B SURVEY
D Allow for coordinate with service authorities and obtain all Permits to
Work (landowners & local authorities) sum
F Management,Supervision
Establishment (Progress related) sum
G Project Signboard
Provision of project Signboard sum
Maintanence sum
Removal sum
I GENERAL CLEARANCE
General site clearance in accordance to the specifications and drawings sum
prior handover to the Employer
J.1 Dismantling Exsiting Units & connections in exsiting site units and prepatre
for installation including all neassesry works
Flow Meter EA
Valves EA
Pipes M
differential pressure meter EA
b
Supply and installation of GRP Kiosk as near as possible to NWC metering
chamber. including the manual sampling line and components as per the
drawings and specifications
KIOSK & CIVIL Works for Monitoring Room
Minimum dimension 1200 x 1300 x 400 (WxHxD);
Supply of kiosk
Installation of GRP Kiosk
Work to lay new pipeline complete as per NWC/SWCC and International Standards requirements and as instructed
including: Supply of steel pipes; Excavate; Install by open cut and NDM if needed, instrumentation and control equi
whole pipes lengths; Joint; Tie-In; Protect; Lining; Testing; Bedding & Surrounding; backfilling with selected excavat
off site of surplus excavated material; Disinfection along the running length of pipe in trenches or beneath services
works include all Accessories; Ancillaries; Fittings; Joints; reinstatement, and connection with existing network; and
internal lining where required, SCADA works and equipment. This includes equipment mobilization and demobiliza
site investigations, dewatering, protection of existing services and utilities rerouting /modifications of exisiting utiliti
trench protection, bidding, foot path diversion, minor & major crossing becks & streams, lateral connections, exces
removal off site off rock, removal or control of running water or running sands which affect pipelining, major crossi
motor ways, railways which necessitate other methods of pipe laying other than open cut, coordination with utility
security, traffic diversions management & all signage to suit works location etc. as per the drawings and specificatio
Supply of steel pipes
DN1500 M
DN1300 M
Excavation M
Beveling & supports M
Trench preparation M
Sand bedding & Surrounding M
compaction works- 5 times M
backfilling M
Exsiting finishing reinstatement M
Ancillaries & supports works SUM
piping installation Works M
P.2 Supply and installations of pipe fittings
E Feeder pillar
F Service Turret
Supply and installation of service turret; including connection to
power supply and all associated works, as per specification and EA
drawings
supply of cables m
installation of cables m
supply of cables tray m
installation of cables tray m
Q Access to Site
q.1 Gate with fenceing
S Temporary Works
temporary detour roads sum
temporary bridges & culverts sum
other facilities for their Works or for maintenance of traffic in locations sum
affected by their Works
W ADDITIONAL ITEMS
The Tenderer is to detail below any additional items with quantities and
rates not previously included to complete the build up of the Lump Sum
price for this section of the works. Should the tenderer fail to insert any
items here, it will be deemed that his Lump Sum price for the Tender
includes all items and no subsequent claim for any additional item will be
entertained
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
4
4
4
1
1
1
4
4
200
2
7
7
7
7
7
6
2
4
6
6
6
6
6
4
4
4
4
4
4
4
4
4
1
4
4
100
100
200
200
200
200
200
200
200
1
200
8
32
16
32
16
16
8
32
16
32
16
16
8
4
4
4
4
4
3000
3000
4
4
700
3000
3000
50
50
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
1
4
4
4
4
4
4
4
4
UPGRADE OF CONNECTION POINTS BETWEEN PRODUCTION AND
TRANSMISSION TO MEET THE REQUIREMENTS OF THE SEAWATER BILL OF QUANTITIES
ITEM DESALINATION CODE
ITEM DESCRIPTION UNIT
B SURVEY
D Allow for coordinate with service authorities and obtain all Permits to
Work (landowners & local authorities) sum
F Management,Supervision
Establishment (Progress related) sum
G Project Signboard
Provision of project Signboard sum
Maintanence sum
Removal sum
I GENERAL CLEARANCE
General site clearance in accordance to the specifications and drawings sum
prior handover to the Employer
J.1 Dismantling Exsiting Units & connections in exsiting site units and prepatre
