Job Number Sheet

Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

Frame Analysis Ver W3.0.04 - 29 Jan 2016


Input file:C:\Users\RDD\Desktop\design\provincial Road Development Department unit.A03
Created : 7/23/2020 12:08:23 PM A03

Deflections for Load Case C1

Deflections for Load Case C1


Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

Deflections for Load Case C1

Deflections for Load Case C1


Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

========== S p a c e - F r a m e A n a l y s i s - P R O K O N ===========
Ver W3.0.04 - 29 Jan 2016

TITLE :FRAME E(1-4)

Data file : C:\Users\RDD\Desktop\design\provincial Road Development Department unit.A03


Created on: 7/23/2020

========================== NODAL POINT COORDINATES ============================

Node No X-coord Y-coord Z-coord Node No X-coord Y-coord Z-coord


m m m m m m

1 0.000 0.000 0.000 2 0.000 1.150 0.000


3 0.000 4.900 0.000 4 0.000 8.500 0.000
5 0.000 12.100 0.000 6 3.500 0.000 0.000
7 3.500 1.150 0.000 8 3.500 4.900 0.000
9 3.500 8.500 0.000 10 3.500 12.100 0.000
11 5.500 0.000 0.000 12 5.500 1.150 0.000
13 5.500 4.900 0.000 14 5.500 8.500 0.000
15 5.500 12.100 0.000 16 9.600 0.000 0.000
17 9.600 1.150 0.000 18 9.600 4.900 0.000
19 9.600 8.500 0.000 20 9.600 12.100 0.000

=============================== ELEMENT DATA ==================================

Beam Secn. type Fixity Length ß Group no.


m (°)

1-2 COLUMN 00 1.150 0.00 0


2-3 COLUMN 00 3.750 0.00 0
3-4 COLUMN 00 3.600 0.00 0
4-5 COLUMN 00 3.600 0.00 0
6-7 COLUMN 00 1.150 0.00 0
7-8 COLUMN 00 3.750 0.00 0
8-9 COLUMN 00 3.600 0.00 0
9-10 COLUMN 00 3.600 0.00 0
11-12 COLUMN 00 1.150 0.00 0
12-13 COLUMN 00 3.750 0.00 0
13-14 COLUMN 00 3.600 0.00 0
14-15 COLUMN 00 3.600 0.00 0
16-17 COLUMN 00 1.150 0.00 0
17-18 COLUMN 00 3.750 0.00 0
18-19 COLUMN 00 3.600 0.00 0
19-20 COLUMN 00 3.600 0.00 0
2-7 PLINTH 00 3.500 0.00 0
7-12 PLINTH 00 2.000 0.00 0
12-17 PLINTH 00 4.100 0.00 0
3-8 BEAM 00 3.500 0.00 0
4-9 BEAM 00 3.500 0.00 0
5-10 BEAM 00 3.500 0.00 0
8-13 BEAM 00 2.000 0.00 0
9-14 BEAM 00 2.000 0.00 0
10-15 BEAM 00 2.000 0.00 0
13-18 BEAM 00 4.100 0.00 0
14-19 BEAM 00 4.100 0.00 0
15-20 BEAM 00 4.100 0.00 0

============================ SECTION PROPERTIES ===============================

Section : COLUMN Section designation: 300x300 RC


----------------
A Ay Ax Ixx Iyy J Material
m^2 m^2 m^2 m^4 m^4 m^4

88.80E-3 0.000 0.000 650E-6 650E-6 1.14E-3 Concrete:25 MPa

Section : PLINTH Section designation: 300x300 RC


----------------
A Ay Ax Ixx Iyy J Material
m^2 m^2 m^2 m^4 m^4 m^4

88.80E-3 0.000 0.000 650E-6 650E-6 1.14E-3 Concrete:25 MPa

Section : BEAM Section designation: 200*320 RC


----------------
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

A Ay Ax Ixx Iyy J Material


m^2 m^2 m^2 m^4 m^4 m^4

97.80E-3 0.000 0.000 1.61E-3 386E-6 1.11E-3 Concrete:25 MPa

================================== MATERIALS ==================================

Designation E poisson Density Exp. coeff.


kPa kN/m^3
Concrete:25 MPa 25.00E6 0.20 25.00 10.00E-6

=============================== SUPPORT DATA ==================================

Prescribed displacements
Node Fixity X Y Z X-Rot Y-Rot Z-Rot Orien node
m m m rad. rad. rad.

1 XY 0.00 0.00 0.00 0.00 0.00 0.00 0


6 XY 0.00 0.00 0.00 0.00 0.00 0.00 0
11 XY 0.00 0.00 0.00 0.00 0.00 0.00 0
16 XY 0.00 0.00 0.00 0.00 0.00 0.00 0

Spring constants
Node Fixity X Y Z X-Rot Y-Rot Z-Rot
kN/m kN/m kN/m kNm/rad kNm/rad kNm/rad

=================================== LOADS =====================================

Load Case Description

W wind load
D5 dead load
D1 dead load
D2 dead load
D3 dead load
D4 dead load
L1 imposed load
L2 imposed load
L3 imposed load
L4 imposed load

Own weight not added to any load case/combination

============================= LOAD CASE W ====================================


wind load

*** POINT LOADS ***

Node Fx Fy Fz Mx My Mz
kN kN kN kNm kNm kNm

17 -8.55 0.00 0.00 0.00 0.00 0.00


18 -16.79 0.00 0.00 0.00 0.00 0.00
19 -20.36 0.00 0.00 0.00 0.00 0.00
20 -11.84 0.00 0.00 0.00 0.00 0.00

============================= LOAD CASE D5 ====================================


dead load

*** POINT LOADS ***

Node Fx Fy Fz Mx My Mz
kN kN kN kNm kNm kNm

1 0.00 -2.50 0.00 0.00 0.00 0.00


6 0.00 -2.50 0.00 0.00 0.00 0.00
11 0.00 -2.50 0.00 0.00 0.00 0.00
16 0.00 -2.50 0.00 0.00 0.00 0.00
2 0.00 -8.10 0.00 0.00 0.00 0.00
7 0.00 -8.10 0.00 0.00 0.00 0.00
12 0.00 -8.10 0.00 0.00 0.00 0.00
17 0.00 -8.10 0.00 0.00 0.00 0.00
3 0.00 -7.75 0.00 0.00 0.00 0.00
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

8 0.00 -7.75 0.00 0.00 0.00 0.00


13 0.00 -7.75 0.00 0.00 0.00 0.00
18 0.00 -7.75 0.00 0.00 0.00 0.00
4 0.00 -7.75 0.00 0.00 0.00 0.00
9 0.00 -7.75 0.00 0.00 0.00 0.00
14 0.00 -7.75 0.00 0.00 0.00 0.00
19 0.00 -7.75 0.00 0.00 0.00 0.00
5 0.00 -3.88 0.00 0.00 0.00 0.00
10 0.00 -3.88 0.00 0.00 0.00 0.00
15 0.00 -3.88 0.00 0.00 0.00 0.00
20 0.00 -3.88 0.00 0.00 0.00 0.00

============================= LOAD CASE D1 ====================================


dead load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

2-7 Y 0.00 0.00 -32.5 -32.5 0.00 3.50 0.00


3-8 Y 0.00 0.00 -32.5 -32.5 0.00 3.50 0.00
4-9 Y 0.00 0.00 -32.5 -32.5 0.00 3.50 0.00

============================= LOAD CASE D2 ====================================


dead load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

7-12 Y 0.00 0.00 -17.6 -17.6 0.00 2.00 0.00


8-13 Y 0.00 0.00 -17.6 -17.6 0.00 2.00 0.00
9-14 Y 0.00 0.00 -17.6 -17.6 0.00 2.00 0.00

============================= LOAD CASE D3 ====================================


dead load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

15-20 Y 0.00 0.00 -17.8 -17.8 0.00 4.10 0.00


10-15 Y 0.00 0.00 -17.8 -17.8 0.00 2.00 0.00
5-10 Y 0.00 0.00 -17.8 -17.8 0.00 3.50 0.00

============================= LOAD CASE D4 ====================================


dead load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

12-17 Y 0.00 0.00 -32.5 -32.5 0.00 4.10 0.00


13-18 Y 0.00 0.00 -32.5 -32.5 0.00 4.10 0.00
14-19 Y 0.00 0.00 -32.5 -32.5 0.00 4.10 0.00

============================= LOAD CASE L1 ====================================


imposed load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

3-8 Y 0.00 0.00 -14.4 -14.4 0.00 3.50 0.00


4-9 Y 0.00 0.00 -14.4 -14.4 0.00 3.50 0.00

============================= LOAD CASE L2 ====================================


imposed load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

kN m kN/m kN/m m m °C

8-13 Y 0.00 0.00 -14.4 -14.4 0.00 2.00 0.00


9-14 Y 0.00 0.00 -14.4 -14.4 0.00 2.00 0.00

============================= LOAD CASE L3 ====================================


imposed load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

15-20 Y 0.00 0.00 -17.5 -17.5 0.00 4.10 0.00


10-15 Y 0.00 0.00 -17.5 -17.5 0.00 2.00 0.00
5-10 Y 0.00 0.00 -17.5 -17.5 0.00 3.50 0.00

============================= LOAD CASE L4 ====================================


imposed load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

13-18 Y 0.00 0.00 -14.4 -14.4 0.00 4.10 0.00


14-19 Y 0.00 0.00 -14.4 -14.4 0.00 4.10 0.00

============================= LOAD COMBINATIONS ===============================

Load Comb Description

C1
C2
C3
C4
C5
C6
C7

Comb. Load factor for each load case: Ultimate Limit State

W D5 D1 D2 D3 D4 L1 L2 L3

C1 0.00 1.40 1.40 1.40 1.40 1.40 1.60 1.60 1.60


C2 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20
C3 1.40 1.40 1.40 1.40 1.40 1.40 0.00 0.00 0.00
C4 1.40 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00
C5 -1.00 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20
C6 -1.40 1.40 1.40 1.40 1.40 1.40 0.00 0.00 0.00
C7 0.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00

L4

C1 1.60
C2 1.20
C3 0.00
C4 0.00
C5 1.20
C6 0.00
C7 0.00

Comb. Load factor for each load case: Serviceability Limit State

W D5 D1 D2 D3 D4 L1 L2 L3

C1 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00


C2 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
C3 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00
C4 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00
C5 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
C6 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00
C7 0.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00

L4

C1 1.00
C2 1.00
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

C3 0.00
C4 0.00
C5 1.00
C6 0.00
C7 0.00

========================== OWN WEIGHT ACCELERATIONS ===========================

Direction Acceleration (g)


X 0.00
Y -1.00
Z 0.00

========================== OUTPUT: LINEAR ANALYSIS ============================


====================== NODAL POINT DISPLACEMENTS at SLS =======================

Node Lcase X-disp. Y-disp Z-rot.


mm mm rad.

1 C1 0.00 0.00 0.0002


C2 0.00 0.00 0.0016
C3 0.00 0.00 0.0016
C4 0.00 0.00 0.0016
C5 0.00 0.00 0.0016
C6 0.00 0.00 0.0016
C7 0.00 0.00 0.0002
2 C1 -0.02 -0.16 -0.0004
C2 -1.45 -0.18 0.0007
C3 -1.45 -0.14 0.0006
C4 -1.45 -0.14 0.0006
C5 -1.45 -0.18 0.0007
C6 -1.45 -0.14 0.0006
C7 -0.02 -0.12 -0.0004
3 C1 -0.15 -0.56 -0.0006
C2 -7.27 -0.62 -0.0001
C3 -7.27 -0.45 0.0002
C4 -7.27 -0.45 0.0002
C5 -7.27 -0.62 -0.0001
C6 -7.27 -0.45 0.0002
C7 -0.14 -0.39 -0.0004
4 C1 -0.23 -0.80 -0.0006
C2 -10.44 -0.88 -0.0003
C3 -10.41 -0.63 -0.0001
C4 -10.41 -0.63 -0.0001
C5 -10.44 -0.88 -0.0003
C6 -10.41 -0.63 -0.0001
C7 -0.20 -0.54 -0.0004
5 C1 -0.28 -0.90 -0.0007
C2 -11.76 -0.99 -0.0006
C3 -11.71 -0.68 -0.0002
C4 -11.71 -0.68 -0.0002
C5 -11.76 -0.99 -0.0006
C6 -11.71 -0.68 -0.0002
C7 -0.23 -0.60 -0.0003
6 C1 0.00 0.00 -0.0001
C2 0.00 0.00 0.0014
C3 0.00 0.00 0.0014
C4 0.00 0.00 0.0014
C5 0.00 0.00 0.0014
C6 0.00 0.00 0.0014
C7 0.00 0.00 -0.0001
7 C1 -0.03 -0.22 0.0003
C2 -1.46 -0.24 0.0010
C3 -1.46 -0.17 0.0010
C4 -1.46 -0.17 0.0010
C5 -1.46 -0.24 0.0010
C6 -1.46 -0.17 0.0010
C7 -0.03 -0.16 0.0003
8 C1 -0.14 -0.81 0.0003
C2 -7.28 -0.84 0.0006
C3 -7.27 -0.56 0.0005
C4 -7.27 -0.56 0.0005
C5 -7.28 -0.84 0.0006
C6 -7.27 -0.56 0.0005
C7 -0.14 -0.52 0.0002
9 C1 -0.23 -1.17 0.0003
C2 -10.44 -1.21 0.0004
C3 -10.42 -0.79 0.0004
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

C4 -10.42 -0.79 0.0004


C5 -10.44 -1.21 0.0004
C6 -10.42 -0.79 0.0004
C7 -0.20 -0.75 0.0002
10 C1 -0.29 -1.34 0.0003
C2 -11.78 -1.38 0.0003
C3 -11.72 -0.87 0.0002
C4 -11.72 -0.87 0.0002
C5 -11.78 -1.38 0.0003
C6 -11.72 -0.87 0.0002
C7 -0.24 -0.83 0.0001
11 C1 0.00 0.00 0.0002
C2 0.00 0.00 0.0018
C3 0.00 0.00 0.0018
C4 0.00 0.00 0.0018
C5 0.00 0.00 0.0018
C6 0.00 0.00 0.0018
C7 0.00 0.00 0.0003
12 C1 -0.03 -0.26 -0.0004
C2 -1.46 -0.24 0.0003
C3 -1.47 -0.16 0.0002
C4 -1.47 -0.16 0.0002
C5 -1.46 -0.24 0.0003
C6 -1.47 -0.16 0.0002
C7 -0.04 -0.18 -0.0004
13 C1 -0.14 -0.93 -0.0005
C2 -7.28 -0.88 -0.0003
C3 -7.28 -0.56 -0.0001
C4 -7.28 -0.56 -0.0001
C5 -7.28 -0.88 -0.0003
C6 -7.28 -0.56 -0.0001
C7 -0.14 -0.61 -0.0004
14 C1 -0.22 -1.35 -0.0005
C2 -10.45 -1.29 -0.0003
C3 -10.43 -0.80 -0.0002
C4 -10.43 -0.80 -0.0002
C5 -10.45 -1.29 -0.0003
C6 -10.43 -0.80 -0.0002
C7 -0.20 -0.86 -0.0004
15 C1 -0.30 -1.54 -0.0005
C2 -11.79 -1.48 -0.0004
C3 -11.73 -0.90 -0.0002
C4 -11.73 -0.90 -0.0002
C5 -11.79 -1.48 -0.0004
C6 -11.73 -0.90 -0.0002
C7 -0.24 -0.96 -0.0002
16 C1 0.00 0.00 -0.0002
C2 0.00 0.00 0.0011
C3 0.00 0.00 0.0011
C4 0.00 0.00 0.0011
C5 0.00 0.00 0.0011
C6 0.00 0.00 0.0011
C7 0.00 0.00 -0.0002
17 C1 -0.05 -0.18 0.0006
C2 -1.50 -0.16 0.0017
C3 -1.51 -0.12 0.0017
C4 -1.51 -0.12 0.0017
C5 -1.50 -0.16 0.0017
C6 -1.51 -0.12 0.0017
C7 -0.06 -0.13 0.0006
18 C1 -0.14 -0.64 0.0009
C2 -7.30 -0.59 0.0015
C3 -7.30 -0.39 0.0012
C4 -7.30 -0.39 0.0012
C5 -7.30 -0.59 0.0015
C6 -7.30 -0.39 0.0012
C7 -0.13 -0.44 0.0006
19 C1 -0.22 -0.92 0.0009
C2 -10.48 -0.86 0.0012
C3 -10.45 -0.56 0.0009
C4 -10.45 -0.56 0.0009
C5 -10.48 -0.86 0.0012
C6 -10.45 -0.56 0.0009
C7 -0.20 -0.62 0.0006
20 C1 -0.32 -1.04 0.0010
C2 -11.83 -0.97 0.0011
C3 -11.76 -0.61 0.0006
C4 -11.76 -0.61 0.0006
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

C5 -11.83 -0.97 0.0011


C6 -11.76 -0.61 0.0006
C7 -0.25 -0.68 0.0005

============================== REACTIONS AT ULS ===============================


(In rotated axes where applicable)
Node Lcase X-force Y-forcet Z-moment
kN kN kNm

1 C1 20.22 441.80 0.00


C2 26.52 413.18 0.00
C3 32.19 373.02 0.00
C4 26.01 282.39 0.00
C5 9.95 325.46 0.00
C6 11.10 261.38 0.00
C7 15.46 226.57 0.00
6 C1 -14.78 628.01 0.00
C2 14.02 552.31 0.00
C3 15.63 465.14 0.00
C4 20.09 344.23 0.00
C5 -35.07 486.38 0.00
C6 -46.85 381.23 0.00
C7 -11.15 302.27 0.00
11 C1 21.91 725.51 0.00
C2 44.55 550.58 0.00
C3 53.05 435.75 0.00
C4 46.44 295.92 0.00
C5 -2.45 634.89 0.00
C6 -6.77 543.05 0.00
C7 16.53 349.57 0.00
16 C1 -27.35 508.63 0.00
C2 -16.04 382.55 0.00
C3 -20.31 318.87 0.00
C4 -11.97 215.16 0.00
C5 -29.97 451.88 0.00
C6 -38.03 407.11 0.00
C7 -20.84 259.28 0.00

EQUILIBRIUM CHECK AT ULS:

LC APPLIED LOADS & MOMENTS about (0.0,0.0,0.0) in global axes

Sum of: Px Py Mz

C1 0.00 -2303.95 -11071.19


C2 -69.05 -1898.62 -8633.73
C3 -80.56 -1592.78 -7085.78
C4 -80.56 -1137.70 -4897.90
C5 57.54 -1898.62 -9532.27
C6 80.56 -1592.78 -8229.38
C7 0.00 -1137.70 -5469.70

LC REACTIONS & REACTION MOMENTS about (0.0,0.0,0.0) in global axes

Sum of: Rx Ry MRz

C1 0.00 2303.95 11071.19


C2 69.05 1898.62 8633.73
C3 80.56 1592.78 7085.78
C4 80.56 1137.70 4897.90
C5 -57.54 1898.62 9532.27
C6 -80.56 1592.78 8229.38
C7 0.00 1137.70 5469.70

================== REACTIONS AT SLS (Combinations only) =======================

(In rotated axes


Node Lcase X-force Y-forcet Z-moment
kN kN kNm

1 C1 14.57 304.44 0.00


C2 22.10 344.31 0.00
C3 22.99 266.44 0.00
C4 22.99 266.44 0.00
C5 22.10 344.31 0.00
C6 22.99 266.44 0.00
C7 15.46 226.57 0.00
6 C1 -10.63 430.29 0.00
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

C2 11.68 460.26 0.00


C3 11.16 332.24 0.00
C4 11.16 332.24 0.00
C5 11.68 460.26 0.00
C6 11.16 332.24 0.00
C7 -11.15 302.27 0.00
11 C1 15.76 497.14 0.00
C2 37.12 458.82 0.00
C3 37.89 311.25 0.00
C4 37.89 311.25 0.00
C5 37.12 458.82 0.00
C6 37.89 311.25 0.00
C7 16.53 349.57 0.00
16 C1 -19.70 350.30 0.00
C2 -13.37 318.79 0.00
C3 -14.51 227.77 0.00
C4 -14.51 227.77 0.00
C5 -13.37 318.79 0.00
C6 -14.51 227.77 0.00
C7 -20.84 259.28 0.00

