FACTOR METHOD

WIND LOAD – LONGITUDINAL SECTION

COMPUTATION OF STIFFNESS
I
K=
L
Where:

bh3
I=
12
L = Length of beams and column

SIZES OF COLUMNS AND BEAMS

COLUMNS, in mm BEAMS, in mm HEIGHT, in meters

FIRST FLOOR 500 500 450 500 4

SECOND FLOOR 450 450 400 450 4

STIFFNESS COMPUTATIONS, in mm3

FOR COLUMNS, x 10 4 mm3

GROUND TO SECOND FLOOR 130.2

SECOND FLOOR TO ROOF TOP 85.4

FOR BEAMS, x 10 4 mm3

WIDTH, in meters 2ND FLOOR LEVEL ROOF LEVEL

B1 6 78.1 50.6

B2 5 93.8 60.8

B3 5 93.8 60.8

B4 6 78.1 50.6

B5 5 93.8 60.8

B6 5 93.8 60.8

B7 6 78.1 50.6

Campuses: Hilltop | MH del Pilar | Pallocan East | Pallocan West | Lipa


Telephone Numbers: +63 43 723 1446 | 980 0041
Website: www.ub.edu.ph
COMPUTATION OF GIDER FACTOR, G FOR EACH JOINT

∑k COLUMN
G=
∑ k @ JOINT

ROOF LEVEL SECOND FLOOR LEVEL

C-D 0.628 B-E 0.734

D-C 0.434 E-B 0.556

D-I 0.434 E-H 0.556

I-D 0.413 H-E 0.535

I-J 0.413 H-K 0.535

J-I 0.434 K-H 0.556

J-O 0.434 K-N 0.556

O-J 0.434 N-K 0.556

O-P 0.434 N-Q 0.556

P-O 0.413 Q-N 0.535

P-U 0.413 Q-T 0.535

U-P 0.434 T-Q 0.556

U-V 0.434 T-W 0.556

V-U 0.628 W-T 0.734

Campuses: Hilltop | MH del Pilar | Pallocan East | Pallocan West | Lipa


Telephone Numbers: +63 43 723 1446 | 980 0041
Website: www.ub.edu.ph
COMPUTATION OF COLUMN FACTOR, C

C = 1 – GIRDER FACTOR

ROOF LEVEL SECOND FLOOR LEVEL

B-C 0.266 A-B 1

C-B 0.372 B-A 0.266

E-D 0.444 F-E 1

D-E 0.566 E-F 0.444

H-I 0.465 G-H 1

I-H 0.587 H-G 0.465

K-J 0.444 L-K 1

J-K 0.566 K-L 0.444

N-O 0.444 M-N 1

O-N 0.566 N-M 0.444

Q-P 0.465 R-Q 1

P-Q 0.587 Q-R 0.465

T-U 0.444 S-T 1

U-T 0.566 T-S 0.444

W-V 0.266 X-W 1

V-W 0.372 W-X 0.266

Campuses: Hilltop | MH del Pilar | Pallocan East | Pallocan West | Lipa


Telephone Numbers: +63 43 723 1446 | 980 0041
Website: www.ub.edu.ph
COMPUTATION OF GIRDER MOMENT FACTOR