for installation including all neassesry works
Flow Meter EA
Valves EA
Pipes M
differential pressure meter EA
b
Supply and installation of GRP Kiosk as near as possible to NWC metering
chamber. including the manual sampling line and components as per the
drawings and specifications
KIOSK & CIVIL Works for Monitoring Room
Minimum dimension 1200 x 1300 x 400 (WxHxD);
Supply of kiosk
Installation of GRP Kiosk
M.1 Water Quality On-Line Monitoring Equipment
Civil & Installation of Monitoring Equipment EA
Instrumentation work of Monitoring Equipment EA
N Pressure transmitter
Work to lay new pipeline complete as per NWC/SWCC and International Standards requirements and as instructed
including: Supply of steel pipes; Excavate; Install by open cut and NDM if needed, instrumentation and control equi
whole pipes lengths; Joint; Tie-In; Protect; Lining; Testing; Bedding & Surrounding; backfilling with selected excavat
Removal off site of surplus excavated material; Disinfection along the running length of pipe in trenches or beneath
roads. Pipe works include all Accessories; Ancillaries; Fittings; Joints; reinstatement, and connection with existing n
provision with internal lining where required, SCADA works and equipment. This includes equipment mobilization a
all necessary site investigations, dewatering, protection of existing services and utilities rerouting /modifications of
required, trench protection, bidding, foot path diversion, minor & major crossing becks & streams, lateral connectio
excavation and removal off site off rock, removal or control of running water or running sands which affect pipelini
includes roads, motor ways, railways which necessitate other methods of pipe laying other than open cut, coordina
suppliers, safety, security, traffic diversions management & all signage to suit works location etc. as per the drawing
specifications
Supply of steel pipes M
Excavation M
Beveling & supports M
Trench preparation M
Sand bedding & Surrounding M
compaction works M
backfilling M
Exsiting finishing reinstatement M
Ancillaries & supports works sum
piping installation Works M
P.2 Supply and installations of pipe fittings
Supply and installations of pipe fittings as per NWC/SWCC and international
standards and as instructed by the Engineer as per the drawings and
specifications (following SWD-Code), such as Double socket reducer, Double
socket sleeve (collar), Flanged spigot with anchor flange, Puddle flange,
Dismantling joint, Double flange pipe.
supply of Double socket reducer EA
supply of Double socket sleeve (collar) EA
supply of Flanged spigot with anchor flange EA
supply of Puddle flange EA
supply of Double flange pipe EA
supply of Dismantling joint EA
P.3 installation of fittings & Joints
installation of Double socket reducer EA
installation of Double socket sleeve (collar) EA
installation of Flanged spigot with anchor flange EA
installation of Puddle flange EA
installation of Double flange pipe EA
installation of Dismantling joint EA
connection with existing network EA
E Feeder pillar
F Service Turret
Supply and installation of service turret; including connection to
power supply and all associated works, as per specification and EA
drawings
supply of cables m
installation of cables m
supply of cables tray m
installation of cables tray m
Q Access to Site
q.1 Gate with fenceing
S Temporary Works
temporary detour roads sum
temporary bridges & culverts sum
other facilities for their Works or for maintenance of traffic in locations sum
affected by their Works
W ADDITIONAL ITEMS
The Tenderer is to detail below any additional items with quantities and
rates not previously included to complete the build up of the Lump Sum
price for this section of the works. Should the tenderer fail to insert any
items here, it will be deemed that his Lump Sum price for the Tender
includes all items and no subsequent claim for any additional item will be
entertained
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
3
3
3
1
1
1
0
4
200
0
4
4
4
2
2
2
6
2
4
2
4
6
6
6
6
6
3
3
3
3
3
3
3
3
3
1
3
3
200
200
200
200
200
200
200
200
1
200
6
24
14
24
14
14
6
24
14
14
14
14
6
1
1
1
1
1
6100
6100
3
3
1200
6100
6100
75
75
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
UPGRADE OF CONNECTION POINTS BETWEEN PRODUCTION AND
TRANSMISSION TO MEET THE REQUIREMENTS OF THE SEAWATER BILL OF QUANTITIES
