams, lateral connections, exces
removal off site off rock, removal or control of running water or running sands which affect pipelining, major crossi
motor ways, railways which necessitate other methods of pipe laying other than open cut, coordination with utility
security, traffic diversions management & all signage to suit works location etc. as per the drawings and specificatio
Supply of steel pipes M
Excavation M
Beveling & supports M
Trench preparation M
Sand bedding & Surrounding M
compaction works M
backfilling M
Exsiting finishing reinstatement M
Ancillaries & supports works sum
piping installation Works M
P.2 Supply and installations of pipe fittings

Supply and installations of pipe fittings as per NWC/SWCC and international


standards and as instructed by the Engineer as per the drawings and
specifications (following SWD-Code), such as Double socket reducer, Double
socket sleeve (collar), Flanged spigot with anchor flange, Puddle flange,
Dismantling joint, Double flange pipe.
supply of Double socket reducer EA
supply of Double socket sleeve (collar) EA
supply of Flanged spigot with anchor flange EA
supply of Puddle flange EA
supply of Double flange pipe EA
supply of Dismantling joint EA
P.3 installation of fittings & Joints
installation of Double socket reducer EA
installation of Double socket sleeve (collar) EA
installation of Flanged spigot with anchor flange EA
installation of Puddle flange EA
installation of Double flange pipe EA
installation of Dismantling joint EA
connection with existing network EA

Control systems and data communication works sum


ladders, scaffolding for work sum
Electrical works- general sum
Instrumentation works- general sum
related MEP works sum
Existing Bend

Installation of existing bend from existing network as per the


drawings and specifications, including inspection of the condition sum
to verify the operational condition of the value; recommend the
owner to reuse/replace the value. If reusable, contractor to get
approval from owner

Supply and installation of conduit in trench as per SWCC/NWC and


A international standards;HDPE 50mm diameter;as per the drawings and m
specifications, including :
Incoming power supply conduit;
Instrument cable conduit;
Spare conduit;

Supply and installation of conduit in trench as per SWCC/NCW


B and international standards;HDPE 20mm diameter as per the
drawings and specifications, including:
Sample in m

Supply and installation of conduit in trench as per NWC and


C international standards;HDPE 20mm diameter as per the
drawings and specifications, icluding:
Drain to deep soakaway; m

Supply and installation of cable in HDPE conduit as per


D SWCC/NWC and international standards, including m
splicing/jointing, commissioning & testing, including:
Incoming power supply cable;
Instrument cable;

E Feeder pillar

Supply and installation of feeder pillar; including connection to


main power supply and all associated works, including earthing &
bonding, civils and ancillary works, as per standard specification
and drawings
Supply of feeder pillar EA
installation of feeder pillar EA
main power supply and all associated works EA

F Service Turret
Supply and installation of service turret; including connection to
power supply and all associated works, as per specification and EA
drawings

P.5 Electrical works

supply of cables m
installation of cables m
supply of cables tray m
installation of cables tray m

AC Uninterruptable Power Supply (UPS) EA


Battery Bank EA

Q Access to Site
q.1 Gate with fenceing

Supply, fabrication and erection of fence with gates, including all


required steel members, galvanizing, welding, joints, fittings,
fixing, including gates, all accessories complete as detailed on
Contract drawings and recommended by manufacturer and
approved by the Client.
Gate EA
fenceing sum
Steel structural
Mono pitched to roof shelter
Columns support for shelter

q.2 Site Work


protection of the existing surfaces, sum
road kerbs sum
soft landscaping sum
comply with all security sum
regulations and requirements in operation at the site
temporary access points with existing surfaces, kerbs, soft landscaping sum

R Construction Plant, Tools and Vehicles


Vehicles sum
Tools sum
lifting equipment sum
hoists sum
transport facilities sum
consumables sum

S Temporary Works
temporary detour roads sum
temporary bridges & culverts sum
other facilities for their Works or for maintenance of traffic in locations sum
affected by their Works

T QA/QC , Safty & Documentation works


daily/weekly/monthly progress reports including photographs sum
office related sum
test reports sum
commissioning tests sum

U Utilities for the Works


clean water and fresh water sum
u.1 drainage facility
Soakaway as per NWC Kiosk drawing and specification;
500x500x500 deep soakaway filled with 20mm nominal size wadi ea
gravel wrapped in geotextile fabric (non woven 200gmc/m2)

temporary plumbing receptacles for storage sum


supply of all electrical power and all lighting sum
make provision to store electrical equipment and distribute electrical power sum
on Site.

V Site clearing & waste dispostal sum


Removal off site of surplus excavated material sum

W ADDITIONAL ITEMS
The Tenderer is to detail below any additional items with quantities and
rates not previously included to complete the build up of the Lump Sum
price for this section of the works. Should the tenderer fail to insert any
items here, it will be deemed that his Lump Sum price for the Tender
includes all items and no subsequent claim for any additional item will be
entertained

Marker Post sum


BILL OF QUANTITIES PART NO.
QUANTITY RATE

1
1
1
1
1

1
1
1
1
1

1
1

1
1
1

3
3
3

1
1
1

0
3
150
0

0
0
0
0
0
0
0

0
2

1
2
3
3
3
3
3

1
1
1
1
1

1
1

0
0

1
1
1

andards requirements and as instructed by the Engineer,


eeded, instrumentation and control equipment along the
unding; backfilling with selected excavated material; Removal
h of pipe in trenches or beneath services or across roads. Pipe
nd connection with existing network; and the provision with
equipment mobilization and demobilization, all necessary
rerouting /modifications of exisiting utilities if required,
cks & streams, lateral connections, excessive excavation and
nds which affect pipelining, major crossings includes roads,
r than open cut, coordination with utility suppliers, safety,
n etc. as per the drawings and specifications
150
150
150
150
150
150
150
150
3
150
6
24
12
24
11
12

12
24
12
24
11
12
6

3
3
3
3
3

2350

2350
1
1
1

2350
2350
50
50

3
3

3
3
3
3
3

3
3
3
3
3
3

3
3
3

3
3
3
3

3
3
3

3
3
3
UPGRADE OF CONNECTION POINTS BETWEEN PRODUCTION AND
TRANSMISSION TO MEET THE REQUIREMENTS OF THE SEAWATER BILL OF QUANTITIES
ITEM DESALINATION CODE
ITEM DESCRIPTION UNIT

A GENERAL ITEMS CONTRACTUAL REQUIREMENTS


1 Establishment of office equipment sum
Store for material sum
concrete batching plant sum
Maintanence sum
Removal sum

B SURVEY

Site Survey to investigations and all necessary civil, Hydraulic, mechanical,


1 electrical and ICT works & to check the existing equipment and utilities in lot
the connection point, including location of existing assets, power sources,
communication connections, etc.
2 Geotechnical survey & Investication lot
3 Topographical analysis lot
4 pre-construction and postconstruction lot
condition surveys
5 Assessment and Management of Existing Utilities lot
6 identify, protect or divert/relocate temporarily as necessary including trial lot
pits & divert

Obstacles shall include, but not be limited to existing


7 buildings, walls, fences, gates, wells, septic tanks, manholes, pits, culverts, lot
roadways, pavements, signs and rubbish dumps, whether or not shown on
any drawings provided as part of this Tender process.

