4 Jir-L&t-26.06.18 PDF

You might also like

Download as pdf
Download as pdf
You are on page 1of 2
echnico (India) Private Limited AUTHORITY ON FIRE PROTECTION JOINT INSPECTION REPORT DATE OF INSPECTION + 25.06.2018 & 26.06.2018 PLACE OF INSPECTION + TECHNICO (INDIA) B:7.ROAD WORKS, KOLKATA CUSTOMER = NPCIL, PROJECT : FIRE PROTEGTION SYSTEM FOR NPCIL.~ L&T KAPP UNITH#S & #4 AND RAPP UNIT #78 #8 NPCIL PO. ON LAT + CMMIMMP/23- 7-10 -6/PO/6070 DTD. 22.07.2011 & (CMMHMB/22 — 79 ~ 10 - 016/PO/8415 DTD. 22.07.2011, MAIN CONTRACTOR LAT LTD, SUBCONTRACTOR /MFGR. : TECHNICO INDIA PVT. LTD., KOLKATA LT PO ON TIPL + E5470P02000031 DTD. 31.07.2012 FOR KAPP UNIT #3 & #4 & £E5472P02000028 DTD. 08.12.2012 FOR RAPP UNIT #7 & #8 REE, DOG. FOR INSPECTION: |) QAP for LCP: TIPLILETIKAPP 384, RAPP 7&8IQAP/16-17103 (REV-0) |i) App. Functional Test Procedure: KAPP-384/67 140/6008/TP li) Approved Dra. No.: KAPP-384167 140/6101/ED (REV-1), KAPP-384/67140(6103/ED (REV-1) & KAPP.284/87140/6105/ED (REV-1), rem -FERED FOR INSPECTION/CHECKIN /ATION: 1. PL~7,8,9, 10,11, 12, 15, 16, 17, 19, 20-11 Nos Panels .ETAILS OF INSPECTIONS OBSEV/ |E NOTED BELO\ 1. QAP Stage No.3 1: Dimensional check done & found ok, Al the panels visually checked and found that 3 nos of panels (PL 10, 11 8 12) doors have misalignment with respect to the body, cosing and opening operation is sticky. Door locking & unlocking is also sticky. Pane! no (PL 9, 17, 19, 16, 7, 8, 15, 20) doors opening, closing, locking & unlocking found smooth, hence rest ofthe ‘3nos panels (PL 10, 14 & 12) should be rected for their smooth operation of cosing & opening of doors & locks. Bom checked as per approved drawing & found satisfactory. ‘QAP Stage No3.2: 11 nos of panels checked of winng continuly and circuitry & found satisfactory as per Dra, ‘QAP Stage No 3.4; Functional check 100% done as per approved procedure and result found satisfactory. During Functional test observed points as per mentioned in annexure-t have tobe rectified in as bul drawings. U291930R1979PTCUO0844 Road, Kolkata 700 029 * Phone +91 33 6620 0400 Registered Office : Plot No. 1986, , NH 5, Bhubaneswar 751 019, Odisho * Phone +91 674 247 0540 Branch Office : 3B B Gonguly Street, Kolkata 700 012 @technico.co. + wwwechnico.co.in Annexure -1 Following pints have been observed and have to be rectified in as built drawing: 1. Ferrule nos to be provided in ED. 2. In drawing no: KAPP-3&4/67140/6105/ED (Sheet No S of 14) & KAPP-3&4/67140/6103/ED (Sheet no 4 of 6) EV open and close switch indication printed wrongly, is to be rectified. 3. 220V AC incoming supply termination details to be provided in all the LCP wiring drawing. 4. In drawing no: KAPP-3&4/67140/6101/ED (Sheet no: 2 of 4) MCB no to be changed from MCB2 tomce3, 4 5. Internal components arrangement of LCP is to be revised in GA. 6. In drawing no: KAPP-3&4/67140/6101/ED (Sheet no: 2 of 4) 2 / < symbol is to be mentioned for all the PS contacts. 7. In drawing no: KAPP-3&4/67140/6105/ED (Sheet No 6 of 14) fire detected potential free contact one Sub-EV no printed wrongly, is to be rectified. 8. Wiring Details is to be provided from motherboard (PCB) to FD fault signal (PCB) & FD fault signal (PCB) to Fire Detected Signal (PCB). A, sh Cle 8 . "2oe/B 9 a Aca 26fee) 1 TIPL Lar Si Deepa THe)

You might also like