============ BEAM ELEMENT END FORCES IN LOCAL ELEMENT AXES at ULS ==============

Elem Lcase Axial Y-Shea M-xx Axial Y-Shea M-xx


kN kN kNm kN kN kNm

1-2 C1 438.30 -20.22 0.00 -438.30 20.22 -23.25


C2 410.18 -26.52 0.00 -410.18 26.52 -30.50
C3 369.52 -32.19 0.00 -369.52 32.19 -37.02
C4 279.89 -26.01 0.00 -279.89 26.01 -29.91
C5 322.46 -9.95 0.00 -322.46 9.95 -11.44
C6 257.88 -11.10 0.00 -257.88 11.10 -12.76
C7 224.07 -15.46 0.00 -224.07 15.46 -17.78
2-3 C1 347.60 -10.64 -18.26 -347.60 10.64 -21.62
C2 316.47 -20.79 -35.25 -316.47 20.79 -42.70
C3 260.44 -22.33 -38.99 -260.44 22.33 -44.75
C4 196.64 -19.92 -34.46 -196.64 19.92 -40.23
C5 258.08 1.04 1.15 -258.08 -1.04 2.74
C6 186.13 5.45 7.34 -186.13 -5.45 13.09
C7 159.49 -6.03 -11.30 -159.49 6.03 -11.31
3-4 C1 220.69 -13.92 -25.24 -220.69 13.92 -24.87
C2 193.20 -19.10 -33.03 -193.20 19.10 -35.74
C3 150.45 -18.12 -30.72 -150.45 18.12 -34.51
C4 111.87 -15.50 -26.06 -111.87 15.50 -29.75
C5 168.97 -5.02 -10.38 -168.97 5.02 -7.68
C6 119.61 -0.19 -1.89 -119.61 0.19 1.19
C7 96.45 -6.54 -11.65 -96.45 6.54 -11.90
4-5 C1 92.34 -14.80 -25.83 -92.34 14.80 -27.46
C2 77.57 -14.82 -25.07 -77.57 14.82 -28.29
C3 50.48 -11.52 -20.12 -50.48 11.52 -21.35
C4 37.16 -9.17 -15.72 -37.16 9.17 -17.31
C5 71.47 -9.61 -17.65 -71.47 9.61 -16.95
C6 42.72 -4.88 -10.68 -42.72 4.88 -6.91
C7 33.28 -5.86 -11.00 -33.28 5.86 -10.09
6-7 C1 624.51 14.78 0.00 -624.51 -14.78 16.99
C2 549.31 -14.02 0.00 -549.31 14.02 -16.12
C3 461.64 -15.63 0.00 -461.64 15.63 -17.97
C4 341.73 -20.09 0.00 -341.73 20.09 -23.10
C5 483.38 35.07 0.00 -483.38 -35.07 40.33
C6 377.73 46.85 0.00 -377.73 -46.85 53.88
C7 299.77 11.15 0.00 -299.77 -11.15 12.82
7-8 C1 510.28 5.94 10.84 -510.28 -5.94 11.43
C2 430.32 -13.05 -22.55 -430.32 13.05 -26.38
C3 322.91 -15.99 -27.03 -322.91 15.99 -32.94
C4 235.60 -17.44 -29.89 -235.60 17.44 -35.50
C5 403.06 20.03 35.67 -403.06 -20.03 39.45
C6 288.22 26.11 47.07 -288.22 -26.11 50.85
C7 218.26 3.61 7.15 -218.26 -3.61 6.39
8-9 C1 332.33 6.54 12.09 -332.33 -6.54 11.44
C2 273.88 -6.58 -11.11 -273.88 6.58 -12.58
C3 195.82 -9.26 -16.07 -195.82 9.26 -17.25
C4 141.26 -10.61 -18.51 -141.26 10.61 -19.68
C5 266.22 15.40 27.56 -266.22 -15.40 27.89
C6 186.07 18.72 33.14 -186.07 -18.72 34.25
C7 136.39 3.38 6.10 -136.39 -3.38 6.07
9-10 C1 153.39 5.76 10.56 -153.39 -5.76 10.19
C2 122.73 0.28 1.16 -122.73 -0.28 -0.14
C3 75.24 -1.70 -1.73 -75.24 1.70 -4.40
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

C4 53.60 -2.69 -3.74 -53.60 2.69 -5.93


C5 123.51 8.36 14.94 -123.51 -8.36 15.17
C6 76.24 8.58 15.81 -76.24 -8.58 15.08
C7 54.10 2.46 5.03 -54.10 -2.46 3.81
11-12 C1 722.01 -21.91 0.00 -722.01 21.91 -25.19
C2 547.58 -44.55 0.00 -547.58 44.55 -51.23
C3 432.25 -53.05 0.00 -432.25 53.05 -61.00
C4 293.42 -46.44 0.00 -293.42 46.44 -53.40
C5 631.89 2.45 0.00 -631.89 -2.45 2.82
C6 539.55 6.77 0.00 -539.55 -6.77 7.79
C7 347.07 -16.53 0.00 -347.07 16.53 -19.01
12-13 C1 589.89 -9.73 -17.36 -589.89 9.73 -19.14
C2 459.09 -25.84 -45.68 -459.09 25.84 -51.23
C3 328.37 -28.68 -51.62 -328.37 28.68 -55.92
C4 227.50 -26.38 -47.21 -227.50 26.38 -51.71
C5 497.87 6.57 11.16 -497.87 -6.57 13.48
C6 377.72 12.57 20.71 -377.72 -12.57 26.44
C7 252.18 -5.75 -11.04 -252.18 5.75 -10.53
13-14 C1 380.92 -11.74 -21.29 -380.92 11.74 -20.98
C2 302.35 -21.47 -38.21 -302.35 21.47 -39.08
C3 210.31 -21.90 -38.66 -210.31 21.90 -40.16
C4 147.98 -19.57 -34.51 -147.98 19.57 -35.94
C5 314.65 0.15 -0.28 -314.65 -0.15 0.82
C6 225.96 5.62 9.61 -225.96 -5.62 10.62
C7 155.81 -5.81 -10.38 -155.81 5.81 -10.55
14-15 C1 176.53 -11.56 -20.74 -176.53 11.56 -20.89
C2 141.30 -13.72 -24.28 -141.30 13.72 -25.10
C3 84.39 -11.77 -21.55 -84.39 11.77 -20.84
C4 60.22 -9.85 -17.84 -60.22 9.85 -17.63
C5 141.58 -5.79 -10.84 -141.58 5.79 -10.00
C6 84.74 -1.68 -4.45 -84.74 1.68 -1.62
C7 60.40 -4.81 -9.29 -60.40 4.81 -8.02
16-17 C1 505.13 27.35 0.00 -505.13 -27.35 31.45
C2 379.55 16.04 0.00 -379.55 -16.04 18.45
C3 315.37 20.31 0.00 -315.37 -20.31 23.36
C4 212.66 11.97 0.00 -212.66 -11.97 13.77
C5 448.88 29.97 0.00 -448.88 -29.97 34.46
C6 403.61 38.03 0.00 -403.61 -38.03 43.74
C7 256.78 20.84 0.00 -256.78 -20.84 23.96
17-18 C1 401.60 14.43 24.68 -401.60 -14.43 29.44
C2 303.10 0.89 2.40 -303.10 -0.89 0.94
C3 226.49 -1.59 0.04 -226.49 1.59 -5.98
C4 153.26 -4.85 -6.11 -153.26 4.85 -12.08
C5 349.96 21.35 36.17 -349.96 -21.35 43.89
C6 286.13 24.46 43.02 -286.13 -24.46 48.69
C7 183.08 8.17 15.38 -183.08 -8.17 15.25
18-19 C1 255.63 19.12 34.80 -255.63 -19.12 34.04
C2 197.70 8.51 17.22 -197.70 -8.51 13.43
C3 143.01 4.19 9.28 -143.01 -4.19 5.82
C4 98.59 0.60 2.87 -98.59 -0.60 -0.69
C5 217.28 21.67 37.91 -217.28 -21.67 40.09
C6 167.93 20.94 35.62 -167.93 -20.94 39.75
C7 111.05 8.97 16.03 -111.05 -8.97 16.27
19-20 C1 107.51 20.60 35.76 -107.51 -20.60 38.40
C2 83.68 14.05 25.56 -83.68 -14.05 25.01
C3 50.86 8.42 17.38 -50.86 -8.42 12.93
C4 35.41 5.14 11.22 -35.41 -5.14 7.27
C5 88.71 18.88 32.11 -88.71 -18.88 35.85
C6 57.26 14.57 25.71 -57.26 -14.57 26.73
C7 38.61 8.21 15.39 -38.61 -8.21 14.16
2-7 C1 9.58 79.36 41.51 -9.58 79.89 -42.44
C2 5.74 83.99 65.75 -5.74 52.51 -10.65
C3 9.86 97.74 76.01 -9.86 61.51 -12.59
C4 6.09 75.15 64.37 -6.09 38.60 -0.41
C5 10.99 54.66 10.29 -10.99 81.84 -57.86
C6 16.55 60.41 5.42 -16.55 98.84 -72.67
C7 9.43 56.48 29.08 -9.43 57.27 -30.45
7-12 C1 0.74 23.00 14.61 -0.74 26.42 -18.03
C2 6.71 56.76 49.33 -6.71 -14.40 21.84
C3 9.50 65.88 57.60 -9.50 -16.46 24.75
C4 8.74 59.42 53.41 -8.74 -24.12 30.14
C5 -4.05 -11.24 -18.14 4.05 53.60 -46.69
C6 -4.19 -20.66 -28.28 4.19 70.08 -62.47
C7 1.89 16.15 10.47 -1.89 19.15 -13.47
12-17 C1 12.92 94.36 60.58 -12.92 92.19 -56.14
C2 25.41 93.17 75.07 -25.41 66.73 -20.85
C3 33.86 109.00 87.88 -33.86 77.55 -23.39
C4 28.80 81.94 70.47 -28.80 51.31 -7.66
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

C5 0.07 70.70 32.71 -0.07 89.20 -70.63


C6 1.61 80.40 33.98 -1.61 106.15 -86.76
C7 12.67 67.64 43.52 -12.67 65.61 -39.34
3-8 C1 -3.28 116.06 46.87 3.28 123.83 -60.47
C2 1.68 113.97 75.74 -1.68 83.01 -21.56
C3 4.21 99.14 75.47 -4.21 60.11 -7.17
C4 4.41 77.02 66.29 -4.41 36.73 4.23
C5 -6.06 79.81 7.64 6.06 117.17 -73.01
C6 -5.64 55.67 -11.20 5.64 103.58 -72.65
C7 -0.51 55.29 22.95 0.51 58.46 -28.51
4-9 C1 -0.88 117.50 50.70 0.88 122.39 -59.25
C2 4.28 106.33 60.80 -4.28 90.65 -33.37
C3 6.60 89.12 54.62 -6.60 70.13 -21.39
C4 6.33 66.95 45.47 -6.33 46.80 -10.19
C5 -4.59 88.20 25.33 4.59 108.78 -61.36
C6 -4.69 66.05 9.48 4.69 93.20 -57.01
C7 0.68 55.42 22.90 -0.68 58.33 -28.00
5-10 C1 14.80 86.91 27.46 -14.80 98.31 -47.42
C2 14.82 72.92 28.29 -14.82 75.34 -32.54
C3 11.52 45.05 21.35 -11.52 42.17 -16.32
C4 9.17 33.28 17.31 -9.17 29.02 -9.84
C5 9.61 66.82 16.95 -9.61 81.44 -42.54
C6 4.88 37.29 6.91 -4.88 49.93 -29.04
C7 5.86 29.40 10.09 -5.86 32.90 -16.20
8-13 C1 -2.68 43.27 36.95 2.68 52.23 -45.90
C2 8.15 64.12 59.05 -8.15 12.80 -7.73
C3 10.95 56.13 56.19 -10.95 -6.71 6.65
C4 11.24 49.86 49.78 -11.24 -14.56 14.65
C5 -10.69 10.37 6.00 10.69 66.55 -62.18
C6 -13.03 -12.29 -11.34 13.03 61.71 -62.65
C7 -0.75 15.66 16.02 0.75 19.64 -20.00
9-14 C1 -1.66 45.70 37.25 1.66 49.80 -41.35
C2 11.15 51.20 44.80 -11.15 25.72 -19.32
C3 14.15 39.60 40.37 -14.15 9.82 -10.59
C4 14.25 33.12 33.61 -14.25 2.18 -2.68
C5 -11.63 24.63 18.53 11.63 52.29 -46.20
C6 -14.83 5.78 6.95 14.83 43.64 -44.81
C7 -0.24 16.21 16.90 0.24 19.09 -19.79
10-15 C1 9.04 49.64 37.23 -9.04 56.20 -43.79
C2 14.54 42.73 32.68 -14.54 41.99 -31.94
C3 13.22 27.63 20.72 -13.22 22.21 -15.30
C4 11.86 20.70 15.77 -11.86 14.90 -9.96
C5 1.25 37.41 27.37 -1.25 47.31 -37.26
C6 -3.69 20.87 13.96 3.69 28.97 -22.06
C7 3.40 17.32 12.39 -3.40 18.28 -13.34
13-18 C1 -4.69 145.89 86.33 4.69 135.12 -64.24
C2 12.52 134.65 97.17 -12.52 96.10 -18.16
C3 17.73 113.92 87.94 -17.73 72.63 -3.30
C4 18.05 86.33 71.58 -18.05 46.92 9.22
C5 -17.11 107.37 48.98 17.11 123.38 -81.80
C6 -19.99 79.20 26.61 19.99 107.35 -84.30
C7 -0.81 68.97 40.91 0.81 64.28 -31.29
14-19 C1 -1.48 143.74 83.07 1.48 137.27 -69.80
C2 18.90 126.03 82.68 -18.90 104.72 -38.99
C3 24.28 105.25 72.31 -24.28 81.30 -23.20
C4 23.97 77.83 56.46 -23.97 55.42 -10.53
C5 -17.57 111.48 56.22 17.57 119.27 -72.20
C6 -22.14 86.73 38.64 22.14 99.82 -65.47
C7 0.76 68.57 39.62 -0.76 64.68 -31.67
15-20 C1 20.60 114.90 64.67 -20.60 102.08 -38.40
C2 28.26 94.65 57.05 -28.26 79.02 -25.01
C3 25.00 56.75 36.14 -25.00 45.43 -12.93
C4 21.71 41.45 27.59 -21.71 31.53 -7.27
C5 7.04 89.62 47.26 -7.04 84.05 -35.85
C6 -2.01 50.34 23.68 2.01 51.83 -26.73
C7 8.21 38.25 21.36 -8.21 34.73 -14.16

============================== STATISTICAL DATA ===============================

Weights of beam elements: (Not included in analysis)

Section Designation Total Mass


(kN) (kg)

COLUMN 300x300 RC 107.448 10952.9


PLINTH 300x300 RC 21.312 2172.5
BEAM 200*320 RC 70.416 7178.0
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

---------------------
199.176 20303.4

Total weight of structure = 0.00 kN

No. of real numbers in Stiffness matrix = 0 (0 bytes)


Time used to analyse = 0: 0:0.187 seconds
Total number of : Nodes = 20
Beam Elements = 28
Cable Elements = 0
Shell Elements = 0
Supports = 4
Section Properties = 3
Load Cases = 10
Load Combinations = 7

=============================== END OF OUTPUT =================================

========== S p a c e - F r a m e A n a l y s i s - P R O K O N ===========
Ver W3.0.04 - 29 Jan 2016

TITLE :FRAME E(1-4)

Data file : C:\Users\RDD\Desktop\design\provincial Road Development Department unit.A03


Created on: 7/23/2020

========================== NODAL POINT COORDINATES ============================

Node No X-coord Y-coord Z-coord Node No X-coord Y-coord Z-coord


m m m m m m

1 0.000 0.000 0.000 2 0.000 1.150 0.000


3 0.000 4.900 0.000 4 0.000 8.500 0.000
5 0.000 12.100 0.000 6 3.500 0.000 0.000
7 3.500 1.150 0.000 8 3.500 4.900 0.000
9 3.500 8.500 0.000 10 3.500 12.100 0.000
11 5.500 0.000 0.000 12 5.500 1.150 0.000
13 5.500 4.900 0.000 14 5.500 8.500 0.000
15 5.500 12.100 0.000 16 9.600 0.000 0.000
17 9.600 1.150 0.000 18 9.600 4.900 0.000
19 9.600 8.500 0.000 20 9.600 12.100 0.000

=============================== ELEMENT DATA ==================================

Beam Secn. type Fixity Length ß Group no.


m (°)

1-2 COLUMN 00 1.150 0.00 0


2-3 COLUMN 00 3.750 0.00 0
3-4 COLUMN 00 3.600 0.00 0
4-5 COLUMN 00 3.600 0.00 0
6-7 COLUMN 00 1.150 0.00 0
7-8 COLUMN 00 3.750 0.00 0
8-9 COLUMN 00 3.600 0.00 0
9-10 COLUMN 00 3.600 0.00 0
11-12 COLUMN 00 1.150 0.00 0
12-13 COLUMN 00 3.750 0.00 0
13-14 COLUMN 00 3.600 0.00 0
14-15 COLUMN 00 3.600 0.00 0
16-17 COLUMN 00 1.150 0.00 0
17-18 COLUMN 00 3.750 0.00 0
18-19 COLUMN 00 3.600 0.00 0
19-20 COLUMN 00 3.600 0.00 0
2-7 PLINTH 00 3.500 0.00 0
7-12 PLINTH 00 2.000 0.00 0
12-17 PLINTH 00 4.100 0.00 0
3-8 BEAM 00 3.500 0.00 0
4-9 BEAM 00 3.500 0.00 0
5-10 BEAM 00 3.500 0.00 0
8-13 BEAM 00 2.000 0.00 0
9-14 BEAM 00 2.000 0.00 0
10-15 BEAM 00 2.000 0.00 0
13-18 BEAM 00 4.100 0.00 0
14-19 BEAM 00 4.100 0.00 0
15-20 BEAM 00 4.100 0.00 0
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

============================ SECTION PROPERTIES ===============================

Section : COLUMN Section designation: 300x300 RC


----------------
A Ay Ax Ixx Iyy J Material
m^2 m^2 m^2 m^4 m^4 m^4

88.80E-3 0.000 0.000 650E-6 650E-6 1.14E-3 Concrete:25 MPa

Section : PLINTH Section designation: 300x300 RC


----------------
A Ay Ax Ixx Iyy J Material
m^2 m^2 m^2 m^4 m^4 m^4

88.80E-3 0.000 0.000 650E-6 650E-6 1.14E-3 Concrete:25 MPa

Section : BEAM Section designation: 200*320 RC


----------------
A Ay Ax Ixx Iyy J Material
m^2 m^2 m^2 m^4 m^4 m^4

97.80E-3 0.000 0.000 1.61E-3 386E-6 1.11E-3 Concrete:25 MPa

================================== MATERIALS ==================================

Designation E poisson Density Exp. coeff.


kPa kN/m^3
Concrete:25 MPa 25.00E6 0.20 25.00 10.00E-6

=============================== SUPPORT DATA ==================================

Prescribed displacements
Node Fixity X Y Z X-Rot Y-Rot Z-Rot Orien node
m m m rad. rad. rad.

1 XY 0.00 0.00 0.00 0.00 0.00 0.00 0


6 XY 0.00 0.00 0.00 0.00 0.00 0.00 0
11 XY 0.00 0.00 0.00 0.00 0.00 0.00 0
16 XY 0.00 0.00 0.00 0.00 0.00 0.00 0

Spring constants
Node Fixity X Y Z X-Rot Y-Rot Z-Rot
kN/m kN/m kN/m kNm/rad kNm/rad kNm/rad

=================================== LOADS =====================================

Load Case Description

W wind load
D5 dead load
D1 dead load
D2 dead load
D3 dead load
D4 dead load
L1 imposed load
L2 imposed load
L3 imposed load
L4 imposed load

Own weight not added to any load case/combination

============================= LOAD CASE W ====================================


wind load

*** POINT LOADS ***

Node Fx Fy Fz Mx My Mz
kN kN kN kNm kNm kNm

17 -8.55 0.00 0.00 0.00 0.00 0.00


18 -16.79 0.00 0.00 0.00 0.00 0.00
19 -20.36 0.00 0.00 0.00 0.00 0.00
20 -11.84 0.00 0.00 0.00 0.00 0.00
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

============================= LOAD CASE D5 ====================================


dead load

*** POINT LOADS ***

Node Fx Fy Fz Mx My Mz
kN kN kN kNm kNm kNm

1 0.00 -2.50 0.00 0.00 0.00 0.00


6 0.00 -2.50 0.00 0.00 0.00 0.00
11 0.00 -2.50 0.00 0.00 0.00 0.00
16 0.00 -2.50 0.00 0.00 0.00 0.00
2 0.00 -8.10 0.00 0.00 0.00 0.00
7 0.00 -8.10 0.00 0.00 0.00 0.00
12 0.00 -8.10 0.00 0.00 0.00 0.00
17 0.00 -8.10 0.00 0.00 0.00 0.00
3 0.00 -7.75 0.00 0.00 0.00 0.00
8 0.00 -7.75 0.00 0.00 0.00 0.00
13 0.00 -7.75 0.00 0.00 0.00 0.00
18 0.00 -7.75 0.00 0.00 0.00 0.00
4 0.00 -7.75 0.00 0.00 0.00 0.00
9 0.00 -7.75 0.00 0.00 0.00 0.00
14 0.00 -7.75 0.00 0.00 0.00 0.00
19 0.00 -7.75 0.00 0.00 0.00 0.00
5 0.00 -3.88 0.00 0.00 0.00 0.00
10 0.00 -3.88 0.00 0.00 0.00 0.00
15 0.00 -3.88 0.00 0.00 0.00 0.00
20 0.00 -3.88 0.00 0.00 0.00 0.00

============================= LOAD CASE D1 ====================================


dead load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

2-7 Y 0.00 0.00 -32.5 -32.5 0.00 3.50 0.00


3-8 Y 0.00 0.00 -32.5 -32.5 0.00 3.50 0.00
4-9 Y 0.00 0.00 -32.5 -32.5 0.00 3.50 0.00

============================= LOAD CASE D2 ====================================


dead load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

7-12 Y 0.00 0.00 -17.6 -17.6 0.00 2.00 0.00


8-13 Y 0.00 0.00 -17.6 -17.6 0.00 2.00 0.00
9-14 Y 0.00 0.00 -17.6 -17.6 0.00 2.00 0.00

============================= LOAD CASE D3 ====================================


dead load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

15-20 Y 0.00 0.00 -17.8 -17.8 0.00 4.10 0.00


10-15 Y 0.00 0.00 -17.8 -17.8 0.00 2.00 0.00
5-10 Y 0.00 0.00 -17.8 -17.8 0.00 3.50 0.00

============================= LOAD CASE D4 ====================================


dead load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

12-17 Y 0.00 0.00 -32.5 -32.5 0.00 4.10 0.00


13-18 Y 0.00 0.00 -32.5 -32.5 0.00 4.10 0.00
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

14-19 Y 0.00 0.00 -32.5 -32.5 0.00 4.10 0.00

============================= LOAD CASE L1 ====================================


imposed load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

3-8 Y 0.00 0.00 -14.4 -14.4 0.00 3.50 0.00


4-9 Y 0.00 0.00 -14.4 -14.4 0.00 3.50 0.00

============================= LOAD CASE L2 ====================================


imposed load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

8-13 Y 0.00 0.00 -14.4 -14.4 0.00 2.00 0.00


9-14 Y 0.00 0.00 -14.4 -14.4 0.00 2.00 0.00

============================= LOAD CASE L3 ====================================


imposed load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

15-20 Y 0.00 0.00 -17.5 -17.5 0.00 4.10 0.00


10-15 Y 0.00 0.00 -17.5 -17.5 0.00 2.00 0.00
5-10 Y 0.00 0.00 -17.5 -17.5 0.00 3.50 0.00

============================= LOAD CASE L4 ====================================


imposed load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

13-18 Y 0.00 0.00 -14.4 -14.4 0.00 4.10 0.00


14-19 Y 0.00 0.00 -14.4 -14.4 0.00 4.10 0.00

============================= LOAD COMBINATIONS ===============================

Load Comb Description

C1
C2
C3
C4
C5
C6
C7

Comb. Load factor for each load case: Ultimate Limit State

W D5 D1 D2 D3 D4 L1 L2 L3

C1 0.00 1.40 1.40 1.40 1.40 1.40 1.60 1.60 1.60


C2 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20
C3 1.40 1.40 1.40 1.40 1.40 1.40 0.00 0.00 0.00
C4 1.40 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00
C5 -1.00 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20
C6 -1.40 1.40 1.40 1.40 1.40 1.40 0.00 0.00 0.00
C7 0.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00

L4

C1 1.60
C2 1.20
C3 0.00
C4 0.00
C5 1.20
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

C6 0.00
C7 0.00

Comb. Load factor for each load case: Serviceability Limit State

W D5 D1 D2 D3 D4 L1 L2 L3

C1 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00


C2 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
C3 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00
C4 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00
C5 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
C6 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00
C7 0.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00

L4

C1 1.00
C2 1.00
C3 0.00
C4 0.00
C5 1.00
C6 0.00
C7 0.00

========================== OWN WEIGHT ACCELERATIONS ===========================

Direction Acceleration (g)


X 0.00
Y -1.00
Z 0.00

========================== OUTPUT: LINEAR ANALYSIS ============================


====================== NODAL POINT DISPLACEMENTS at SLS =======================

Node Lcase X-disp. Y-disp Z-rot.


mm mm rad.