C Specified Temporary Works


1 House Keeping for Site sum
2 Cover and barricade open excavations and other hazards including provision sum
& maintenance of warning lamps and signs

D Allow for coordinate with service authorities and obtain all Permits to
Work (landowners & local authorities) sum

E Accommodation and buildings for the Contractor


Establishment (Fixed) sum
Maintanence sum
Removal sum

F Management,Supervision
Establishment (Progress related) sum

G Project Signboard
Provision of project Signboard sum
Maintanence sum
Removal sum

H Design & Engineering

Submit detailed design complying with all obligations and liabilities in


regards to the design work in accordance with the Conditions of Contract
and Specifications. All design works shall be approved by the Engineer and
concerned authorities.Including the submission of the following:-
Detailed Design Works sum
Detailed Design of Temporary Works sum
Construction Documents sum

I GENERAL CLEARANCE
General site clearance in accordance to the specifications and drawings sum
prior handover to the Employer

J Signage & lable


Signage & lable sum

J.1 Dismantling Exsiting Units & connections in exsiting site units and prepatre
for installation including all neassesry works
Flow Meter EA
Valves EA
Pipes M
differential pressure meter EA

K Flow Meter System

Installation, testing, commissioning, calibration and other


required tests of Electromagnetic Flow Meter complete with all
accessories including grounding, communication to SWCC and
NWC control centres as per the drawings and specifications.
Installation Flow Meter Works - New DN1000 EA
calibration for flow meter DN1000 EA
Testing & commissioning DN1000 EA
Instrumentation work for flow meter EA

K.1 Chambers Work

In-situ concrete; sized as per standard drawings; including heavy duty


lockable cast iron cover and frame, step irons, blinding concrete,
reinforcement and concrete as per drawings and specifications
Chamber CIVIL Works for flow meter including all neassesry works EA
3400x3200x4000

L Isolation Valves Works


L.1 Chambers Work
In-situ concrete; sized as per standard drawings; including heavy duty
lockable cast iron cover and frame, step irons, blinding concrete,
reinforcement and concrete as per drawings and specifications
Chambers CIVIL for isolation valves EA
2600x3000x3000
L.2 Valves Supply & Installation

Supply, installation, testing, and commissioning of valves including all


fittings, couplings and any connection to adjacent network, bolts, nuts,
gaskets, all accessories,SCADA works and equipment, and all required works
as per NWC/SWCC standards and specifications. Installation of the isolation
Butterfly Valves in chambers or open ground, complete with all accessories
as specified in the dtrawings and specifications. Valve size shall match with
the Flow Meter size in the site.
Supply of Isolation Valves DN 1000 EA
Supply of valve actuators EA
callibration of Isolation Valves EA
installation of Isolation Valves & actuators EA
Testing & commissioning valves EA
Instrumentation work actuators EA

M Water Quality On-Line Monitoring Equipment

Installation of GRP Kiosk as near as possible to SWCC metering chamber,


including the communication system and assocaited required software and
a programming as per the drawings and specifications. Water Quality Online
Monitoring System shall contain equipment capable of measuring: (i) the
temperature; (ii) the pH value; (iii) the conductivity; (iv) the alkalinity (quasi-
continuously); and (v) the residual chlorine and calculate the TDS.
Moreover, this shall be communicated to a Central SCADA or Monitoring
centre through GSM.
CIVIL Works for Monitoring Room Minimum dimension 1200 x 1300 x 400 EA
(WxHxD);
Supply of kiosk EA
Installation of GRP Kiosk EA

b
Supply and installation of GRP Kiosk as near as possible to NWC metering
chamber. including the manual sampling line and components as per the
drawings and specifications
KIOSK & CIVIL Works for Monitoring Room
Minimum dimension 1200 x 1300 x 400 (WxHxD);
Supply of kiosk
Installation of GRP Kiosk

M.1 Water Quality On-Line Monitoring Equipment


Civil & Installation of Monitoring Equipment EA
Instrumentation work of Monitoring Equipment EA

N Pressure transmitter
installation, testing and commissioning and other required tests of pressure
indicator, complete with all accessories as per the drawings and
specifications
Installation of Pressure transmitter EA
Instrumentation work of Pressure transmitter EA

O Manual Sampling Point


Supply and installation of manual sampling point/drain in chambers ,
complete with all accessories all as per the drawings and specifications
Supply of materials for Sampling Point related Works EA
installation & civil works for Sampling Point related Works EA

P Other Civil Engineering Activities


Design for Civil Works & hydraulic & sterss design, structural designs SUM
collection of water released during the line de-watering process SUM
safe disposal of water released during the line de-watering process SUM
P.1 Pipe Design Works

Work to lay new pipeline complete as per NWC/SWCC and International Standards requirements and as instructed
including: Supply of steel pipes; Excavate; Install by open cut and NDM if needed, instrumentation and control equi
whole pipes lengths; Joint; Tie-In; Protect; Lining; Testing; Bedding & Surrounding; backfilling with selected excavat
off site of surplus excavated material; Disinfection along the running length of pipe in trenches or beneath services
works include all Accessories; Ancillaries; Fittings; Joints; reinstatement, and connection with existing network; and
internal lining where required, SCADA works and equipment. This includes equipment mobilization and demobiliza
site investigations, dewatering, protection of existing services and utilities rerouting /modifications of exisiting utiliti
trench protection, bidding, foot path diversion, minor & major crossing becks & streams, lateral connections, exces
removal off site off rock, removal or control of running water or running sands which affect pipelining, major crossi
motor ways, railways which necessitate other methods of pipe laying other than open cut, coordination with utility
security, traffic diversions management & all signage to suit works location etc. as per the drawings and specificatio
Supply of frp pipes M
Excavation M
Beveling & supports M
Trench preparation M
Sand bedding & Surrounding M
compaction works M
backfilling M
Exsiting finishing reinstatement M
Ancillaries & supports works sum
piping installation Works M
P.2 Supply and installations of pipe fittings

Supply and installations of pipe fittings as per NWC/SWCC and international


standards and as instructed by the Engineer as per the drawings and
specifications (following SWD-Code), such as Double socket reducer, Double
socket sleeve (collar), Flanged spigot with anchor flange, Puddle flange,
Dismantling joint, Double flange pipe.
supply of Double socket reducer EA
supply of Double socket sleeve (collar) EA
supply of Flanged spigot with anchor flange EA
supply of Puddle flange EA
supply of Double flange pipe EA
supply of Dismantling joint EA
P.3 installation of fittings & Joints
installation of Double socket reducer EA
installation of Double socket sleeve (collar) EA
installation of Flanged spigot with anchor flange EA
installation of Puddle flange EA
installation of Double flange pipe EA
installation of Dismantling joint EA
connection with existing network EA

Control systems and data communication works sum


ladders, scaffolding for work sum
Electrical works- general sum
Instrumentation works- general sum
related MEP works sum
Existing Bend

Installation of existing bend from existing network as per the


drawings and specifications, including inspection of the condition sum
to verify the operational condition of the value; recommend the
owner to reuse/replace the value. If reusable, contractor to get
approval from owner

Supply and installation of conduit in trench as per SWCC/NWC and


A international standards;HDPE 50mm diameter;as per the drawings and m
specifications, including :
Incoming power supply conduit;
Instrument cable conduit;
Spare conduit;

Supply and installation of conduit in trench as per SWCC/NCW


B and international standards;HDPE 20mm diameter as per the
drawings and specifications, including:
Sample in m

Supply and installation of conduit in trench as per NWC and


C international standards;HDPE 20mm diameter as per the
drawings and specifications, icluding:
Drain to deep soakaway; m

Supply and installation of cable in HDPE conduit as per


D SWCC/NWC and international standards, including m
splicing/jointing, commissioning & testing, including:
Incoming power supply cable;
Instrument cable;
E Feeder pillar

Supply and installation of feeder pillar; including connection to


main power supply and all associated works, including earthing &
bonding, civils and ancillary works, as per standard specification
and drawings
Supply of feeder pillar EA
installation of feeder pillar EA
main power supply and all associated works m

F Service Turret
Supply and installation of service turret; including connection to
power supply and all associated works, as per specification and EA
drawings

P.5 Electrical works

supply of cables m
installation of cables m
supply of cables tray m
installation of cables tray m

AC Uninterruptable Power Supply (UPS) EA


Battery Bank EA

Q Access to Site
q.1 Gate with fenceing

Supply, fabrication and erection of fence with gates, including all


required steel members, galvanizing, welding, joints, fittings,
fixing, including gates, all accessories complete as detailed on
Contract drawings and recommended by manufacturer and
approved by the Client.
Gate EA
fenceing sum
Steel structural
Mono pitched to roof shelter
Columns support for shelter

q.2 Site Work


protection of the existing surfaces, sum
road kerbs sum
soft landscaping sum
comply with all security sum
regulations and requirements in operation at the site
temporary access points with existing surfaces, kerbs, soft landscaping sum

R Construction Plant, Tools and Vehicles


Vehicles sum
Tools sum
lifting equipment sum
hoists sum
transport facilities sum
consumables sum

S Temporary Works
temporary detour roads sum
temporary bridges & culverts sum
other facilities for their Works or for maintenance of traffic in locations sum
affected by their Works

T QA/QC , Safty & Documentation works


daily/weekly/monthly progress reports including photographs sum
office related sum
test reports sum
commissioning tests sum

U Utilities for the Works sum


clean water and fresh water sum
u.1 drainage facility
Soakaway as per NWC Kiosk drawing and specification;
500x500x500 deep soakaway filled with 20mm nominal size wadi sum
gravel wrapped in geotextile fabric (non woven 200gmc/m2)

temporary plumbing receptacles for storage sum


supply of all electrical power and all lighting sum
make provision to store electrical equipment and distribute electrical power sum
on Site.