ITEM DESALINATION CODE
ITEM DESCRIPTION UNIT
B SURVEY
D Allow for coordinate with service authorities and obtain all Permits to
Work (landowners & local authorities) sum
F Management,Supervision
Establishment (Progress related) sum
G Project Signboard
Provision of project Signboard sum
Maintanence sum
Removal sum
I GENERAL CLEARANCE
General site clearance in accordance to the specifications and drawings sum
prior handover to the Employer
J.1 Dismantling Exsiting Units & connections in exsiting site units and prepatre
for installation including all neassesry works
Flow Meter EA
Valves EA
Pipes M
differential pressure meter EA
b
Supply and installation of GRP Kiosk as near as possible to NWC metering
chamber. including the manual sampling line and components as per the
drawings and specifications
KIOSK & CIVIL Works for Monitoring Room
Minimum dimension 1200 x 1300 x 400 (WxHxD);
Supply of kiosk
Installation of GRP Kiosk
N Pressure transmitter
Work to lay new pipeline complete as per NWC/SWCC and International Standards requirements and as instructed
including: Supply of steel pipes; Excavate; Install by open cut and NDM if needed, instrumentation and control equi
whole pipes lengths; Joint; Tie-In; Protect; Lining; Testing; Bedding & Surrounding; backfilling with selected excavat
off site of surplus excavated material; Disinfection along the running length of pipe in trenches or beneath services
works include all Accessories; Ancillaries; Fittings; Joints; reinstatement, and connection with existing network; and
internal lining where required, SCADA works and equipment. This includes equipment mobilization and demobiliza
site investigations, dewatering, protection of existing services and utilities rerouting /modifications of exisiting utiliti
trench protection, bidding, foot path diversion, minor & major crossing becks & streams, lateral connections, exces
removal off site off rock, removal or control of running water or running sands which affect pipelining, major crossi
motor ways, railways which necessitate other methods of pipe laying other than open cut, coordination with utility
security, traffic diversions management & all signage to suit works location etc. as per the drawings and specificatio
Supply of steel pipes M
Excavation M
Beveling & supports M
Trench preparation M
Sand bedding & Surrounding M
compaction works M
backfilling M
Exsiting finishing reinstatement M
Ancillaries & supports works sum
piping installation Works M
P.2 Supply and installations of pipe fittings
E Feeder pillar
F Service Turret
Supply and installation of service turret; including connection to
power supply and all associated works, as per specification and EA
drawings
supply of cables m
installation of cables m
supply of cables tray m
installation of cables tray m
Q Access to Site
q.1 Gate with fenceing
S Temporary Works
temporary detour roads sum
temporary bridges & culverts sum
other facilities for their Works or for maintenance of traffic in locations sum
affected by their Works
W ADDITIONAL ITEMS
The Tenderer is to detail below any additional items with quantities and
rates not previously included to complete the build up of the Lump Sum
price for this section of the works. Should the tenderer fail to insert any
items here, it will be deemed that his Lump Sum price for the Tender
includes all items and no subsequent claim for any additional item will be
entertained
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
3
3
3
1
1
1
0
3
150
0
0
0
0
0
0
0
0
0
2
1
2
3
3
3
3
3
1
1
1
1
1
1
1
0
0
1
1
1
12
24
12
24
11
12
6
3
3
3
3
3
2350
2350
1
1
1
2350
2350
50
50
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
UPGRADE OF CONNECTION POINTS BETWEEN PRODUCTION AND
TRANSMISSION TO MEET THE REQUIREMENTS OF THE SEAWATER BILL OF QUANTITIES
ITEM DESALINATION CODE
ITEM DESCRIPTION UNIT
B SURVEY
D Allow for coordinate with service authorities and obtain all Permits to
Work (landowners & local authorities) sum
F Management,Supervision
Establishment (Progress related) sum
G Project Signboard
Provision of project Signboard sum
Maintanence sum
Removal sum
I GENERAL CLEARANCE
General site clearance in accordance to the specifications and drawings sum
prior handover to the Employer
J.1 Dismantling Exsiting Units & connections in exsiting site units and prepatre