GMF = SUM OBTAINED x k

ROOF LEVEL SECOND FLOOR LEVEL

GMFCD 0.845 x 50.6 = 42.753 GMF BE 1.012 x 78.1 = 79.059

GMF DC 0.748 x 50.6 = 37.844 GMF EB 0.923 x 78.1 = 72.120

GMF DI 0.640 x 60.8 = 38.926 GMF EH 0.824 x 93.8 = 77.268

GMF ID 0.630 x 60.8 = 38.276 GMF HE 0.813 x 93.8 = 76.252

GMF IJ 0.630 x 60.8 = 38.276 GMF HK 0.813 x 93.8 = 76.252

GMF JI 0.640 x 60.8 = 38.926 GMF KH 0.824 x 93.8 = 77.268

GMF JO 0.651 x 50.6 = 32.936 GMF KN 0.835 x 78.1 = 65.181

GMFOJ 0.651 x 50.6 = 32.936 GMF NK 0.835 x 78.1 = 65.181

GMFOP 0.640 x 60.8 = 38.926 GMF NQ 0.824 x 93.8 = 77.268

GMF PO 0.630 x 60.8 = 38.276 GMFQN 0.813 x 93.8 = 76.252

GMF PU 0.630 x 60.8 = 38.276 GMFQT 0.813 x 93.8 = 76.252

GMFUP 0.640 x 60.8 = 38.926 GMFTQ 0.824 x 93.8 = 77.268

GMFUV 0.748 x 50.6 = 37.844 GMFTW 0.923 x 78.1 = 72.120

GMFVU 0.845 x 50.6 = 42.753 GMFWT 1.012 x 78.1 = 79.059

Campuses: Hilltop | MH del Pilar | Pallocan East | Pallocan West | Lipa


Telephone Numbers: +63 43 723 1446 | 980 0041
Website: www.ub.edu.ph
COMPUTATION OF COLUMN MOMENT FACTOR

CMF = SUM OBTAINED x k

2ND FLOOR TO ROOF LEVEL (k = 85.4) GROUND TO 2ND FLOOR (k = 130.2)

CMF CB 0.505 x 85.4 = 43.129 CMF BA 0.766 x 130.2 = 99.723

CMF BC 0.452 x 85.4 = 38.596 CMF AB 1.133 x 130.2 = 147.511

CMF DE 0.788x 85.4 = 67.284 CMF EF 0.944 x 130.2 = 122.858

CMF ED 0.727 x 85.4 = 62.055 CMF FE 1.222 x 130.2 = 159.079

CMF IH 0.820 x 85.4 = 70.035 CMF HG 0.965 x 130.2 = 125.679

CMF HI 0.759 x 85.4 = 64.818 CMF GH 1.233 x 130.2 = 160.490

CMF JK 0.788 x 85.4 = 67.284 CMF KL 0.944 x 130.2 = 122.858

CMF KJ 0.727 x 85.4 = 62.055 CMF LK 1.222 x 130.2 = 159.079

CMF ON 0.788 x 85.4 = 67.284 CMF NM 0.944 x 130.2 = 122.858

CMF NO 0.727 x85.4 = 62.055 CMF MN 1.222 x 130.2 = 159.079

CMF PQ 0.820 x 85.4 = 70.035 CMF QR 0.965 x 130.2 = 125.679

CMF QP 0.759 x 85.4 = 64.818 CMF RQ 1.233 x 130.2 = 160.490

CMF UT 0.788 x 85.4 = 67.284 CMF TS 0.944 x 130.2 = 122.858

CMF TU 0.727 x 85.4 = 62.055 CMF ST 1.222 x 130.2 = 159.079

CMF VW 0.505 x 85.4 = 43.129 CMF WX 0.766 x 130.2 = 99.723

CMF WV 0.452 x 85.4 = 38.596 CMF XW 1.133 x 130.2 = 147.511

∑Q 950.511 ∑Q 2194.555

Campuses: Hilltop | MH del Pilar | Pallocan East | Pallocan West | Lipa


Telephone Numbers: +63 43 723 1446 | 980 0041
Website: www.ub.edu.ph
COMPUTATION OF CONSTANT, N X
FORMULA:

∑ H (h)
N X=
∑QCOLUMN

WHERE:
N X – Moment constant @ x-storey
∑ H - Sum of lateral forces for x-storey
∑ Q - Sum of column moments factor for the storey
h – Height of every storey

2ND STOREY
∑H = 6 + 3 = 9
∑ Q = 950.511
h=4

9 (4)
N X=
950.511
N X =0.037874

1ST STOREY
∑ H = 6 + 3 + 7.50 + 4.00 = 20.5
∑ Q = 2194.555
h=4

20.5(4 )
N X=
2194.555
N X =0.037365

Campuses: Hilltop | MH del Pilar | Pallocan East | Pallocan West | Lipa


Telephone Numbers: +63 43 723 1446 | 980 0041
Website: www.ub.edu.ph
COMPUTATION OF COLUMN MOMENT