V Site clearing & waste dispostal sum


Removal off site of surplus excavated material sum

W ADDITIONAL ITEMS

The Tenderer is to detail below any additional items with quantities and
rates not previously included to complete the build up of the Lump Sum
price for this section of the works. Should the tenderer fail to insert any
items here, it will be deemed that his Lump Sum price for the Tender
includes all items and no subsequent claim for any additional item will be
entertained
sum
Marker Post sum
BILL OF QUANTITIES PART NO.
QUANTITY RATE

1
1
1
1
1

1
1
1
1
1

1
1

1
1
1

1
1
1

1
1
1

2
1
50
0

2
2
2
2

2
2

2
2
2
2
2
2

1
1
1

1
1
1
1

1
1

1
1
1

andards requirements and as instructed by the Engineer,


eeded, instrumentation and control equipment along the
unding; backfilling with selected excavated material; Removal
h of pipe in trenches or beneath services or across roads. Pipe
nd connection with existing network; and the provision with
equipment mobilization and demobilization, all necessary
rerouting /modifications of exisiting utilities if required,
cks & streams, lateral connections, excessive excavation and
nds which affect pipelining, major crossings includes roads,
r than open cut, coordination with utility suppliers, safety,
n etc. as per the drawings and specifications
50
50
50
50
50
50
50
50
1
50

2
8
4
8
4
4

2
8
4
4
4
4
2

1
1
1
1
1

1000

1000
1
1
1000

1000
1000
25
25

1
1

1
1
1
1
1
1
1
1
1
1
1

1
1
1

1
1
1
1

1
1

1
1
1

1
1

1
1
UPGRADE OF CONNECTION POINTS BETWEEN PRODUCTION AND
TRANSMISSION TO MEET THE REQUIREMENTS OF THE SEAWATER BILL OF QUANTITIES
ITEM DESALINATION CODE
ITEM DESCRIPTION UNIT

A GENERAL ITEMS CONTRACTUAL REQUIREMENTS


1 Establishment of office equipment sum
Store for material sum
concrete batching plant sum
Maintanence sum
Removal sum

B SURVEY

Site Survey to investigations and all necessary civil, Hydraulic, mechanical,


1 electrical and ICT works & to check the existing equipment and utilities in lot
the connection point, including location of existing assets, power sources,
communication connections, etc.
2 Geotechnical survey & Investication lot
3 Topographical analysis lot
4 pre-construction and postconstruction lot
condition surveys
5 Assessment and Management of Existing Utilities lot
6 identify, protect or divert/relocate temporarily as necessary including trial lot
pits & divert

Obstacles shall include, but not be limited to existing


7 buildings, walls, fences, gates, wells, septic tanks, manholes, pits, culverts, lot
roadways, pavements, signs and rubbish dumps, whether or not shown on
any drawings provided as part of this Tender process.

C Specified Temporary Works


1 House Keeping for Site sum
2 Cover and barricade open excavations and other hazards including provision sum
& maintenance of warning lamps and signs

D Allow for coordinate with service authorities and obtain all Permits to
Work (landowners & local authorities) sum

E Accommodation and buildings for the Contractor


Establishment (Fixed) sum
Maintanence sum
Removal sum

F Management,Supervision
Establishment (Progress related) sum

G Project Signboard
Provision of project Signboard sum
Maintanence sum
Removal sum

H Design & Engineering

Submit detailed design complying with all obligations and liabilities in


regards to the design work in accordance with the Conditions of Contract
and Specifications. All design works shall be approved by the Engineer and
concerned authorities.Including the submission of the following:-
Detailed Design Works sum
Detailed Design of Temporary Works sum
Construction Documents sum

I GENERAL CLEARANCE
General site clearance in accordance to the specifications and drawings sum
prior handover to the Employer

J Signage & lable


Signage & lable sum

J.1 Dismantling Exsiting Units & connections in exsiting site units and prepatre
for installation including all neassesry works
Flow Meter EA
Valves EA
Pipes M
differential pressure meter EA

K Flow Meter System

Installation, testing, commissioning, calibration and other


required tests of Electromagnetic Flow Meter complete with all
accessories including grounding, communication to SWCC and
NWC control centres as per the drawings and specifications.
Installation Flow Meter Works - New DN1500&DN1200&DN700 EA
calibration for flow meter DN1500&DN1200&DN700 EA
Testing & commissioning DN1500&DN1200&DN700 EA
Instrumentation work for flow meter EA

K.1 Chambers Work

In-situ concrete; sized as per standard drawings; including heavy duty


lockable cast iron cover and frame, step irons, blinding concrete,
reinforcement and concrete as per drawings and specifications
Chamber CIVIL Works for flow meter including all neassesry works EA
4000x3600x4000
Chamber CIVIL Works for flow meter including all neassesry works EA
3600x3300x4000
Chamber CIVIL Works for flow meter including all neassesry works EA
3300x2900x4000
L Isolation Valves Works
L.1 Chambers Work

In-situ concrete; sized as per standard drawings; including heavy duty


lockable cast iron cover and frame, step irons, blinding concrete,
reinforcement and concrete as per drawings and specifications
Chambers CIVIL for isolation valves EA
4500x3500x4000
Chambers CIVIL for isolation valves EA
4000x3000x4000
Chambers CIVIL for isolation valves EA
3500x2800x4000
L.2 Valves Supply & Installation

Supply, installation, testing, and commissioning of valves including all


fittings, couplings and any connection to adjacent network, bolts, nuts,
gaskets, all accessories,SCADA works and equipment, and all required works
as per NWC/SWCC standards and specifications. Installation of the isolation
Butterfly Valves in chambers or open ground, complete with all accessories
as specified in the dtrawings and specifications. Valve size shall match with
the Flow Meter size in the site.
Supply of Isolation Valves DN 1500 & DN 1200 & DN700 EA
Supply of valve actuators EA
callibration of Isolation Valves EA
installation of Isolation Valves & actuators EA
Testing & commissioning valves EA
Instrumentation work actuators EA

M Water Quality On-Line Monitoring Equipment

Installation of GRP Kiosk as near as possible to SWCC metering chamber,


including the communication system and assocaited required software and
a programming as per the drawings and specifications. Water Quality Online
Monitoring System shall contain equipment capable of measuring: (i) the
temperature; (ii) the pH value; (iii) the conductivity; (iv) the alkalinity (quasi-
continuously); and (v) the residual chlorine and calculate the TDS.
Moreover, this shall be communicated to a Central SCADA or Monitoring
centre through GSM.
CIVIL Works for Monitoring Room Minimum dimension 1200 x 1300 x 400 EA
(WxHxD);
Supply of kiosk EA
Installation of GRP Kiosk EA

b
Supply and installation of GRP Kiosk as near as possible to NWC metering
chamber. including the manual sampling line and components as per the
drawings and specifications
KIOSK & CIVIL Works for Monitoring Room
Minimum dimension 1200 x 1300 x 400 (WxHxD);
Supply of kiosk
Installation of GRP Kiosk
M.1 Water Quality On-Line Monitoring Equipment
Civil & Installation of Monitoring Equipment EA
Instrumentation work of Monitoring Equipment EA

