Professional Documents
Culture Documents
MDL-VIM-001 - Task Plan Rev 1
MDL-VIM-001 - Task Plan Rev 1
MDL-VIM-001 - Task Plan Rev 1
VIM-001
Installation, Commissioning and Testing
Guidance
DATE 28/01/20
REV 0
Contents
1. Introduction...................................................................................................................................3
1.1. Reference Documents...............................................................................................................3
1.2. Roles and Responsibilities..........................................................................................................4
1.3. First Delivery..............................................................................................................................5
1.4. Second Delivery.........................................................................................................................6
1.5. Third Delivery............................................................................................................................7
1.6. Fourth Delivery..........................................................................................................................8
1.7. Hydraulic Flushing......................................................................................................................9
1.8. Commissioning/Function Testing...............................................................................................9
1.9. Commissioning/Function Testing Checklist..............................................................................10
1.10. Load Test..............................................................................................................................13
1.11. Sign Off................................................................................................................................13
MDL-ENG-STD-001 REV 1 2 OF 14
©2020 Maritime Developments Ltd
CONFIDENTIAL - do not copy, cite or distribute without express permission of Maritime Developments Ltd
DOCUMENT No MDL-VIM-001-PRO-001
DATE 28/01/20
REV 0
1. Introduction
This document outlines the major tasks that will make up the commissioning, function testing and
mobilisation of the Pipe Handling System. The following is based on 4 main shipments of equipment
from Singapore to Astrakhan.
MDL-ENG-STD-001 REV 1 3 OF 14
©2020 Maritime Developments Ltd
CONFIDENTIAL - do not copy, cite or distribute without express permission of Maritime Developments Ltd
DOCUMENT No MDL-VIM-001-PRO-001
DATE 28/01/20
REV 0
The MDL on-site team shall be made up of the following personnel, from 01/03/2020:
1. 1-Off Equipment Supervisor
2. 1-Off Hydraulic/Mechanical Technician
3. 1-Off Electrical Technician
The MDL team shall be onsite to supervise the tasks mentioned only.
Vimar to take care of lift planning for unloading Flat Racks & containers from wagons.
Specific reference shall be made to TRA and TBT documents applicable to the site where the works
are being carried out.
MDL-ENG-STD-001 REV 1 4 OF 14
©2020 Maritime Developments Ltd
CONFIDENTIAL - do not copy, cite or distribute without express permission of Maritime Developments Ltd
DOCUMENT No MDL-VIM-001-PRO-001
DATE 28/01/20
REV 0
MDL-ENG-STD-001 REV 1 5 OF 14
©2020 Maritime Developments Ltd
CONFIDENTIAL - do not copy, cite or distribute without express permission of Maritime Developments Ltd
DOCUMENT No MDL-VIM-001-PRO-001
DATE 28/01/20
REV 0
DATE 28/01/20
REV 0
MDL-ENG-STD-001 REV 1 7 OF 14
©2020 Maritime Developments Ltd
CONFIDENTIAL - do not copy, cite or distribute without express permission of Maritime Developments Ltd
DOCUMENT No MDL-VIM-001-PRO-001
DATE 28/01/20
REV 0
7 Unload & Assemble 1-Off Control System for Tensioner & Winch
MDL-ENG-STD-001 REV 1 8 OF 14
©2020 Maritime Developments Ltd
CONFIDENTIAL - do not copy, cite or distribute without express permission of Maritime Developments Ltd
DOCUMENT No MDL-VIM-001-PRO-001
DATE 28/01/20
REV 0
MDL-ENG-STD-001 REV 1 9 OF 14
©2020 Maritime Developments Ltd
CONFIDENTIAL - do not copy, cite or distribute without express permission of Maritime Developments Ltd
DOCUMENT No MDL-VIM-001-PRO-001
DATE 28/01/20
REV 0
11
MDL-ENG-STD-001 REV 1 10 OF 14
©2020 Maritime Developments Ltd
CONFIDENTIAL - do not copy, cite or distribute without express permission of Maritime Developments Ltd
DOCUMENT No MDL-VIM-001-PRO-001
DATE 28/01/20
REV 0
MDL-ENG-STD-001 REV 1 11 OF 14
©2020 Maritime Developments Ltd
CONFIDENTIAL - do not copy, cite or distribute without express permission of Maritime Developments Ltd
DOCUMENT No MDL-VIM-001-PRO-001
DATE 28/01/20
REV 0
MDL-ENG-STD-001 REV 1 12 OF 14
©2020 Maritime Developments Ltd
CONFIDENTIAL - do not copy, cite or distribute without express permission of Maritime Developments Ltd
DOCUMENT No MDL-VIM-001-PRO-001
DATE 28/01/20
REV 0
MDL-ENG-STD-001 REV 1 13 OF 14
©2020 Maritime Developments Ltd
CONFIDENTIAL - do not copy, cite or distribute without express permission of Maritime Developments Ltd
DOCUMENT No MDL-VIM-001-PRO-001
DATE 28/01/20
REV 0
Attach A&R Winch wire to end of test pipe and pull against
2 tensioners to perform load test
Date:
Sign & Print: MDL SITE REPRESENTATIVE
Date:
Sign & Print: CLIENT SITE REPRESENTATIVE
Comments:
MDL-ENG-STD-001 REV 1 14 OF 14
©2020 Maritime Developments Ltd