APEGS Test: Competency Report

Name APEGS Test


Discipline of Application
Jurisdiction Engineers and Geoscientists BC

EDUCATION

Institution Degree Discipline Location Date

Bachelor of Engineering Mechanical

COMPETENCY SUMMARY

Category Applicant Required


Technical Competence 3.2 3
Communication 3.0 3
Project and Financial Management 3.0 2
Team Effectiveness 3.5 3
Professional Accountability 3.0 3
Social, Economic, Environmental and Sustainability 3.2 2
Personal Continuing Professional Development 3.0 3
EMPLOYMENT HISTORY

Employer Position Supervisor Location Date

1 Employer Three Supervisor Three

2 Employer Two Supervisor Two

3 Employer One Supervisor One

Period 1

Employer:
Position:
Supervisor:
Location:
Date
Major Responsibilities and Projects:

APEGS Test: Competency Report


Period 2

Employer:
Position:
Supervisor:
Location:
Date

Major Responsibilities and Projects:

Period 3

Employer:
Position:
Supervisor:
Location:
Date

Major Responsibilities and Projects:


APEGS Test: Competency Report


COMPETENCY ASSESSMENT

Competency Category 1: Technical Competence Required Average Level: 3

1.1 Regulations, Codes & Standards: Demonstrate knowledge of regulations, codes, standards, and safety - this includes local engineering procedures and practices
as applicable.

Employer Position Validator Date Canadian Environment?

Employer Three

Situation

While working as HVAC Engineer at First Gulf Company, Riyadh, Saudi Arabia, there was the situation raised related to maintaining the ethical code of conduct
with following the safety and other standards.

Action

I was responsible for HVAC mechanical system consisted York reciprocating chiller plants, Petra screw type compressor chiller plant including all pumps and water
treatments of chilled water system.

I also worked on air handling unit’s uni-zone and multi-zones, FCUS, VAVs, package units for main building office of Governor Riyadh, Royal court, Deera mosque,
Masmaq Mosque and Haya buildings. I followed all the ethical standards in the work and maintained the mechanical engineering code of conduct throughout the work
tenure.

Outcome

I implemented the HVAC mechanical system installation with the safe substation determination for the site and for the public spaces. I set the ground fault
protection settings and conducted testing for safety limits which was according to Saudi code of conduct.

The client was very much satisfied with the execution of the work activities.

1.1 Competency Level

APEGS Test: Competency Report


Applicant: 4

1.2 Project & Design Constraints: Demonstrate knowledge of materials, or operations as appropriate, project and design constraints, design to best fit the purpose
or service intended and address inter-disciplinary impacts.

Employer Position Validator Date Canadian Environment?


Modern Architecture Co
Employer Three HVAC Engineer Ltd Thuwal Yes

Situation

The situation was related to design, operation and performance of mechanisms, components and systems.

Action

I planned and managed projects, and prepared material, cost and timing estimates, reports and design specifications for the systems. I analyzed dynamics and
vibrations of mechanical systems. It was followed with supervision and inspection of the installation, modification and commissioning of mechanical systems at
residential & facilities.

Outcome

I developed maintenance standards, schedules and programs through Maximo and provided guidance to maintenance crews. I investigated the mechanical failures or
unexpected maintenance issues which was followed with preparation of root cause analysis along with avoiding the repeated failure.

1.2 Competency Level

Applicant: 3

1.3 Risk Identification & Mitigation: Analyze technical risks and offer solutions to mitigate the risks.

Employer Position Validator Date Canadian Environment?

APEGS Test: Competency Report


Employer Two HVAC Engineer Yes

Situation

I was responsible for both HVAC and KLE, kitchen and laundry services.

Action

It included all pumps and water treatments for chilled water system. There was HVAC system which consisted of about 10,000 ton chillers (Reciprocating and
Centrifugal) of various sizes and various brands including, “Carrier”, “Trane”, “York”. More than 1000 air handling units of various sizes. More than 100 packaged/roof
top units.

Outcome

There were more than 500 split A/C units, 3000 fan coils units and more than 1000 window A/C units. It included large number of kitchen and laundry equipment, cold
storages, etc. combined. I finally prepared a report which included all the points.

