List of Contract Specifications Looked Through by RTO DATED 30 JUNE 2020
List of Contract Specifications Looked Through by RTO DATED 30 JUNE 2020
S/N Clause Description of the Date Complied by the If no, why the site
No. Clause site (Y/N) has not complied?
4.13,
2-Jun-20 Y
4.14.
4.15
QUALITY OF
4.16.2 CONCRETE WORKS
a,
4-Jun-20 Y
b
c
READING ON HDB
SPECS SEC 4.7 4.7.1
4.7, DES MIX, 4.7.2 TRIAL
4.7.1 MIXES 4.7.3 MIX
ADJUSTMENT, 4.9 5-Jun-20 Y
4.9 mixing concrete, 4.10
ready mix concrete
Look into HDB SPECS
SECTION 4 .12 placing
of concrete, 4.13
COMPACTION OF
CONC, CURING OF
CONCRETE,
CONSTRUCTION JOINT
DRAWING ( To follow
up to Maincon this
4.12 , Matter) 6-Jun-20 Y
4.13
7-Jun-20 Y
READINGs ON HDB
SPECS SEC
4.16QUALITY OF
CONRETE WORKS,
4.16.1 TESTING OF
4.16 STRUCT CONC. A, b, c, 8-Jun-20 Y
4.16.1 d Sampling of
Concrete
READINGs ON HDB
SPECS SEC
4.16QUALITY OF
4.16 CONRETE WORKS,
Grade 4.16.1 TESTING OF
9-Jun-20 Y
strengt STRUCT CONC. A, b, c,
h d Sampling of
Concrete
READINGs ON HDB
4.16 SPECS SEC
charact 4.16QUALITY OF 10-Jun-20 Y
eristics CONRETE WORKS,
READINGs ON HDB
SPECS SEC 4.19
FORMWORKS 4.20
STRIKING OF
FORMWORKS,
(STRUTTS AND
SUPPORTS OF
4.19 , PRECAST BEAM / PC
11-Jun-20 Y
4.20 HOLLOW CORE TO
FOLLOW UP TO LCT),
ZOOM MEETING with
HDB PD/ MAINCON/
CONSULTANTS,
permanent structure
joints WATERSTOP P U
FOAM BACKING ROD
4.23 12-Jun-20 Y
READINGs ON HDB
SPECS SEC 4.25 MASS
AND LEAN CONCRETE,
4.25 , 4.26 CEMENT
13-Jun-20 Y
4.26 MORTAR AND GROUT
14-Jun-20 Y
BACK READ ON HDB
SPECS SEC 4.25 MASS
AND LEAN CONCRETE,
4.25 , 4.26 CEMENT
15-Jun-20 Y
4.26 MORTAR AND GROUT
KEEP RECORD ON
BEAM CLASH TO ESS
LOUVER DRWNG
CPL/171839_AR_S-ST-
03 ,
CPL/171839_AR_S-ST-
05 READINGs ON
HDB SPECS SEC 4.29
4.29 LIFT PITS, 4.30, 4.31
4.30 FLOORS 17-Jun-20 Y
4.31
READINGs
FAMILIARISED ON
HDB SPECS SEC 6
6.1.4 SEMI PRECAST 18-Jun-20 Y
CONSTRUCTION 6.1.4
TO 6.2
READINGs
FAMILIARISED ON
HDB SPECS SEC 6
SEMI PRECAST
CONSTRUCTION 6.1.4
TO 6.2
6 6.2.2 19-Jun-20 Y
MANUFACTURING
PRECAST CONCRETE
TOLERANCES ON
DIMENSIONS
6 3.5 20-Jun-20 Y
21-Jun-20 Y
READINGs
FAMILIARISED ON
HDB SPECS SEC 6
SEMI PRECAST
CONSTRUCTION 6.3.6
CURING AND
PROTECTION OF
CONCRETE
6.3.6 22-Jun-20 Y
PRECAST STORAGE
6.5 23-Jun-20 Y
ERECTION OF PRECAST
COMPONENTS
6.6
24-Jun-20 Y
6.6.3
SUBMISSION AND
APPROVAL OPF
SUPPLY AND
ERECTION SCHEDULES
6.9 25-Jun-20 Y
STRUCTURAL PRECAST
CONCRETE ERECTION
6.2 DRAWINGS 26-Jun-20 Y
BRICKWORK AND
BLOCKWORK MORTAR
MIX FOR BLOCK AND
BRICKWORK SOLID
CONCRETE BRICKS OR
BLOCKS LAYING OF
SOLID COCRETE
12 BLOCKS
12.1
12.2 27-Jun-20 Y
12.2.1
28-Jun-20 Y
PLASTERING CLAY
12.3.1 BRICKS
LAYING OF CLAY
12.3.2 BRICKS
MODULAR COMMON
12.3.3 CLAY BRICKS
FACING CLAY BRICKS
CAVITY WALL BRICK
12.4 CLADDING
20 WALL FINISHES 29-Jun-20 Y
APPROVED
20.1 MATERIALS FOR
PLASTERING AND
20.1.1 SKIMMING WORKS
20.1.2
APPROVED
MATERIALS FOR
PLASTERING AND
SKIMMING WORKS
CAVITY WALL
BRICK CLADDING
WALL FINISHES
APPROVED
MATERIALS FOR
20.1 PLASTERING AND
SKIMMING WORKS
20.1.1
20.1.2
30-Jun-20 Y
20.2
20.3
20.4
20.5
ough by RTO from1 JUNE 2020
Remark
Relevant to the site
for follow up later?
Y
Relevant to the site
RTO to ensure to
implement
Y
Relevant to the site
RTO to ensure to
implement
Y
Relevant to the site
RTO to ensure to NO PRECAST TO BE STORED ON THE GROUND TO
implement PREVENT SOILING THEY SHALL BE STORED WITH DUE
PROTECTION TO STAINING OR PHYSICAL DAMAGE
RTO TO ENSURE CONTRACTOR MET THE QUALITY
STANDARDS OF PC COMPONENTS CAN ONLY BE
Y ERECTED HORIZONTAL AND VERTICAL
Relevant to the site JOINTS TO BE KEPT CORRECTLY ALIGNED AND
RTO to ensure to POSITIONED JOINT WIDTHS SHOULD BE PROPERLY
implement MAINTAINED, ensure no defective PRECAST
COMPONENT SHALL BE DELIVERED
RTO TO ENSURE CONTRACTOR TO SUBMIT
RESPECTIVE SUPPLY AND ERECTION SCHEDULES
DETAILING THE TYPE AND QUANTITY OF THE PC
Y COMPONENTS TO THE SO REP FOR APPROVAL
Relevant to the site WITHIN THREE MONTHS FROM THE DATE OF LOA
RTO to ensure to CONTRACTOR TO ASDHERE STRICTLY TO THE
implement APPROVED RESPECTIVE DELIVERY AND ERECTION
SCHEDULES