N Pressure transmitter

installation, testing and commissioning and other required tests of pressure


indicator, complete with all accessories as per the drawings and
specifications
Installation of Pressure transmitter EA
Instrumentation work of Pressure transmitter EA

O Manual Sampling Point


Supply and installation of manual sampling point/drain in chambers ,
complete with all accessories all as per the drawings and specifications
Supply of materials for Sampling Point related Works EA
installation & civil works for Sampling Point related Works EA

P Other Civil Engineering Activities


Design for Civil Works & hydraulic & sterss design, structural designs SUM
collection of water released during the line de-watering process SUM
safe disposal of water released during the line de-watering process SUM
P.1 Pipe Design Works

Work to lay new pipeline complete as per NWC/SWCC and International Standards requirements and as instructed
including: Supply of steel pipes; Excavate; Install by open cut and NDM if needed, instrumentation and control equi
whole pipes lengths; Joint; Tie-In; Protect; Lining; Testing; Bedding & Surrounding; backfilling with selected excavat
off site of surplus excavated material; Disinfection along the running length of pipe in trenches or beneath services
works include all Accessories; Ancillaries; Fittings; Joints; reinstatement, and connection with existing network; and
internal lining where required, SCADA works and equipment. This includes equipment mobilization and demobiliza
site investigations, dewatering, protection of existing services and utilities rerouting /modifications of exisiting utiliti
trench protection, bidding, foot path diversion, minor & major crossing becks & streams, lateral connections, exces
removal off site off rock, removal or control of running water or running sands which affect pipelining, major crossi
motor ways, railways which necessitate other methods of pipe laying other than open cut, coordination with utility
security, traffic diversions management & all signage to suit works location etc. as per the drawings and specificatio
Supply of steel pipes M
Excavation M
Beveling & supports M
Trench preparation M
Sand bedding & Surrounding M
compaction works M
backfilling M
Exsiting finishing reinstatement M
Ancillaries & supports works SUM
piping installation Works M
P.2 Supply and installations of pipe fittings
Supply and installations of pipe fittings as per NWC/SWCC and international
standards and as instructed by the Engineer as per the drawings and
specifications (following SWD-Code), such as Double socket reducer, Double
socket sleeve (collar), Flanged spigot with anchor flange, Puddle flange,
Dismantling joint, Double flange pipe.
supply of Double socket reducer EA
supply of Double socket sleeve (collar) EA
supply of Flanged spigot with anchor flange EA
supply of Puddle flange EA
supply of Double flange pipe EA
supply of Dismantling joint EA
P.3 installation of fittings & Joints
installation of Double socket reducer EA
installation of Double socket sleeve (collar) EA
installation of Flanged spigot with anchor flange EA
installation of Puddle flange EA
installation of Double flange pipe EA
installation of Dismantling joint EA
connection with existing network EA

Control systems and data communication works sum


ladders, scaffolding for work sum
Electrical works- general sum
Instrumentation works- general sum
related MEP works sum
Existing Bend

Installation of existing bend from existing network as per the


drawings and specifications, including inspection of the condition sum
to verify the operational condition of the value; recommend the
owner to reuse/replace the value. If reusable, contractor to get
approval from owner

Supply and installation of conduit in trench as per SWCC/NWC and


A international standards;HDPE 50mm diameter;as per the drawings and m
specifications, including :
Incoming power supply conduit;
Instrument cable conduit;
Spare conduit;

Supply and installation of conduit in trench as per SWCC/NCW


B and international standards;HDPE 20mm diameter as per the
drawings and specifications, including:
Sample in m

Supply and installation of conduit in trench as per NWC and


C international standards;HDPE 20mm diameter as per the
drawings and specifications, icluding:
Drain to deep soakaway; m

Supply and installation of cable in HDPE conduit as per


D SWCC/NWC and international standards, including m
splicing/jointing, commissioning & testing, including:
Incoming power supply cable;
Instrument cable;

E Feeder pillar

Supply and installation of feeder pillar; including connection to


main power supply and all associated works, including earthing &
bonding, civils and ancillary works, as per standard specification
and drawings
Supply of feeder pillar EA
installation of feeder pillar EA
main power supply and all associated works m

F Service Turret
Supply and installation of service turret; including connection to
power supply and all associated works, as per specification and EA
drawings

P.5 Electrical works

supply of cables m
installation of cables m
supply of cables tray m
installation of cables tray m

AC Uninterruptable Power Supply (UPS) EA


Battery Bank EA

Q Access to Site
q.1 Gate with fenceing

Supply, fabrication and erection of fence with gates, including all


required steel members, galvanizing, welding, joints, fittings,
fixing, including gates, all accessories complete as detailed on
Contract drawings and recommended by manufacturer and
approved by the Client.
Gate EA
fenceing sum
Steel structural
Mono pitched to roof shelter
Columns support for shelter
q.2 Site Work
protection of the existing surfaces, sum
road kerbs sum
soft landscaping sum
comply with all security sum
regulations and requirements in operation at the site
temporary access points with existing surfaces, kerbs, soft landscaping sum

R Construction Plant, Tools and Vehicles


Vehicles sum
Tools sum
lifting equipment sum
hoists sum
transport facilities sum
consumables sum

S Temporary Works
temporary detour roads sum
temporary bridges & culverts sum
other facilities for their Works or for maintenance of traffic in locations sum
affected by their Works

T QA/QC , Safty & Documentation works


daily/weekly/monthly progress reports including photographs sum
office related sum
test reports sum
commissioning tests sum

U Utilities for the Works


clean water and fresh water sum
u.1 drainage facility sum
Soakaway as per NWC Kiosk drawing and specification;
500x500x500 deep soakaway filled with 20mm nominal size wadi sum
gravel wrapped in geotextile fabric (non woven 200gmc/m2)

temporary plumbing receptacles for storage sum


supply of all electrical power and all lighting sum
make provision to store electrical equipment and distribute electrical power sum
on Site.

V Site clearing & waste dispostal sum


Removal off site of surplus excavated material sum

W ADDITIONAL ITEMS
The Tenderer is to detail below any additional items with quantities and
rates not previously included to complete the build up of the Lump Sum
price for this section of the works. Should the tenderer fail to insert any
items here, it will be deemed that his Lump Sum price for the Tender
includes all items and no subsequent claim for any additional item will be
entertained

Marker Post sum


BILL OF QUANTITIES PART NO.
QUANTITY RATE

1
1
1
1
1

1
1
1
1
1

1
1

1
1
1

3
3
3

1
1
1

3
3
150
0

5
5
5
5

2
2

3
3
3
3
3
3

2
2
2
2
2

2
2

2
2

1
2
2

andards requirements and as instructed by the Engineer,


eeded, instrumentation and control equipment along the
unding; backfilling with selected excavated material; Removal
h of pipe in trenches or beneath services or across roads. Pipe
nd connection with existing network; and the provision with
equipment mobilization and demobilization, all necessary
rerouting /modifications of exisiting utilities if required,
cks & streams, lateral connections, excessive excavation and
nds which affect pipelining, major crossings includes roads,
r than open cut, coordination with utility suppliers, safety,
n etc. as per the drawings and specifications
150
150
150
150
150
150
150
150
1
150
6
24
12
24
12
12

6
24
12
24
12
12
6

1
1
1
1
1

4950
4950

2
2
1000

4950
4950
75
75

3
3
3
3
3
3
3

3
3
3
3
3
3

3
3
3

3
3
3
3

3
3

3
3
3

3
3
3
UPGRADE OF CONNECTION POINTS BETWEEN PRODUCTION AND
TRANSMISSION TO MEET THE REQUIREMENTS OF THE SEAWATER BILL OF QUANTITIES
ITEM DESALINATION CODE
ITEM DESCRIPTION UNIT

A GENERAL ITEMS CONTRACTUAL REQUIREMENTS


1 Establishment of office equipment sum
Store for material sum
concrete batching plant sum
Maintanence sum
Removal sum

B SURVEY

Site Survey to investigations and all necessary civil, Hydraulic, mechanical,


1 electrical and ICT works & to check the existing equipment and utilities in lot
the connection point, including location of existing assets, power sources,
communication connections, etc.
2 Geotechnical survey & Investication lot
3 Topographical analysis lot
4 pre-construction and postconstruction lot
condition surveys
5 Assessment and Management of Existing Utilities lot
6 identify, protect or divert/relocate temporarily as necessary including trial lot
pits & divert

Obstacles shall include, but not be limited to existing


7 buildings, walls, fences, gates, wells, septic tanks, manholes, pits, culverts, lot
roadways, pavements, signs and rubbish dumps, whether or not shown on
any drawings provided as part of this Tender process.