1.3 Competency Level

Applicant: 3

1.4 Application of Theory: Apply engineering knowledge to design solutions.

Employer Position Validator Date Canadian Environment?

Saudi Oger Ltd. – Riyadh


Employer Three HVAC Engineer Central Region Yes

Situation

A client came to us reporting power factor surcharges at several of their terminals. I was responsible for reviewing the existing electrical systems and
making recommendations to correct the low power factor issues.
Action

I was able to understand design codes and its specifications. I prepared HVAC site qualifications & BOQ with estimation. I applied adequate knowledge of the
pipe installation, duct installation and plant room installation of HVAC equipment’s. I attained the cooling tower, chiller plants reciprocating, centrifugal, AHUS, and
FCUs commissioning. I applied adequate understanding related to the chilled water blanching and commissioning of the buildings. I handled labors and site
materials.

APEGS Test: Competency Report


Outcome

I executed site safety and followed the SSOW and work permits and ensure work permit receivers on site while execution its confined space, cold, hot and welding and
cutting. All the design activities were carried out with the pipe installation, duct installation and plant room installation of HVAC equipment.

1.4 Competency Level

Applicant: 4

1.5 Solution Techniques: Be able to understand solution techniques and independently verify the results.

Employer Position Validator Date Canadian Environment?


Saudi Oger Limited Thuwal
Employer One HVAC Engineer -Jeddah, KSA Yes

Situation

The feasibility, design, operation and performance of mechanism, components and systems were followed in the design with the situation which was faced
related to mechanical engineering.
Action

I conducted research into the feasibility, design, operation and performance of mechanism, components, and systems. I planned and managed projects, and prepared
material, cost and timing estimates, reports and design specifications for the systems. I analyzed dynamics and vibrations of mechanical systems which was followed
with supervising and inspecting the installation, modification and commissioning of mechanical systems at residential & facilities. I developed maintenance standards,
schedules and programs through Maximo and provide guidance to maintenance crews. I investigated mechanical failures or unexpected maintenance problems and
prepare root cause analysis and avoid repeated failures.

Outcome

I worked on developing maintenance standards along with schedules and programs which were done through Maximo and provided guidance to maintenance crews. It
resulted to be successfully executed utilizing mechanical engineering concepts within the estimated timeline.

APEGS Test: Competency Report


1.5 Competency Level

Applicant: 3

1.6 Safety Awareness: Safety awareness: be aware of safety risks inherent in the design; and Demonstrate Safety Awareness - on-site and possible
safety authorization/certificate as appropriate.

Employer Position Validator Date Canadian Environment?


Saudi Oger Ltd. Thuwal,
Employer Three HVAC Engineer Saudi Arabia Yes

Situation

The situation was faced related to safety risks inherent in design and obtained the safety authorization as appropriate.

Action

I demonstrated awareness of safety risks inherent in a design and/or on-site and/or obtain safety authorization/certificate, as appropriate. It was followed with the
demonstration of all HVAC systems as well as of components of systems. I applied quality control during design and construction including independent design check
and independent reviews of design, field checks and reviews for new buildings. I worked on transferring design intentions to drawings and sketches; and understood
transmittal of design information to design documents.

Outcome

The projects resulted to be completed within the budget while maintaining the safety standards and following all the inherent safety risks. I worked on practicing
the safety aspects with design principles which worked with safe work practices.

1.6 Competency Level

Applicant: 4

APEGS Test: Competency Report


1.7 Systems & Their Components: Demonstrate understanding of systems as well as of components of systems.

Employer Position Validator Date Canadian Environment?

Employer Three

Situation

The technical situation was faced related to the HVAC installation which was needed to be sorted using mechanical engineering skills.

Action

While working as HVAC Engineer at Yamamah Palace, (Official residence of King) ORPR sites, I was responsible for both HVAC and KLE, kitchen and laundry
services. It included all pumps and water treatments for chilled water system. I noted that the HVAC system consisted of about 10,000 ton chillers (Reciprocating and
Centrifugal) of various sizes and various brands including, “Carrier”, “Trane”, “York”. There were more than 1000 air handling units of various sizes. More than 100
packaged/roof top units. More than 500 split A/C units, 3000 fan coils units and more than 1000 window A/C units. I also combined large number of kitchen and laundry
equipment, cold storages, etc.

