B-U00-A-MS-3010 - R01 Method Statement For Sealant Application & Repair Procedure - FC - Removed
B-U00-A-MS-3010 - R01 Method Statement For Sealant Application & Repair Procedure - FC - Removed
EB-STA-GL3010
-
Sumitomo Corporation
Confidential & Proprietary
Technical information and trade secrets in this drawing or document is the
property of Sumitomo Corporation and is not to be disclosed, reproduced or
copied in whole or in part, or used for the benefit of anyone other than
Sumitomo Corporation without Sumitomo Corporation’s prior written consent.
CONTRACTOR DRAWING
PROJECT DRAWING No.
Code
出図先 部数
PT BPI
SC
GNP
MES
本社プ計
三島PM
FOR INFORMATION
EM
長 PJ実行
プ PJ計画 15 Nov
推 PJ管理 1 For Construction F.M K.I
2019
三 電
REV. DESCRIPTION BY APPR’D DATE
長 計 機
プ
OWNER:
設 伝 熱
長 プ装1
プ
調 プ装2
長 電
計制設二
PT. BHIMASENA POWER INDONESIA
長 配計一
空
設 配計二
長 制御設 JOB:
制 制御試
ソ
長風力
CENTRAL JAVA PROJECT
ボ ボ設計
設 CONTRACT No.
一 ボ設設
長鉄構 DWG. TITLE:
燃 燃焼T
技 ミルT METHOD STATEMENT FOR
タ タ設一計
SEALANT APPLICATION & REPAIR PROCEDURE
設 タ設一本 CONSULTANT:
一 タ設一ガ
長火計(企)
長計電
PREPARED Frank CHECKED H. Okuyama APPR’D K. Itagaki
長試技
DATE 15 Nov 2019 DATE 15 Nov 2019 DATE 15 Nov 2019
長建設
長土建 SECTION SCALE PROJECT DRAWING No. REV.NO.
長ロジ 58 SHEETS
品 証
長プ品
WITH COVER C&A B-U00-A-MS-3010 1
CONFERRED None
原輸二 PORTION CONTRACTOR DRAWING No. REV.NO.
PM
機 調
指導員 ORDER ITEM EB-STA-GL3010
事前検討
機品( ) WBS DRAWING No.
一 工 N/A N/A
二 工
メーカ
-
控 1
計
CIVIL Division
DRAWN 15 Nov 2019 ISSUE
1/58
REVISION HISTORY
Note 1:
2/58
3/58
QUALITY MANAGEMENT SYSTEM Page 2 of 8
Title ; Procedure No
SEALANT APPLICATION MIS – CM.BLDG – 012
& REPAIR PROCEDURE
Revision : 05
Job No ; MD-2317 Central Java IPP Project, 2 x 1000 MW Coal Fired Power Plant
INDEX OF CONTENTS
Table of Contents
1. PURPOSE
2. SCOPE OF WORK
3. DEFINITION
4. REFERENCE
5. MAN POWER AND EQUIPMENT
5.1 MANPOWER
5.2 TOOLS, EQUIPMENT & MACHINERY
6. WORK METHOD
6.1 GENERAL
6.2 WALL SEALANT & PLASTER REPAIR PROCEDURE
7. SAFETY PLAN
7.1 SAFETY TRAINING & PPE PROVISION
7.2 OTHER PREVENTION MEASURES
4/58
QUALITY MANAGEMENT SYSTEM Page 3 of 8
Title ; Procedure No
SEALANT APPLICATION MIS – CM.BLDG – 012
& REPAIR PROCEDURE
Revision : 05
Job No ; MD-2317 Central Java IPP Project, 2 x 1000 MW Coal Fired Power Plant
ATTACHMENT:
5/58
QUALITY MANAGEMENT SYSTEM Page 4 of 8
Title ; Procedure No
SEALANT APPLICATION MIS – CM.BLDG – 012
& REPAIR PROCEDURE
Revision : 05
Job No ; MD-2317 Central Java IPP Project, 2 x 1000 MW Coal Fired Power Plant
1. PURPOSE
The purpose of this wall sealant application & repair procedure is to describe the
procedure and methodology for sealant application & repair which need to meet technical
requirement of each facility on the project.