C Specified Temporary Works


1 House Keeping for Site sum
2 Cover and barricade open excavations and other hazards including provision sum
& maintenance of warning lamps and signs

D Allow for coordinate with service authorities and obtain all Permits to
Work (landowners & local authorities) sum

E Accommodation and buildings for the Contractor


Establishment (Fixed) sum
Maintanence sum
Removal sum

F Management,Supervision
Establishment (Progress related) sum

G Project Signboard
Provision of project Signboard sum
Maintanence sum
Removal sum

H Design & Engineering

Submit detailed design complying with all obligations and liabilities in


regards to the design work in accordance with the Conditions of Contract
and Specifications. All design works shall be approved by the Engineer and
concerned authorities.Including the submission of the following:-
Detailed Design Works sum
Detailed Design of Temporary Works sum
Construction Documents sum

I GENERAL CLEARANCE
General site clearance in accordance to the specifications and drawings sum
prior handover to the Employer

J Signage & lable


Signage & lable sum

J.1 Dismantling Exsiting Units & connections in exsiting site units and prepatre
for installation including all neassesry works
Flow Meter EA
Valves EA
Pipes M
differential pressure meter EA

K Flow Meter System

Installation, testing, commissioning, calibration and other


required tests of Electromagnetic Flow Meter complete with all
accessories including grounding, communication to SWCC and
NWC control centres as per the drawings and specifications.
Installation Flow Meter Works - New DN2000&DN1800 EA
calibration for flow meter DN2000&DN1800 EA
Testing & commissioning DN2000&DN1800 EA
Instrumentation work for flow meter EA
Installation Flow Meter Works - New DN400& DN1200 EA
calibration for flow meter DN400& DN1200 EA
Testing & commissioning DN400& DN1200 EA
Instrumentation work for flow meter EA

Chamber CIVIL Works for flow meter including all neassesry works EA
7200x5900x5000
Chamber CIVIL Works for flow meter including all neassesry works EA
4200x3900x5000

L Isolation Valves Works


L.1 Chambers Work
In-situ concrete; sized as per standard drawings; including heavy duty
lockable cast iron cover and frame, step irons, blinding concrete,
reinforcement and concrete as per drawings and specifications
Chambers CIVIL for isolation valves EA
5200x3900x5000
Chambers CIVIL for isolation valves EA
4500x3500x5000
Chambers CIVIL for isolation valves EA
4000x3000x5000
L.2 Valves Supply & Installation

Supply, installation, testing, and commissioning of valves including all


fittings, couplings and any connection to adjacent network, bolts, nuts,
gaskets, all accessories,SCADA works and equipment, and all required works
as per NWC/SWCC standards and specifications. Installation of the isolation
Butterfly Valves in chambers or open ground, complete with all accessories
as specified in the dtrawings and specifications. Valve size shall match with
the Flow Meter size in the site.
Supply of Isolation Valves DN 2000 & DN 1800 EA
Supply of Isolation Valves DN 1400 & DN 1200 EA
Supply of valve actuators EA
callibration of Isolation Valves EA
installation of Isolation Valves & actuators EA
Testing & commissioning valves EA
Instrumentation work actuators EA

M Water Quality On-Line Monitoring Equipment

Installation of GRP Kiosk as near as possible to SWCC metering chamber,


including the communication system and assocaited required software and
a programming as per the drawings and specifications. Water Quality Online
Monitoring System shall contain equipment capable of measuring: (i) the
temperature; (ii) the pH value; (iii) the conductivity; (iv) the alkalinity (quasi-
continuously); and (v) the residual chlorine and calculate the TDS.
Moreover, this shall be communicated to a Central SCADA or Monitoring
centre through GSM.
CIVIL Works for Monitoring Room Minimum dimension 1200 x 1300 x 400 EA
(WxHxD);
Supply of kiosk EA
Installation of GRP Kiosk EA

b
Supply and installation of GRP Kiosk as near as possible to NWC metering
chamber. including the manual sampling line and components as per the
drawings and specifications
KIOSK & CIVIL Works for Monitoring Room
Minimum dimension 1200 x 1300 x 400 (WxHxD);
Supply of kiosk
Installation of GRP Kiosk
M.1 Water Quality On-Line Monitoring Equipment
Civil & Installation of Monitoring Equipment EA
Instrumentation work of Monitoring Equipment EA

N Pressure transmitter

installation, testing and commissioning and other required tests of pressure


indicator, complete with all accessories as per the drawings and
specifications
Installation of Pressure transmitter EA
Instrumentation work of Pressure transmitter EA

O Manual Sampling Point


Supply and installation of manual sampling point/drain in chambers ,
complete with all accessories all as per the drawings and specifications
Supply of materials for Sampling Point related Works EA
installation & civil works for Sampling Point related Works EA

P Other Civil Engineering Activities


Design for Civil Works & hydraulic & sterss design, structural designs SUM
collection of water released during the line de-watering process SUM
safe disposal of water released during the line de-watering process SUM
P.1 Pipe Design Works

Work to lay new pipeline complete as per NWC/SWCC and International Standards requirements and as instructed
including: Supply of steel pipes; Excavate; Install by open cut and NDM if needed, instrumentation and control equi
whole pipes lengths; Joint; Tie-In; Protect; Lining; Testing; Bedding & Surrounding; backfilling with selected excavat
off site of surplus excavated material; Disinfection along the running length of pipe in trenches or beneath services
works include all Accessories; Ancillaries; Fittings; Joints; reinstatement, and connection with existing network; and
internal lining where required, SCADA works and equipment. This includes equipment mobilization and demobiliza
site investigations, dewatering, protection of existing services and utilities rerouting /modifications of exisiting utiliti
trench protection, bidding, foot path diversion, minor & major crossing becks & streams, lateral connections, exces
removal off site off rock, removal or control of running water or running sands which affect pipelining, major crossi
motor ways, railways which necessitate other methods of pipe laying other than open cut, coordination with utility
security, traffic diversions management & all signage to suit works location etc. as per the drawings and specificatio
Supply of steel pipes M
Excavation M
Beveling & supports M
Trench preparation M
Sand bedding & Surrounding M
compaction works M
backfilling M
Exsiting finishing reinstatement M
Ancillaries & supports works sum
piping installation Works M
P.2 Supply and installations of pipe fittings
Supply and installations of pipe fittings as per NWC/SWCC and international
standards and as instructed by the Engineer as per the drawings and
specifications (following SWD-Code), such as Double socket reducer, Double
socket sleeve (collar), Flanged spigot with anchor flange, Puddle flange,
Dismantling joint, Double flange pipe.
supply of Double socket reducer EA
supply of Double socket sleeve (collar) EA
supply of Flanged spigot with anchor flange EA
supply of Puddle flange EA
supply of Double flange pipe EA
supply of Dismantling joint EA
P.3 installation of fittings & Joints
installation of Double socket reducer EA
installation of Double socket sleeve (collar) EA
installation of Flanged spigot with anchor flange EA
installation of Puddle flange EA
installation of Double flange pipe EA
installation of Dismantling joint EA
connection with existing network EA

