BUILDING WORKS AT HOUGANG TOWN

DAILY SITE RECORD Thursday, September 17, 2020 DAILY SITE PHOTO
Activities Location Description of works Remarks
Structural w PILE CAP STATUS

LOWER DECK: PILE CAP STATUS


Pil e CAP works in progress.

total completed to date: 17 nos.


total Number OF Pile Caps@ Lower Deck 27 nos. 62.96%
UPPER DECK: PILE CAP STATUS
Pil e CAP works in progress.
total completed to date: 29 nos.
nos.
total Number OF Pile Caps 30 96.67%
Structural work

MSCP PILES 100.00%


CONTIGUOUS Bored Pile ( CBP ) 100.00%
GROUT PILES 100.00%
TOWER CRANE PILE CAP CAST 100.00%
CAPPING BEAMS CAST TO DATE 82.00%
1ST STOREY WALL- COLUMN STUMP CAST TO DATE 45.00%
DETENTION DRAIN CAST TO DATE 70.00%
INTERNAL DRAINAGE UPDATE 42.86%

SITE VIEW

INSTALL ING REINFORCING


BARS, AND CLOSING
Architectural

FORMWORKS @ LIFT PIT AREA


work
M & E Work

STATUS: PINK SHADES AT Lower Deck Level REMAINS @ 62.96% INSTALL ING REINFORCING BARS, AND CLOSING FORMWORKS @ LIFT PIT
AREA
10 Pile caps more to complete at lower Deck Level , GREEN
TO CAST FRIDAY WITH WATERPROOF CONCRETE
SHADES @Upper Deck Level PILE CAP @ 96.67% Complete YELLOW
CLOUDS AT ELECTRICAL SUBSTATION AREA PURPLE CLOUDS AT
LIFT PIT REINFORCING BARS AND FORMWORKS INSTALLATION IN
PROGRESS

MAIN CON STRUCTURAL ARCHITECTURAL M&E MACHINERY SPLIT LEVEL BEAM


ATTENDANCE P Manager Supervisor Generator
GH11b and GH11c
1 1 2 CAST
Site Supervisor Safety Supervisor Excavator CL @ IC WORKS #4 TO
1 1 1 @ DETENTION
Safety officer LOWER DECK DEEP DRAIN: UPDATED
BEAM FORMWORK
AT 70% COMPLETE IC#3: INSTALL
INSTALL / CAST DETENTION DRAIN
150MM DIAMETER
08:30 17:30 1 6
DUCTILE IRON PIPE
Site engineer LIFT PIT REBAR BAR BENDER MACHINE
1 FORMWORKS 4 @ REMAINING
1

RTO BIG BREAKER AREA OF


DETENTION DRAIN
1 ESS FORMWORKS 2 1
TO COMPLETE
@30%
DISMANTLE DEEP 1 TONNE ROLLER-
BEAM FORMWORKS COMPACTOR
REMARKS Administrator 1 2 1

UPPER /LOWER AIR RECEIVER


DECKSLADROP PANEL/
Coordinator 1 WALL BEAM REBAR 6 1
INSTALL

TC INSTALLED
ECO 1 1

G Worker
Weather 10

TC OPERATOR 1
LBD HACK TEAM 3
EXCAV. OPTR
1 IC WORKS IC#4
5
RAIN
EXCAV SUPVSR 1
Manpower
12:00NN 16:30 TOTAL : 18 TOTAL : 28 TOTAL : 0 TOTAL : 5 51 KEY PLAN SHOWING DETENTION DRAIN @70% COMPLETE, DETENTION SPLIT LEVEL WALL WB4a WB4 WB5 CAST
DRAIN COVER AND GRATING TO BE INSTALLED AT LATER STAGE

Housekeeping work inprogress,

AT Lower Deck Level REMAINS @ 62.96% 10 Pile caps more to complete at lower Deck Level , GREEN SHADES @Upper Deck Level PILE
CAP @ 96.67% Complete YELLOW CLOUDS AT ELECTRICAL SUBSTATION AREA PURPLE CLOUDS AT LIFT PIT REINFORCING BARSAND RC SUMPS AND PIPE
FORMWORKS INSTALLATION IN PROGRESS HAUNCHING @42.86%
COMPLETE