1 C1 0.00 0.00 0.0002


C2 0.00 0.00 0.0016
C3 0.00 0.00 0.0016
C4 0.00 0.00 0.0016
C5 0.00 0.00 0.0016
C6 0.00 0.00 0.0016
C7 0.00 0.00 0.0002
2 C1 -0.02 -0.16 -0.0004
C2 -1.45 -0.18 0.0007
C3 -1.45 -0.14 0.0006
C4 -1.45 -0.14 0.0006
C5 -1.45 -0.18 0.0007
C6 -1.45 -0.14 0.0006
C7 -0.02 -0.12 -0.0004
3 C1 -0.15 -0.56 -0.0006
C2 -7.27 -0.62 -0.0001
C3 -7.27 -0.45 0.0002
C4 -7.27 -0.45 0.0002
C5 -7.27 -0.62 -0.0001
C6 -7.27 -0.45 0.0002
C7 -0.14 -0.39 -0.0004
4 C1 -0.23 -0.80 -0.0006
C2 -10.44 -0.88 -0.0003
C3 -10.41 -0.63 -0.0001
C4 -10.41 -0.63 -0.0001
C5 -10.44 -0.88 -0.0003
C6 -10.41 -0.63 -0.0001
C7 -0.20 -0.54 -0.0004
5 C1 -0.28 -0.90 -0.0007
C2 -11.76 -0.99 -0.0006
C3 -11.71 -0.68 -0.0002
C4 -11.71 -0.68 -0.0002
C5 -11.76 -0.99 -0.0006
C6 -11.71 -0.68 -0.0002
C7 -0.23 -0.60 -0.0003
6 C1 0.00 0.00 -0.0001
C2 0.00 0.00 0.0014
C3 0.00 0.00 0.0014
C4 0.00 0.00 0.0014
C5 0.00 0.00 0.0014
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

C6 0.00 0.00 0.0014


C7 0.00 0.00 -0.0001
7 C1 -0.03 -0.22 0.0003
C2 -1.46 -0.24 0.0010
C3 -1.46 -0.17 0.0010
C4 -1.46 -0.17 0.0010
C5 -1.46 -0.24 0.0010
C6 -1.46 -0.17 0.0010
C7 -0.03 -0.16 0.0003
8 C1 -0.14 -0.81 0.0003
C2 -7.28 -0.84 0.0006
C3 -7.27 -0.56 0.0005
C4 -7.27 -0.56 0.0005
C5 -7.28 -0.84 0.0006
C6 -7.27 -0.56 0.0005
C7 -0.14 -0.52 0.0002
9 C1 -0.23 -1.17 0.0003
C2 -10.44 -1.21 0.0004
C3 -10.42 -0.79 0.0004
C4 -10.42 -0.79 0.0004
C5 -10.44 -1.21 0.0004
C6 -10.42 -0.79 0.0004
C7 -0.20 -0.75 0.0002
10 C1 -0.29 -1.34 0.0003
C2 -11.78 -1.38 0.0003
C3 -11.72 -0.87 0.0002
C4 -11.72 -0.87 0.0002
C5 -11.78 -1.38 0.0003
C6 -11.72 -0.87 0.0002
C7 -0.24 -0.83 0.0001
11 C1 0.00 0.00 0.0002
C2 0.00 0.00 0.0018
C3 0.00 0.00 0.0018
C4 0.00 0.00 0.0018
C5 0.00 0.00 0.0018
C6 0.00 0.00 0.0018
C7 0.00 0.00 0.0003
12 C1 -0.03 -0.26 -0.0004
C2 -1.46 -0.24 0.0003
C3 -1.47 -0.16 0.0002
C4 -1.47 -0.16 0.0002
C5 -1.46 -0.24 0.0003
C6 -1.47 -0.16 0.0002
C7 -0.04 -0.18 -0.0004
13 C1 -0.14 -0.93 -0.0005
C2 -7.28 -0.88 -0.0003
C3 -7.28 -0.56 -0.0001
C4 -7.28 -0.56 -0.0001
C5 -7.28 -0.88 -0.0003
C6 -7.28 -0.56 -0.0001
C7 -0.14 -0.61 -0.0004
14 C1 -0.22 -1.35 -0.0005
C2 -10.45 -1.29 -0.0003
C3 -10.43 -0.80 -0.0002
C4 -10.43 -0.80 -0.0002
C5 -10.45 -1.29 -0.0003
C6 -10.43 -0.80 -0.0002
C7 -0.20 -0.86 -0.0004
15 C1 -0.30 -1.54 -0.0005
C2 -11.79 -1.48 -0.0004
C3 -11.73 -0.90 -0.0002
C4 -11.73 -0.90 -0.0002
C5 -11.79 -1.48 -0.0004
C6 -11.73 -0.90 -0.0002
C7 -0.24 -0.96 -0.0002
16 C1 0.00 0.00 -0.0002
C2 0.00 0.00 0.0011
C3 0.00 0.00 0.0011
C4 0.00 0.00 0.0011
C5 0.00 0.00 0.0011
C6 0.00 0.00 0.0011
C7 0.00 0.00 -0.0002
17 C1 -0.05 -0.18 0.0006
C2 -1.50 -0.16 0.0017
C3 -1.51 -0.12 0.0017
C4 -1.51 -0.12 0.0017
C5 -1.50 -0.16 0.0017
C6 -1.51 -0.12 0.0017
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

C7 -0.06 -0.13 0.0006


18 C1 -0.14 -0.64 0.0009
C2 -7.30 -0.59 0.0015
C3 -7.30 -0.39 0.0012
C4 -7.30 -0.39 0.0012
C5 -7.30 -0.59 0.0015
C6 -7.30 -0.39 0.0012
C7 -0.13 -0.44 0.0006
19 C1 -0.22 -0.92 0.0009
C2 -10.48 -0.86 0.0012
C3 -10.45 -0.56 0.0009
C4 -10.45 -0.56 0.0009
C5 -10.48 -0.86 0.0012
C6 -10.45 -0.56 0.0009
C7 -0.20 -0.62 0.0006
20 C1 -0.32 -1.04 0.0010
C2 -11.83 -0.97 0.0011
C3 -11.76 -0.61 0.0006
C4 -11.76 -0.61 0.0006
C5 -11.83 -0.97 0.0011
C6 -11.76 -0.61 0.0006
C7 -0.25 -0.68 0.0005

============================== REACTIONS AT ULS ===============================


(In rotated axes where applicable)
Node Lcase X-force Y-forcet Z-moment
kN kN kNm

1 C1 20.22 441.80 0.00


C2 26.52 413.18 0.00
C3 32.19 373.02 0.00
C4 26.01 282.39 0.00
C5 9.95 325.46 0.00
C6 11.10 261.38 0.00
C7 15.46 226.57 0.00
6 C1 -14.78 628.01 0.00
C2 14.02 552.31 0.00
C3 15.63 465.14 0.00
C4 20.09 344.23 0.00
C5 -35.07 486.38 0.00
C6 -46.85 381.23 0.00
C7 -11.15 302.27 0.00
11 C1 21.91 725.51 0.00
C2 44.55 550.58 0.00
C3 53.05 435.75 0.00
C4 46.44 295.92 0.00
C5 -2.45 634.89 0.00
C6 -6.77 543.05 0.00
C7 16.53 349.57 0.00
16 C1 -27.35 508.63 0.00
C2 -16.04 382.55 0.00
C3 -20.31 318.87 0.00
C4 -11.97 215.16 0.00
C5 -29.97 451.88 0.00
C6 -38.03 407.11 0.00
C7 -20.84 259.28 0.00

EQUILIBRIUM CHECK AT ULS:

LC APPLIED LOADS & MOMENTS about (0.0,0.0,0.0) in global axes

Sum of: Px Py Mz

C1 0.00 -2303.95 -11071.19


C2 -69.05 -1898.62 -8633.73
C3 -80.56 -1592.78 -7085.78
C4 -80.56 -1137.70 -4897.90
C5 57.54 -1898.62 -9532.27
C6 80.56 -1592.78 -8229.38
C7 0.00 -1137.70 -5469.70

LC REACTIONS & REACTION MOMENTS about (0.0,0.0,0.0) in global axes

Sum of: Rx Ry MRz

C1 0.00 2303.95 11071.19


C2 69.05 1898.62 8633.73
C3 80.56 1592.78 7085.78
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

C4 80.56 1137.70 4897.90


C5 -57.54 1898.62 9532.27
C6 -80.56 1592.78 8229.38
C7 0.00 1137.70 5469.70

================== REACTIONS AT SLS (Combinations only) =======================

(In rotated axes


Node Lcase X-force Y-forcet Z-moment
kN kN kNm

1 C1 14.57 304.44 0.00


C2 22.10 344.31 0.00
C3 22.99 266.44 0.00
C4 22.99 266.44 0.00
C5 22.10 344.31 0.00
C6 22.99 266.44 0.00
C7 15.46 226.57 0.00
6 C1 -10.63 430.29 0.00
C2 11.68 460.26 0.00
C3 11.16 332.24 0.00
C4 11.16 332.24 0.00
C5 11.68 460.26 0.00
C6 11.16 332.24 0.00
C7 -11.15 302.27 0.00
11 C1 15.76 497.14 0.00
C2 37.12 458.82 0.00
C3 37.89 311.25 0.00
C4 37.89 311.25 0.00
C5 37.12 458.82 0.00
C6 37.89 311.25 0.00
C7 16.53 349.57 0.00
16 C1 -19.70 350.30 0.00
C2 -13.37 318.79 0.00
C3 -14.51 227.77 0.00
C4 -14.51 227.77 0.00
C5 -13.37 318.79 0.00
C6 -14.51 227.77 0.00
C7 -20.84 259.28 0.00

============ BEAM ELEMENT END FORCES IN LOCAL ELEMENT AXES at ULS ==============

Elem Lcase Axial Y-Shea M-xx Axial Y-Shea M-xx


kN kN kNm kN kN kNm

1-2 C1 438.30 -20.22 0.00 -438.30 20.22 -23.25


C2 410.18 -26.52 0.00 -410.18 26.52 -30.50
C3 369.52 -32.19 0.00 -369.52 32.19 -37.02
C4 279.89 -26.01 0.00 -279.89 26.01 -29.91
C5 322.46 -9.95 0.00 -322.46 9.95 -11.44
C6 257.88 -11.10 0.00 -257.88 11.10 -12.76
C7 224.07 -15.46 0.00 -224.07 15.46 -17.78
2-3 C1 347.60 -10.64 -18.26 -347.60 10.64 -21.62
C2 316.47 -20.79 -35.25 -316.47 20.79 -42.70
C3 260.44 -22.33 -38.99 -260.44 22.33 -44.75
C4 196.64 -19.92 -34.46 -196.64 19.92 -40.23
C5 258.08 1.04 1.15 -258.08 -1.04 2.74
C6 186.13 5.45 7.34 -186.13 -5.45 13.09
C7 159.49 -6.03 -11.30 -159.49 6.03 -11.31
3-4 C1 220.69 -13.92 -25.24 -220.69 13.92 -24.87
C2 193.20 -19.10 -33.03 -193.20 19.10 -35.74
C3 150.45 -18.12 -30.72 -150.45 18.12 -34.51
C4 111.87 -15.50 -26.06 -111.87 15.50 -29.75
C5 168.97 -5.02 -10.38 -168.97 5.02 -7.68
C6 119.61 -0.19 -1.89 -119.61 0.19 1.19
C7 96.45 -6.54 -11.65 -96.45 6.54 -11.90
4-5 C1 92.34 -14.80 -25.83 -92.34 14.80 -27.46
C2 77.57 -14.82 -25.07 -77.57 14.82 -28.29
C3 50.48 -11.52 -20.12 -50.48 11.52 -21.35
C4 37.16 -9.17 -15.72 -37.16 9.17 -17.31
C5 71.47 -9.61 -17.65 -71.47 9.61 -16.95
C6 42.72 -4.88 -10.68 -42.72 4.88 -6.91
C7 33.28 -5.86 -11.00 -33.28 5.86 -10.09
6-7 C1 624.51 14.78 0.00 -624.51 -14.78 16.99
C2 549.31 -14.02 0.00 -549.31 14.02 -16.12
C3 461.64 -15.63 0.00 -461.64 15.63 -17.97
C4 341.73 -20.09 0.00 -341.73 20.09 -23.10
C5 483.38 35.07 0.00 -483.38 -35.07 40.33
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

C6 377.73 46.85 0.00 -377.73 -46.85 53.88


C7 299.77 11.15 0.00 -299.77 -11.15 12.82
7-8 C1 510.28 5.94 10.84 -510.28 -5.94 11.43
C2 430.32 -13.05 -22.55 -430.32 13.05 -26.38
C3 322.91 -15.99 -27.03 -322.91 15.99 -32.94
C4 235.60 -17.44 -29.89 -235.60 17.44 -35.50
C5 403.06 20.03 35.67 -403.06 -20.03 39.45
C6 288.22 26.11 47.07 -288.22 -26.11 50.85
C7 218.26 3.61 7.15 -218.26 -3.61 6.39
8-9 C1 332.33 6.54 12.09 -332.33 -6.54 11.44
C2 273.88 -6.58 -11.11 -273.88 6.58 -12.58
C3 195.82 -9.26 -16.07 -195.82 9.26 -17.25
C4 141.26 -10.61 -18.51 -141.26 10.61 -19.68
C5 266.22 15.40 27.56 -266.22 -15.40 27.89
C6 186.07 18.72 33.14 -186.07 -18.72 34.25
C7 136.39 3.38 6.10 -136.39 -3.38 6.07
9-10 C1 153.39 5.76 10.56 -153.39 -5.76 10.19
C2 122.73 0.28 1.16 -122.73 -0.28 -0.14
C3 75.24 -1.70 -1.73 -75.24 1.70 -4.40
C4 53.60 -2.69 -3.74 -53.60 2.69 -5.93
C5 123.51 8.36 14.94 -123.51 -8.36 15.17
C6 76.24 8.58 15.81 -76.24 -8.58 15.08
C7 54.10 2.46 5.03 -54.10 -2.46 3.81
11-12 C1 722.01 -21.91 0.00 -722.01 21.91 -25.19
C2 547.58 -44.55 0.00 -547.58 44.55 -51.23
C3 432.25 -53.05 0.00 -432.25 53.05 -61.00
C4 293.42 -46.44 0.00 -293.42 46.44 -53.40
C5 631.89 2.45 0.00 -631.89 -2.45 2.82
C6 539.55 6.77 0.00 -539.55 -6.77 7.79
C7 347.07 -16.53 0.00 -347.07 16.53 -19.01
12-13 C1 589.89 -9.73 -17.36 -589.89 9.73 -19.14
C2 459.09 -25.84 -45.68 -459.09 25.84 -51.23
C3 328.37 -28.68 -51.62 -328.37 28.68 -55.92
C4 227.50 -26.38 -47.21 -227.50 26.38 -51.71
C5 497.87 6.57 11.16 -497.87 -6.57 13.48
C6 377.72 12.57 20.71 -377.72 -12.57 26.44
C7 252.18 -5.75 -11.04 -252.18 5.75 -10.53
13-14 C1 380.92 -11.74 -21.29 -380.92 11.74 -20.98
C2 302.35 -21.47 -38.21 -302.35 21.47 -39.08
C3 210.31 -21.90 -38.66 -210.31 21.90 -40.16
C4 147.98 -19.57 -34.51 -147.98 19.57 -35.94
C5 314.65 0.15 -0.28 -314.65 -0.15 0.82
C6 225.96 5.62 9.61 -225.96 -5.62 10.62
C7 155.81 -5.81 -10.38 -155.81 5.81 -10.55
14-15 C1 176.53 -11.56 -20.74 -176.53 11.56 -20.89
C2 141.30 -13.72 -24.28 -141.30 13.72 -25.10
C3 84.39 -11.77 -21.55 -84.39 11.77 -20.84
C4 60.22 -9.85 -17.84 -60.22 9.85 -17.63
C5 141.58 -5.79 -10.84 -141.58 5.79 -10.00
C6 84.74 -1.68 -4.45 -84.74 1.68 -1.62
C7 60.40 -4.81 -9.29 -60.40 4.81 -8.02
16-17 C1 505.13 27.35 0.00 -505.13 -27.35 31.45
C2 379.55 16.04 0.00 -379.55 -16.04 18.45
C3 315.37 20.31 0.00 -315.37 -20.31 23.36
C4 212.66 11.97 0.00 -212.66 -11.97 13.77
C5 448.88 29.97 0.00 -448.88 -29.97 34.46
C6 403.61 38.03 0.00 -403.61 -38.03 43.74
C7 256.78 20.84 0.00 -256.78 -20.84 23.96
17-18 C1 401.60 14.43 24.68 -401.60 -14.43 29.44
C2 303.10 0.89 2.40 -303.10 -0.89 0.94
C3 226.49 -1.59 0.04 -226.49 1.59 -5.98
C4 153.26 -4.85 -6.11 -153.26 4.85 -12.08
C5 349.96 21.35 36.17 -349.96 -21.35 43.89
C6 286.13 24.46 43.02 -286.13 -24.46 48.69
C7 183.08 8.17 15.38 -183.08 -8.17 15.25
18-19 C1 255.63 19.12 34.80 -255.63 -19.12 34.04
C2 197.70 8.51 17.22 -197.70 -8.51 13.43
C3 143.01 4.19 9.28 -143.01 -4.19 5.82
C4 98.59 0.60 2.87 -98.59 -0.60 -0.69
C5 217.28 21.67 37.91 -217.28 -21.67 40.09
C6 167.93 20.94 35.62 -167.93 -20.94 39.75
C7 111.05 8.97 16.03 -111.05 -8.97 16.27
19-20 C1 107.51 20.60 35.76 -107.51 -20.60 38.40
C2 83.68 14.05 25.56 -83.68 -14.05 25.01
C3 50.86 8.42 17.38 -50.86 -8.42 12.93
C4 35.41 5.14 11.22 -35.41 -5.14 7.27
C5 88.71 18.88 32.11 -88.71 -18.88 35.85
C6 57.26 14.57 25.71 -57.26 -14.57 26.73
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