Outcome

The outcome resulted to be positive with the installation of HVAC system and technical report was also prepared at the end which was presented to the senior
management.

1.7 Competency Level

Applicant: 3

1.8 Project & Process Lifecycle: Exposure to all stages of the process/project life cycle from concept and feasibility analysis through implementation.

Employer Position Validator Date Canadian Environment?

Employer Three Yes


Situation

While conducting the duties at Saudi Oger Ltd. as an HVAC Engineer, there was the process of project life cycle which include concept and feasibility analysis.

APEGS Test: Competency Report


Action

I was able to understand the design codes and its specifications. I conducted the preparation of HVAC site qualifications & BOQ with estimation and adequate
knowledge of the pipe installation, duct installation and plant room installation of HVAC equipment’s. I also obtained significant knowledge related to the cooling tower,
chiller plants reciprocation, centrifugal, AHUS, and FCUs commissioning. I applied adequate knowledge related to chilled water blanching and commissioning of the
buildings. I also handled labors and site materials with following the site safety and work permits for ensuring receivers on site while executing the confined space with
cold, hot, welding and cutting.

Outcome

The work outcome was based on following all the project and process lifecycle along with addressing other related principles. I successfully obtained all the associated
work results under the guidance of senior management in the work.

1.8 Competency Level

Applicant: 3

1.9 Quality Control: Understand the concept of quality control during design and construction including independent design check and independent reviews of
design, field checks and reviews.

Employer Position Validator Date Canadian Environment?


Employer Two

Situation

All quality control standards were maintained for understanding the concept of design and construction and the situation initiated which was needed to be addressed.
APEGS Test: Competency Report
Action

I worked on following all the regulations, standards, codes, and safety which included local engineering processes and practices as applicable. I applied knowledge of
materials, or operations as appropriate, project and design constraints, design to best fit the purpose or service intended and address inter-disciplinary impacts. I
worked on analyzing the technical risks and offered solutions for mitigating the risks while maintaining the quality standards. I applied engineering knowledge to design
solutions. It included solution methods and independent results verification. I also demonstrated awareness of safety risks inherent in a design and/or on-site and/or
obtain safety authorization/certificate, as appropriate. Furthermore, I demonstrated understanding of all HVAC systems as well as of components of systems. I applied
quality control during design and construction including independent design check and independent reviews of design, field checks and reviews for new buildings. I
worked on transferring design intentions to drawing and sketches along with understanding the design information transmittal to design documents.

Outcome

All the project outcomes were specified with the regulations and standards followed in the work. I obtained definite work results within the specified project timeline.

1.9 Competency Level

Applicant: 2

1.10 Engineering Documentation: Transfer design intentions to drawings and sketches; Understand transmittal of design information to design documents.

Employer Position Validator Date Canadian Environment?

Employer Three Yes

Situation

The situation occurred when preparing the documents related to project which included sketches and drawings.

Action

Appropriate actions were taken during the project which included preparing reports and analyzing the work related concepts. I also understood the design information
transmittal to design documents and made appropriate research regarding numerous factors for adequate work activities implementation.
APEGS Test: Competency Report
Outcome

The project results were accomplished with the adequate actions which were being taken regarding the work reports preparation along with preparing the presentation
of work activities within the defined timeline.

1.10 Competency Level

Applicant: 3

Competency Category 2: Communication Required Average Level: 3

2.1

Employer Position Validator Date Canadian Environment?

Situation

Action

.
Outcome

2.1 Competency Level

APEGS Test: Competency Report


Applicant: 3

2.2 Written Communication: In Writing.

Employer Position Validator Date Canadian Environment?

Situation

Action

Outcome

2.2 Competency Level

Applicant: 3

2.3 Reading & Comprehension:

Employer Position Validator Date Canadian Environment?

Situation

Action

APEGS Test: Competency Report


Outcome

2.3 Competency Level

Applicant: 3

Competency Category 3: Project and Financial Management Required Average Level: 2

3.1 Project Management Principles:

Employer Position Validator Date Canadian Environment?