CM =N X (CMF)

2ND STOREY 1ST STOREY

CM CB 43.129 x 0.037874= 1.633 CM BA 99.723 x0.037365 = 3.726

CM BC 38.596 x 0.037874 = 1.462 CM AB 147.511 x 0.037365 = 5.512

CM DE 67.284 x 0.037874 = 2.548 CM EF 122.858 x 0.037365 = 4.591

CM ED 62.055 x 0.037874 = 2.350 CM FE 159.079 x 0.037365 = 5.944

CM IH 70.035 x 0.037874 = 2.653 CM HG 125.679 x 0.037365 = 4.696

CM HI 64.818 x 0.037874 = 2.455 CM GH 160.490 x 0.037365 = 5.997

CM JK 67.284 x 0.037874 = 2.548 CM KL 122.858 x 0.037365 = 4.591

CM KJ 62.055 x 0.037874 = 2.350 CM LK 159.079 x 0.037365 = 5.944

CM ON 67.284 x 0.037874= 2.548 CM NM 122.858 x 0.037365 = 4.591

CM NO 62.055 x 0.037874= 2.350 CM MN 159.079 x 0.037365 = 5.944

CM PQ 70.035 x 0.037874= 2.653 CM QR 125.679 x 0.037365 = 4.696

CM QP 64.818 x 0.037874= 2.455 CM RQ 160.490 x 0.037365 = 5.997

CM UT 67.284 x 0.037874 = 2.548 CM TS 122.858 x 0.037365 = 4.591

CM TU 62.055 x 0.037874 = 2.350 CM ST 159.079 x 0.037365= 5.944

CM VW 43.129 x 0.037874 = 1.633 CM WX 99.723 x 0.037365 = 3.726

CM WV 38.596 x 0.037874= 1.462 CM XW 147.511 x 0.037365 = 5.512

Campuses: Hilltop | MH del Pilar | Pallocan East | Pallocan West | Lipa


Telephone Numbers: +63 43 723 1446 | 980 0041
Website: www.ub.edu.ph
COMPUTATION OF JOINT FACTOR, J FOR GIRDER

∑ M Columnmoment @ joint
J=
∑ Q GMF @ joint

ROOF LEVEL 2ND FLOOR LEVEL

1.633 0.0382 1.462+3.726 0.0656


@ Joint C= @ Joint B=
42.753 79.059

2.548 0.0332 2.350+4.591 0.0465


@ Joint D= @ Joint E=
37.844+38.926 72.120+77.268

2.653 0.0347 2.455+ 4.696 0.0469


@ Joint I = @ Joint H=
38.276+38.276 76.252+76.252

2.548 0.0355 2.350+ 4.591 0.0487


@ Joint J = @ Joint K=
38.926+32.936 77.268+65.181

2.548 0.0355 2.350+ 4.591 0.0487


@ Joint O= @ Joint N =
38.926+32.936 77.268+65.181

2.653 0.0347 2.455+ 4.696 0.0469


@ Joint P= @ Joint Q=
38.276+38.276 76.252+76.252

2.548 0.0332 2.350+ 4.591 0.0465


@ Joint U= @ Joint T =
37.844+38.926 77.267+72.120

1.633 0.0382 1.462+3.726 0.0656


@ Joint V = @ Joint W =
42.753 79.059

Campuses: Hilltop | MH del Pilar | Pallocan East | Pallocan West | Lipa


Telephone Numbers: +63 43 723 1446 | 980 0041
Website: www.ub.edu.ph
COMPUTATION OF GIRDER MOMENTS