C7 38.61 8.21 15.39 -38.61 -8.21 14.16


2-7 C1 9.58 79.36 41.51 -9.58 79.89 -42.44
C2 5.74 83.99 65.75 -5.74 52.51 -10.65
C3 9.86 97.74 76.01 -9.86 61.51 -12.59
C4 6.09 75.15 64.37 -6.09 38.60 -0.41
C5 10.99 54.66 10.29 -10.99 81.84 -57.86
C6 16.55 60.41 5.42 -16.55 98.84 -72.67
C7 9.43 56.48 29.08 -9.43 57.27 -30.45
7-12 C1 0.74 23.00 14.61 -0.74 26.42 -18.03
C2 6.71 56.76 49.33 -6.71 -14.40 21.84
C3 9.50 65.88 57.60 -9.50 -16.46 24.75
C4 8.74 59.42 53.41 -8.74 -24.12 30.14
C5 -4.05 -11.24 -18.14 4.05 53.60 -46.69
C6 -4.19 -20.66 -28.28 4.19 70.08 -62.47
C7 1.89 16.15 10.47 -1.89 19.15 -13.47
12-17 C1 12.92 94.36 60.58 -12.92 92.19 -56.14
C2 25.41 93.17 75.07 -25.41 66.73 -20.85
C3 33.86 109.00 87.88 -33.86 77.55 -23.39
C4 28.80 81.94 70.47 -28.80 51.31 -7.66
C5 0.07 70.70 32.71 -0.07 89.20 -70.63
C6 1.61 80.40 33.98 -1.61 106.15 -86.76
C7 12.67 67.64 43.52 -12.67 65.61 -39.34
3-8 C1 -3.28 116.06 46.87 3.28 123.83 -60.47
C2 1.68 113.97 75.74 -1.68 83.01 -21.56
C3 4.21 99.14 75.47 -4.21 60.11 -7.17
C4 4.41 77.02 66.29 -4.41 36.73 4.23
C5 -6.06 79.81 7.64 6.06 117.17 -73.01
C6 -5.64 55.67 -11.20 5.64 103.58 -72.65
C7 -0.51 55.29 22.95 0.51 58.46 -28.51
4-9 C1 -0.88 117.50 50.70 0.88 122.39 -59.25
C2 4.28 106.33 60.80 -4.28 90.65 -33.37
C3 6.60 89.12 54.62 -6.60 70.13 -21.39
C4 6.33 66.95 45.47 -6.33 46.80 -10.19
C5 -4.59 88.20 25.33 4.59 108.78 -61.36
C6 -4.69 66.05 9.48 4.69 93.20 -57.01
C7 0.68 55.42 22.90 -0.68 58.33 -28.00
5-10 C1 14.80 86.91 27.46 -14.80 98.31 -47.42
C2 14.82 72.92 28.29 -14.82 75.34 -32.54
C3 11.52 45.05 21.35 -11.52 42.17 -16.32
C4 9.17 33.28 17.31 -9.17 29.02 -9.84
C5 9.61 66.82 16.95 -9.61 81.44 -42.54
C6 4.88 37.29 6.91 -4.88 49.93 -29.04
C7 5.86 29.40 10.09 -5.86 32.90 -16.20
8-13 C1 -2.68 43.27 36.95 2.68 52.23 -45.90
C2 8.15 64.12 59.05 -8.15 12.80 -7.73
C3 10.95 56.13 56.19 -10.95 -6.71 6.65
C4 11.24 49.86 49.78 -11.24 -14.56 14.65
C5 -10.69 10.37 6.00 10.69 66.55 -62.18
C6 -13.03 -12.29 -11.34 13.03 61.71 -62.65
C7 -0.75 15.66 16.02 0.75 19.64 -20.00
9-14 C1 -1.66 45.70 37.25 1.66 49.80 -41.35
C2 11.15 51.20 44.80 -11.15 25.72 -19.32
C3 14.15 39.60 40.37 -14.15 9.82 -10.59
C4 14.25 33.12 33.61 -14.25 2.18 -2.68
C5 -11.63 24.63 18.53 11.63 52.29 -46.20
C6 -14.83 5.78 6.95 14.83 43.64 -44.81
C7 -0.24 16.21 16.90 0.24 19.09 -19.79
10-15 C1 9.04 49.64 37.23 -9.04 56.20 -43.79
C2 14.54 42.73 32.68 -14.54 41.99 -31.94
C3 13.22 27.63 20.72 -13.22 22.21 -15.30
C4 11.86 20.70 15.77 -11.86 14.90 -9.96
C5 1.25 37.41 27.37 -1.25 47.31 -37.26
C6 -3.69 20.87 13.96 3.69 28.97 -22.06
C7 3.40 17.32 12.39 -3.40 18.28 -13.34
13-18 C1 -4.69 145.89 86.33 4.69 135.12 -64.24
C2 12.52 134.65 97.17 -12.52 96.10 -18.16
C3 17.73 113.92 87.94 -17.73 72.63 -3.30
C4 18.05 86.33 71.58 -18.05 46.92 9.22
C5 -17.11 107.37 48.98 17.11 123.38 -81.80
C6 -19.99 79.20 26.61 19.99 107.35 -84.30
C7 -0.81 68.97 40.91 0.81 64.28 -31.29
14-19 C1 -1.48 143.74 83.07 1.48 137.27 -69.80
C2 18.90 126.03 82.68 -18.90 104.72 -38.99
C3 24.28 105.25 72.31 -24.28 81.30 -23.20
C4 23.97 77.83 56.46 -23.97 55.42 -10.53
C5 -17.57 111.48 56.22 17.57 119.27 -72.20
C6 -22.14 86.73 38.64 22.14 99.82 -65.47
C7 0.76 68.57 39.62 -0.76 64.68 -31.67
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

15-20 C1 20.60 114.90 64.67 -20.60 102.08 -38.40


C2 28.26 94.65 57.05 -28.26 79.02 -25.01
C3 25.00 56.75 36.14 -25.00 45.43 -12.93
C4 21.71 41.45 27.59 -21.71 31.53 -7.27
C5 7.04 89.62 47.26 -7.04 84.05 -35.85
C6 -2.01 50.34 23.68 2.01 51.83 -26.73
C7 8.21 38.25 21.36 -8.21 34.73 -14.16

============================== STATISTICAL DATA ===============================

Weights of beam elements: (Not included in analysis)

Section Designation Total Mass


(kN) (kg)

COLUMN 300x300 RC 107.448 10952.9


PLINTH 300x300 RC 21.312 2172.5
BEAM 200*320 RC 70.416 7178.0
---------------------
199.176 20303.4

Total weight of structure = 0.00 kN

No. of real numbers in Stiffness matrix = 0 (0 bytes)


Time used to analyse = 0: 0:0.187 seconds
Total number of : Nodes = 20
Beam Elements = 28
Cable Elements = 0
Shell Elements = 0
Supports = 4
Section Properties = 3
Load Cases = 10
Load Combinations = 7

=============================== END OF OUTPUT =================================

========== S p a c e - F r a m e A n a l y s i s - P R O K O N ===========
Ver W3.0.04 - 29 Jan 2016

TITLE :FRAME E(1-4)

Data file : C:\Users\RDD\Desktop\design\provincial Road Development Department unit.A03


Created on: 7/23/2020

========================== NODAL POINT COORDINATES ============================

Node No X-coord Y-coord Z-coord Node No X-coord Y-coord Z-coord


m m m m m m

1 0.000 0.000 0.000 2 0.000 1.150 0.000


3 0.000 4.900 0.000 4 0.000 8.500 0.000
5 0.000 12.100 0.000 6 3.500 0.000 0.000
7 3.500 1.150 0.000 8 3.500 4.900 0.000
9 3.500 8.500 0.000 10 3.500 12.100 0.000
11 5.500 0.000 0.000 12 5.500 1.150 0.000
13 5.500 4.900 0.000 14 5.500 8.500 0.000
15 5.500 12.100 0.000 16 9.600 0.000 0.000
17 9.600 1.150 0.000 18 9.600 4.900 0.000
19 9.600 8.500 0.000 20 9.600 12.100 0.000

=============================== ELEMENT DATA ==================================

Beam Secn. type Fixity Length ß Group no.


m (°)

1-2 COLUMN 00 1.150 0.00 0


2-3 COLUMN 00 3.750 0.00 0
3-4 COLUMN 00 3.600 0.00 0
4-5 COLUMN 00 3.600 0.00 0
6-7 COLUMN 00 1.150 0.00 0
7-8 COLUMN 00 3.750 0.00 0
8-9 COLUMN 00 3.600 0.00 0
9-10 COLUMN 00 3.600 0.00 0
11-12 COLUMN 00 1.150 0.00 0
12-13 COLUMN 00 3.750 0.00 0
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

13-14 COLUMN 00 3.600 0.00 0


14-15 COLUMN 00 3.600 0.00 0
16-17 COLUMN 00 1.150 0.00 0
17-18 COLUMN 00 3.750 0.00 0
18-19 COLUMN 00 3.600 0.00 0
19-20 COLUMN 00 3.600 0.00 0
2-7 PLINTH 00 3.500 0.00 0
7-12 PLINTH 00 2.000 0.00 0
12-17 PLINTH 00 4.100 0.00 0
3-8 BEAM 00 3.500 0.00 0
4-9 BEAM 00 3.500 0.00 0
5-10 BEAM 00 3.500 0.00 0
8-13 BEAM 00 2.000 0.00 0
9-14 BEAM 00 2.000 0.00 0
10-15 BEAM 00 2.000 0.00 0
13-18 BEAM 00 4.100 0.00 0
14-19 BEAM 00 4.100 0.00 0
15-20 BEAM 00 4.100 0.00 0

============================ SECTION PROPERTIES ===============================

Section : COLUMN Section designation: 300x300 RC


----------------
A Ay Ax Ixx Iyy J Material
m^2 m^2 m^2 m^4 m^4 m^4

88.80E-3 0.000 0.000 650E-6 650E-6 1.14E-3 Concrete:25 MPa

Section : PLINTH Section designation: 300x300 RC


----------------
A Ay Ax Ixx Iyy J Material
m^2 m^2 m^2 m^4 m^4 m^4

88.80E-3 0.000 0.000 650E-6 650E-6 1.14E-3 Concrete:25 MPa

Section : BEAM Section designation: 200*320 RC


----------------
A Ay Ax Ixx Iyy J Material
m^2 m^2 m^2 m^4 m^4 m^4

97.80E-3 0.000 0.000 1.61E-3 386E-6 1.11E-3 Concrete:25 MPa

================================== MATERIALS ==================================

Designation E poisson Density Exp. coeff.


kPa kN/m^3
Concrete:25 MPa 25.00E6 0.20 25.00 10.00E-6

=============================== SUPPORT DATA ==================================

Prescribed displacements
Node Fixity X Y Z X-Rot Y-Rot Z-Rot Orien node
m m m rad. rad. rad.

1 XY 0.00 0.00 0.00 0.00 0.00 0.00 0


6 XY 0.00 0.00 0.00 0.00 0.00 0.00 0
11 XY 0.00 0.00 0.00 0.00 0.00 0.00 0
16 XY 0.00 0.00 0.00 0.00 0.00 0.00 0

Spring constants
Node Fixity X Y Z X-Rot Y-Rot Z-Rot
kN/m kN/m kN/m kNm/rad kNm/rad kNm/rad

=================================== LOADS =====================================

Load Case Description

W wind load
D5 dead load
D1 dead load
D2 dead load
D3 dead load
D4 dead load
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

L1 imposed load
L2 imposed load
L3 imposed load
L4 imposed load

Own weight not added to any load case/combination

============================= LOAD CASE W ====================================


wind load

*** POINT LOADS ***

Node Fx Fy Fz Mx My Mz
kN kN kN kNm kNm kNm

17 -8.55 0.00 0.00 0.00 0.00 0.00


18 -16.79 0.00 0.00 0.00 0.00 0.00
19 -20.36 0.00 0.00 0.00 0.00 0.00
20 -11.84 0.00 0.00 0.00 0.00 0.00

============================= LOAD CASE D5 ====================================


dead load

*** POINT LOADS ***

Node Fx Fy Fz Mx My Mz
kN kN kN kNm kNm kNm

1 0.00 -2.50 0.00 0.00 0.00 0.00


6 0.00 -2.50 0.00 0.00 0.00 0.00
11 0.00 -2.50 0.00 0.00 0.00 0.00
16 0.00 -2.50 0.00 0.00 0.00 0.00
2 0.00 -8.10 0.00 0.00 0.00 0.00
7 0.00 -8.10 0.00 0.00 0.00 0.00
12 0.00 -8.10 0.00 0.00 0.00 0.00
17 0.00 -8.10 0.00 0.00 0.00 0.00
3 0.00 -7.75 0.00 0.00 0.00 0.00
8 0.00 -7.75 0.00 0.00 0.00 0.00
13 0.00 -7.75 0.00 0.00 0.00 0.00
18 0.00 -7.75 0.00 0.00 0.00 0.00
4 0.00 -7.75 0.00 0.00 0.00 0.00
9 0.00 -7.75 0.00 0.00 0.00 0.00
14 0.00 -7.75 0.00 0.00 0.00 0.00
19 0.00 -7.75 0.00 0.00 0.00 0.00
5 0.00 -3.88 0.00 0.00 0.00 0.00
10 0.00 -3.88 0.00 0.00 0.00 0.00
15 0.00 -3.88 0.00 0.00 0.00 0.00
20 0.00 -3.88 0.00 0.00 0.00 0.00

============================= LOAD CASE D1 ====================================


dead load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

2-7 Y 0.00 0.00 -32.5 -32.5 0.00 3.50 0.00


3-8 Y 0.00 0.00 -32.5 -32.5 0.00 3.50 0.00
4-9 Y 0.00 0.00 -32.5 -32.5 0.00 3.50 0.00

============================= LOAD CASE D2 ====================================


dead load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

7-12 Y 0.00 0.00 -17.6 -17.6 0.00 2.00 0.00


8-13 Y 0.00 0.00 -17.6 -17.6 0.00 2.00 0.00
9-14 Y 0.00 0.00 -17.6 -17.6 0.00 2.00 0.00

============================= LOAD CASE D3 ====================================


dead load
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

15-20 Y 0.00 0.00 -17.8 -17.8 0.00 4.10 0.00


10-15 Y 0.00 0.00 -17.8 -17.8 0.00 2.00 0.00
5-10 Y 0.00 0.00 -17.8 -17.8 0.00 3.50 0.00

============================= LOAD CASE D4 ====================================


dead load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

12-17 Y 0.00 0.00 -32.5 -32.5 0.00 4.10 0.00


13-18 Y 0.00 0.00 -32.5 -32.5 0.00 4.10 0.00
14-19 Y 0.00 0.00 -32.5 -32.5 0.00 4.10 0.00

============================= LOAD CASE L1 ====================================


imposed load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

3-8 Y 0.00 0.00 -14.4 -14.4 0.00 3.50 0.00


4-9 Y 0.00 0.00 -14.4 -14.4 0.00 3.50 0.00

============================= LOAD CASE L2 ====================================


imposed load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

8-13 Y 0.00 0.00 -14.4 -14.4 0.00 2.00 0.00


9-14 Y 0.00 0.00 -14.4 -14.4 0.00 2.00 0.00

============================= LOAD CASE L3 ====================================


imposed load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

15-20 Y 0.00 0.00 -17.5 -17.5 0.00 4.10 0.00


10-15 Y 0.00 0.00 -17.5 -17.5 0.00 2.00 0.00
5-10 Y 0.00 0.00 -17.5 -17.5 0.00 3.50 0.00

============================= LOAD CASE L4 ====================================


imposed load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

13-18 Y 0.00 0.00 -14.4 -14.4 0.00 4.10 0.00


14-19 Y 0.00 0.00 -14.4 -14.4 0.00 4.10 0.00

============================= LOAD COMBINATIONS ===============================

Load Comb Description

C1
C2
C3
C4
C5
C6
C7
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

Comb. Load factor for each load case: Ultimate Limit State

W D5 D1 D2 D3 D4 L1 L2 L3

C1 0.00 1.40 1.40 1.40 1.40 1.40 1.60 1.60 1.60


C2 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20
C3 1.40 1.40 1.40 1.40 1.40 1.40 0.00 0.00 0.00
C4 1.40 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00
C5 -1.00 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20
C6 -1.40 1.40 1.40 1.40 1.40 1.40 0.00 0.00 0.00
C7 0.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00

L4

C1 1.60
C2 1.20
C3 0.00
C4 0.00
C5 1.20
C6 0.00
C7 0.00

Comb. Load factor for each load case: Serviceability Limit State

W D5 D1 D2 D3 D4 L1 L2 L3

C1 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00


C2 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
C3 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00
C4 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00
C5 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
C6 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00
C7 0.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00

L4

C1 1.00
C2 1.00
C3 0.00
C4 0.00
C5 1.00
C6 0.00
C7 0.00

========================== OWN WEIGHT ACCELERATIONS ===========================

Direction Acceleration (g)


X 0.00
Y -1.00
Z 0.00

========================== OUTPUT: LINEAR ANALYSIS ============================


====================== NODAL POINT DISPLACEMENTS at SLS =======================

Node Lcase X-disp. Y-disp Z-rot.


mm mm rad.

1 C1 0.00 0.00 0.0002


C2 0.00 0.00 0.0016
C3 0.00 0.00 0.0016
C4 0.00 0.00 0.0016
C5 0.00 0.00 0.0016
C6 0.00 0.00 0.0016
C7 0.00 0.00 0.0002
2 C1 -0.02 -0.16 -0.0004
C2 -1.45 -0.18 0.0007
C3 -1.45 -0.14 0.0006
C4 -1.45 -0.14 0.0006
C5 -1.45 -0.18 0.0007
C6 -1.45 -0.14 0.0006
C7 -0.02 -0.12 -0.0004
3 C1 -0.15 -0.56 -0.0006
C2 -7.27 -0.62 -0.0001
C3 -7.27 -0.45 0.0002
C4 -7.27 -0.45 0.0002
C5 -7.27 -0.62 -0.0001
C6 -7.27 -0.45 0.0002
C7 -0.14 -0.39 -0.0004
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

4 C1 -0.23 -0.80 -0.0006


C2 -10.44 -0.88 -0.0003
C3 -10.41 -0.63 -0.0001
C4 -10.41 -0.63 -0.0001
C5 -10.44 -0.88 -0.0003
C6 -10.41 -0.63 -0.0001
C7 -0.20 -0.54 -0.0004
5 C1 -0.28 -0.90 -0.0007
C2 -11.76 -0.99 -0.0006
C3 -11.71 -0.68 -0.0002
C4 -11.71 -0.68 -0.0002
C5 -11.76 -0.99 -0.0006
C6 -11.71 -0.68 -0.0002
C7 -0.23 -0.60 -0.0003
6 C1 0.00 0.00 -0.0001
C2 0.00 0.00 0.0014
C3 0.00 0.00 0.0014
C4 0.00 0.00 0.0014
C5 0.00 0.00 0.0014
C6 0.00 0.00 0.0014
C7 0.00 0.00 -0.0001
7 C1 -0.03 -0.22 0.0003
C2 -1.46 -0.24 0.0010
C3 -1.46 -0.17 0.0010
C4 -1.46 -0.17 0.0010
C5 -1.46 -0.24 0.0010
C6 -1.46 -0.17 0.0010
C7 -0.03 -0.16 0.0003
8 C1 -0.14 -0.81 0.0003
C2 -7.28 -0.84 0.0006
C3 -7.27 -0.56 0.0005
C4 -7.27 -0.56 0.0005
C5 -7.28 -0.84 0.0006
C6 -7.27 -0.56 0.0005
C7 -0.14 -0.52 0.0002
9 C1 -0.23 -1.17 0.0003
C2 -10.44 -1.21 0.0004
C3 -10.42 -0.79 0.0004
C4 -10.42 -0.79 0.0004
C5 -10.44 -1.21 0.0004
C6 -10.42 -0.79 0.0004
C7 -0.20 -0.75 0.0002
10 C1 -0.29 -1.34 0.0003
C2 -11.78 -1.38 0.0003
C3 -11.72 -0.87 0.0002
C4 -11.72 -0.87 0.0002
C5 -11.78 -1.38 0.0003
C6 -11.72 -0.87 0.0002
C7 -0.24 -0.83 0.0001
11 C1 0.00 0.00 0.0002
C2 0.00 0.00 0.0018
C3 0.00 0.00 0.0018
C4 0.00 0.00 0.0018
C5 0.00 0.00 0.0018
C6 0.00 0.00 0.0018
C7 0.00 0.00 0.0003
12 C1 -0.03 -0.26 -0.0004
C2 -1.46 -0.24 0.0003
C3 -1.47 -0.16 0.0002
C4 -1.47 -0.16 0.0002
C5 -1.46 -0.24 0.0003
C6 -1.47 -0.16 0.0002
C7 -0.04 -0.18 -0.0004
13 C1 -0.14 -0.93 -0.0005
C2 -7.28 -0.88 -0.0003
C3 -7.28 -0.56 -0.0001
C4 -7.28 -0.56 -0.0001
C5 -7.28 -0.88 -0.0003
C6 -7.28 -0.56 -0.0001
C7 -0.14 -0.61 -0.0004
14 C1 -0.22 -1.35 -0.0005
C2 -10.45 -1.29 -0.0003
C3 -10.43 -0.80 -0.0002
C4 -10.43 -0.80 -0.0002
C5 -10.45 -1.29 -0.0003
C6 -10.43 -0.80 -0.0002
C7 -0.20 -0.86 -0.0004
15 C1 -0.30 -1.54 -0.0005
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

C2 -11.79 -1.48 -0.0004


C3 -11.73 -0.90 -0.0002
C4 -11.73 -0.90 -0.0002
C5 -11.79 -1.48 -0.0004
C6 -11.73 -0.90 -0.0002
C7 -0.24 -0.96 -0.0002
16 C1 0.00 0.00 -0.0002
C2 0.00 0.00 0.0011
C3 0.00 0.00 0.0011
C4 0.00 0.00 0.0011
C5 0.00 0.00 0.0011
C6 0.00 0.00 0.0011
C7 0.00 0.00 -0.0002
17 C1 -0.05 -0.18 0.0006
C2 -1.50 -0.16 0.0017
C3 -1.51 -0.12 0.0017
C4 -1.51 -0.12 0.0017
C5 -1.50 -0.16 0.0017
C6 -1.51 -0.12 0.0017
C7 -0.06 -0.13 0.0006
18 C1 -0.14 -0.64 0.0009
C2 -7.30 -0.59 0.0015
C3 -7.30 -0.39 0.0012
C4 -7.30 -0.39 0.0012
C5 -7.30 -0.59 0.0015
C6 -7.30 -0.39 0.0012
C7 -0.13 -0.44 0.0006
19 C1 -0.22 -0.92 0.0009
C2 -10.48 -0.86 0.0012
C3 -10.45 -0.56 0.0009
C4 -10.45 -0.56 0.0009
C5 -10.48 -0.86 0.0012
C6 -10.45 -0.56 0.0009
C7 -0.20 -0.62 0.0006
20 C1 -0.32 -1.04 0.0010
C2 -11.83 -0.97 0.0011
C3 -11.76 -0.61 0.0006
C4 -11.76 -0.61 0.0006
C5 -11.83 -0.97 0.0011
C6 -11.76 -0.61 0.0006
C7 -0.25 -0.68 0.0005