Situation

Action

Outcome

APEGS Test: Competency Report


3.1 Competency Level

Applicant: 3

3.2 Level of Responsibility:

Employer Position Validator Date Canadian Environment?

Situation

Action

Outcome

3.2 Competency Level

Applicant: 3

3.3 Expectations vs Resources:

Employer Position Validator Date Canadian Environment?

APEGS Test: Competency Report


Situation

Action

Outcome

3.3 Competency Level

Applicant: 3

3.4 Financial & Budgets:

Employer Position Validator Date Canadian Environment?

APEGS Test: Competency Report


Situation

Action

Outcome

3.4 Competency Level

Applicant: 3

3.5 Response to Feedback:

Employer Position Validator Date Canadian Environment?

Situation

Action

APEGS Test: Competency Report


Outcome

3.5 Competency Level

Applicant: 3

Competency Category 4: Team Effectiveness Required Average Level: 3

4.1 Work Respectfully:

Employer Position Validator Date Canadian Environment?

Situation

Action

Outcome

4.1 Competency Level

Applicant: 4

4.2 Resolve Differences:

APEGS Test: Competency Report


Employer Position Validator Date Canadian Environment?

Situation

.
Action

Outcome

4.2 Competency Level

Applicant: 3

Competency Category 5: Professional Accountability Required Average Level: 3

5.1 Code of Ethics:

Employer Position Validator Date Canadian Environment?

Situation

Action

APEGS Test: Competency Report


Outcome

5.1 Competency Level

Applicant: 3

5.2 Awareness of Limitations:

Employer Position Validator Date Canadian Environment?

Situation

Action

Outcome

5.2 Competency Level

Applicant: 3

APEGS Test: Competency Report


5.3 Conflict of Interest:

Employer Position Validator Date Canadian Environment?

Situation

Action

Outcome

5.3 Competency Level

Applicant: 3

5.4 Professional Liability:

Employer Position Validator Date Canadian Environment?

Situation

Action

APEGS Test: Competency Report


Outcome

5.4 Competency Level

Applicant: 3

5.5 Use of Stamp & Seal:

Employer Position Validator Date Canadian Environment?

Situation

Action

Outcome

5.5 Competency Level

Applicant: 3

APEGS Test: Competency Report


5.6 Strengths & Weaknesses:

Employer Position Validator Date Canadian Environment?

Situation

Action

Outcome

5.6 Competency Level

Applicant: 3

Competency Category 6: Social, Economic, Environmental and Sustainability Required Average Level: 2

6.1 Public Impacts & Safeguards:

Employer Position Validator Date Canadian Environment?

APEGS Test: Competency Report


Situation

Action

Outcome

6.1 Competency Level

Applicant: 2

6.2 Engineering & the Public:

Employer Position Validator Date Canadian Environment?

Situation

Action

Outcome

APEGS Test: Competency Report


6.2 Competency Level

Applicant: 3

6.3 Role of Regulatory Bodies:

Employer Position Validator Date Canadian Environment?

Validator Three, PENG Jan 2016 - Mar 2018 Yes

Situation

Action

Outcome

6.3 Competency Level

Applicant: 3

APEGS Test: Competency Report


6.4 Sustainability & Practice Guidelines:

Employer Position Validator Date Canadian Environment?

Situation

Action

Outcome

6.4 Competency Level

Applicant: 4

6.5 Promotion of Sustainability:

Employer Position Validator Date Canadian Environment?

Situation

Action

APEGS Test: Competency Report


Outcome

6.5 Competency Level

Applicant: 4

Competency Category 7: Personal Continuing Professional Development Required Average Level: 3

7.1 Professional Development Activities: Demonstrate completion of professional development activities.

Employer Position Validator Date Canadian Environment?

Situation

Action

Outcome

APEGS Test: Competency Report


7.1 Competency Level

Applicant: 3

7.2 Identify Training Needs:

Employer Position Validator Date Canadian Environment?

Situation

Action

Outcome

APEGS Test: Competency Report


7.2 Competency Level

Applicant: 3

7.3 Professional Development Plan:

Employer Position Validator Date Canadian Environment?

Situation

Action

Outcome

7.3 Competency Level

Applicant: 3

APEGS Test: Competency Report