DPR – PREPARATION

DATA
1. Location
2. Revenue Village
3. Taluk
4. District
5. VAO Statement
1. Registered Ayacut
2. Average Cultivation
3. Fasali details (5 Years)
4. Source of supply
a. Own Free catchment
b. Upper Tank
c. From Anicut across river
5. Surplus goes to
a. Lower Tank (or) River
6. Memoir of Tank
7. Village Map
8. F.M. Sketch of Tank
9. Ayacut Survey No
10. No.of Surplus arrangement details
11. No.of Sluice Details
12. Water spread area Survey Nos. in foreshore area.

6. G.I.Sheet
7. Walk through survey and Identify the existing conditions of Tank
1. Upper Tank
2. Lower Tank
3. Tank Bund
4. Surplus Arrangement
5. No.of Sluices
6. Water Spread area, Foreshore area, Ayacut area
7. Surplus course
8. Supply Channel
8. Total Length of bund from L.S 0m
9. L.S of weir and length of weir, existing condition of weir, Type of weir, apron
condition, surplus course condition
10. L.S of Sluices
Type of Sluice
Vent Size
Barrel Length
Existing Condition of Slucie

11. Levels (Connected with MSL)


Tank Weir FTL Connected with MSL level
(Near from PWD Tanks, Anicut)
Temporary Bench mark fixied @ LF end and RF end

L.S & C.S of Tank bund


@ Every 50m intervals
C.S of weir,
C.S of Sluice
Sill level of sluice
Foreshore levels at every 50m interval
Deepest bed level
Contour levels for water spread area at every 10m intervals

Preparation of Report for existing condition of tank and to discuss with Higher
officials

Proposals

1. Strengthening of tank bund and raising the Tank Bund for bund standards. Top width
3.00m, side slopes
Front 1 ½ : 1, Rear 2 : 1

2. (i) Renovation of existing weir


(ii) Reconstruction of weir
(iii) Newly construction of weir

3. (i) Renovation of Sluice


(ii) Reconstruction of Sluice
(iii) Newly Construction of Sluice
(iv) U/S leading channel of Sluice
(v) D/S Field channel of Sluice

4. Desilting of tank
DPR Preparation - Detailed Estimate Preparation

1. Strengthening of Tank Bund


(i) L.S of Tank Bund (Map)

(Existing Top Bund level, Existing ground level, deep bed level, location of existing
structures)

(ii) C.S of Tank Bund @ every 50m (Map)


Top width = 3.00m Front : 1 ½ : 1
FTL, M.W.L, T.B.L Rear : 2 : 1

(iii) Area calculation

Earthwork calculation sheet

SI.No CS at Area Mean area Discharge Qty


M2 M2 M M3
1 0 10 - 0 -
2 50 20 15 50
Total
Add 5% untouched levels
Total Quantity

Proposed for Renovation (or) Rehabilitation of Existing weir (or) Construction of weir

Hydrology
1. Free Catchment area
2. Intercepted catchment
3. Combined catchment area
4. Computation of max flood discharge
5. Fixation of F.T.L
M.W.L
T.B.L
6. Block levels @ weir site

Design of weir (N.C Weir (or) B.C Weir)

Max flood discharge

Q = cd L H 3/2 Q = Max flood discharge in Cumecs


C = Co-efficient of discharge
for N.C.Weir = C = 1.845 S.C.Weir = 1.969
for B.C.Weir = C = 1.66 Bye wash = 1.291
for H.C.Weir = 2.43 N.G.E. = 1.107.
Q L = Length of weir in m.
L =
Cd H 3/2 H = Head over crest M.
(M.W.L – F.T.L)

L=M H = 0.45m (or)


0.60m

From the surplus arrangement site block levels to Asses the average bed level

Average bed level = 50.000m


FTL = 51.200m
MWL = 51.800m
TBL = MWL + Freeboard
= 51.800 + 1.000
= 52.800m

Height of weir = 1.20m


Thickness of apron
Provide Minimum = 0.75m

0.60m = 1 : 3 : 6 Concrete M10


Using 20mm HBGS Jelly
0.15m = Wearing cost
C.C 1 ½ : 3 M20
Using 20mm HBGS Jelly

D/S apron FPS MPS

Hs Hs
Length of solid apron L1 = 4c x 4C
10 33

L1 = Length in foot (or) metre course sand C = 12


C = Bligh’s creep coeff HBS C = 10
Hs= Height of weir in ft / metre Clay C=C
DMR C=C
HR C=O