============================== REACTIONS AT ULS ===============================


(In rotated axes where applicable)
Node Lcase X-force Y-forcet Z-moment
kN kN kNm

1 C1 20.22 441.80 0.00


C2 26.52 413.18 0.00
C3 32.19 373.02 0.00
C4 26.01 282.39 0.00
C5 9.95 325.46 0.00
C6 11.10 261.38 0.00
C7 15.46 226.57 0.00
6 C1 -14.78 628.01 0.00
C2 14.02 552.31 0.00
C3 15.63 465.14 0.00
C4 20.09 344.23 0.00
C5 -35.07 486.38 0.00
C6 -46.85 381.23 0.00
C7 -11.15 302.27 0.00
11 C1 21.91 725.51 0.00
C2 44.55 550.58 0.00
C3 53.05 435.75 0.00
C4 46.44 295.92 0.00
C5 -2.45 634.89 0.00
C6 -6.77 543.05 0.00
C7 16.53 349.57 0.00
16 C1 -27.35 508.63 0.00
C2 -16.04 382.55 0.00
C3 -20.31 318.87 0.00
C4 -11.97 215.16 0.00
C5 -29.97 451.88 0.00
C6 -38.03 407.11 0.00
C7 -20.84 259.28 0.00

EQUILIBRIUM CHECK AT ULS:


Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

LC APPLIED LOADS & MOMENTS about (0.0,0.0,0.0) in global axes

Sum of: Px Py Mz

C1 0.00 -2303.95 -11071.19


C2 -69.05 -1898.62 -8633.73
C3 -80.56 -1592.78 -7085.78
C4 -80.56 -1137.70 -4897.90
C5 57.54 -1898.62 -9532.27
C6 80.56 -1592.78 -8229.38
C7 0.00 -1137.70 -5469.70

LC REACTIONS & REACTION MOMENTS about (0.0,0.0,0.0) in global axes

Sum of: Rx Ry MRz

C1 0.00 2303.95 11071.19


C2 69.05 1898.62 8633.73
C3 80.56 1592.78 7085.78
C4 80.56 1137.70 4897.90
C5 -57.54 1898.62 9532.27
C6 -80.56 1592.78 8229.38
C7 0.00 1137.70 5469.70

================== REACTIONS AT SLS (Combinations only) =======================

(In rotated axes


Node Lcase X-force Y-forcet Z-moment
kN kN kNm

1 C1 14.57 304.44 0.00


C2 22.10 344.31 0.00
C3 22.99 266.44 0.00
C4 22.99 266.44 0.00
C5 22.10 344.31 0.00
C6 22.99 266.44 0.00
C7 15.46 226.57 0.00
6 C1 -10.63 430.29 0.00
C2 11.68 460.26 0.00
C3 11.16 332.24 0.00
C4 11.16 332.24 0.00
C5 11.68 460.26 0.00
C6 11.16 332.24 0.00
C7 -11.15 302.27 0.00
11 C1 15.76 497.14 0.00
C2 37.12 458.82 0.00
C3 37.89 311.25 0.00
C4 37.89 311.25 0.00
C5 37.12 458.82 0.00
C6 37.89 311.25 0.00
C7 16.53 349.57 0.00
16 C1 -19.70 350.30 0.00
C2 -13.37 318.79 0.00
C3 -14.51 227.77 0.00
C4 -14.51 227.77 0.00
C5 -13.37 318.79 0.00
C6 -14.51 227.77 0.00
C7 -20.84 259.28 0.00

============ BEAM ELEMENT END FORCES IN LOCAL ELEMENT AXES at ULS ==============

Elem Lcase Axial Y-Shea M-xx Axial Y-Shea M-xx


kN kN kNm kN kN kNm

1-2 C1 438.30 -20.22 0.00 -438.30 20.22 -23.25


C2 410.18 -26.52 0.00 -410.18 26.52 -30.50
C3 369.52 -32.19 0.00 -369.52 32.19 -37.02
C4 279.89 -26.01 0.00 -279.89 26.01 -29.91
C5 322.46 -9.95 0.00 -322.46 9.95 -11.44
C6 257.88 -11.10 0.00 -257.88 11.10 -12.76
C7 224.07 -15.46 0.00 -224.07 15.46 -17.78
2-3 C1 347.60 -10.64 -18.26 -347.60 10.64 -21.62
C2 316.47 -20.79 -35.25 -316.47 20.79 -42.70
C3 260.44 -22.33 -38.99 -260.44 22.33 -44.75
C4 196.64 -19.92 -34.46 -196.64 19.92 -40.23
C5 258.08 1.04 1.15 -258.08 -1.04 2.74
C6 186.13 5.45 7.34 -186.13 -5.45 13.09
C7 159.49 -6.03 -11.30 -159.49 6.03 -11.31
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

3-4 C1 220.69 -13.92 -25.24 -220.69 13.92 -24.87


C2 193.20 -19.10 -33.03 -193.20 19.10 -35.74
C3 150.45 -18.12 -30.72 -150.45 18.12 -34.51
C4 111.87 -15.50 -26.06 -111.87 15.50 -29.75
C5 168.97 -5.02 -10.38 -168.97 5.02 -7.68
C6 119.61 -0.19 -1.89 -119.61 0.19 1.19
C7 96.45 -6.54 -11.65 -96.45 6.54 -11.90
4-5 C1 92.34 -14.80 -25.83 -92.34 14.80 -27.46
C2 77.57 -14.82 -25.07 -77.57 14.82 -28.29
C3 50.48 -11.52 -20.12 -50.48 11.52 -21.35
C4 37.16 -9.17 -15.72 -37.16 9.17 -17.31
C5 71.47 -9.61 -17.65 -71.47 9.61 -16.95
C6 42.72 -4.88 -10.68 -42.72 4.88 -6.91
C7 33.28 -5.86 -11.00 -33.28 5.86 -10.09
6-7 C1 624.51 14.78 0.00 -624.51 -14.78 16.99
C2 549.31 -14.02 0.00 -549.31 14.02 -16.12
C3 461.64 -15.63 0.00 -461.64 15.63 -17.97
C4 341.73 -20.09 0.00 -341.73 20.09 -23.10
C5 483.38 35.07 0.00 -483.38 -35.07 40.33
C6 377.73 46.85 0.00 -377.73 -46.85 53.88
C7 299.77 11.15 0.00 -299.77 -11.15 12.82
7-8 C1 510.28 5.94 10.84 -510.28 -5.94 11.43
C2 430.32 -13.05 -22.55 -430.32 13.05 -26.38
C3 322.91 -15.99 -27.03 -322.91 15.99 -32.94
C4 235.60 -17.44 -29.89 -235.60 17.44 -35.50
C5 403.06 20.03 35.67 -403.06 -20.03 39.45
C6 288.22 26.11 47.07 -288.22 -26.11 50.85
C7 218.26 3.61 7.15 -218.26 -3.61 6.39
8-9 C1 332.33 6.54 12.09 -332.33 -6.54 11.44
C2 273.88 -6.58 -11.11 -273.88 6.58 -12.58
C3 195.82 -9.26 -16.07 -195.82 9.26 -17.25
C4 141.26 -10.61 -18.51 -141.26 10.61 -19.68
C5 266.22 15.40 27.56 -266.22 -15.40 27.89
C6 186.07 18.72 33.14 -186.07 -18.72 34.25
C7 136.39 3.38 6.10 -136.39 -3.38 6.07
9-10 C1 153.39 5.76 10.56 -153.39 -5.76 10.19
C2 122.73 0.28 1.16 -122.73 -0.28 -0.14
C3 75.24 -1.70 -1.73 -75.24 1.70 -4.40
C4 53.60 -2.69 -3.74 -53.60 2.69 -5.93
C5 123.51 8.36 14.94 -123.51 -8.36 15.17
C6 76.24 8.58 15.81 -76.24 -8.58 15.08
C7 54.10 2.46 5.03 -54.10 -2.46 3.81
11-12 C1 722.01 -21.91 0.00 -722.01 21.91 -25.19
C2 547.58 -44.55 0.00 -547.58 44.55 -51.23
C3 432.25 -53.05 0.00 -432.25 53.05 -61.00
C4 293.42 -46.44 0.00 -293.42 46.44 -53.40
C5 631.89 2.45 0.00 -631.89 -2.45 2.82
C6 539.55 6.77 0.00 -539.55 -6.77 7.79
C7 347.07 -16.53 0.00 -347.07 16.53 -19.01
12-13 C1 589.89 -9.73 -17.36 -589.89 9.73 -19.14
C2 459.09 -25.84 -45.68 -459.09 25.84 -51.23
C3 328.37 -28.68 -51.62 -328.37 28.68 -55.92
C4 227.50 -26.38 -47.21 -227.50 26.38 -51.71
C5 497.87 6.57 11.16 -497.87 -6.57 13.48
C6 377.72 12.57 20.71 -377.72 -12.57 26.44
C7 252.18 -5.75 -11.04 -252.18 5.75 -10.53
13-14 C1 380.92 -11.74 -21.29 -380.92 11.74 -20.98
C2 302.35 -21.47 -38.21 -302.35 21.47 -39.08
C3 210.31 -21.90 -38.66 -210.31 21.90 -40.16
C4 147.98 -19.57 -34.51 -147.98 19.57 -35.94
C5 314.65 0.15 -0.28 -314.65 -0.15 0.82
C6 225.96 5.62 9.61 -225.96 -5.62 10.62
C7 155.81 -5.81 -10.38 -155.81 5.81 -10.55
14-15 C1 176.53 -11.56 -20.74 -176.53 11.56 -20.89
C2 141.30 -13.72 -24.28 -141.30 13.72 -25.10
C3 84.39 -11.77 -21.55 -84.39 11.77 -20.84
C4 60.22 -9.85 -17.84 -60.22 9.85 -17.63
C5 141.58 -5.79 -10.84 -141.58 5.79 -10.00
C6 84.74 -1.68 -4.45 -84.74 1.68 -1.62
C7 60.40 -4.81 -9.29 -60.40 4.81 -8.02
16-17 C1 505.13 27.35 0.00 -505.13 -27.35 31.45
C2 379.55 16.04 0.00 -379.55 -16.04 18.45
C3 315.37 20.31 0.00 -315.37 -20.31 23.36
C4 212.66 11.97 0.00 -212.66 -11.97 13.77
C5 448.88 29.97 0.00 -448.88 -29.97 34.46
C6 403.61 38.03 0.00 -403.61 -38.03 43.74
C7 256.78 20.84 0.00 -256.78 -20.84 23.96
17-18 C1 401.60 14.43 24.68 -401.60 -14.43 29.44
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

C2 303.10 0.89 2.40 -303.10 -0.89 0.94


C3 226.49 -1.59 0.04 -226.49 1.59 -5.98
C4 153.26 -4.85 -6.11 -153.26 4.85 -12.08
C5 349.96 21.35 36.17 -349.96 -21.35 43.89
C6 286.13 24.46 43.02 -286.13 -24.46 48.69
C7 183.08 8.17 15.38 -183.08 -8.17 15.25
18-19 C1 255.63 19.12 34.80 -255.63 -19.12 34.04
C2 197.70 8.51 17.22 -197.70 -8.51 13.43
C3 143.01 4.19 9.28 -143.01 -4.19 5.82
C4 98.59 0.60 2.87 -98.59 -0.60 -0.69
C5 217.28 21.67 37.91 -217.28 -21.67 40.09
C6 167.93 20.94 35.62 -167.93 -20.94 39.75
C7 111.05 8.97 16.03 -111.05 -8.97 16.27
19-20 C1 107.51 20.60 35.76 -107.51 -20.60 38.40
C2 83.68 14.05 25.56 -83.68 -14.05 25.01
C3 50.86 8.42 17.38 -50.86 -8.42 12.93
C4 35.41 5.14 11.22 -35.41 -5.14 7.27
C5 88.71 18.88 32.11 -88.71 -18.88 35.85
C6 57.26 14.57 25.71 -57.26 -14.57 26.73
C7 38.61 8.21 15.39 -38.61 -8.21 14.16
2-7 C1 9.58 79.36 41.51 -9.58 79.89 -42.44
C2 5.74 83.99 65.75 -5.74 52.51 -10.65
C3 9.86 97.74 76.01 -9.86 61.51 -12.59
C4 6.09 75.15 64.37 -6.09 38.60 -0.41
C5 10.99 54.66 10.29 -10.99 81.84 -57.86
C6 16.55 60.41 5.42 -16.55 98.84 -72.67
C7 9.43 56.48 29.08 -9.43 57.27 -30.45
7-12 C1 0.74 23.00 14.61 -0.74 26.42 -18.03
C2 6.71 56.76 49.33 -6.71 -14.40 21.84
C3 9.50 65.88 57.60 -9.50 -16.46 24.75
C4 8.74 59.42 53.41 -8.74 -24.12 30.14
C5 -4.05 -11.24 -18.14 4.05 53.60 -46.69
C6 -4.19 -20.66 -28.28 4.19 70.08 -62.47
C7 1.89 16.15 10.47 -1.89 19.15 -13.47
12-17 C1 12.92 94.36 60.58 -12.92 92.19 -56.14
C2 25.41 93.17 75.07 -25.41 66.73 -20.85
C3 33.86 109.00 87.88 -33.86 77.55 -23.39
C4 28.80 81.94 70.47 -28.80 51.31 -7.66
C5 0.07 70.70 32.71 -0.07 89.20 -70.63
C6 1.61 80.40 33.98 -1.61 106.15 -86.76
C7 12.67 67.64 43.52 -12.67 65.61 -39.34
3-8 C1 -3.28 116.06 46.87 3.28 123.83 -60.47
C2 1.68 113.97 75.74 -1.68 83.01 -21.56
C3 4.21 99.14 75.47 -4.21 60.11 -7.17
C4 4.41 77.02 66.29 -4.41 36.73 4.23
C5 -6.06 79.81 7.64 6.06 117.17 -73.01
C6 -5.64 55.67 -11.20 5.64 103.58 -72.65
C7 -0.51 55.29 22.95 0.51 58.46 -28.51
4-9 C1 -0.88 117.50 50.70 0.88 122.39 -59.25
C2 4.28 106.33 60.80 -4.28 90.65 -33.37
C3 6.60 89.12 54.62 -6.60 70.13 -21.39
C4 6.33 66.95 45.47 -6.33 46.80 -10.19
C5 -4.59 88.20 25.33 4.59 108.78 -61.36
C6 -4.69 66.05 9.48 4.69 93.20 -57.01
C7 0.68 55.42 22.90 -0.68 58.33 -28.00
5-10 C1 14.80 86.91 27.46 -14.80 98.31 -47.42
C2 14.82 72.92 28.29 -14.82 75.34 -32.54
C3 11.52 45.05 21.35 -11.52 42.17 -16.32
C4 9.17 33.28 17.31 -9.17 29.02 -9.84
C5 9.61 66.82 16.95 -9.61 81.44 -42.54
C6 4.88 37.29 6.91 -4.88 49.93 -29.04
C7 5.86 29.40 10.09 -5.86 32.90 -16.20
8-13 C1 -2.68 43.27 36.95 2.68 52.23 -45.90
C2 8.15 64.12 59.05 -8.15 12.80 -7.73
C3 10.95 56.13 56.19 -10.95 -6.71 6.65
C4 11.24 49.86 49.78 -11.24 -14.56 14.65
C5 -10.69 10.37 6.00 10.69 66.55 -62.18
C6 -13.03 -12.29 -11.34 13.03 61.71 -62.65
C7 -0.75 15.66 16.02 0.75 19.64 -20.00
9-14 C1 -1.66 45.70 37.25 1.66 49.80 -41.35
C2 11.15 51.20 44.80 -11.15 25.72 -19.32
C3 14.15 39.60 40.37 -14.15 9.82 -10.59
C4 14.25 33.12 33.61 -14.25 2.18 -2.68
C5 -11.63 24.63 18.53 11.63 52.29 -46.20
C6 -14.83 5.78 6.95 14.83 43.64 -44.81
C7 -0.24 16.21 16.90 0.24 19.09 -19.79
10-15 C1 9.04 49.64 37.23 -9.04 56.20 -43.79
C2 14.54 42.73 32.68 -14.54 41.99 -31.94
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

C3 13.22 27.63 20.72 -13.22 22.21 -15.30


C4 11.86 20.70 15.77 -11.86 14.90 -9.96
C5 1.25 37.41 27.37 -1.25 47.31 -37.26
C6 -3.69 20.87 13.96 3.69 28.97 -22.06
C7 3.40 17.32 12.39 -3.40 18.28 -13.34
13-18 C1 -4.69 145.89 86.33 4.69 135.12 -64.24
C2 12.52 134.65 97.17 -12.52 96.10 -18.16
C3 17.73 113.92 87.94 -17.73 72.63 -3.30
C4 18.05 86.33 71.58 -18.05 46.92 9.22
C5 -17.11 107.37 48.98 17.11 123.38 -81.80
C6 -19.99 79.20 26.61 19.99 107.35 -84.30
C7 -0.81 68.97 40.91 0.81 64.28 -31.29
14-19 C1 -1.48 143.74 83.07 1.48 137.27 -69.80
C2 18.90 126.03 82.68 -18.90 104.72 -38.99
C3 24.28 105.25 72.31 -24.28 81.30 -23.20
C4 23.97 77.83 56.46 -23.97 55.42 -10.53
C5 -17.57 111.48 56.22 17.57 119.27 -72.20
C6 -22.14 86.73 38.64 22.14 99.82 -65.47
C7 0.76 68.57 39.62 -0.76 64.68 -31.67
15-20 C1 20.60 114.90 64.67 -20.60 102.08 -38.40
C2 28.26 94.65 57.05 -28.26 79.02 -25.01
C3 25.00 56.75 36.14 -25.00 45.43 -12.93
C4 21.71 41.45 27.59 -21.71 31.53 -7.27
C5 7.04 89.62 47.26 -7.04 84.05 -35.85
C6 -2.01 50.34 23.68 2.01 51.83 -26.73
C7 8.21 38.25 21.36 -8.21 34.73 -14.16

============================== STATISTICAL DATA ===============================

Weights of beam elements: (Not included in analysis)

Section Designation Total Mass


(kN) (kg)

COLUMN 300x300 RC 107.448 10952.9


PLINTH 300x300 RC 21.312 2172.5
BEAM 200*320 RC 70.416 7178.0
---------------------
199.176 20303.4

Total weight of structure = 0.00 kN

No. of real numbers in Stiffness matrix = 0 (0 bytes)


Time used to analyse = 0: 0:0.187 seconds
Total number of : Nodes = 20
Beam Elements = 28
Cable Elements = 0
Shell Elements = 0
Supports = 4
Section Properties = 3
Load Cases = 10
Load Combinations = 7

=============================== END OF OUTPUT =================================


Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

========== S p a c e - F r a m e A n a l y s i s - P R O K O N ===========
Ver W3.0.04 - 29 Jan 2016

TITLE :FRAME E(1-4)

Data file : C:\Users\RDD\Desktop\design\provincial Road Development Department unit.A03


Created on: 7/23/2020

========================== NODAL POINT COORDINATES ============================

Node No X-coord Y-coord Z-coord Node No X-coord Y-coord Z-coord


m m m m m m

1 0.000 0.000 0.000 2 0.000 1.150 0.000


3 0.000 4.900 0.000 4 0.000 8.500 0.000
5 0.000 12.100 0.000 6 3.500 0.000 0.000
7 3.500 1.150 0.000 8 3.500 4.900 0.000
9 3.500 8.500 0.000 10 3.500 12.100 0.000
11 5.500 0.000 0.000 12 5.500 1.150 0.000
13 5.500 4.900 0.000 14 5.500 8.500 0.000
15 5.500 12.100 0.000 16 9.600 0.000 0.000
17 9.600 1.150 0.000 18 9.600 4.900 0.000
19 9.600 8.500 0.000 20 9.600 12.100 0.000

=============================== ELEMENT DATA ==================================

Beam Secn. type Fixity Length ß Group no.


m (°)

1-2 COLUMN 00 1.150 0.00 0


2-3 COLUMN 00 3.750 0.00 0
3-4 COLUMN 00 3.600 0.00 0
4-5 COLUMN 00 3.600 0.00 0
6-7 COLUMN 00 1.150 0.00 0
7-8 COLUMN 00 3.750 0.00 0
8-9 COLUMN 00 3.600 0.00 0
9-10 COLUMN 00 3.600 0.00 0
11-12 COLUMN 00 1.150 0.00 0
12-13 COLUMN 00 3.750 0.00 0
13-14 COLUMN 00 3.600 0.00 0
14-15 COLUMN 00 3.600 0.00 0
16-17 COLUMN 00 1.150 0.00 0
17-18 COLUMN 00 3.750 0.00 0
18-19 COLUMN 00 3.600 0.00 0
19-20 COLUMN 00 3.600 0.00 0
2-7 PLINTH 00 3.500 0.00 0
7-12 PLINTH 00 2.000 0.00 0
12-17 PLINTH 00 4.100 0.00 0
3-8 BEAM 00 3.500 0.00 0
4-9 BEAM 00 3.500 0.00 0
5-10 BEAM 00 3.500 0.00 0
8-13 BEAM 00 2.000 0.00 0
9-14 BEAM 00 2.000 0.00 0
10-15 BEAM 00 2.000 0.00 0
13-18 BEAM 00 4.100 0.00 0
14-19 BEAM 00 4.100 0.00 0
15-20 BEAM 00 4.100 0.00 0

============================ SECTION PROPERTIES ===============================

Section : COLUMN Section designation: 300x300 RC


----------------
A Ay Ax Ixx Iyy J Material
m^2 m^2 m^2 m^4 m^4 m^4

88.80E-3 0.000 0.000 650E-6 650E-6 1.14E-3 Concrete:25 MPa

Section : PLINTH Section designation: 300x300 RC


----------------
A Ay Ax Ixx Iyy J Material
m^2 m^2 m^2 m^4 m^4 m^4

88.80E-3 0.000 0.000 650E-6 650E-6 1.14E-3 Concrete:25 MPa

Section : BEAM Section designation: 200*320 RC


----------------
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

A Ay Ax Ixx Iyy J Material


m^2 m^2 m^2 m^4 m^4 m^4

97.80E-3 0.000 0.000 1.61E-3 386E-6 1.11E-3 Concrete:25 MPa

================================== MATERIALS ==================================

Designation E poisson Density Exp. coeff.


kPa kN/m^3
Concrete:25 MPa 25.00E6 0.20 25.00 10.00E-6

=============================== SUPPORT DATA ==================================

Prescribed displacements
Node Fixity X Y Z X-Rot Y-Rot Z-Rot Orien node
m m m rad. rad. rad.