for installation including all neassesry works
Flow Meter EA
Valves EA
Pipes M
differential pressure meter EA
b
Supply and installation of GRP Kiosk as near as possible to NWC metering
chamber. including the manual sampling line and components as per the
drawings and specifications
KIOSK & CIVIL Works for Monitoring Room
Minimum dimension 1200 x 1300 x 400 (WxHxD);
Supply of kiosk
Installation of GRP Kiosk
N Pressure transmitter
installation, testing and commissioning and other required tests of pressure
indicator, complete with all accessories as per the drawings and
specifications
Installation of Pressure transmitter EA
Instrumentation work of Pressure transmitter EA
Work to lay new pipeline complete as per NWC/SWCC and International Standards requirements and as instructed
including: Supply of steel pipes; Excavate; Install by open cut and NDM if needed, instrumentation and control equi
whole pipes lengths; Joint; Tie-In; Protect; Lining; Testing; Bedding & Surrounding; backfilling with selected excavat
off site of surplus excavated material; Disinfection along the running length of pipe in trenches or beneath services
works include all Accessories; Ancillaries; Fittings; Joints; reinstatement, and connection with existing network; and
internal lining where required, SCADA works and equipment. This includes equipment mobilization and demobiliza
site investigations, dewatering, protection of existing services and utilities rerouting /modifications of exisiting utiliti
trench protection, bidding, foot path diversion, minor & major crossing becks & streams, lateral connections, exces
removal off site off rock, removal or control of running water or running sands which affect pipelining, major crossi
motor ways, railways which necessitate other methods of pipe laying other than open cut, coordination with utility
security, traffic diversions management & all signage to suit works location etc. as per the drawings and specificatio
Supply of frp pipes M
Excavation M
Beveling & supports M
Trench preparation M
Sand bedding & Surrounding M
compaction works M
backfilling M
Exsiting finishing reinstatement M
Ancillaries & supports works sum
piping installation Works M
P.2 Supply and installations of pipe fittings
F Service Turret
Supply and installation of service turret; including connection to
power supply and all associated works, as per specification and EA
drawings
supply of cables m
installation of cables m
supply of cables tray m
installation of cables tray m
Q Access to Site
q.1 Gate with fenceing
S Temporary Works
temporary detour roads sum
temporary bridges & culverts sum
other facilities for their Works or for maintenance of traffic in locations sum
affected by their Works
W ADDITIONAL ITEMS
The Tenderer is to detail below any additional items with quantities and
rates not previously included to complete the build up of the Lump Sum
price for this section of the works. Should the tenderer fail to insert any
items here, it will be deemed that his Lump Sum price for the Tender
includes all items and no subsequent claim for any additional item will be
entertained
sum
Marker Post sum
BILL OF QUANTITIES PART NO.
QUANTITY RATE
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
50
0
2
2
2
2
2
2
2
2
2
2
2
2
1
1
1
1
1
1
1
1
1
1
1
1
2
8
4
8
4
4
2
8
4
4
4
4
2
1
1
1
1
1
1000
1000
1
1
1000
1000
1000
25
25
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
UPGRADE OF CONNECTION POINTS BETWEEN PRODUCTION AND
TRANSMISSION TO MEET THE REQUIREMENTS OF THE SEAWATER BILL OF QUANTITIES
ITEM DESALINATION CODE
ITEM DESCRIPTION UNIT
B SURVEY
D Allow for coordinate with service authorities and obtain all Permits to
Work (landowners & local authorities) sum
F Management,Supervision
Establishment (Progress related) sum
G Project Signboard
Provision of project Signboard sum
Maintanence sum
Removal sum
I GENERAL CLEARANCE
General site clearance in accordance to the specifications and drawings sum
prior handover to the Employer
J.1 Dismantling Exsiting Units & connections in exsiting site units and prepatre
for installation including all neassesry works
Flow Meter EA
Valves EA
Pipes M
differential pressure meter EA
b
Supply and installation of GRP Kiosk as near as possible to NWC metering
chamber. including the manual sampling line and components as per the