Control systems and data communication works sum


ladders, scaffolding for work sum
Electrical works- general sum
Instrumentation works- general sum
related MEP works sum
Existing Bend

Installation of existing bend from existing network as per the


drawings and specifications, including inspection of the condition sum
to verify the operational condition of the value; recommend the
owner to reuse/replace the value. If reusable, contractor to get
approval from owner

Supply and installation of conduit in trench as per SWCC/NWC and


A international standards;HDPE 50mm diameter;as per the drawings and m
specifications, including :
Incoming power supply conduit;
Instrument cable conduit;
Spare conduit;

Supply and installation of conduit in trench as per SWCC/NCW


B and international standards;HDPE 20mm diameter as per the
drawings and specifications, including:
Sample in m

Supply and installation of conduit in trench as per NWC and


C international standards;HDPE 20mm diameter as per the
drawings and specifications, icluding:
Drain to deep soakaway; m

Supply and installation of cable in HDPE conduit as per


D SWCC/NWC and international standards, including m
splicing/jointing, commissioning & testing, including:
Incoming power supply cable;
Instrument cable;

E Feeder pillar

Supply and installation of feeder pillar; including connection to


main power supply and all associated works, including earthing &
bonding, civils and ancillary works, as per standard specification
and drawings
Supply of feeder pillar EA
installation of feeder pillar EA
main power supply and all associated works m

F Service Turret
Supply and installation of service turret; including connection to
power supply and all associated works, as per specification and EA
drawings

P.5 Electrical works

supply of cables m
installation of cables m
supply of cables tray m
installation of cables tray m

AC Uninterruptable Power Supply (UPS) EA


Battery Bank EA

Q Access to Site
q.1 Gate with fenceing

Supply, fabrication and erection of fence with gates, including all


required steel members, galvanizing, welding, joints, fittings,
fixing, including gates, all accessories complete as detailed on
Contract drawings and recommended by manufacturer and
approved by the Client.
Gate EA
fenceing sum
Steel structural
Mono pitched to roof shelter
Columns support for shelter
q.2 Site Work sum
protection of the existing surfaces, sum
road kerbs sum
soft landscaping sum
comply with all security sum
regulations and requirements in operation at the site
temporary access points with existing surfaces, kerbs, soft landscaping sum

R Construction Plant, Tools and Vehicles


Vehicles sum
Tools sum
lifting equipment sum
hoists sum
transport facilities sum
consumables sum

S Temporary Works
temporary detour roads sum
temporary bridges & culverts sum
other facilities for their Works or for maintenance of traffic in locations sum
affected by their Works

T QA/QC , Safty & Documentation works


daily/weekly/monthly progress reports including photographs sum
office related sum
test reports sum
commissioning tests sum

U Utilities for the Works


clean water and fresh water sum
u.1 drainage facility sum
Soakaway as per NWC Kiosk drawing and specification;
500x500x500 deep soakaway filled with 20mm nominal size wadi sum
gravel wrapped in geotextile fabric (non woven 200gmc/m2)

temporary plumbing receptacles for storage sum


supply of all electrical power and all lighting sum
make provision to store electrical equipment and distribute electrical power sum
on Site.

V Site clearing & waste dispostal sum


Removal off site of surplus excavated material sum

W ADDITIONAL ITEMS
The Tenderer is to detail below any additional items with quantities and
rates not previously included to complete the build up of the Lump Sum
price for this section of the works. Should the tenderer fail to insert any
items here, it will be deemed that his Lump Sum price for the Tender
includes all items and no subsequent claim for any additional item will be
entertained
sum
Marker Post sum
BILL OF QUANTITIES PART NO.
QUANTITY RATE

1
1
1
1
1

1
1
1
1
1

1
1

1
1
1

6
6
6

1
1
1

12
14
450
2

10
10
10
10
8
8
8
8

10

8
10

10
8
18
18
18
18
18

9
9
9
9
9

9
9

9
9

1
9
9

andards requirements and as instructed by the Engineer,


eeded, instrumentation and control equipment along the
unding; backfilling with selected excavated material; Removal
h of pipe in trenches or beneath services or across roads. Pipe
nd connection with existing network; and the provision with
equipment mobilization and demobilization, all necessary
rerouting /modifications of exisiting utilities if required,
cks & streams, lateral connections, excessive excavation and
nds which affect pipelining, major crossings includes roads,
r than open cut, coordination with utility suppliers, safety,
n etc. as per the drawings and specifications
450
450
450
450
450
450
450
450
6
450
18
72
36
72
36
36

18
72
36
72
36
36
18

9
9
9
9
9

4725
4725

9
9
3200

4725
4725
225
225

6
6
6
6
6
6
6
6

6
6
6
6
6
6

6
6
6

6
6
6
6

6
6

6
6
6

6
6
6
6
UPGRADE OF CONNECTION POINTS BETWEEN PRODUCTION AND
TRANSMISSION TO MEET THE REQUIREMENTS OF THE SEAWATER BILL OF QUANTITIES
ITEM DESALINATION CODE
ITEM DESCRIPTION UNIT

A GENERAL ITEMS CONTRACTUAL REQUIREMENTS


1 Establishment of office equipment sum
Store for material sum
concrete batching plant sum
Maintanence sum
Removal sum

B SURVEY

Site Survey to investigations and all necessary civil, Hydraulic, mechanical,


1 electrical and ICT works & to check the existing equipment and utilities in lot
the connection point, including location of existing assets, power sources,
communication connections, etc.
2 Geotechnical survey & Investication lot
3 Topographical analysis lot
4 pre-construction and postconstruction lot
condition surveys
5 Assessment and Management of Existing Utilities lot
6 identify, protect or divert/relocate temporarily as necessary including trial lot
pits & divert

Obstacles shall include, but not be limited to existing


7 buildings, walls, fences, gates, wells, septic tanks, manholes, pits, culverts, lot
roadways, pavements, signs and rubbish dumps, whether or not shown on
any drawings provided as part of this Tender process.

C Specified Temporary Works


1 House Keeping for Site sum
2 Cover and barricade open excavations and other hazards including provision sum
& maintenance of warning lamps and signs

D Allow for coordinate with service authorities and obtain all Permits to
Work (landowners & local authorities) sum

E Accommodation and buildings for the Contractor


Establishment (Fixed) sum
Maintanence sum
Removal sum

F Management,Supervision
Establishment (Progress related) sum

G Project Signboard
Provision of project Signboard sum
Maintanence sum
Removal sum

H Design & Engineering

Submit detailed design complying with all obligations and liabilities in


regards to the design work in accordance with the Conditions of Contract
and Specifications. All design works shall be approved by the Engineer and
concerned authorities.Including the submission of the following:-
Detailed Design Works sum
Detailed Design of Temporary Works sum
Construction Documents sum

I GENERAL CLEARANCE
General site clearance in accordance to the specifications and drawings sum
prior handover to the Employer

J Signage & lable


Signage & lable sum

J.1 Dismantling Exsiting Units & connections in exsiting site units and prepatre
for installation including all neassesry works
Flow Meter EA
Valves EA
Pipes M
differential pressure meter EA

K Flow Meter System

Installation, testing, commissioning, calibration and other


required tests of Electromagnetic Flow Meter complete with all
accessories including grounding, communication to SWCC and
NWC control centres as per the drawings and specifications.
Installation Flow Meter Works - New DN1000 & DN800 EA
calibration for flow meter DN1000& DN800 EA
Testing & commissioning DN1000& DN800 EA
Instrumentation work for flow meter EA

K.1 Chambers Work

In-situ concrete; sized as per standard drawings; including heavy duty


lockable cast iron cover and frame, step irons, blinding concrete,
reinforcement and concrete as per drawings and specifications
Chamber CIVIL Works for flow meter including all neassesry works EA
3400x3200x4000