1 XY 0.00 0.00 0.00 0.00 0.00 0.00 0


6 XY 0.00 0.00 0.00 0.00 0.00 0.00 0
11 XY 0.00 0.00 0.00 0.00 0.00 0.00 0
16 XY 0.00 0.00 0.00 0.00 0.00 0.00 0

Spring constants
Node Fixity X Y Z X-Rot Y-Rot Z-Rot
kN/m kN/m kN/m kNm/rad kNm/rad kNm/rad

=================================== LOADS =====================================

Load Case Description

W wind load
D5 dead load
D1 dead load
D2 dead load
D3 dead load
D4 dead load
L1 imposed load
L2 imposed load
L3 imposed load
L4 imposed load

Own weight not added to any load case/combination

============================= LOAD CASE W ====================================


wind load

*** POINT LOADS ***

Node Fx Fy Fz Mx My Mz
kN kN kN kNm kNm kNm

17 -8.55 0.00 0.00 0.00 0.00 0.00


18 -16.79 0.00 0.00 0.00 0.00 0.00
19 -20.36 0.00 0.00 0.00 0.00 0.00
20 -11.84 0.00 0.00 0.00 0.00 0.00

============================= LOAD CASE D5 ====================================


dead load

*** POINT LOADS ***

Node Fx Fy Fz Mx My Mz
kN kN kN kNm kNm kNm

1 0.00 -2.50 0.00 0.00 0.00 0.00


6 0.00 -2.50 0.00 0.00 0.00 0.00
11 0.00 -2.50 0.00 0.00 0.00 0.00
16 0.00 -2.50 0.00 0.00 0.00 0.00
2 0.00 -8.10 0.00 0.00 0.00 0.00
7 0.00 -8.10 0.00 0.00 0.00 0.00
12 0.00 -8.10 0.00 0.00 0.00 0.00
17 0.00 -8.10 0.00 0.00 0.00 0.00
3 0.00 -7.75 0.00 0.00 0.00 0.00
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

8 0.00 -7.75 0.00 0.00 0.00 0.00


13 0.00 -7.75 0.00 0.00 0.00 0.00
18 0.00 -7.75 0.00 0.00 0.00 0.00
4 0.00 -7.75 0.00 0.00 0.00 0.00
9 0.00 -7.75 0.00 0.00 0.00 0.00
14 0.00 -7.75 0.00 0.00 0.00 0.00
19 0.00 -7.75 0.00 0.00 0.00 0.00
5 0.00 -3.88 0.00 0.00 0.00 0.00
10 0.00 -3.88 0.00 0.00 0.00 0.00
15 0.00 -3.88 0.00 0.00 0.00 0.00
20 0.00 -3.88 0.00 0.00 0.00 0.00

============================= LOAD CASE D1 ====================================


dead load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

2-7 Y 0.00 0.00 -32.5 -32.5 0.00 3.50 0.00


3-8 Y 0.00 0.00 -32.5 -32.5 0.00 3.50 0.00
4-9 Y 0.00 0.00 -32.5 -32.5 0.00 3.50 0.00

============================= LOAD CASE D2 ====================================


dead load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

7-12 Y 0.00 0.00 -17.6 -17.6 0.00 2.00 0.00


8-13 Y 0.00 0.00 -17.6 -17.6 0.00 2.00 0.00
9-14 Y 0.00 0.00 -17.6 -17.6 0.00 2.00 0.00

============================= LOAD CASE D3 ====================================


dead load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

15-20 Y 0.00 0.00 -17.8 -17.8 0.00 4.10 0.00


10-15 Y 0.00 0.00 -17.8 -17.8 0.00 2.00 0.00
5-10 Y 0.00 0.00 -17.8 -17.8 0.00 3.50 0.00

============================= LOAD CASE D4 ====================================


dead load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

12-17 Y 0.00 0.00 -32.5 -32.5 0.00 4.10 0.00


13-18 Y 0.00 0.00 -32.5 -32.5 0.00 4.10 0.00
14-19 Y 0.00 0.00 -32.5 -32.5 0.00 4.10 0.00

============================= LOAD CASE L1 ====================================


imposed load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

3-8 Y 0.00 0.00 -14.4 -14.4 0.00 3.50 0.00


4-9 Y 0.00 0.00 -14.4 -14.4 0.00 3.50 0.00

============================= LOAD CASE L2 ====================================


imposed load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

kN m kN/m kN/m m m °C

8-13 Y 0.00 0.00 -14.4 -14.4 0.00 2.00 0.00


9-14 Y 0.00 0.00 -14.4 -14.4 0.00 2.00 0.00

============================= LOAD CASE L3 ====================================


imposed load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

15-20 Y 0.00 0.00 -17.5 -17.5 0.00 4.10 0.00


10-15 Y 0.00 0.00 -17.5 -17.5 0.00 2.00 0.00
5-10 Y 0.00 0.00 -17.5 -17.5 0.00 3.50 0.00

============================= LOAD CASE L4 ====================================


imposed load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

13-18 Y 0.00 0.00 -14.4 -14.4 0.00 4.10 0.00


14-19 Y 0.00 0.00 -14.4 -14.4 0.00 4.10 0.00

============================= LOAD COMBINATIONS ===============================

Load Comb Description

C1
C2
C3
C4
C5
C6
C7

Comb. Load factor for each load case: Ultimate Limit State

W D5 D1 D2 D3 D4 L1 L2 L3

C1 0.00 1.40 1.40 1.40 1.40 1.40 1.60 1.60 1.60


C2 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20
C3 1.40 1.40 1.40 1.40 1.40 1.40 0.00 0.00 0.00
C4 1.40 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00
C5 -1.00 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20
C6 -1.40 1.40 1.40 1.40 1.40 1.40 0.00 0.00 0.00
C7 0.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00

L4

C1 1.60
C2 1.20
C3 0.00
C4 0.00
C5 1.20
C6 0.00
C7 0.00

Comb. Load factor for each load case: Serviceability Limit State

W D5 D1 D2 D3 D4 L1 L2 L3

C1 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00


C2 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
C3 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00
C4 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00
C5 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
C6 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00
C7 0.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00

L4

C1 1.00
C2 1.00
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

C3 0.00
C4 0.00
C5 1.00
C6 0.00
C7 0.00

========================== OWN WEIGHT ACCELERATIONS ===========================

Direction Acceleration (g)


X 0.00
Y -1.00
Z 0.00

========================== OUTPUT: LINEAR ANALYSIS ============================


====================== NODAL POINT DISPLACEMENTS at SLS =======================

Node Lcase X-disp. Y-disp Z-rot.


mm mm rad.

1 C1 0.00 0.00 0.0002


C2 0.00 0.00 0.0016
C3 0.00 0.00 0.0016
C4 0.00 0.00 0.0016
C5 0.00 0.00 0.0016
C6 0.00 0.00 0.0016
C7 0.00 0.00 0.0002
2 C1 -0.02 -0.16 -0.0004
C2 -1.45 -0.18 0.0007
C3 -1.45 -0.14 0.0006
C4 -1.45 -0.14 0.0006
C5 -1.45 -0.18 0.0007
C6 -1.45 -0.14 0.0006
C7 -0.02 -0.12 -0.0004
3 C1 -0.15 -0.56 -0.0006
C2 -7.27 -0.62 -0.0001
C3 -7.27 -0.45 0.0002
C4 -7.27 -0.45 0.0002
C5 -7.27 -0.62 -0.0001
C6 -7.27 -0.45 0.0002
C7 -0.14 -0.39 -0.0004
4 C1 -0.23 -0.80 -0.0006
C2 -10.44 -0.88 -0.0003
C3 -10.41 -0.63 -0.0001
C4 -10.41 -0.63 -0.0001
C5 -10.44 -0.88 -0.0003
C6 -10.41 -0.63 -0.0001
C7 -0.20 -0.54 -0.0004
5 C1 -0.28 -0.90 -0.0007
C2 -11.76 -0.99 -0.0006
C3 -11.71 -0.68 -0.0002
C4 -11.71 -0.68 -0.0002
C5 -11.76 -0.99 -0.0006
C6 -11.71 -0.68 -0.0002
C7 -0.23 -0.60 -0.0003
6 C1 0.00 0.00 -0.0001
C2 0.00 0.00 0.0014
C3 0.00 0.00 0.0014
C4 0.00 0.00 0.0014
C5 0.00 0.00 0.0014
C6 0.00 0.00 0.0014
C7 0.00 0.00 -0.0001
7 C1 -0.03 -0.22 0.0003
C2 -1.46 -0.24 0.0010
C3 -1.46 -0.17 0.0010
C4 -1.46 -0.17 0.0010
C5 -1.46 -0.24 0.0010
C6 -1.46 -0.17 0.0010
C7 -0.03 -0.16 0.0003
8 C1 -0.14 -0.81 0.0003
C2 -7.28 -0.84 0.0006
C3 -7.27 -0.56 0.0005
C4 -7.27 -0.56 0.0005
C5 -7.28 -0.84 0.0006
C6 -7.27 -0.56 0.0005
C7 -0.14 -0.52 0.0002
9 C1 -0.23 -1.17 0.0003
C2 -10.44 -1.21 0.0004
C3 -10.42 -0.79 0.0004
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

C4 -10.42 -0.79 0.0004


C5 -10.44 -1.21 0.0004
C6 -10.42 -0.79 0.0004
C7 -0.20 -0.75 0.0002
10 C1 -0.29 -1.34 0.0003
C2 -11.78 -1.38 0.0003
C3 -11.72 -0.87 0.0002
C4 -11.72 -0.87 0.0002
C5 -11.78 -1.38 0.0003
C6 -11.72 -0.87 0.0002
C7 -0.24 -0.83 0.0001
11 C1 0.00 0.00 0.0002
C2 0.00 0.00 0.0018
C3 0.00 0.00 0.0018
C4 0.00 0.00 0.0018
C5 0.00 0.00 0.0018
C6 0.00 0.00 0.0018
C7 0.00 0.00 0.0003
12 C1 -0.03 -0.26 -0.0004
C2 -1.46 -0.24 0.0003
C3 -1.47 -0.16 0.0002
C4 -1.47 -0.16 0.0002
C5 -1.46 -0.24 0.0003
C6 -1.47 -0.16 0.0002
C7 -0.04 -0.18 -0.0004
13 C1 -0.14 -0.93 -0.0005
C2 -7.28 -0.88 -0.0003
C3 -7.28 -0.56 -0.0001
C4 -7.28 -0.56 -0.0001
C5 -7.28 -0.88 -0.0003
C6 -7.28 -0.56 -0.0001
C7 -0.14 -0.61 -0.0004
14 C1 -0.22 -1.35 -0.0005
C2 -10.45 -1.29 -0.0003
C3 -10.43 -0.80 -0.0002
C4 -10.43 -0.80 -0.0002
C5 -10.45 -1.29 -0.0003
C6 -10.43 -0.80 -0.0002
C7 -0.20 -0.86 -0.0004
15 C1 -0.30 -1.54 -0.0005
C2 -11.79 -1.48 -0.0004
C3 -11.73 -0.90 -0.0002
C4 -11.73 -0.90 -0.0002
C5 -11.79 -1.48 -0.0004
C6 -11.73 -0.90 -0.0002
C7 -0.24 -0.96 -0.0002
16 C1 0.00 0.00 -0.0002
C2 0.00 0.00 0.0011
C3 0.00 0.00 0.0011
C4 0.00 0.00 0.0011
C5 0.00 0.00 0.0011
C6 0.00 0.00 0.0011
C7 0.00 0.00 -0.0002
17 C1 -0.05 -0.18 0.0006
C2 -1.50 -0.16 0.0017
C3 -1.51 -0.12 0.0017
C4 -1.51 -0.12 0.0017
C5 -1.50 -0.16 0.0017
C6 -1.51 -0.12 0.0017
C7 -0.06 -0.13 0.0006
18 C1 -0.14 -0.64 0.0009
C2 -7.30 -0.59 0.0015
C3 -7.30 -0.39 0.0012
C4 -7.30 -0.39 0.0012
C5 -7.30 -0.59 0.0015
C6 -7.30 -0.39 0.0012
C7 -0.13 -0.44 0.0006
19 C1 -0.22 -0.92 0.0009
C2 -10.48 -0.86 0.0012
C3 -10.45 -0.56 0.0009
C4 -10.45 -0.56 0.0009
C5 -10.48 -0.86 0.0012
C6 -10.45 -0.56 0.0009
C7 -0.20 -0.62 0.0006
20 C1 -0.32 -1.04 0.0010
C2 -11.83 -0.97 0.0011
C3 -11.76 -0.61 0.0006
C4 -11.76 -0.61 0.0006
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

C5 -11.83 -0.97 0.0011


C6 -11.76 -0.61 0.0006
C7 -0.25 -0.68 0.0005

============================== REACTIONS AT ULS ===============================


(In rotated axes where applicable)
Node Lcase X-force Y-forcet Z-moment
kN kN kNm

1 C1 20.22 441.80 0.00


C2 26.52 413.18 0.00
C3 32.19 373.02 0.00
C4 26.01 282.39 0.00
C5 9.95 325.46 0.00
C6 11.10 261.38 0.00
C7 15.46 226.57 0.00
6 C1 -14.78 628.01 0.00
C2 14.02 552.31 0.00
C3 15.63 465.14 0.00
C4 20.09 344.23 0.00
C5 -35.07 486.38 0.00
C6 -46.85 381.23 0.00
C7 -11.15 302.27 0.00
11 C1 21.91 725.51 0.00
C2 44.55 550.58 0.00
C3 53.05 435.75 0.00
C4 46.44 295.92 0.00
C5 -2.45 634.89 0.00
C6 -6.77 543.05 0.00
C7 16.53 349.57 0.00
16 C1 -27.35 508.63 0.00
C2 -16.04 382.55 0.00
C3 -20.31 318.87 0.00
C4 -11.97 215.16 0.00
C5 -29.97 451.88 0.00
C6 -38.03 407.11 0.00
C7 -20.84 259.28 0.00

EQUILIBRIUM CHECK AT ULS:

LC APPLIED LOADS & MOMENTS about (0.0,0.0,0.0) in global axes

Sum of: Px Py Mz

C1 0.00 -2303.95 -11071.19


C2 -69.05 -1898.62 -8633.73
C3 -80.56 -1592.78 -7085.78
C4 -80.56 -1137.70 -4897.90
C5 57.54 -1898.62 -9532.27
C6 80.56 -1592.78 -8229.38
C7 0.00 -1137.70 -5469.70

LC REACTIONS & REACTION MOMENTS about (0.0,0.0,0.0) in global axes

Sum of: Rx Ry MRz

C1 0.00 2303.95 11071.19


C2 69.05 1898.62 8633.73
C3 80.56 1592.78 7085.78
C4 80.56 1137.70 4897.90
C5 -57.54 1898.62 9532.27
C6 -80.56 1592.78 8229.38
C7 0.00 1137.70 5469.70

================== REACTIONS AT SLS (Combinations only) =======================

(In rotated axes


Node Lcase X-force Y-forcet Z-moment
kN kN kNm

1 C1 14.57 304.44 0.00


C2 22.10 344.31 0.00
C3 22.99 266.44 0.00
C4 22.99 266.44 0.00
C5 22.10 344.31 0.00
C6 22.99 266.44 0.00
C7 15.46 226.57 0.00
6 C1 -10.63 430.29 0.00
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

C2 11.68 460.26 0.00


C3 11.16 332.24 0.00
C4 11.16 332.24 0.00
C5 11.68 460.26 0.00
C6 11.16 332.24 0.00
C7 -11.15 302.27 0.00
11 C1 15.76 497.14 0.00
C2 37.12 458.82 0.00
C3 37.89 311.25 0.00
C4 37.89 311.25 0.00
C5 37.12 458.82 0.00
C6 37.89 311.25 0.00
C7 16.53 349.57 0.00
16 C1 -19.70 350.30 0.00
C2 -13.37 318.79 0.00
C3 -14.51 227.77 0.00
C4 -14.51 227.77 0.00
C5 -13.37 318.79 0.00
C6 -14.51 227.77 0.00
C7 -20.84 259.28 0.00

============ BEAM ELEMENT END FORCES IN LOCAL ELEMENT AXES at ULS ==============

Elem Lcase Axial Y-Shea M-xx Axial Y-Shea M-xx


kN kN kNm kN kN kNm

1-2 C1 438.30 -20.22 0.00 -438.30 20.22 -23.25


C2 410.18 -26.52 0.00 -410.18 26.52 -30.50
C3 369.52 -32.19 0.00 -369.52 32.19 -37.02
C4 279.89 -26.01 0.00 -279.89 26.01 -29.91
C5 322.46 -9.95 0.00 -322.46 9.95 -11.44
C6 257.88 -11.10 0.00 -257.88 11.10 -12.76
C7 224.07 -15.46 0.00 -224.07 15.46 -17.78
2-3 C1 347.60 -10.64 -18.26 -347.60 10.64 -21.62
C2 316.47 -20.79 -35.25 -316.47 20.79 -42.70
C3 260.44 -22.33 -38.99 -260.44 22.33 -44.75
C4 196.64 -19.92 -34.46 -196.64 19.92 -40.23
C5 258.08 1.04 1.15 -258.08 -1.04 2.74
C6 186.13 5.45 7.34 -186.13 -5.45 13.09
C7 159.49 -6.03 -11.30 -159.49 6.03 -11.31
3-4 C1 220.69 -13.92 -25.24 -220.69 13.92 -24.87
C2 193.20 -19.10 -33.03 -193.20 19.10 -35.74
C3 150.45 -18.12 -30.72 -150.45 18.12 -34.51
C4 111.87 -15.50 -26.06 -111.87 15.50 -29.75
C5 168.97 -5.02 -10.38 -168.97 5.02 -7.68
C6 119.61 -0.19 -1.89 -119.61 0.19 1.19
C7 96.45 -6.54 -11.65 -96.45 6.54 -11.90
4-5 C1 92.34 -14.80 -25.83 -92.34 14.80 -27.46
C2 77.57 -14.82 -25.07 -77.57 14.82 -28.29
C3 50.48 -11.52 -20.12 -50.48 11.52 -21.35
C4 37.16 -9.17 -15.72 -37.16 9.17 -17.31
C5 71.47 -9.61 -17.65 -71.47 9.61 -16.95
C6 42.72 -4.88 -10.68 -42.72 4.88 -6.91
C7 33.28 -5.86 -11.00 -33.28 5.86 -10.09
6-7 C1 624.51 14.78 0.00 -624.51 -14.78 16.99
C2 549.31 -14.02 0.00 -549.31 14.02 -16.12
C3 461.64 -15.63 0.00 -461.64 15.63 -17.97
C4 341.73 -20.09 0.00 -341.73 20.09 -23.10
C5 483.38 35.07 0.00 -483.38 -35.07 40.33
C6 377.73 46.85 0.00 -377.73 -46.85 53.88
C7 299.77 11.15 0.00 -299.77 -11.15 12.82
7-8 C1 510.28 5.94 10.84 -510.28 -5.94 11.43
C2 430.32 -13.05 -22.55 -430.32 13.05 -26.38
C3 322.91 -15.99 -27.03 -322.91 15.99 -32.94
C4 235.60 -17.44 -29.89 -235.60 17.44 -35.50
C5 403.06 20.03 35.67 -403.06 -20.03 39.45
C6 288.22 26.11 47.07 -288.22 -26.11 50.85
C7 218.26 3.61 7.15 -218.26 -3.61 6.39
8-9 C1 332.33 6.54 12.09 -332.33 -6.54 11.44
C2 273.88 -6.58 -11.11 -273.88 6.58 -12.58
C3 195.82 -9.26 -16.07 -195.82 9.26 -17.25
C4 141.26 -10.61 -18.51 -141.26 10.61 -19.68
C5 266.22 15.40 27.56 -266.22 -15.40 27.89
C6 186.07 18.72 33.14 -186.07 -18.72 34.25
C7 136.39 3.38 6.10 -136.39 -3.38 6.07
9-10 C1 153.39 5.76 10.56 -153.39 -5.76 10.19
C2 122.73 0.28 1.16 -122.73 -0.28 -0.14
C3 75.24 -1.70 -1.73 -75.24 1.70 -4.40
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