drawings and specifications
KIOSK & CIVIL Works for Monitoring Room
Minimum dimension 1200 x 1300 x 400 (WxHxD);
Supply of kiosk
Installation of GRP Kiosk
M.1 Water Quality On-Line Monitoring Equipment
Civil & Installation of Monitoring Equipment EA
Instrumentation work of Monitoring Equipment EA
N Pressure transmitter
Work to lay new pipeline complete as per NWC/SWCC and International Standards requirements and as instructed
including: Supply of steel pipes; Excavate; Install by open cut and NDM if needed, instrumentation and control equi
whole pipes lengths; Joint; Tie-In; Protect; Lining; Testing; Bedding & Surrounding; backfilling with selected excavat
off site of surplus excavated material; Disinfection along the running length of pipe in trenches or beneath services
works include all Accessories; Ancillaries; Fittings; Joints; reinstatement, and connection with existing network; and
internal lining where required, SCADA works and equipment. This includes equipment mobilization and demobiliza
site investigations, dewatering, protection of existing services and utilities rerouting /modifications of exisiting utiliti
trench protection, bidding, foot path diversion, minor & major crossing becks & streams, lateral connections, exces
removal off site off rock, removal or control of running water or running sands which affect pipelining, major crossi
motor ways, railways which necessitate other methods of pipe laying other than open cut, coordination with utility
security, traffic diversions management & all signage to suit works location etc. as per the drawings and specificatio
Supply of steel pipes M
Excavation M
Beveling & supports M
Trench preparation M
Sand bedding & Surrounding M
compaction works M
backfilling M
Exsiting finishing reinstatement M
Ancillaries & supports works SUM
piping installation Works M
P.2 Supply and installations of pipe fittings
Supply and installations of pipe fittings as per NWC/SWCC and international
standards and as instructed by the Engineer as per the drawings and
specifications (following SWD-Code), such as Double socket reducer, Double
socket sleeve (collar), Flanged spigot with anchor flange, Puddle flange,
Dismantling joint, Double flange pipe.
supply of Double socket reducer EA
supply of Double socket sleeve (collar) EA
supply of Flanged spigot with anchor flange EA
supply of Puddle flange EA
supply of Double flange pipe EA
supply of Dismantling joint EA
P.3 installation of fittings & Joints
installation of Double socket reducer EA
installation of Double socket sleeve (collar) EA
installation of Flanged spigot with anchor flange EA
installation of Puddle flange EA
installation of Double flange pipe EA
installation of Dismantling joint EA
connection with existing network EA
E Feeder pillar
F Service Turret
Supply and installation of service turret; including connection to
power supply and all associated works, as per specification and EA
drawings
supply of cables m
installation of cables m
supply of cables tray m
installation of cables tray m
Q Access to Site
q.1 Gate with fenceing
S Temporary Works
temporary detour roads sum
temporary bridges & culverts sum
other facilities for their Works or for maintenance of traffic in locations sum
affected by their Works
W ADDITIONAL ITEMS
The Tenderer is to detail below any additional items with quantities and
rates not previously included to complete the build up of the Lump Sum
price for this section of the works. Should the tenderer fail to insert any
items here, it will be deemed that his Lump Sum price for the Tender
includes all items and no subsequent claim for any additional item will be
entertained
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
3
3
3
1
1
1
3
3
150
0
5
5
5
5
2
2
3
3
3
3
3
3
2
2
2
2
2
2
2
2
2
1
2
2
6
24
12
24
12
12
6
1
1
1
1
1
4950
4950
2
2
1000
4950
4950
75
75
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
UPGRADE OF CONNECTION POINTS BETWEEN PRODUCTION AND
TRANSMISSION TO MEET THE REQUIREMENTS OF THE SEAWATER BILL OF QUANTITIES
ITEM DESALINATION CODE
ITEM DESCRIPTION UNIT
B SURVEY
D Allow for coordinate with service authorities and obtain all Permits to
Work (landowners & local authorities) sum
F Management,Supervision
Establishment (Progress related) sum
G Project Signboard
Provision of project Signboard sum
Maintanence sum
Removal sum