L Isolation Valves Works


L.1 Chambers Work
In-situ concrete; sized as per standard drawings; including heavy duty
lockable cast iron cover and frame, step irons, blinding concrete,
reinforcement and concrete as per drawings and specifications
Chambers CIVIL for isolation valves EA
2600x3000x3000
L.2 Valves Supply & Installation

Supply, installation, testing, and commissioning of valves including all


fittings, couplings and any connection to adjacent network, bolts, nuts,
gaskets, all accessories,SCADA works and equipment, and all required works
as per NWC/SWCC standards and specifications. Installation of the isolation
Butterfly Valves in chambers or open ground, complete with all accessories
as specified in the dtrawings and specifications. Valve size shall match with
the Flow Meter size in the site.
Supply of Isolation Valves DN 1800 EA
Supply of Isolation Valves DN 1000& DN800 &DN450 EA
Supply of valve actuators EA
callibration of Isolation Valves EA
installation of Isolation Valves & actuators EA
Testing & commissioning valves EA
Instrumentation work actuators EA

M Water Quality On-Line Monitoring Equipment

Installation of GRP Kiosk as near as possible to SWCC metering chamber,


including the communication system and assocaited required software and
a programming as per the drawings and specifications. Water Quality Online
Monitoring System shall contain equipment capable of measuring: (i) the
temperature; (ii) the pH value; (iii) the conductivity; (iv) the alkalinity (quasi-
continuously); and (v) the residual chlorine and calculate the TDS.
Moreover, this shall be communicated to a Central SCADA or Monitoring
centre through GSM.
CIVIL Works for Monitoring Room Minimum dimension 1200 x 1300 x 400 EA
(WxHxD);
Supply of kiosk EA
Installation of GRP Kiosk EA

b
Supply and installation of GRP Kiosk as near as possible to NWC metering
chamber. including the manual sampling line and components as per the
drawings and specifications
KIOSK & CIVIL Works for Monitoring Room
Minimum dimension 1200 x 1300 x 400 (WxHxD);
Supply of kiosk
Installation of GRP Kiosk

M.1 Water Quality On-Line Monitoring Equipment


Civil & Installation of Monitoring Equipment EA
Instrumentation work of Monitoring Equipment EA
N Pressure transmitter

installation, testing and commissioning and other required tests of pressure


indicator, complete with all accessories as per the drawings and
specifications
Installation of Pressure transmitter EA
Instrumentation work of Pressure transmitter EA

O Manual Sampling Point


Supply and installation of manual sampling point/drain in chambers ,
complete with all accessories all as per the drawings and specifications
Supply of materials for Sampling Point related Works EA
installation & civil works for Sampling Point related Works EA

P Other Civil Engineering Activities


Design for Civil Works & hydraulic & sterss design, structural designs SUM
collection of water released during the line de-watering process SUM
safe disposal of water released during the line de-watering process SUM
P.1 Pipe Design Works

Work to lay new pipeline complete as per NWC/SWCC and International Standards requirements and as instructed
including: Supply of steel pipes; Excavate; Install by open cut and NDM if needed, instrumentation and control equi
whole pipes lengths; Joint; Tie-In; Protect; Lining; Testing; Bedding & Surrounding; backfilling with selected excavat
off site of surplus excavated material; Disinfection along the running length of pipe in trenches or beneath services
works include all Accessories; Ancillaries; Fittings; Joints; reinstatement, and connection with existing network; and
internal lining where required, SCADA works and equipment. This includes equipment mobilization and demobiliza
site investigations, dewatering, protection of existing services and utilities rerouting /modifications of exisiting utiliti
trench protection, bidding, foot path diversion, minor & major crossing becks & streams, lateral connections, exces
removal off site off rock, removal or control of running water or running sands which affect pipelining, major crossi
motor ways, railways which necessitate other methods of pipe laying other than open cut, coordination with utility
security, traffic diversions management & all signage to suit works location etc. as per the drawings and specificatio
Supply of steel pipes M
Excavation M
Beveling & supports M
Trench preparation M
Sand bedding & Surrounding M
compaction works M
backfilling M
Exsiting finishing reinstatement M
Ancillaries & supports works SUM
piping installation Works M
P.2 Supply and installations of pipe fittings

Supply and installations of pipe fittings as per NWC/SWCC and international


standards and as instructed by the Engineer as per the drawings and
specifications (following SWD-Code), such as Double socket reducer, Double
socket sleeve (collar), Flanged spigot with anchor flange, Puddle flange,
Dismantling joint, Double flange pipe.
supply of Double socket reducer EA
supply of Double socket sleeve (collar) EA
supply of Flanged spigot with anchor flange EA
supply of Puddle flange EA
supply of Double flange pipe EA
supply of Dismantling joint EA
P.3 installation of fittings & Joints
installation of Double socket reducer EA
installation of Double socket sleeve (collar) EA
installation of Flanged spigot with anchor flange EA
installation of Puddle flange EA
installation of Double flange pipe EA
installation of Dismantling joint EA
connection with existing network EA

Control systems and data communication works sum


ladders, scaffolding for work sum
Electrical works- general sum
Instrumentation works- general sum
related MEP works sum
Existing Bend

Installation of existing bend from existing network as per the


drawings and specifications, including inspection of the condition sum
to verify the operational condition of the value; recommend the
owner to reuse/replace the value. If reusable, contractor to get
approval from owner

Supply and installation of conduit in trench as per SWCC/NWC and


A international standards;HDPE 50mm diameter;as per the drawings and m
specifications, including :
Incoming power supply conduit;
Instrument cable conduit;
Spare conduit;

Supply and installation of conduit in trench as per SWCC/NCW


B and international standards;HDPE 20mm diameter as per the
drawings and specifications, including:
Sample in m

Supply and installation of conduit in trench as per NWC and


C international standards;HDPE 20mm diameter as per the
drawings and specifications, icluding:
Drain to deep soakaway; m

Supply and installation of cable in HDPE conduit as per


D SWCC/NWC and international standards, including m
splicing/jointing, commissioning & testing, including:
Incoming power supply cable;
Instrument cable;
E Feeder pillar

Supply and installation of feeder pillar; including connection to


main power supply and all associated works, including earthing &
bonding, civils and ancillary works, as per standard specification
and drawings
Supply of feeder pillar EA
installation of feeder pillar EA
main power supply and all associated works m

F Service Turret
Supply and installation of service turret; including connection to
power supply and all associated works, as per specification and EA
drawings

P.5 Electrical works

supply of cables m
installation of cables m
supply of cables tray m
installation of cables tray m

AC Uninterruptable Power Supply (UPS) EA


Battery Bank EA

Q Access to Site
q.1 Gate with fenceing

Supply, fabrication and erection of fence with gates, including all


required steel members, galvanizing, welding, joints, fittings,
fixing, including gates, all accessories complete as detailed on
Contract drawings and recommended by manufacturer and
approved by the Client.
Gate EA
fenceing sum
Steel structural
Mono pitched to roof shelter
Columns support for shelter

q.2 Site Work


protection of the existing surfaces, sum
road kerbs sum
soft landscaping sum
comply with all security sum
regulations and requirements in operation at the site
temporary access points with existing surfaces, kerbs, soft landscaping sum
R Construction Plant, Tools and Vehicles
Vehicles sum
Tools sum
lifting equipment sum
hoists sum
transport facilities sum
consumables sum

S Temporary Works
temporary detour roads sum
temporary bridges & culverts sum
other facilities for their Works or for maintenance of traffic in locations sum
affected by their Works

T QA/QC , Safty & Documentation works


daily/weekly/monthly progress reports including photographs sum
office related sum
test reports sum
commissioning tests sum

U Utilities for the Works


clean water and fresh water sum
u.1 drainage facility
Soakaway as per NWC Kiosk drawing and specification;
500x500x500 deep soakaway filled with 20mm nominal size wadi sum
gravel wrapped in geotextile fabric (non woven 200gmc/m2)

temporary plumbing receptacles for storage sum


supply of all electrical power and all lighting sum
make provision to store electrical equipment and distribute electrical power sum
on Site.