2. SCOPE OF WORK
This procedure shall be applied for sealant application & sealant repair work on facilities
which included scope of Building Works in Central Java IPP 2 x 1000 MW Coal Fired
Power Plant Project by PT. Murinda Iron Steel.
3. DEFINITION
- MES : Mitsui Engineering Shipbuilding Co., LTD
- Murinda : PT. Murinda Iron Steel
- SD : Shop drawing made by Murinda
4. REFERENCE
Standard drawing:
B-U00-A-MS-0204 Rev 5 (Building Works – Typical Detail Interior Block Wall)
B-U00-A-MS-0205 Rev 5 (Building Works – Typical Detail Exterior Block Wall)
B-U00-A-MS-0206 Rev 5 (Building Works – Typical Detail Fire Block Wall)
Material proposal:
A-U00-C-MS-0181 (Material Proposal for Expansion and Construction Joint Sealant)
6/58
QUALITY MANAGEMENT SYSTEM Page 5 of 8
Title ; Procedure No
SEALANT APPLICATION MIS – CM.BLDG – 012
& REPAIR PROCEDURE
Revision : 05
Job No ; MD-2317 Central Java IPP Project, 2 x 1000 MW Coal Fired Power Plant
No Equipment Remarks
7/58
QUALITY MANAGEMENT SYSTEM Page 6 of 8
Title ; Procedure No
SEALANT APPLICATION MIS – CM.BLDG – 012
& REPAIR PROCEDURE
Revision : 05
Job No ; MD-2317 Central Java IPP Project, 2 x 1000 MW Coal Fired Power Plant
6. WORK METHOD
6.1. GENERAL
This procedure shows method of sealant application & repair procedure on:
Project Name : CENTRAL JAVA IPP, 2 X 1000 MW COAL FIRED POWER
PLANT PROJECT
Location : BATANG – CENTRAL JAVA
Client : MITSUI ENGINEERING & SHIPBUILDING CO., LTD
This work procedure is a guidance to achieve a successful work completion with acceptable
quality, within schedule and with client’s satisfaction.
To achieve good performance, this procedure in this document must be followed strictly. In
case of any changes or adaption of different method or action from this document, written
notice/instruction from Site Manager under the approval of MES or Authorized MES’s
representative.
8/58
QUALITY MANAGEMENT SYSTEM Page 7 of 8
Title ; Procedure No
SEALANT APPLICATION MIS – CM.BLDG – 012
& REPAIR PROCEDURE
Revision : 05
Job No ; MD-2317 Central Java IPP Project, 2 x 1000 MW Coal Fired Power Plant
Please refer to “Attachment – 4” of this document for step by step sequence for this
sealant application & repair procedure.
7. SAFETY PLAN
7.1 SAFETY TRAINING & PPE PROVISION:
- Prior to commencement of work, induction training will be provided by contractor to
ensure that all workers (related to this task) are conversant with site layout, welfare
provision and emergency procedure.
- All necessary Personal Protective Equipment (PPE) shall be provided by the contractor
to their workers.
9/58
QUALITY MANAGEMENT SYSTEM Page 8 of 8
Title ; Procedure No
SEALANT APPLICATION MIS – CM.BLDG – 012
& REPAIR PROCEDURE
Revision : 05
Job No ; MD-2317 Central Java IPP Project, 2 x 1000 MW Coal Fired Power Plant
10/58
ATTACHMENT 3:
INSPECTION AND TEST PLAN
32/58
Doc.No. Revision :
MIS-QC-ITP-001 2
Inspection And Test Plan for Sealant Application & Repair Procedure
Project No. : MD - 2317 DATE:
(1) Cleaning wall surface Visual Cleaning wall portion where we plan to apply MIS-QC-FORM-048 Once, before applying A1 W2 N/A N/A
sealant (to avoid poor bonding between existing sealant
wall and new applied sealant).