I GENERAL CLEARANCE
General site clearance in accordance to the specifications and drawings sum
prior handover to the Employer
J.1 Dismantling Exsiting Units & connections in exsiting site units and prepatre
for installation including all neassesry works
Flow Meter EA
Valves EA
Pipes M
differential pressure meter EA
Chamber CIVIL Works for flow meter including all neassesry works EA
7200x5900x5000
Chamber CIVIL Works for flow meter including all neassesry works EA
4200x3900x5000
b
Supply and installation of GRP Kiosk as near as possible to NWC metering
chamber. including the manual sampling line and components as per the
drawings and specifications
KIOSK & CIVIL Works for Monitoring Room
Minimum dimension 1200 x 1300 x 400 (WxHxD);
Supply of kiosk
Installation of GRP Kiosk
M.1 Water Quality On-Line Monitoring Equipment
Civil & Installation of Monitoring Equipment EA
Instrumentation work of Monitoring Equipment EA
N Pressure transmitter
Work to lay new pipeline complete as per NWC/SWCC and International Standards requirements and as instructed
including: Supply of steel pipes; Excavate; Install by open cut and NDM if needed, instrumentation and control equi
whole pipes lengths; Joint; Tie-In; Protect; Lining; Testing; Bedding & Surrounding; backfilling with selected excavat
off site of surplus excavated material; Disinfection along the running length of pipe in trenches or beneath services
works include all Accessories; Ancillaries; Fittings; Joints; reinstatement, and connection with existing network; and
internal lining where required, SCADA works and equipment. This includes equipment mobilization and demobiliza
site investigations, dewatering, protection of existing services and utilities rerouting /modifications of exisiting utiliti
trench protection, bidding, foot path diversion, minor & major crossing becks & streams, lateral connections, exces
removal off site off rock, removal or control of running water or running sands which affect pipelining, major crossi
motor ways, railways which necessitate other methods of pipe laying other than open cut, coordination with utility
security, traffic diversions management & all signage to suit works location etc. as per the drawings and specificatio
Supply of steel pipes M
Excavation M
Beveling & supports M
Trench preparation M
Sand bedding & Surrounding M
compaction works M
backfilling M
Exsiting finishing reinstatement M
Ancillaries & supports works sum
piping installation Works M
P.2 Supply and installations of pipe fittings
Supply and installations of pipe fittings as per NWC/SWCC and international
standards and as instructed by the Engineer as per the drawings and
specifications (following SWD-Code), such as Double socket reducer, Double
socket sleeve (collar), Flanged spigot with anchor flange, Puddle flange,
Dismantling joint, Double flange pipe.
supply of Double socket reducer EA
supply of Double socket sleeve (collar) EA
supply of Flanged spigot with anchor flange EA
supply of Puddle flange EA
supply of Double flange pipe EA
supply of Dismantling joint EA
P.3 installation of fittings & Joints
installation of Double socket reducer EA
installation of Double socket sleeve (collar) EA
installation of Flanged spigot with anchor flange EA
installation of Puddle flange EA
installation of Double flange pipe EA
installation of Dismantling joint EA
connection with existing network EA
E Feeder pillar
F Service Turret
Supply and installation of service turret; including connection to
power supply and all associated works, as per specification and EA
drawings
supply of cables m
installation of cables m
supply of cables tray m
installation of cables tray m
Q Access to Site
q.1 Gate with fenceing
S Temporary Works
temporary detour roads sum
temporary bridges & culverts sum
other facilities for their Works or for maintenance of traffic in locations sum
affected by their Works
W ADDITIONAL ITEMS
The Tenderer is to detail below any additional items with quantities and
rates not previously included to complete the build up of the Lump Sum
price for this section of the works. Should the tenderer fail to insert any
items here, it will be deemed that his Lump Sum price for the Tender
includes all items and no subsequent claim for any additional item will be
entertained
sum
Marker Post sum
BILL OF QUANTITIES PART NO.