Total Length of solid apron FPS MPS

HS d Hs d
L = 10C 10C
10 75 33 75
Hs = Height of weir d = discharge in
d = Discharge in cuses/ ft.run cusesc/m.run

Length of Talus apron = L – L1


Discharge Calculation FPS MKS
S.C Weir 3.568 LH3/2 1.969 LH 3/2
N.C Weir 3.343 LH3/2 1.845 LH 3/2
B.C Weir 3.007 LH 3/2 1.66 LH 3/2
H.C Weir 4.4 LH 3/2 2.43 LH 3/2
Bye wash 2.338 LH 3/2 1.291 LH 3/2
N.G.E 2.01 LH 3/2 1.107 LH 3/2

D/S. Cut off wall


Scour Depth
Max.F- Discharge = m3/sec
Length of weir
q = = Cumec/m
Discharge

Normal Scour = R = 1.35 (q2) Silt factor f = 0.80 to 1.0


f f=1

R= m

Scour level = MWL - 1.5R = +


Scour depth = Ave. bed level = Scour level.

Adopt minimum 1.50m for scour depth for D/S cutoff wall

Creep length
Creep Length = CHS Hs = Height of weir - 1.20m

= 12 x 1.2 = 14.40m C = 12

Creep length provided = 1.5 + 2.0 + 1.00 + 8.00 + 1.5 = 14 14>12


Hence, safe.

Exist gradient

H = Height of weir
b = Width of impervious apron
d = Depth of D/S cutoff wall

ʎ = b/d
ʎ = 1 + √1 + ʎ 2
2

Exit gradient H/d x 1 1 to 1


∏ʎ 5 7
Safe
Rehabilitation of Weir

1. Pointing in CM 1:3 (R.R Masonry Structures)


2. Top Plastering in CM 1:4
3. To arrest body wall leakage to provide skin wall @ U/S of body wall
4. D/S Solid apron, cutoff wall
5. D/S Talus apron
6. Abutment, U/S wings, D/S wings

Reconstruction of Sluice

Sill level = + Plug hole = 0.08mφ

Vent Size = 0.15m x 0.15m F.T.L to Sill level


Barrel length = upto 2.40m = wing wall
Wing wall type (or) Tower head above 2.40m = Tower Head

U/S leading channel = Barrel slab concrete = 20 Cm thickness M15.


D/S field channel = Steel = 100 Kg / m2
Plug & Plug rod =

Desilting of Tank (Water spread area)

1) Water spread area Map F.T.L. = +56.500.


2) F.T.L. Contour
3) Deepest sill level contour
4) Grid level every 10m.
5) Area calculation every 50 Cm intervals.

Contour Cumulative
Sl. Contour Area in Mean Capacity
intervals Capacity
No. Level in m. Sq.m. area M.Cum.
@m M.Cum.
53.000
1 - - - - -
(Sill level)
2 53.500 0.50

3 54.000 0.50

4 54.500 0.50

5 55.000 0.50

6 56.000 0.50
Contour Cumulative
Sl. Contour Area in Mean Capacity
intervals Capacity
No. Level in m. Sq.m. area M.Cum.
@m M.Cum.

7 56.500 0.50

Original capacity of Tank = mm3


Present capacity of Tank = mm3
--------------------
Desilting quantity = mm3
--------------------

= mm3
(-) Strenghthening of Tank Bund
Earth work quantity = (-) mm3

--------------------
Proposed desilting quantity = mm3
---------------------
DPR Estimate

1. Contents
2. Index Map
3. Report
4. General Abstract
5. Hydraulic Particulars Salient features
6. Strengthening of Tank Bund
7. Earthwork Calculation sheet
8. Detailed Estimate
9. Desilting Calculation sheet
10. Reconstruction of Weir D.E
11. Reconstruction of Sluice D.E
12. Lead
13. Data
14. E.W (Strengthening tank bund) Abstract
15. Desilting E.W Abstract
16. Reconstruction of weir Abstract
17. Reconstruction of Sluice Abstract