(2) Material acceptance Visual Used sealant: MIS-QC-FORM-048 Once, before applying A1 W2 N/A N/A
1) For Inside Building Application sealant
a. For normal wall use Seal 'N' Flex 1 ex. Bostik
(refer to A-U00-C-MS-0181).
b. For firerated wall use Sikaflex-400 Fire ex.
SIKA.
2) For Outside Building Application: Use Seal 'N'
Flex 1 ex. Bostik (refer to A-U00-C-MS-0181).
(3) Sealant application Visual * Intended joint completely covered with sealant. MIS-QC-FORM-048 Once, after applying A1 W2 N/A N/A
* Joint sealant is visually smooth and consistent sealant
surface.
(1) Removal of existing sealant application Visual Visual check: Sealant on inspected corner has been MIS-QC-FORM-048 Once, before re-applying A1 W2 N/A N/A
removed completely. sealant
(2) Cleaning wall surface Visual Cleaning wall portion where we plan to re-apply MIS-QC-FORM-048 Once, before re-applying A1 W2 N/A N/A
sealant (to avoid poor bonding between existing sealant
wall and new applied sealant).
(3) Material acceptance Visual Used sealant: MIS-QC-FORM-048 Once, before re-applying A1 W2 N/A N/A
1) For Inside Building Application sealant
a. For normal wall use Seal 'N' Flex 1 ex. Bostik
(refer to A-U00-C-MS-0181).
b. For firerated wall use Sikaflex-400 Fire ex.
SIKA.
2) For Outside Building Application: Use Seal 'N'
Flex 1 ex. Bostik (refer to A-U00-C-MS-0181).
(4) Sealant application Visual * Intended joint completely covered with sealant. MIS-QC-FORM-048 Once, after re-applying A1 W2 N/A N/A
* Joint sealant is visually smooth and consistent sealant
surface.
33/58
Doc.No. Revision :
MIS-QC-ITP-001 2
Inspection And Test Plan for Sealant Application & Repair Procedure
Project No. : MD - 2317 DATE:
C Final Visual
(1) Final visual inspection (sealant repair) Visual Joint sealant is visually smooth and consistent MIS-QC-FORM-048 Once after sealant has A1 W1 N/A N/A
surface. been applied
LEGEND :
INSPECTION/TEST/VERIFICATION CODE MIS : PT.MURINDA IRON STEEL
A1 : 100 % Actual Inspection Test MES : MITSUI ENGINEERING & SHIPBUILDING CO.,LTD.
A2 : Sample Inspection/Test SC : SUMITOMO CORPORATION
W1 : 100% Witness Inspection Test BPI : PT. BHIMASENA POWER INDONESIA
W2 : Spot Witness
DOCUMENTATION
R1 : 100% Documentation Review
R2 : Sample Document Review
FI : For Information Only
34/58
QUALITY MANAGEMENT SYSTEM MIS-QC-FORM-048 Date:
Rev: 02
Drawing Reference :
RESULT
No. ITEM OF INSPECTION ACCEPTANCE CRITERIA REMARKS
YES NOT N/A
1 NEW SEALANT APPLICATION (FOR ENERGIZED OR NON-ENERGIZED BUILDING)
- Cleaning wall surface Cleaning wall portion where we plan to apply
sealant (to avoid poor bonding between
existing wall and new applied sealant).
3 FINAL VISUAL
- Final visual inspection (sealant repair) Joint sealant is visually smooth and consistent
surface.
Notes :
MURINDA MES SC
Prepared by Inspected by Approved by Witnessed by
Name
Signature
Date
35/58
ATTACHMENT 4:
METHOD DRAWING
36/58
37/58
38/58
39/58
ATTACHMENT 5:
BUILDING LIST FOR SEALANT APPLICATION
40/58
Building List for Sealant Application
41/58