QUANTITY RATE
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
6
6
6
1
1
1
12
14
450
2
10
10
10
10
8
8
8
8
10
8
10
10
8
18
18
18
18
18
9
9
9
9
9
9
9
9
9
1
9
9
18
72
36
72
36
36
18
9
9
9
9
9
4725
4725
9
9
3200
4725
4725
225
225
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
UPGRADE OF CONNECTION POINTS BETWEEN PRODUCTION AND
TRANSMISSION TO MEET THE REQUIREMENTS OF THE SEAWATER BILL OF QUANTITIES
ITEM DESALINATION CODE
ITEM DESCRIPTION UNIT
B SURVEY
D Allow for coordinate with service authorities and obtain all Permits to
Work (landowners & local authorities) sum
F Management,Supervision
Establishment (Progress related) sum
G Project Signboard
Provision of project Signboard sum
Maintanence sum
Removal sum
I GENERAL CLEARANCE
General site clearance in accordance to the specifications and drawings sum
prior handover to the Employer
J.1 Dismantling Exsiting Units & connections in exsiting site units and prepatre
for installation including all neassesry works
Flow Meter EA
Valves EA
Pipes M
differential pressure meter EA
b
Supply and installation of GRP Kiosk as near as possible to NWC metering
chamber. including the manual sampling line and components as per the
drawings and specifications
KIOSK & CIVIL Works for Monitoring Room
Minimum dimension 1200 x 1300 x 400 (WxHxD);
Supply of kiosk
Installation of GRP Kiosk
Work to lay new pipeline complete as per NWC/SWCC and International Standards requirements and as instructed
including: Supply of steel pipes; Excavate; Install by open cut and NDM if needed, instrumentation and control equi
whole pipes lengths; Joint; Tie-In; Protect; Lining; Testing; Bedding & Surrounding; backfilling with selected excavat
off site of surplus excavated material; Disinfection along the running length of pipe in trenches or beneath services
works include all Accessories; Ancillaries; Fittings; Joints; reinstatement, and connection with existing network; and
internal lining where required, SCADA works and equipment. This includes equipment mobilization and demobiliza
site investigations, dewatering, protection of existing services and utilities rerouting /modifications of exisiting utiliti
trench protection, bidding, foot path diversion, minor & major crossing becks & streams, lateral connections, exces
removal off site off rock, removal or control of running water or running sands which affect pipelining, major crossi
motor ways, railways which necessitate other methods of pipe laying other than open cut, coordination with utility
security, traffic diversions management & all signage to suit works location etc. as per the drawings and specificatio
Supply of steel pipes M
Excavation M
Beveling & supports M
Trench preparation M
Sand bedding & Surrounding M
compaction works M
backfilling M
Exsiting finishing reinstatement M
Ancillaries & supports works SUM
piping installation Works M
P.2 Supply and installations of pipe fittings
F Service Turret
Supply and installation of service turret; including connection to
power supply and all associated works, as per specification and EA
drawings
supply of cables m
installation of cables m
supply of cables tray m
installation of cables tray m
Q Access to Site
q.1 Gate with fenceing
S Temporary Works
temporary detour roads sum
temporary bridges & culverts sum
other facilities for their Works or for maintenance of traffic in locations sum
affected by their Works
W ADDITIONAL ITEMS
The Tenderer is to detail below any additional items with quantities and
rates not previously included to complete the build up of the Lump Sum
price for this section of the works. Should the tenderer fail to insert any
items here, it will be deemed that his Lump Sum price for the Tender
includes all items and no subsequent claim for any additional item will be
entertained
sum
Marker Post sum
BILL OF QUANTITIES PART NO.
QUANTITY RATE
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
4
4
4
1
1
1
2
1
200
0
4
4
4
4
4
7
2
5
7
7
7
7
7
3
3
3
3
3
3
3
3
3
1
4
4
8
32
16
32
16
16
8
32
16
32
16
16
8
4
4
4
4
4
9150
9150
4
4
4
9150
9150
100
3000
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
1. As per your below Email, Line Monitoring Equipment is Supply by ABB – The GRP Kiosk included or NOT or Kiosk not requ
( please provide Monitoring Equipment basic information’s and details like overall Dimensions, fixing Methods..
2. In APPENDIX 2 ( CONNECTION POINT SUMMARY DATA ) - Some Valves and flow meter are Mentioned as Reuse – please
3. Please provide specifications for Isolation valves and SWCC standard Documents (APPENDIX 3 – not receive from ABB)
4. ABB supply Flow meters with calibration or without ( with only Factory calibration certificate )
5. Fences & gates are required or not for existing connection points.
6. ABB supply Monitoring system with UPS SYSTEM or without
7. Supply of pipe length & fittings qty not mentioned (please provide drawings if available apart from SWCC standard drawi
