An UDP on “HYDRO POWER PLANT’

CERTIFICATE

This is to certify that research work in this UDP entitled


“Hydro was
Power Plant”

carried out by
Mr. PARMAR
NARESHKUMAR
Enrollment
No.166100309023
at Christ

Polytechnic Institute, Rajkot


for partial fulfillment of Diploma Engineering to be awarded by

Gujarat Technological University. This research work has been carried out under my supervision

and is to the satisfaction of department. Theork


students
has been
w accepted.

Date: ________________

Place: Rajkot

Under guidance of Lab in charge


Miss. HIRAL TRIVEDI Mr.NARESH NADIYAPARA
(Lecturer,E.E.Dept. C.P.I.,Rajkot) Miss.HIRAL TRIVEDI
(Lecturer,E.E.Dept. C.P.I.,Rajkot
)

Mr. H.N. PARVADIYA


(H.O.D. E.E.Dept.C.P.I.,Rajkot)
CERTIFICATE

This is to certify that research work in this UDP entitled


“Hydro was carried
Power Plant”

out byMr.MARU DINESH


Enrollment
No.156100309032 at Christ Polytechnic Institute,

Rajkotfor partial fulfillment of Diploma Engineering to be awarded by Gujarat Technological

University. This research work has been carried out under my supervision and is to the satisfaction

of department. The studentshas


work
been accepted.

Date: ________________

Place: Rajkot

Under guidance of Lab in charge


Miss. HIRAL TRIVEDI Mr.NARESH NADIYAPARA
(Lecturer,E.E.Dept. C.P.I.,Rajkot) Miss.HIRAL TRIVEDI
(Lecturer,E.E.Dept. C.P.I.,Rajkot
)

Mr. H.N. PARVADIYA

(H.O.D. E.E.Dept.C.P.I.,Rajko
CERTIFICATE

This is to certify that research work in this“Hydro


UDP entitled was carried
Power Plant”

out byMr. PITHADIYA KALPESH


Enrollment No.
176108309006
at Christ Polytechnic

Institute, Rajkot
for partial fulfillment of Diploma Engineering to be awarded by Gujarat

Technological University. This research work has been carried out under my supervision and is to

the satisfaction of department. The students


has been
work
accepted.

Date: ________________

Place: Rajkot

Under guidance of Lab in charge


Miss.HIRAL TRIVEDI Mr. NARESH NADIYAPARA
(Lecturer,E.E.Dept. C.P.I.,Rajkot
) Miss.HIRAL TRIVEDI
(Lecturer E.E.Dept. C.P.I.,Rajkot
)

Mr.H.N. PARVADIYA

(H.O.D. E.E.Dept.C.P.I., Rajko


CERTIFICATE

This is to certify that research work in this UDP entitled


“Hydro was carried
Power Plant”

out by Miss. ODEDRA VAIBHAVI


Enrollment No.
166100309020
at Christ Polytechnic

Institute, Rajkot
for partial fulfillment of Diploma Engineering to be awarded
Gujaratby

Technological University. This research work has been carried out under my supervision and is to

the satisfaction of department. The students work has been accepted.

Date: ________________

Place: Rajkot

Under guidance of Lab in charge

Miss.HIRAL TRIVEDI Mr. NARESH NADIYAPARA


(Lecturer,E.E.Dept. C.P.I.,Rajkot
) Miss.HIRAL TRIVEDI
(Lecturer E.E.Dept.C.P.I.,Rajkot)

Mr.H.N. PARVADIYA

(H.O.D. E.E.Dept.C.P.I., )Rajkot


Student signature
166100309020
166100309020

Student signature
166100309020

Student signature
Student signature
ABSTRACT

 Today’s fast moving world, most of the required to electricity. Delivering supply of
electricity to its customers has become an important part of people.
 Smaller dams mainly serve
irrigation purposes, the world's 44 largest reservoirs all
havehydropower
as theirmain goal
. ... In suitable locations and purely financial
terms,hydropower
can be a cheap source of electricity with low emissions.
 Electricity powered plants, which
eeded
are nin some hydro power ventures, reduces the
need for coal or petrol fuel electricity. Dams are often a part of the hydro plant, and used
as power governors or controls for the rates and amounts
aterreleased
of wfrom reservoirs,
which is where wate
the r is stored.
 Converts the mechanical energy from the turbine into electric energy. Generators in
hydropower plants
work just like the generators in other types of power
plants.
Transmission lines. Conduct electricityhydropower
from the plant
to homes and
business.
INDEX

SR CHAPTER NAME PAGE


NO.

1. INTRODUCTION

1.1 What is hydro power plant?

1.2 Brief History

1.3 Gujarat

2. Hydro Power Station

2.1 Selection of site

2.2 Classification

3. Elements of Hydro Power station

3.1 Reservoir

3.2 Pressure valve

3.3 Penstock

3.4 Pump

3.5 Boost converter


3.6 DC to AC Inverter

4. Turbine used in hydro power station

4.1 Pelton wheel turbine

5 Different schemes

5.1 Low head scheme

6 Working model of hydro power plant

7 Safety in hydro power plant

8 Advantages & Disadvantages

9 Application of hydro power plant

10 Reference

Figure index
1 Reservoir

2 Pressure valve

3 Penstock

4 Pump

5 Boost converter

6 DC to AC inverter

7 Pelton wheel turbine

8 Working model of hydro power plant