Building Works at Hougang Town: Daily Site Record
Building Works at Hougang Town: Daily Site Record
SITE VIEW
SITE VIEW
work
Architectural
M & E Work
STATUS: PINK SHADES AT Lower Deck Level REMAINS @ 71.43% CAST STAIRCASE #1 PILE CAP
ECO 1 TC INSTALLED 1
Weather G Worker 10
TC OPERATOR 1
LBD HACK TEAM 3
EXCAV. OPTR 1 5
IC WORKS IC#4
FAIR
EXCAV SUPVSR 1
Manpower
8:30AM 5:30PM
TOTAL : 18 TOTAL : 28 TOTAL : 0 TOTAL : 5 51 KEY PLAN SHOWING DETENTION DRAIN @88% COMPLETE, DETENTION SLAB BOTTOM BARS AND DROP PANEL BARS INSTALLED 1ST SEGMENT OF
DRAIN COVER AND GRATING TO BE INSTALLED AT LATER STAGES OF SLAB TARGRET TO CAST ON 29 SEPTEMBER 2020
WORKS
AT Lower Deck Level REMAINS @ 60.71% 11 Pile caps more to complete at lower Deck Level , GREEN
SHADES @ Upper Deck Level PILE CAP @ 100% Completed , AT ELECTRICAL SUBSTATION AREA, AT LIFT
PIT PREPARATION TO RECEIVE DAVCO WATERPROOFING MEMBRANE, ON GOIMG EXCAVATION WORKS FOR RC SUMPS AND PIPE
CAST 3 8 MORE
PILE CAPS AT GRIDLINE A 1 1 to 4. PILE CAPS
HAUNCHING @43.00%
PILE
COMPLETE
CAPS
DETENTION DRAIN @88% COMPLETE, DETENTION DRAIN COVER AND GRATING TO BE INSTALLED
AT LATER STAGES OF WORKS
INTERNAL DRAINAGE
RC SUMPS AND PIPE HAUNCHING remains at 43.00% COMPLETE STAIRCASE #1 PILE CAP CAST. KEY PLAN SHOWING 8 MORE PILE CAPS KEY PLAN SHOWING AREAS OF RC SUMPS AND PIPE HAUNCHING remains at
TO CAST AT LOWER DECK LEVEL 43.00% COMPLETE
SLAB REBAR IN PROGRESS , DROP PANEL BOTTOM BARS, SLAB BOTTOM REINFORCING BARS IN
PROGRESS, DONE UNTIL GRIDLINE 12-9C-G @75% COMPLETED FIRST SEGMENT OF SLAB 01B GROUND BEAM AND DROP PANEL,SLAB
TARGET TO CAST ON 29 SEPTEMBER
BOTTOM BARS INSTALLATION IN PROGRESS
AT AREAS OF UPPER DECK SLAB GRIDLINE 12
TO 7 D TO G
ESS
AT ESS BELOW TRANSFORMER ROOM TO CAST UPSTAND BEAMS WITHIN THIS WEEK. SLAB REBAR IN PROGRESS , DROP PANEL BOTTOM BARS, SLAB BOTTOM AT ESS BELOW TRANSFORMER ROOM TO CAST UPSTAND BEAMS WITHIN
REINFORCING BARS IN PROGRESS, DONE UNTIL GRIDLINE 12-9C-G @75% THIS WEEK.
COMPLETED FIRST SEGMENT OF SLAB 01B TARGET TO CAST ON 29
SEPTEMBER
LIFT COREWALL: APPLICATION WITH DAVCO WATERPROOFING MEMBRANE COVERED WITH HARD
POLYFOAM PROTECTION TO NEWLY INSTALLED WATERPROOFING MEMBRANE PRIOR TO
BACKFILLING WORKS REMAINING AREA OF
CAPPING BEAM
ANOTHER 18% TO
COMPLETE
INSTALLED 10 DROP PANELS BOTTOM REINFORCING BARS AND 3 ROWS OF GROUND BEAMS REMAINING AREA OF CAPPING BEAM ANOTHER 18% TO COMPLETE LIFT COREWALL: APPLICATION WITH DAVCO WATERPROOFING MEMBRANE
COVERED WITH HARD POLYFOAM PROTECTION TO NEWLY INSTALLED
INSTALLED, 4 SPLIT LEVEL WALLS APPLIED WITH DAVCO WATERPROOFING MEMBRANE
WATERPROOFING MEMBRANE PRIOR TO BACKFILLING WORKS
22 WORKERS +8 LCT +2 LBD +2CL 4 WATERPROOFING WORKS AND DOING SITEWORKS: 22 WORKERS +8 LCT +2 LBD +2CL 4 WATERPROOFING WORKS AND
INSTALLED 10 DROP PANELS SLAB SPLIT LEVEL BEAM APPLIED
DOING SITEWORKS: BEAKDOWN OF MANPOWER @ LOWER DECK DEEP
BEAKDOWN OF MANPOWER @ LOWER DECK DEEP BEAM FORMWORK INSTALL / 6 WORKERS LIFT PIT BOTTOM REINFORCING BARS AND 3 DAVCO WATERPROOF
BEAM FORMWORK INSTALL / 6 WORKERS LIFT PIT DISMANTLE
DISMANTLE FORMWORKS=4 WORKERSESS FORMWORKS=4 WORKERS UPSTAND ROWS OF GROUND BEAMS INSTALLED MEMBRANE
AT GRID LINE 12 T0 9 D E F G FORMWORKS=4 WORKERSESS FORMWORKS=4 WORKERS UPSTAND
BEAMSFORMWORKS =2WORKERS UPPER /LOWER DECK SLAB DROP PANEL REBAR INSTALL=6 BEAMSFORMWORKS =2WORKERS UPPER /LOWER DECK SLAB DROP
REBAR WORKERS 8 DEPLOYED WORKERS TO DO WATERPROOFING PREPARATION GRINDING PANEL REBAR INSTALL=6 REBAR WORKERS 8 DEPLOYED WORKERS TO
TOUCH UP, ASSIST TOWER CRANE, SHIFTING OF MATERIALS/ HOUSEKEEPING HOUSEKEEPING DO WATERPROOFING PREPARATION GRINDING TOUCH UP, ASSIST
@ELECTRICAL SUBSTATION
TOWER CRANE, SHIFTING OF MATERIALS/ HOUSEKEEPING
AND OTHER SITE WORKS BELOW TRANSFORMER
HOUSEKEEPING AND OTHER SITE WORKS
ROOM : INSTALLING
REBARS FOR UPSTAND
BEAMS TO CAST WITHIN
THIS WEEK
E
F
G
C
9
9