8. We presume in instrumentation works, contractor scope only manpower, Erection of equipment’s, cabling works please
9. Pipes & fittings & Isolation valves have any restrictions like specific country of origin.
Butterfly Valves with Actuator with Chamber
1. Maximum barometri Pressure = 1030mbar
2. Flange Rating = Class 300
3. Butterfly valve with actuator
4. Design Temperature - 60°C
5. Maximum Metal temperature in the sun - 85°C
Description
DN 2400 4 2
DN2000
DN1800
DN1500 2 2
DN1400
DN1300 4
DN1200
DN1000 1 2
DN900
DN800
DN700
DN450
Actuator with Chamber
EA
6 EA
4 4 EA
6 2 8 EA
1 5 EA
4 4 EA
4 EA
4 4 EA
2 5 EA
1 1 EA
2 2 EA
1 1 EA
1 1 EA
Flow Meter Chamber
EA
DN 2400 4 4 EA
DN2000 4 4 EA
DN1800 6 6 EA
DN1500 4 2 1 7 EA
DN1400 4 4 EA
DN1300 3 3 EA
DN1200 2 4 6 EA
DN1000 2 2 4 EA
DN900 0 EA
DN800 2 2 EA
DN700 2 2 EA
DN450 0 EA
Fittings
1. Maximum barometri Pressure = 1030mbar
2. Flange Rating = Class 300
3. CS Material
4. Design Temperature - 60°C
5. Maximum Metal temperature in the sun - 85°C
Drain
DN2400 2 2
DN2000
DN1500 2 1
DN1800
DN1400
DN1300 2
DN1200
DN1000 1 1
DN700
DN800
DN450
Flange
DN2400 24 24
DN2000
DN1500 24 12
DN1800
DN1400
DN1300 24
DN1200
DN1000 12 12
DN700
DN800
DN450
Coller
DN2400 16 16
DN2000
DN1500 16 8
DN1800
DN1400
DN1300 16
DN1200
DN1000 8 8
DN700
DN800
DN450
Anger flange
DN2400 16 16
DN2000
DN1500 16 8
DN1800
DN1400
DN1300 16
DN1200
DN1000 8 8
DN700
DN800
DN450
Dismantling Joint
DN2400 8 8
DN2000
DN1500 8 4
DN1800
DN1400
DN1300 8
DN1200
DN1000 4 4
DN700
DN800
DN450
Sampling point
DN2400 2 2
DN2000
DN1500 2 1
DN1800
DN1400
DN1300 2
DN1200
DN1000 1 1
DN700
DN800
DN450
ttings
sure = 1030mbar Pipe Material
lass 300 DN800- CS
al DN1800 - RFP
ure - 60°C DN450 - FRP
re in the sun - 85°C DN1000 - UN
8 EA
4 4 EA
2 8 EA
2 2 EA
4 4 EA
4 EA
2 4 6 EA
4 EA
2 2 4 EA
2 2 EA
2 2 EA
4 EA
2 2 EA
1 4 EA
1 1 EA
2 2 EA
2 EA
1 2 3 EA
2 EA
1 1 2 EA
1 1 EA
1 1 EA
48 EA
24 24 EA
12 48 EA
12 12 EA
24 24 EA
24 EA
12 24 36 EA
24 EA
12 12 24 EA
12 12 EA
12 12 EA
20 EA
10 10 EA
5 20 EA
5 5 EA
10 10 EA
10 EA
5 10 15 EA
10 EA
5 5 10 EA
5 5 EA
5 5 EA
32 EA
16 16 EA
8 32 EA
8 8 EA
16 16 EA
16 EA
8 16 24 EA
16 EA
8 8 16 EA
8 8 EA
8 8 EA
32 EA
16 16 EA
8 32 EA
8 8 EA
16 16 EA
16 EA
8 16 24 EA
16 EA
8 8 16 EA
8 8 EA
8 8 EA
16 EA
8 8 EA
4 16 EA
4 4 EA
8 8 EA
8 EA
4 8 12 EA
8 EA
4 4 8 EA
4 4 EA
4 4 EA
4 EA
2 2 EA
1 4 EA
1 1 EA
2 2 EA
2 EA
1 2 3 EA
2 EA
1 1 2 EA
1 1 EA
1 1 EA
984 EA
Pipe
1. Maximum barometri Pressure = 1030mbar
2. Flange Rating = Class 300
3. CS Material
4. Design Temperature - 60°C
5. Maximum Metal temperature in the sun - 85°C