V Site clearing & waste dispostal sum


Removal off site of surplus excavated material sum

W ADDITIONAL ITEMS

The Tenderer is to detail below any additional items with quantities and
rates not previously included to complete the build up of the Lump Sum
price for this section of the works. Should the tenderer fail to insert any
items here, it will be deemed that his Lump Sum price for the Tender
includes all items and no subsequent claim for any additional item will be
entertained
sum
Marker Post sum
BILL OF QUANTITIES PART NO.
QUANTITY RATE

1
1
1
1
1

1
1
1
1
1

1
1

1
1
1

4
4
4

1
1
1

2
1
200
0

4
4
4
4

4
7

2
5
7
7
7
7
7

3
3
3

3
3
3
3

3
3

1
4
4

andards requirements and as instructed by the Engineer,


eeded, instrumentation and control equipment along the
unding; backfilling with selected excavated material; Removal
h of pipe in trenches or beneath services or across roads. Pipe
nd connection with existing network; and the provision with
equipment mobilization and demobilization, all necessary
rerouting /modifications of exisiting utilities if required,
cks & streams, lateral connections, excessive excavation and
nds which affect pipelining, major crossings includes roads,
r than open cut, coordination with utility suppliers, safety,
n etc. as per the drawings and specifications
200
200
200
200
200
200
200
200
1
200

8
32
16
32
16
16

8
32
16
32
16
16
8

4
4
4
4
4

9150

9150
4
4
4

9150
9150
100
3000

4
4

4
4
4
4
4
4
4
4
4
4
4

4
4
4

4
4
4
4

4
4
4

4
4

4
4
1. As per your below Email, Line Monitoring Equipment is Supply by ABB – The GRP Kiosk included or NOT or Kiosk not requ
( please provide Monitoring Equipment basic information’s and details like overall Dimensions, fixing Methods..
2. In APPENDIX 2 ( CONNECTION POINT SUMMARY DATA ) - Some Valves and flow meter are Mentioned as Reuse –  please
3. Please provide specifications for Isolation valves and SWCC standard Documents (APPENDIX 3 – not receive from ABB)
4. ABB supply Flow meters with calibration or without ( with only Factory calibration certificate )
5. Fences & gates are required or not for existing connection points.
6. ABB supply Monitoring system with UPS SYSTEM or without
7. Supply of pipe length & fittings qty not mentioned (please provide drawings if available apart from SWCC standard drawi
8. We presume in instrumentation works, contractor scope only manpower, Erection of equipment’s, cabling works please
9. Pipes & fittings & Isolation valves  have any restrictions like specific country of origin.
Butterfly Valves with Actuator with Chamber
1. Maximum barometri Pressure = 1030mbar
2. Flange Rating = Class 300
3. Butterfly valve with actuator
4. Design Temperature - 60°C
5. Maximum Metal temperature in the sun - 85°C

Al Khobar Jubail Ras al Khair Khafji

Description

DN 2400 4 2
DN2000
DN1800
DN1500 2 2
DN1400
DN1300 4
DN1200
DN1000 1 2
DN900
DN800
DN700
DN450
Actuator with Chamber

Shuqaiq Shoaiba Yanbu

Total Qty UOM

EA
6 EA
4 4 EA
6 2 8 EA
1 5 EA
4 4 EA
4 EA
4 4 EA
2 5 EA
1 1 EA
2 2 EA
1 1 EA
1 1 EA
Flow Meter Chamber

Al Jubail Ras al Khafji Shuqaiq Shoaiba Yanbu


Khobar Khair
Descrip Total UOM
tion Qty

EA
DN 2400 4 4 EA
DN2000 4 4 EA
DN1800 6 6 EA
DN1500 4 2 1 7 EA
DN1400 4 4 EA
DN1300 3 3 EA
DN1200 2 4 6 EA
DN1000 2 2 4 EA
DN900 0 EA
DN800 2 2 EA
DN700 2 2 EA
DN450 0 EA
Fittings
1. Maximum barometri Pressure = 1030mbar
2. Flange Rating = Class 300
3. CS Material
4. Design Temperature - 60°C
5. Maximum Metal temperature in the sun - 85°C

Description Al Khobar Jubail Ras al Khair Khafji


Double socket reducer
DN2400 4 4
DN2000
DN1500 4 2
DN1800
DN1400
DN1300 4
DN1200
DN1000 2 2
DN1000 to DN700
DN800
DN450

Drain
DN2400 2 2
DN2000
DN1500 2 1
DN1800
DN1400
DN1300 2
DN1200
DN1000 1 1
DN700
DN800
DN450

Flange
DN2400 24 24
DN2000
DN1500 24 12
DN1800
DN1400
DN1300 24
DN1200
DN1000 12 12
DN700
DN800
DN450

Double Side Flange Pipe


DN2400 10 10
DN2000
DN1500 10 5
DN1800
DN1400
DN1300 10
DN1200
DN1000 5 5
DN700
DN800
DN450

Coller
DN2400 16 16
DN2000
DN1500 16 8
DN1800
DN1400
DN1300 16
DN1200
DN1000 8 8
DN700
DN800
DN450

Anger flange
DN2400 16 16
DN2000
DN1500 16 8
DN1800
DN1400
DN1300 16
DN1200
DN1000 8 8
DN700
DN800
DN450

Dismantling Joint
DN2400 8 8
DN2000
DN1500 8 4
DN1800
DN1400
DN1300 8
DN1200
DN1000 4 4
DN700
DN800
DN450

Sampling point
DN2400 2 2
DN2000
DN1500 2 1
DN1800
DN1400
DN1300 2
DN1200
DN1000 1 1
DN700
DN800
DN450
ttings
sure = 1030mbar Pipe Material
lass 300 DN800- CS
al DN1800 - RFP
ure - 60°C DN450 - FRP
re in the sun - 85°C DN1000 - UN

Shuqaiq Shoaiba Yanbu Total Qty UOM

8 EA
4 4 EA
2 8 EA
2 2 EA
4 4 EA
4 EA
2 4 6 EA
4 EA
2 2 4 EA
2 2 EA
2 2 EA

4 EA
2 2 EA
1 4 EA
1 1 EA
2 2 EA
2 EA
1 2 3 EA
2 EA
1 1 2 EA
1 1 EA
1 1 EA

48 EA
24 24 EA
12 48 EA
12 12 EA
24 24 EA
24 EA
12 24 36 EA
24 EA
12 12 24 EA
12 12 EA
12 12 EA

20 EA
10 10 EA
5 20 EA
5 5 EA
10 10 EA
10 EA
5 10 15 EA
10 EA
5 5 10 EA
5 5 EA
5 5 EA

32 EA
16 16 EA
8 32 EA
8 8 EA
16 16 EA
16 EA
8 16 24 EA
16 EA
8 8 16 EA
8 8 EA
8 8 EA

32 EA
16 16 EA
8 32 EA
8 8 EA
16 16 EA
16 EA
8 16 24 EA
16 EA
8 8 16 EA
8 8 EA
8 8 EA
16 EA
8 8 EA
4 16 EA
4 4 EA
8 8 EA
8 EA
4 8 12 EA
8 EA
4 4 8 EA
4 4 EA
4 4 EA

4 EA
2 2 EA
1 4 EA
1 1 EA
2 2 EA
2 EA
1 2 3 EA
2 EA
1 1 2 EA
1 1 EA
1 1 EA

984 EA
Pipe
1. Maximum barometri Pressure = 1030mbar
2. Flange Rating = Class 300
3. CS Material
4. Design Temperature - 60°C
5. Maximum Metal temperature in the sun - 85°C

Description Al Khobar Jubail Ras al Khair Khafji


DN2400 100 100
DN2000
DN1500 100 50
DN1800
DN1400
DN1300 100
DN1200
DN1000 50 50
DN700
DN800
DN450
Pipe

Shuqaiq Shoaiba Yanbu Total Qty UOM


200 m
100 100 m
50 200 m
50 50 m
100 100 m
100 m
50 100 150 m
100 m
50 50 100 m
50 50 m
50 50 m