ROOF LEVEL SECOND FLOOR LEVEL

GM CD 42.753 x 0.0382 = 1.633 GM BE 79.059 x 0.0656 = 5.188

GM DC 37.844 x 0.0332 = 1.256 GM EB 72.120 x 0.0465 = 3.351

GM DI 38.926 x 0.0332 = 1.292 GM EH 77.268 x 0.0465 = 3.590

GM ID 38.276 x 0.0347 = 1.326 GM HE 76.252 x 0.0469 = 3.575

GM IJ 38.276 x 0.0347 = 1.326 GM HK 76.252 x 0.0469 = 3.575

GM JI 38.926 x 0.0355 = 1.380 GM KH 77.268 x 0.0487 = 3.765

GM JO 32.936 x 0.0355 = 1.168 GM KN 65.181 x 0.0487 = 3.176

GM OJ 32.936 x 0.0355 = 1.168 GM NK 65.181 x 0.0487 = 3.176

GM OP 38.926 x 0.0355 = 1.380 GM NQ 77.268 x 0.0487 = 3.765

GM PO 38.276 x 0.0347 = 1.326 GM QN 76.252 x 0.0469 = 3.575

GM PU 38.276 x 0.0347 = 1.326 GM QT 76.252 x 0.0469 = 3.575

GM UP 38.926 x 0.0332 = 1.292 GM TQ 77.268 x 0.0465 = 3.590

GM UV 37.844 x 0.0332 = 1.256 GM TW 72.120 x 0.0465 = 3.351

GM VU 42.753 x 0.0382 = 1.633 GM WT 79.059 x 0.0656 = 5.188

Campuses: Hilltop | MH del Pilar | Pallocan East | Pallocan West | Lipa


Telephone Numbers: +63 43 723 1446 | 980 0041
Website: www.ub.edu.ph
WIND LOAD – LONGITUDINAL SECTION
(FACTOR METHOD)
SUMMARY TABLE

JOINTS MEMBERS MOMENT (kN·m)

GIRDER COLUMN

A A-B 5.512

B-A 3.726

B B-E 5.188

B-C 1.462

C C-B 1.633

C-D 1.633

D D-C 1.256

D-E 2.548

D-I 1.292

E-B 3.351

E E-D 2.350

E-F 4.591

E-H 3.590

F F-E 5.944

G G-H 5.997

H-G 4.696

H H-E 3.575

H-I 2.455

H-K 3.575

I I-D 1.326

I-H 2.653

Campuses: Hilltop | MH del Pilar | Pallocan East | Pallocan West | Lipa


Telephone Numbers: +63 43 723 1446 | 980 0041
Website: www.ub.edu.ph
I-J 1.326

J-I 1.380

J J-K 2.548

J-O 1.168

K-J 2.350

K K-H 3.765

K-L 4.591

K-N 3.176

L L-K 5.944

M M-N 5.944

N-K 3.176

N N-M 4.591

N-O 2.350

N-Q 3.765

O-J 1.168

O O-N 2.548

O-P 1.380

P P-O 1.326

P-Q 1.768

P-U 1.326

Q Q-N 3.575

Q-P 2.455

Q-R 4.696

Q-T 3.575

R R-Q 5.997

S S-T 5.944

T-Q 3.590

T T-S 4.591

T-U 2.350

Campuses: Hilltop | MH del Pilar | Pallocan East | Pallocan West | Lipa


Telephone Numbers: +63 43 723 1446 | 980 0041
Website: www.ub.edu.ph
T-W 3.351

U U-P 1.292

U-T 2.548

U-V 1.256

V V-U 1.633

V-W 1.633

W W-T 5.188

W-V 1.462

W-X 3.726

X X-W 5.512

Campuses: Hilltop | MH del Pilar | Pallocan East | Pallocan West | Lipa


Telephone Numbers: +63 43 723 1446 | 980 0041
Website: www.ub.edu.ph
UNIVERSITY OF BATANGAS
COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT

STRUCTURAL DESIGN 1 (REINFORCED CONCRETE)


LABORATORY

TWO STOREY OFFICE BUILDING

GONZALES, SARAH MAE T.


1100779

ENGR. RONALD ALBAY

JUNE 27, 2017

Campuses: Hilltop | MH del Pilar | Pallocan East | Pallocan West | Lipa


Telephone Numbers: +63 43 723 1446 | 980 0041
Website: www.ub.edu.ph
Campuses: Hilltop | MH del Pilar | Pallocan East | Pallocan West | Lipa
Telephone Numbers: +63 43 723 1446 | 980 0041
Website: www.ub.edu.ph

You might also like