C4 53.60 -2.69 -3.74 -53.60 2.69 -5.93


C5 123.51 8.36 14.94 -123.51 -8.36 15.17
C6 76.24 8.58 15.81 -76.24 -8.58 15.08
C7 54.10 2.46 5.03 -54.10 -2.46 3.81
11-12 C1 722.01 -21.91 0.00 -722.01 21.91 -25.19
C2 547.58 -44.55 0.00 -547.58 44.55 -51.23
C3 432.25 -53.05 0.00 -432.25 53.05 -61.00
C4 293.42 -46.44 0.00 -293.42 46.44 -53.40
C5 631.89 2.45 0.00 -631.89 -2.45 2.82
C6 539.55 6.77 0.00 -539.55 -6.77 7.79
C7 347.07 -16.53 0.00 -347.07 16.53 -19.01
12-13 C1 589.89 -9.73 -17.36 -589.89 9.73 -19.14
C2 459.09 -25.84 -45.68 -459.09 25.84 -51.23
C3 328.37 -28.68 -51.62 -328.37 28.68 -55.92
C4 227.50 -26.38 -47.21 -227.50 26.38 -51.71
C5 497.87 6.57 11.16 -497.87 -6.57 13.48
C6 377.72 12.57 20.71 -377.72 -12.57 26.44
C7 252.18 -5.75 -11.04 -252.18 5.75 -10.53
13-14 C1 380.92 -11.74 -21.29 -380.92 11.74 -20.98
C2 302.35 -21.47 -38.21 -302.35 21.47 -39.08
C3 210.31 -21.90 -38.66 -210.31 21.90 -40.16
C4 147.98 -19.57 -34.51 -147.98 19.57 -35.94
C5 314.65 0.15 -0.28 -314.65 -0.15 0.82
C6 225.96 5.62 9.61 -225.96 -5.62 10.62
C7 155.81 -5.81 -10.38 -155.81 5.81 -10.55
14-15 C1 176.53 -11.56 -20.74 -176.53 11.56 -20.89
C2 141.30 -13.72 -24.28 -141.30 13.72 -25.10
C3 84.39 -11.77 -21.55 -84.39 11.77 -20.84
C4 60.22 -9.85 -17.84 -60.22 9.85 -17.63
C5 141.58 -5.79 -10.84 -141.58 5.79 -10.00
C6 84.74 -1.68 -4.45 -84.74 1.68 -1.62
C7 60.40 -4.81 -9.29 -60.40 4.81 -8.02
16-17 C1 505.13 27.35 0.00 -505.13 -27.35 31.45
C2 379.55 16.04 0.00 -379.55 -16.04 18.45
C3 315.37 20.31 0.00 -315.37 -20.31 23.36
C4 212.66 11.97 0.00 -212.66 -11.97 13.77
C5 448.88 29.97 0.00 -448.88 -29.97 34.46
C6 403.61 38.03 0.00 -403.61 -38.03 43.74
C7 256.78 20.84 0.00 -256.78 -20.84 23.96
17-18 C1 401.60 14.43 24.68 -401.60 -14.43 29.44
C2 303.10 0.89 2.40 -303.10 -0.89 0.94
C3 226.49 -1.59 0.04 -226.49 1.59 -5.98
C4 153.26 -4.85 -6.11 -153.26 4.85 -12.08
C5 349.96 21.35 36.17 -349.96 -21.35 43.89
C6 286.13 24.46 43.02 -286.13 -24.46 48.69
C7 183.08 8.17 15.38 -183.08 -8.17 15.25
18-19 C1 255.63 19.12 34.80 -255.63 -19.12 34.04
C2 197.70 8.51 17.22 -197.70 -8.51 13.43
C3 143.01 4.19 9.28 -143.01 -4.19 5.82
C4 98.59 0.60 2.87 -98.59 -0.60 -0.69
C5 217.28 21.67 37.91 -217.28 -21.67 40.09
C6 167.93 20.94 35.62 -167.93 -20.94 39.75
C7 111.05 8.97 16.03 -111.05 -8.97 16.27
19-20 C1 107.51 20.60 35.76 -107.51 -20.60 38.40
C2 83.68 14.05 25.56 -83.68 -14.05 25.01
C3 50.86 8.42 17.38 -50.86 -8.42 12.93
C4 35.41 5.14 11.22 -35.41 -5.14 7.27
C5 88.71 18.88 32.11 -88.71 -18.88 35.85
C6 57.26 14.57 25.71 -57.26 -14.57 26.73
C7 38.61 8.21 15.39 -38.61 -8.21 14.16
2-7 C1 9.58 79.36 41.51 -9.58 79.89 -42.44
C2 5.74 83.99 65.75 -5.74 52.51 -10.65
C3 9.86 97.74 76.01 -9.86 61.51 -12.59
C4 6.09 75.15 64.37 -6.09 38.60 -0.41
C5 10.99 54.66 10.29 -10.99 81.84 -57.86
C6 16.55 60.41 5.42 -16.55 98.84 -72.67
C7 9.43 56.48 29.08 -9.43 57.27 -30.45
7-12 C1 0.74 23.00 14.61 -0.74 26.42 -18.03
C2 6.71 56.76 49.33 -6.71 -14.40 21.84
C3 9.50 65.88 57.60 -9.50 -16.46 24.75
C4 8.74 59.42 53.41 -8.74 -24.12 30.14
C5 -4.05 -11.24 -18.14 4.05 53.60 -46.69
C6 -4.19 -20.66 -28.28 4.19 70.08 -62.47
C7 1.89 16.15 10.47 -1.89 19.15 -13.47
12-17 C1 12.92 94.36 60.58 -12.92 92.19 -56.14
C2 25.41 93.17 75.07 -25.41 66.73 -20.85
C3 33.86 109.00 87.88 -33.86 77.55 -23.39
C4 28.80 81.94 70.47 -28.80 51.31 -7.66
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

C5 0.07 70.70 32.71 -0.07 89.20 -70.63


C6 1.61 80.40 33.98 -1.61 106.15 -86.76
C7 12.67 67.64 43.52 -12.67 65.61 -39.34
3-8 C1 -3.28 116.06 46.87 3.28 123.83 -60.47
C2 1.68 113.97 75.74 -1.68 83.01 -21.56
C3 4.21 99.14 75.47 -4.21 60.11 -7.17
C4 4.41 77.02 66.29 -4.41 36.73 4.23
C5 -6.06 79.81 7.64 6.06 117.17 -73.01
C6 -5.64 55.67 -11.20 5.64 103.58 -72.65
C7 -0.51 55.29 22.95 0.51 58.46 -28.51
4-9 C1 -0.88 117.50 50.70 0.88 122.39 -59.25
C2 4.28 106.33 60.80 -4.28 90.65 -33.37
C3 6.60 89.12 54.62 -6.60 70.13 -21.39
C4 6.33 66.95 45.47 -6.33 46.80 -10.19
C5 -4.59 88.20 25.33 4.59 108.78 -61.36
C6 -4.69 66.05 9.48 4.69 93.20 -57.01
C7 0.68 55.42 22.90 -0.68 58.33 -28.00
5-10 C1 14.80 86.91 27.46 -14.80 98.31 -47.42
C2 14.82 72.92 28.29 -14.82 75.34 -32.54
C3 11.52 45.05 21.35 -11.52 42.17 -16.32
C4 9.17 33.28 17.31 -9.17 29.02 -9.84
C5 9.61 66.82 16.95 -9.61 81.44 -42.54
C6 4.88 37.29 6.91 -4.88 49.93 -29.04
C7 5.86 29.40 10.09 -5.86 32.90 -16.20
8-13 C1 -2.68 43.27 36.95 2.68 52.23 -45.90
C2 8.15 64.12 59.05 -8.15 12.80 -7.73
C3 10.95 56.13 56.19 -10.95 -6.71 6.65
C4 11.24 49.86 49.78 -11.24 -14.56 14.65
C5 -10.69 10.37 6.00 10.69 66.55 -62.18
C6 -13.03 -12.29 -11.34 13.03 61.71 -62.65
C7 -0.75 15.66 16.02 0.75 19.64 -20.00
9-14 C1 -1.66 45.70 37.25 1.66 49.80 -41.35
C2 11.15 51.20 44.80 -11.15 25.72 -19.32
C3 14.15 39.60 40.37 -14.15 9.82 -10.59
C4 14.25 33.12 33.61 -14.25 2.18 -2.68
C5 -11.63 24.63 18.53 11.63 52.29 -46.20
C6 -14.83 5.78 6.95 14.83 43.64 -44.81
C7 -0.24 16.21 16.90 0.24 19.09 -19.79
10-15 C1 9.04 49.64 37.23 -9.04 56.20 -43.79
C2 14.54 42.73 32.68 -14.54 41.99 -31.94
C3 13.22 27.63 20.72 -13.22 22.21 -15.30
C4 11.86 20.70 15.77 -11.86 14.90 -9.96
C5 1.25 37.41 27.37 -1.25 47.31 -37.26
C6 -3.69 20.87 13.96 3.69 28.97 -22.06
C7 3.40 17.32 12.39 -3.40 18.28 -13.34
13-18 C1 -4.69 145.89 86.33 4.69 135.12 -64.24
C2 12.52 134.65 97.17 -12.52 96.10 -18.16
C3 17.73 113.92 87.94 -17.73 72.63 -3.30
C4 18.05 86.33 71.58 -18.05 46.92 9.22
C5 -17.11 107.37 48.98 17.11 123.38 -81.80
C6 -19.99 79.20 26.61 19.99 107.35 -84.30
C7 -0.81 68.97 40.91 0.81 64.28 -31.29
14-19 C1 -1.48 143.74 83.07 1.48 137.27 -69.80
C2 18.90 126.03 82.68 -18.90 104.72 -38.99
C3 24.28 105.25 72.31 -24.28 81.30 -23.20
C4 23.97 77.83 56.46 -23.97 55.42 -10.53
C5 -17.57 111.48 56.22 17.57 119.27 -72.20
C6 -22.14 86.73 38.64 22.14 99.82 -65.47
C7 0.76 68.57 39.62 -0.76 64.68 -31.67
15-20 C1 20.60 114.90 64.67 -20.60 102.08 -38.40
C2 28.26 94.65 57.05 -28.26 79.02 -25.01
C3 25.00 56.75 36.14 -25.00 45.43 -12.93
C4 21.71 41.45 27.59 -21.71 31.53 -7.27
C5 7.04 89.62 47.26 -7.04 84.05 -35.85
C6 -2.01 50.34 23.68 2.01 51.83 -26.73
C7 8.21 38.25 21.36 -8.21 34.73 -14.16

============================== STATISTICAL DATA ===============================

Weights of beam elements: (Not included in analysis)

Section Designation Total Mass


(kN) (kg)

COLUMN 300x300 RC 107.448 10952.9


PLINTH 300x300 RC 21.312 2172.5
BEAM 200*320 RC 70.416 7178.0
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

---------------------
199.176 20303.4

Total weight of structure = 0.00 kN

No. of real numbers in Stiffness matrix = 0 (0 bytes)


Time used to analyse = 0: 0:0.187 seconds
Total number of : Nodes = 20
Beam Elements = 28
Cable Elements = 0
Shell Elements = 0
Supports = 4
Section Properties = 3
Load Cases = 10
Load Combinations = 7

=============================== END OF OUTPUT =================================

========== S p a c e - F r a m e A n a l y s i s - P R O K O N ===========
Ver W3.0.04 - 29 Jan 2016

TITLE :FRAME E(1-4)

Data file : C:\Users\RDD\Desktop\design\provincial Road Development Department unit.A03


Created on: 7/23/2020

========================== NODAL POINT COORDINATES ============================

Node No X-coord Y-coord Z-coord Node No X-coord Y-coord Z-coord


m m m m m m

1 0.000 0.000 0.000 2 0.000 1.150 0.000


3 0.000 4.900 0.000 4 0.000 8.500 0.000
5 0.000 12.100 0.000 6 3.500 0.000 0.000
7 3.500 1.150 0.000 8 3.500 4.900 0.000
9 3.500 8.500 0.000 10 3.500 12.100 0.000
11 5.500 0.000 0.000 12 5.500 1.150 0.000
13 5.500 4.900 0.000 14 5.500 8.500 0.000
15 5.500 12.100 0.000 16 9.600 0.000 0.000
17 9.600 1.150 0.000 18 9.600 4.900 0.000
19 9.600 8.500 0.000 20 9.600 12.100 0.000

=============================== ELEMENT DATA ==================================

Beam Secn. type Fixity Length ß Group no.


m (°)

1-2 COLUMN 00 1.150 0.00 0


2-3 COLUMN 00 3.750 0.00 0
3-4 COLUMN 00 3.600 0.00 0
4-5 COLUMN 00 3.600 0.00 0
6-7 COLUMN 00 1.150 0.00 0
7-8 COLUMN 00 3.750 0.00 0
8-9 COLUMN 00 3.600 0.00 0
9-10 COLUMN 00 3.600 0.00 0
11-12 COLUMN 00 1.150 0.00 0
12-13 COLUMN 00 3.750 0.00 0
13-14 COLUMN 00 3.600 0.00 0
14-15 COLUMN 00 3.600 0.00 0
16-17 COLUMN 00 1.150 0.00 0
17-18 COLUMN 00 3.750 0.00 0
18-19 COLUMN 00 3.600 0.00 0
19-20 COLUMN 00 3.600 0.00 0
2-7 PLINTH 00 3.500 0.00 0
7-12 PLINTH 00 2.000 0.00 0
12-17 PLINTH 00 4.100 0.00 0
3-8 BEAM 00 3.500 0.00 0
4-9 BEAM 00 3.500 0.00 0
5-10 BEAM 00 3.500 0.00 0
8-13 BEAM 00 2.000 0.00 0
9-14 BEAM 00 2.000 0.00 0
10-15 BEAM 00 2.000 0.00 0
13-18 BEAM 00 4.100 0.00 0
14-19 BEAM 00 4.100 0.00 0
15-20 BEAM 00 4.100 0.00 0
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

============================ SECTION PROPERTIES ===============================

Section : COLUMN Section designation: 300x300 RC


----------------
A Ay Ax Ixx Iyy J Material
m^2 m^2 m^2 m^4 m^4 m^4

88.80E-3 0.000 0.000 650E-6 650E-6 1.14E-3 Concrete:25 MPa

Section : PLINTH Section designation: 300x300 RC


----------------
A Ay Ax Ixx Iyy J Material
m^2 m^2 m^2 m^4 m^4 m^4

88.80E-3 0.000 0.000 650E-6 650E-6 1.14E-3 Concrete:25 MPa

Section : BEAM Section designation: 200*320 RC


----------------
A Ay Ax Ixx Iyy J Material
m^2 m^2 m^2 m^4 m^4 m^4

97.80E-3 0.000 0.000 1.61E-3 386E-6 1.11E-3 Concrete:25 MPa

================================== MATERIALS ==================================

Designation E poisson Density Exp. coeff.


kPa kN/m^3
Concrete:25 MPa 25.00E6 0.20 25.00 10.00E-6

=============================== SUPPORT DATA ==================================

Prescribed displacements
Node Fixity X Y Z X-Rot Y-Rot Z-Rot Orien node
m m m rad. rad. rad.

1 XY 0.00 0.00 0.00 0.00 0.00 0.00 0


6 XY 0.00 0.00 0.00 0.00 0.00 0.00 0
11 XY 0.00 0.00 0.00 0.00 0.00 0.00 0
16 XY 0.00 0.00 0.00 0.00 0.00 0.00 0

Spring constants
Node Fixity X Y Z X-Rot Y-Rot Z-Rot
kN/m kN/m kN/m kNm/rad kNm/rad kNm/rad

=================================== LOADS =====================================

Load Case Description

W wind load
D5 dead load
D1 dead load
D2 dead load
D3 dead load
D4 dead load
L1 imposed load
L2 imposed load
L3 imposed load
L4 imposed load

Own weight not added to any load case/combination

============================= LOAD CASE W ====================================


wind load

*** POINT LOADS ***

Node Fx Fy Fz Mx My Mz
kN kN kN kNm kNm kNm

17 -8.55 0.00 0.00 0.00 0.00 0.00


18 -16.79 0.00 0.00 0.00 0.00 0.00
19 -20.36 0.00 0.00 0.00 0.00 0.00
20 -11.84 0.00 0.00 0.00 0.00 0.00
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

============================= LOAD CASE D5 ====================================


dead load

*** POINT LOADS ***

Node Fx Fy Fz Mx My Mz
kN kN kN kNm kNm kNm

1 0.00 -2.50 0.00 0.00 0.00 0.00


6 0.00 -2.50 0.00 0.00 0.00 0.00
11 0.00 -2.50 0.00 0.00 0.00 0.00
16 0.00 -2.50 0.00 0.00 0.00 0.00
2 0.00 -8.10 0.00 0.00 0.00 0.00
7 0.00 -8.10 0.00 0.00 0.00 0.00
12 0.00 -8.10 0.00 0.00 0.00 0.00
17 0.00 -8.10 0.00 0.00 0.00 0.00
3 0.00 -7.75 0.00 0.00 0.00 0.00
8 0.00 -7.75 0.00 0.00 0.00 0.00
13 0.00 -7.75 0.00 0.00 0.00 0.00
18 0.00 -7.75 0.00 0.00 0.00 0.00
4 0.00 -7.75 0.00 0.00 0.00 0.00
9 0.00 -7.75 0.00 0.00 0.00 0.00
14 0.00 -7.75 0.00 0.00 0.00 0.00
19 0.00 -7.75 0.00 0.00 0.00 0.00
5 0.00 -3.88 0.00 0.00 0.00 0.00
10 0.00 -3.88 0.00 0.00 0.00 0.00
15 0.00 -3.88 0.00 0.00 0.00 0.00
20 0.00 -3.88 0.00 0.00 0.00 0.00

============================= LOAD CASE D1 ====================================


dead load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

2-7 Y 0.00 0.00 -32.5 -32.5 0.00 3.50 0.00


3-8 Y 0.00 0.00 -32.5 -32.5 0.00 3.50 0.00
4-9 Y 0.00 0.00 -32.5 -32.5 0.00 3.50 0.00

============================= LOAD CASE D2 ====================================


dead load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

7-12 Y 0.00 0.00 -17.6 -17.6 0.00 2.00 0.00


8-13 Y 0.00 0.00 -17.6 -17.6 0.00 2.00 0.00
9-14 Y 0.00 0.00 -17.6 -17.6 0.00 2.00 0.00

============================= LOAD CASE D3 ====================================


dead load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

15-20 Y 0.00 0.00 -17.8 -17.8 0.00 4.10 0.00


10-15 Y 0.00 0.00 -17.8 -17.8 0.00 2.00 0.00
5-10 Y 0.00 0.00 -17.8 -17.8 0.00 3.50 0.00

============================= LOAD CASE D4 ====================================


dead load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

12-17 Y 0.00 0.00 -32.5 -32.5 0.00 4.10 0.00


13-18 Y 0.00 0.00 -32.5 -32.5 0.00 4.10 0.00
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

14-19 Y 0.00 0.00 -32.5 -32.5 0.00 4.10 0.00

============================= LOAD CASE L1 ====================================


imposed load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

3-8 Y 0.00 0.00 -14.4 -14.4 0.00 3.50 0.00


4-9 Y 0.00 0.00 -14.4 -14.4 0.00 3.50 0.00

============================= LOAD CASE L2 ====================================


imposed load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

8-13 Y 0.00 0.00 -14.4 -14.4 0.00 2.00 0.00


9-14 Y 0.00 0.00 -14.4 -14.4 0.00 2.00 0.00

============================= LOAD CASE L3 ====================================


imposed load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

15-20 Y 0.00 0.00 -17.5 -17.5 0.00 4.10 0.00


10-15 Y 0.00 0.00 -17.5 -17.5 0.00 2.00 0.00
5-10 Y 0.00 0.00 -17.5 -17.5 0.00 3.50 0.00

============================= LOAD CASE L4 ====================================


imposed load

*** BEAM ELEMENT LOADS ***

Element Dir P a Wl Wr a(left) Length dT


kN m kN/m kN/m m m °C

13-18 Y 0.00 0.00 -14.4 -14.4 0.00 4.10 0.00


14-19 Y 0.00 0.00 -14.4 -14.4 0.00 4.10 0.00

============================= LOAD COMBINATIONS ===============================

Load Comb Description

C1
C2
C3
C4
C5
C6
C7

Comb. Load factor for each load case: Ultimate Limit State

W D5 D1 D2 D3 D4 L1 L2 L3

C1 0.00 1.40 1.40 1.40 1.40 1.40 1.60 1.60 1.60


C2 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20
C3 1.40 1.40 1.40 1.40 1.40 1.40 0.00 0.00 0.00
C4 1.40 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00
C5 -1.00 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20
C6 -1.40 1.40 1.40 1.40 1.40 1.40 0.00 0.00 0.00
C7 0.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00

L4

C1 1.60
C2 1.20
C3 0.00
C4 0.00
C5 1.20
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

C6 0.00
C7 0.00

Comb. Load factor for each load case: Serviceability Limit State

W D5 D1 D2 D3 D4 L1 L2 L3

C1 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00


C2 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
C3 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00
C4 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00
C5 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
C6 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00
C7 0.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00

L4

C1 1.00
C2 1.00
C3 0.00
C4 0.00
C5 1.00
C6 0.00
C7 0.00

========================== OWN WEIGHT ACCELERATIONS ===========================

Direction Acceleration (g)


X 0.00
Y -1.00
Z 0.00

========================== OUTPUT: LINEAR ANALYSIS ============================


====================== NODAL POINT DISPLACEMENTS at SLS =======================

Node Lcase X-disp. Y-disp Z-rot.


mm mm rad.

