Debottlenecking Study and Basic Engineering: Sow (11-10-2020) Kothari Response Indczech Response Remark
Debottlenecking Study and Basic Engineering: Sow (11-10-2020) Kothari Response Indczech Response Remark
Debottlenecking Study and Basic Engineering: Sow (11-10-2020) Kothari Response Indczech Response Remark
4. Reactor conversion and selectivity Based on statistical model and simulation, optimum
optimization: value obtained for conversion, selectivity and yield.
Reactor conversion & selectivity has to be studied
and optimized to increase productivity.
5. Oligomer formation optimization: Oligomer formation was high due to high temperature
At present the Oligomer formation is high as operation in the reactor. Based on low temperature
compared to design. This leads to lower operation, Oligomer generation can be minimised. Exact
profitability. This has to be studied and optimized. quantity could not be determined in the absence of
kinetic data.
6. Reactor product draw-off: IndCzech’s design is with side draw to a low NPSH pump.
The reactor product draw-off is practiced from the For liquid retrained to compressor at high level,
reactor circulation line-up instead of the side draw- IndCzech has suggested to replace the existing KOD with
off nozzle, as high level required to cater for draw- a bigger Size KOD with agreed (both KPL and indczech)
off pump NPSH gives liquid entrainment to Liquid carry over assumption.
overhead compressor.
7.Process simulation of the entire train: Aspen plus V11 _ Polymer base Simulation package.
Carry out a complete process simulation of the 1. Pre-simulation – to match with existing plant
entire train and generate the streamwise and condition (27% iB conc).
component-wise mass balance. 2. 36% iB conc simulation for detailed model,
Simulation and Optimization performed.
- HMBT,
- Physical properties,
- Product quality (MW, Flash point, Viscosity)
3. Case study performed:
This document is controlled copy of IndCzech Engineering Private Limited. Neither the whole nor any part of this document may be disclosed to others or reproduced,
stored in a retrieval system, or transmitted in any form without prior written consent of the company.
Page 2 of 7
DEBOTTLENECKING STUDY AND BASIC ENGINEERING
25. Flare System: During Detail Engineering based on the system volumes
Review and provide basic design for revamping of and the relief settings during detailed engineering. Some
the flare system for increased capacity arising out New equipment Sizes need vendor confirmation.
of debottlenecking.
26. PSM conformity: Design changes confirm to PSM guidelines.
KPL has recently performed a gap analysis and has
action in hand for conforming the plant and its
management systems to Process Safety
Management standards as defined in OSHA 29 CFR
1910.119. The BEC shall ensure that its design
recommendations continue to conform to PSM
guidelines.
27. Utility Requirement: Utility Summary submitted.
Provide revised battery limit requirements of all - Cooling water,
utilities including power. - Steam,
- Hot oil,
This document is controlled copy of IndCzech Engineering Private Limited. Neither the whole nor any part of this document may be disclosed to others or reproduced,
stored in a retrieval system, or transmitted in any form without prior written consent of the company.
Page 6 of 7
DEBOTTLENECKING STUDY AND BASIC ENGINEERING
This document is controlled copy of IndCzech Engineering Private Limited. Neither the whole nor any part of this document may be disclosed to others or reproduced,
stored in a retrieval system, or transmitted in any form without prior written consent of the company.