DETENTION DRAIN @70% COMPLETE, DETENTION DRAIN COVER AND GRATING TO BE INSTALLED AT
LATER STAGE

INTERNAL DRAINAGE

RC SUMPS AND PIPE HAUNCHING remains at 42.86 % COMPLETE KEY PLAN SHOWING AREAS OF RC SUMPS AND PIPE HAUNCHING remains at
42.86% COMPLETE

GROUND BEAM REBARS INSTALLATION IN PROGRESS , DROP PANEL BOTTOM BARS, SLAB BOTTOM
REINFORCING BARS STARTED TO INSTALL AT GRIDLINE 12 TO 7 / G TO D GROUND BEAM AND DROP PANEL,SLAB
BOTTOM BARS INSTALLATION IN PROGRESS
AT AREAS OF UPPER DECK SLAB GRIDLINE 12
TO 7 D TO G

ESS

LIFT PIT REINFORCING BARS INSTALLATION AND FORMWORKS IN PROGRESS GROUND BEAM REBARS INSTALLATION IN PROGRESS , DROP PANEL BOTTOM UPPER DECK GROUND BEAMS, DROP PANEL REINFORCING BARS INSTALLATION
BARS, SLAB BOTTOM REINFORCING BARS STARTED TO INSTALL AT GRIDLINE IN PROGRESS.
12 TO 7 / G TO D

REMAINING AREA OF CAPPING BEAM ANOTHER 18% TO COMPLETE

REMAINING AREA OF
CAPPING BEAM
ANOTHER 18% TO
COMPLETE

INSTALLED 10 DROP PANELS BOTTOM REINFORCING BARS AND 3 ROWS OF GROUND BEAMS REMAINING AREA OF CAPPING BEAM ANOTHER 18% TO COMPLETE LIFT PIT REINFORCING BARS INSTALLATION AND FORMWORKS IN PROGRESS
INSTALLED, 4 SPLIT LEVEL WALLS WB4a WB4 WB5 CAST

22 WORKERS +8 LCT +2 LBD +2CL DOING SITEWORKS: BEAKDOWN OF MANPOWER @ LOWER DECK BEAM GH11b GH11c 22 WORKERS +8 LCT +2 LBD +2CL DOING SITEWORKS: BEAKDOWN OF
INSTALLED 10 DROP PANELS SLAB
DEEP BEAM FORMWORK INSTALL / CAST= 6 WORKERS LIFT PIT REBAR FORMWORKS=4 WORKERSESS BOTTOM REINFORCING BARS AND 3 CAST MANPOWER @ LOWER DECK DEEP BEAM FORMWORK INSTALL / CAST= 6
FORMWORKS=4 WORKERS DISMANTLE DEEP BEAM FORMWORKS =2WORKERS UPPER /LOWER DECK ROWS OF GROUND BEAMS
SLAB DROP PANEL REBAR INSTALL=6 REBAR WORKERS 8 DEPLOYED TO WORKERS ASSIST TOWER INSTALLED WORKERS LIFT PIT REBAR FORMWORKS=4 WORKERSESS FORMWORKS=4
CRANE/ SHIFTING OF MATERIALS/ HOUSEKEEPING HOUSEKEEPING AND OTHER SITE WORKS WORKERS DISMANTLE DEEP BEAM FORMWORKS =2WORKERS UPPER
/LOWER DECK SLAB DROP PANEL REBAR INSTALL=6 REBAR WORKERS 8
DEPLOYED TO WORKERS ASSIST TOWER CRANE/ SHIFTING OF
@ELECTRICAL MATERIALS/ HOUSEKEEPING HOUSEKEEPING AND OTHER SITE WORKS
SUBSTATION BELOW
TRANSFORMER ROOM :
FABRICATE FORMWORKS
FOR DEEP BEAMS,
upstand beams

KEY PLAN ON SLAB REINFORCING BARS

Today Noise Meter does not exceed