MAPS

1. Index Map
2. Catchment Area Map
3. Catchment Area Calculation Sheet
4. Reconstruction of Weir , Plan, Section
5. Reconstruction of Sluice, Plan, Section
6. L.S Plan (Tank Bund)
7. C.S Plan
8. Contour Level Map
9. Content Level Calculation Sheet
10. Ayacut Map
Report

Introduction : Name of Tank, Location of Tank, Approach from which place


through MR Km and CT Sub Basin, Main Basin, Source of
Supply, Surplus goes to latitude, longitude, Scheme details

Hydrology : Free catchment, intercepted catchment area, combined catchment


area, Max flood discharge capacity of the tank, Registered ayacut
of tank

Existing Conditions

Tank Bund : Total length


Existing standards
Jungle growth

Surplus Arrangement

1. No.of Surplus arrangement


Location @ LS
Length of Surplus arrangement
Type of Weir
Existing condition (Repair (or) Damaged condition)

Sluice
No.of Sluices
Location @ LS
Type of Sluice
Existing condition (Repair (or) Damaged Condition)
Sill level

Water Spread area of Tank

Water spread area of Tank


Jungle growth
Original capacity of Tank
Existing condition (Silted)

Proposals

Tank Bund : Strengthening of tank bund Earth work Qty F.T.L + M.W.L+
T.B.L+ Top width 3.00m Side slopes front 1 ½ : 1 Rear 2 : 1

Surplus Arrangements : Reconstruction of N.C. weir @ L.S with the length of m.


Discharging capacity of the weir is m3/s as per hydraulic
design necessary cutoff wall, apron, talus apron, abutment and
wings are made in the estimate.
Type of Weir :
Length of Weir :
Max flood discharge :
F.T.L :
M.W.L :
T.B.L :
Height of body wall :
D/S Solid apron length :
D/S cutoff wall depth :

Sluice : Reconstruction of wing wall type sluice @ L.S m. Provision for U/S
leading channel with a length of m and D/S field channel for a length of
m are made in this estimate. Necessary provision for plug & plug rod has been
made in this estimate

Sill level :
Type of Sluice :
F.T.L :
M.W.L :
Vent Size : 0.15 x 0.15m
Plug hole size : 0.08mφ
Barrel length : m
Barrel size : 0.60x0.60m

Desilting of Tank : Necessary contour levels has been tank in water spread area of
tank. Per calculation necessary desilting Qty has been made in
this estimate

Conclusion : Estimate prepared based on the schedule of rate 2016-17


amount works out to Rs.
Hydraulic Particulars

1. Name of Tank :
2. Village :
3. Taluk :
4. District :
5. Latitude, Longitude :
6. Free Catchment :
7. Intercepted Catchment :
8. Combined Catchment :
9. Max flood Discharge :
10. Capacity of F.T.L :
11. Registered Ayacut :
12. Water Spread Area :
13. F.T.L M.W.L TBL :
14. Tank Bund

Length of Bund : m
Top width : 3.00m
Side Slopes Front : 1½:1
Rear : 2 : 1

15. Surplus arrangement :

Length of Weir :
Type of weir :
Discharging capacity of weir :
Height of weir :
Head over crest :
Cutoff wall depth :
Length of solid apron :

16. Sluice
No.of Sluices :
Sluice at LS :
Type of Sluice : Wing wall Type
Sill level of Sluice : + m
Vent size : 0.15x 0.15m
Plug hole : 0.08m
Barrel length : 10m
Barrel size : 0.60m x 0.60m

Ayacut
Registered Ayacut : Acres
Average Cultivation : Acres
Gap : Acres
General Abstract

1. Strengthening of Tank Bund : Rs. 2,00,000/-


2. Desilting of Tank : Rs. 8,00,000/-
3. Construction of Weir : Rs. 15,00,000/-
4. Reconstruction of Sluice : Rs. 12,00,000/-

Provision

1. Provision for surveying leveling 1% : Rs.


2. Provision for P.S Charges 1.25% : Rs.
3. Provision for Contingencies 1.25% : Rs.
4. Provision for Unforeseen items 1% : Rs.
5. Advertisement charges 1% : Rs.
6. Photographic, documentation dewatering : Rs.
7. Labour werlfare fund 1% : Rs.

Total Rs.