1 C1 0.00 0.00 0.0002


C2 0.00 0.00 0.0016
C3 0.00 0.00 0.0016
C4 0.00 0.00 0.0016
C5 0.00 0.00 0.0016
C6 0.00 0.00 0.0016
C7 0.00 0.00 0.0002
2 C1 -0.02 -0.16 -0.0004
C2 -1.45 -0.18 0.0007
C3 -1.45 -0.14 0.0006
C4 -1.45 -0.14 0.0006
C5 -1.45 -0.18 0.0007
C6 -1.45 -0.14 0.0006
C7 -0.02 -0.12 -0.0004
3 C1 -0.15 -0.56 -0.0006
C2 -7.27 -0.62 -0.0001
C3 -7.27 -0.45 0.0002
C4 -7.27 -0.45 0.0002
C5 -7.27 -0.62 -0.0001
C6 -7.27 -0.45 0.0002
C7 -0.14 -0.39 -0.0004
4 C1 -0.23 -0.80 -0.0006
C2 -10.44 -0.88 -0.0003
C3 -10.41 -0.63 -0.0001
C4 -10.41 -0.63 -0.0001
C5 -10.44 -0.88 -0.0003
C6 -10.41 -0.63 -0.0001
C7 -0.20 -0.54 -0.0004
5 C1 -0.28 -0.90 -0.0007
C2 -11.76 -0.99 -0.0006
C3 -11.71 -0.68 -0.0002
C4 -11.71 -0.68 -0.0002
C5 -11.76 -0.99 -0.0006
C6 -11.71 -0.68 -0.0002
C7 -0.23 -0.60 -0.0003
6 C1 0.00 0.00 -0.0001
C2 0.00 0.00 0.0014
C3 0.00 0.00 0.0014
C4 0.00 0.00 0.0014
C5 0.00 0.00 0.0014
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

C6 0.00 0.00 0.0014


C7 0.00 0.00 -0.0001
7 C1 -0.03 -0.22 0.0003
C2 -1.46 -0.24 0.0010
C3 -1.46 -0.17 0.0010
C4 -1.46 -0.17 0.0010
C5 -1.46 -0.24 0.0010
C6 -1.46 -0.17 0.0010
C7 -0.03 -0.16 0.0003
8 C1 -0.14 -0.81 0.0003
C2 -7.28 -0.84 0.0006
C3 -7.27 -0.56 0.0005
C4 -7.27 -0.56 0.0005
C5 -7.28 -0.84 0.0006
C6 -7.27 -0.56 0.0005
C7 -0.14 -0.52 0.0002
9 C1 -0.23 -1.17 0.0003
C2 -10.44 -1.21 0.0004
C3 -10.42 -0.79 0.0004
C4 -10.42 -0.79 0.0004
C5 -10.44 -1.21 0.0004
C6 -10.42 -0.79 0.0004
C7 -0.20 -0.75 0.0002
10 C1 -0.29 -1.34 0.0003
C2 -11.78 -1.38 0.0003
C3 -11.72 -0.87 0.0002
C4 -11.72 -0.87 0.0002
C5 -11.78 -1.38 0.0003
C6 -11.72 -0.87 0.0002
C7 -0.24 -0.83 0.0001
11 C1 0.00 0.00 0.0002
C2 0.00 0.00 0.0018
C3 0.00 0.00 0.0018
C4 0.00 0.00 0.0018
C5 0.00 0.00 0.0018
C6 0.00 0.00 0.0018
C7 0.00 0.00 0.0003
12 C1 -0.03 -0.26 -0.0004
C2 -1.46 -0.24 0.0003
C3 -1.47 -0.16 0.0002
C4 -1.47 -0.16 0.0002
C5 -1.46 -0.24 0.0003
C6 -1.47 -0.16 0.0002
C7 -0.04 -0.18 -0.0004
13 C1 -0.14 -0.93 -0.0005
C2 -7.28 -0.88 -0.0003
C3 -7.28 -0.56 -0.0001
C4 -7.28 -0.56 -0.0001
C5 -7.28 -0.88 -0.0003
C6 -7.28 -0.56 -0.0001
C7 -0.14 -0.61 -0.0004
14 C1 -0.22 -1.35 -0.0005
C2 -10.45 -1.29 -0.0003
C3 -10.43 -0.80 -0.0002
C4 -10.43 -0.80 -0.0002
C5 -10.45 -1.29 -0.0003
C6 -10.43 -0.80 -0.0002
C7 -0.20 -0.86 -0.0004
15 C1 -0.30 -1.54 -0.0005
C2 -11.79 -1.48 -0.0004
C3 -11.73 -0.90 -0.0002
C4 -11.73 -0.90 -0.0002
C5 -11.79 -1.48 -0.0004
C6 -11.73 -0.90 -0.0002
C7 -0.24 -0.96 -0.0002
16 C1 0.00 0.00 -0.0002
C2 0.00 0.00 0.0011
C3 0.00 0.00 0.0011
C4 0.00 0.00 0.0011
C5 0.00 0.00 0.0011
C6 0.00 0.00 0.0011
C7 0.00 0.00 -0.0002
17 C1 -0.05 -0.18 0.0006
C2 -1.50 -0.16 0.0017
C3 -1.51 -0.12 0.0017
C4 -1.51 -0.12 0.0017
C5 -1.50 -0.16 0.0017
C6 -1.51 -0.12 0.0017
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

C7 -0.06 -0.13 0.0006


18 C1 -0.14 -0.64 0.0009
C2 -7.30 -0.59 0.0015
C3 -7.30 -0.39 0.0012
C4 -7.30 -0.39 0.0012
C5 -7.30 -0.59 0.0015
C6 -7.30 -0.39 0.0012
C7 -0.13 -0.44 0.0006
19 C1 -0.22 -0.92 0.0009
C2 -10.48 -0.86 0.0012
C3 -10.45 -0.56 0.0009
C4 -10.45 -0.56 0.0009
C5 -10.48 -0.86 0.0012
C6 -10.45 -0.56 0.0009
C7 -0.20 -0.62 0.0006
20 C1 -0.32 -1.04 0.0010
C2 -11.83 -0.97 0.0011
C3 -11.76 -0.61 0.0006
C4 -11.76 -0.61 0.0006
C5 -11.83 -0.97 0.0011
C6 -11.76 -0.61 0.0006
C7 -0.25 -0.68 0.0005

============================== REACTIONS AT ULS ===============================


(In rotated axes where applicable)
Node Lcase X-force Y-forcet Z-moment
kN kN kNm

1 C1 20.22 441.80 0.00


C2 26.52 413.18 0.00
C3 32.19 373.02 0.00
C4 26.01 282.39 0.00
C5 9.95 325.46 0.00
C6 11.10 261.38 0.00
C7 15.46 226.57 0.00
6 C1 -14.78 628.01 0.00
C2 14.02 552.31 0.00
C3 15.63 465.14 0.00
C4 20.09 344.23 0.00
C5 -35.07 486.38 0.00
C6 -46.85 381.23 0.00
C7 -11.15 302.27 0.00
11 C1 21.91 725.51 0.00
C2 44.55 550.58 0.00
C3 53.05 435.75 0.00
C4 46.44 295.92 0.00
C5 -2.45 634.89 0.00
C6 -6.77 543.05 0.00
C7 16.53 349.57 0.00
16 C1 -27.35 508.63 0.00
C2 -16.04 382.55 0.00
C3 -20.31 318.87 0.00
C4 -11.97 215.16 0.00
C5 -29.97 451.88 0.00
C6 -38.03 407.11 0.00
C7 -20.84 259.28 0.00

EQUILIBRIUM CHECK AT ULS:

LC APPLIED LOADS & MOMENTS about (0.0,0.0,0.0) in global axes

Sum of: Px Py Mz

C1 0.00 -2303.95 -11071.19


C2 -69.05 -1898.62 -8633.73
C3 -80.56 -1592.78 -7085.78
C4 -80.56 -1137.70 -4897.90
C5 57.54 -1898.62 -9532.27
C6 80.56 -1592.78 -8229.38
C7 0.00 -1137.70 -5469.70

LC REACTIONS & REACTION MOMENTS about (0.0,0.0,0.0) in global axes

Sum of: Rx Ry MRz

C1 0.00 2303.95 11071.19


C2 69.05 1898.62 8633.73
C3 80.56 1592.78 7085.78
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

C4 80.56 1137.70 4897.90


C5 -57.54 1898.62 9532.27
C6 -80.56 1592.78 8229.38
C7 0.00 1137.70 5469.70

================== REACTIONS AT SLS (Combinations only) =======================

(In rotated axes


Node Lcase X-force Y-forcet Z-moment
kN kN kNm

1 C1 14.57 304.44 0.00


C2 22.10 344.31 0.00
C3 22.99 266.44 0.00
C4 22.99 266.44 0.00
C5 22.10 344.31 0.00
C6 22.99 266.44 0.00
C7 15.46 226.57 0.00
6 C1 -10.63 430.29 0.00
C2 11.68 460.26 0.00
C3 11.16 332.24 0.00
C4 11.16 332.24 0.00
C5 11.68 460.26 0.00
C6 11.16 332.24 0.00
C7 -11.15 302.27 0.00
11 C1 15.76 497.14 0.00
C2 37.12 458.82 0.00
C3 37.89 311.25 0.00
C4 37.89 311.25 0.00
C5 37.12 458.82 0.00
C6 37.89 311.25 0.00
C7 16.53 349.57 0.00
16 C1 -19.70 350.30 0.00
C2 -13.37 318.79 0.00
C3 -14.51 227.77 0.00
C4 -14.51 227.77 0.00
C5 -13.37 318.79 0.00
C6 -14.51 227.77 0.00
C7 -20.84 259.28 0.00

============ BEAM ELEMENT END FORCES IN LOCAL ELEMENT AXES at ULS ==============

Elem Lcase Axial Y-Shea M-xx Axial Y-Shea M-xx


kN kN kNm kN kN kNm

1-2 C1 438.30 -20.22 0.00 -438.30 20.22 -23.25


C2 410.18 -26.52 0.00 -410.18 26.52 -30.50
C3 369.52 -32.19 0.00 -369.52 32.19 -37.02
C4 279.89 -26.01 0.00 -279.89 26.01 -29.91
C5 322.46 -9.95 0.00 -322.46 9.95 -11.44
C6 257.88 -11.10 0.00 -257.88 11.10 -12.76
C7 224.07 -15.46 0.00 -224.07 15.46 -17.78
2-3 C1 347.60 -10.64 -18.26 -347.60 10.64 -21.62
C2 316.47 -20.79 -35.25 -316.47 20.79 -42.70
C3 260.44 -22.33 -38.99 -260.44 22.33 -44.75
C4 196.64 -19.92 -34.46 -196.64 19.92 -40.23
C5 258.08 1.04 1.15 -258.08 -1.04 2.74
C6 186.13 5.45 7.34 -186.13 -5.45 13.09
C7 159.49 -6.03 -11.30 -159.49 6.03 -11.31
3-4 C1 220.69 -13.92 -25.24 -220.69 13.92 -24.87
C2 193.20 -19.10 -33.03 -193.20 19.10 -35.74
C3 150.45 -18.12 -30.72 -150.45 18.12 -34.51
C4 111.87 -15.50 -26.06 -111.87 15.50 -29.75
C5 168.97 -5.02 -10.38 -168.97 5.02 -7.68
C6 119.61 -0.19 -1.89 -119.61 0.19 1.19
C7 96.45 -6.54 -11.65 -96.45 6.54 -11.90
4-5 C1 92.34 -14.80 -25.83 -92.34 14.80 -27.46
C2 77.57 -14.82 -25.07 -77.57 14.82 -28.29
C3 50.48 -11.52 -20.12 -50.48 11.52 -21.35
C4 37.16 -9.17 -15.72 -37.16 9.17 -17.31
C5 71.47 -9.61 -17.65 -71.47 9.61 -16.95
C6 42.72 -4.88 -10.68 -42.72 4.88 -6.91
C7 33.28 -5.86 -11.00 -33.28 5.86 -10.09
6-7 C1 624.51 14.78 0.00 -624.51 -14.78 16.99
C2 549.31 -14.02 0.00 -549.31 14.02 -16.12
C3 461.64 -15.63 0.00 -461.64 15.63 -17.97
C4 341.73 -20.09 0.00 -341.73 20.09 -23.10
C5 483.38 35.07 0.00 -483.38 -35.07 40.33
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

C6 377.73 46.85 0.00 -377.73 -46.85 53.88


C7 299.77 11.15 0.00 -299.77 -11.15 12.82
7-8 C1 510.28 5.94 10.84 -510.28 -5.94 11.43
C2 430.32 -13.05 -22.55 -430.32 13.05 -26.38
C3 322.91 -15.99 -27.03 -322.91 15.99 -32.94
C4 235.60 -17.44 -29.89 -235.60 17.44 -35.50
C5 403.06 20.03 35.67 -403.06 -20.03 39.45
C6 288.22 26.11 47.07 -288.22 -26.11 50.85
C7 218.26 3.61 7.15 -218.26 -3.61 6.39
8-9 C1 332.33 6.54 12.09 -332.33 -6.54 11.44
C2 273.88 -6.58 -11.11 -273.88 6.58 -12.58
C3 195.82 -9.26 -16.07 -195.82 9.26 -17.25
C4 141.26 -10.61 -18.51 -141.26 10.61 -19.68
C5 266.22 15.40 27.56 -266.22 -15.40 27.89
C6 186.07 18.72 33.14 -186.07 -18.72 34.25
C7 136.39 3.38 6.10 -136.39 -3.38 6.07
9-10 C1 153.39 5.76 10.56 -153.39 -5.76 10.19
C2 122.73 0.28 1.16 -122.73 -0.28 -0.14
C3 75.24 -1.70 -1.73 -75.24 1.70 -4.40
C4 53.60 -2.69 -3.74 -53.60 2.69 -5.93
C5 123.51 8.36 14.94 -123.51 -8.36 15.17
C6 76.24 8.58 15.81 -76.24 -8.58 15.08
C7 54.10 2.46 5.03 -54.10 -2.46 3.81
11-12 C1 722.01 -21.91 0.00 -722.01 21.91 -25.19
C2 547.58 -44.55 0.00 -547.58 44.55 -51.23
C3 432.25 -53.05 0.00 -432.25 53.05 -61.00
C4 293.42 -46.44 0.00 -293.42 46.44 -53.40
C5 631.89 2.45 0.00 -631.89 -2.45 2.82
C6 539.55 6.77 0.00 -539.55 -6.77 7.79
C7 347.07 -16.53 0.00 -347.07 16.53 -19.01
12-13 C1 589.89 -9.73 -17.36 -589.89 9.73 -19.14
C2 459.09 -25.84 -45.68 -459.09 25.84 -51.23
C3 328.37 -28.68 -51.62 -328.37 28.68 -55.92
C4 227.50 -26.38 -47.21 -227.50 26.38 -51.71
C5 497.87 6.57 11.16 -497.87 -6.57 13.48
C6 377.72 12.57 20.71 -377.72 -12.57 26.44
C7 252.18 -5.75 -11.04 -252.18 5.75 -10.53
13-14 C1 380.92 -11.74 -21.29 -380.92 11.74 -20.98
C2 302.35 -21.47 -38.21 -302.35 21.47 -39.08
C3 210.31 -21.90 -38.66 -210.31 21.90 -40.16
C4 147.98 -19.57 -34.51 -147.98 19.57 -35.94
C5 314.65 0.15 -0.28 -314.65 -0.15 0.82
C6 225.96 5.62 9.61 -225.96 -5.62 10.62
C7 155.81 -5.81 -10.38 -155.81 5.81 -10.55
14-15 C1 176.53 -11.56 -20.74 -176.53 11.56 -20.89
C2 141.30 -13.72 -24.28 -141.30 13.72 -25.10
C3 84.39 -11.77 -21.55 -84.39 11.77 -20.84
C4 60.22 -9.85 -17.84 -60.22 9.85 -17.63
C5 141.58 -5.79 -10.84 -141.58 5.79 -10.00
C6 84.74 -1.68 -4.45 -84.74 1.68 -1.62
C7 60.40 -4.81 -9.29 -60.40 4.81 -8.02
16-17 C1 505.13 27.35 0.00 -505.13 -27.35 31.45
C2 379.55 16.04 0.00 -379.55 -16.04 18.45
C3 315.37 20.31 0.00 -315.37 -20.31 23.36
C4 212.66 11.97 0.00 -212.66 -11.97 13.77
C5 448.88 29.97 0.00 -448.88 -29.97 34.46
C6 403.61 38.03 0.00 -403.61 -38.03 43.74
C7 256.78 20.84 0.00 -256.78 -20.84 23.96
17-18 C1 401.60 14.43 24.68 -401.60 -14.43 29.44
C2 303.10 0.89 2.40 -303.10 -0.89 0.94
C3 226.49 -1.59 0.04 -226.49 1.59 -5.98
C4 153.26 -4.85 -6.11 -153.26 4.85 -12.08
C5 349.96 21.35 36.17 -349.96 -21.35 43.89
C6 286.13 24.46 43.02 -286.13 -24.46 48.69
C7 183.08 8.17 15.38 -183.08 -8.17 15.25
18-19 C1 255.63 19.12 34.80 -255.63 -19.12 34.04
C2 197.70 8.51 17.22 -197.70 -8.51 13.43
C3 143.01 4.19 9.28 -143.01 -4.19 5.82
C4 98.59 0.60 2.87 -98.59 -0.60 -0.69
C5 217.28 21.67 37.91 -217.28 -21.67 40.09
C6 167.93 20.94 35.62 -167.93 -20.94 39.75
C7 111.05 8.97 16.03 -111.05 -8.97 16.27
19-20 C1 107.51 20.60 35.76 -107.51 -20.60 38.40
C2 83.68 14.05 25.56 -83.68 -14.05 25.01
C3 50.86 8.42 17.38 -50.86 -8.42 12.93
C4 35.41 5.14 11.22 -35.41 -5.14 7.27
C5 88.71 18.88 32.11 -88.71 -18.88 35.85
C6 57.26 14.57 25.71 -57.26 -14.57 26.73
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

C7 38.61 8.21 15.39 -38.61 -8.21 14.16


2-7 C1 9.58 79.36 41.51 -9.58 79.89 -42.44
C2 5.74 83.99 65.75 -5.74 52.51 -10.65
C3 9.86 97.74 76.01 -9.86 61.51 -12.59
C4 6.09 75.15 64.37 -6.09 38.60 -0.41
C5 10.99 54.66 10.29 -10.99 81.84 -57.86
C6 16.55 60.41 5.42 -16.55 98.84 -72.67
C7 9.43 56.48 29.08 -9.43 57.27 -30.45
7-12 C1 0.74 23.00 14.61 -0.74 26.42 -18.03
C2 6.71 56.76 49.33 -6.71 -14.40 21.84
C3 9.50 65.88 57.60 -9.50 -16.46 24.75
C4 8.74 59.42 53.41 -8.74 -24.12 30.14
C5 -4.05 -11.24 -18.14 4.05 53.60 -46.69
C6 -4.19 -20.66 -28.28 4.19 70.08 -62.47
C7 1.89 16.15 10.47 -1.89 19.15 -13.47
12-17 C1 12.92 94.36 60.58 -12.92 92.19 -56.14
C2 25.41 93.17 75.07 -25.41 66.73 -20.85
C3 33.86 109.00 87.88 -33.86 77.55 -23.39
C4 28.80 81.94 70.47 -28.80 51.31 -7.66
C5 0.07 70.70 32.71 -0.07 89.20 -70.63
C6 1.61 80.40 33.98 -1.61 106.15 -86.76
C7 12.67 67.64 43.52 -12.67 65.61 -39.34
3-8 C1 -3.28 116.06 46.87 3.28 123.83 -60.47
C2 1.68 113.97 75.74 -1.68 83.01 -21.56
C3 4.21 99.14 75.47 -4.21 60.11 -7.17
C4 4.41 77.02 66.29 -4.41 36.73 4.23
C5 -6.06 79.81 7.64 6.06 117.17 -73.01
C6 -5.64 55.67 -11.20 5.64 103.58 -72.65
C7 -0.51 55.29 22.95 0.51 58.46 -28.51
4-9 C1 -0.88 117.50 50.70 0.88 122.39 -59.25
C2 4.28 106.33 60.80 -4.28 90.65 -33.37
C3 6.60 89.12 54.62 -6.60 70.13 -21.39
C4 6.33 66.95 45.47 -6.33 46.80 -10.19
C5 -4.59 88.20 25.33 4.59 108.78 -61.36
C6 -4.69 66.05 9.48 4.69 93.20 -57.01
C7 0.68 55.42 22.90 -0.68 58.33 -28.00
5-10 C1 14.80 86.91 27.46 -14.80 98.31 -47.42
C2 14.82 72.92 28.29 -14.82 75.34 -32.54
C3 11.52 45.05 21.35 -11.52 42.17 -16.32
C4 9.17 33.28 17.31 -9.17 29.02 -9.84
C5 9.61 66.82 16.95 -9.61 81.44 -42.54
C6 4.88 37.29 6.91 -4.88 49.93 -29.04
C7 5.86 29.40 10.09 -5.86 32.90 -16.20
8-13 C1 -2.68 43.27 36.95 2.68 52.23 -45.90
C2 8.15 64.12 59.05 -8.15 12.80 -7.73
C3 10.95 56.13 56.19 -10.95 -6.71 6.65
C4 11.24 49.86 49.78 -11.24 -14.56 14.65
C5 -10.69 10.37 6.00 10.69 66.55 -62.18
C6 -13.03 -12.29 -11.34 13.03 61.71 -62.65
C7 -0.75 15.66 16.02 0.75 19.64 -20.00
9-14 C1 -1.66 45.70 37.25 1.66 49.80 -41.35
C2 11.15 51.20 44.80 -11.15 25.72 -19.32
C3 14.15 39.60 40.37 -14.15 9.82 -10.59
C4 14.25 33.12 33.61 -14.25 2.18 -2.68
C5 -11.63 24.63 18.53 11.63 52.29 -46.20
C6 -14.83 5.78 6.95 14.83 43.64 -44.81
C7 -0.24 16.21 16.90 0.24 19.09 -19.79
10-15 C1 9.04 49.64 37.23 -9.04 56.20 -43.79
C2 14.54 42.73 32.68 -14.54 41.99 -31.94
C3 13.22 27.63 20.72 -13.22 22.21 -15.30
C4 11.86 20.70 15.77 -11.86 14.90 -9.96
C5 1.25 37.41 27.37 -1.25 47.31 -37.26
C6 -3.69 20.87 13.96 3.69 28.97 -22.06
C7 3.40 17.32 12.39 -3.40 18.28 -13.34
13-18 C1 -4.69 145.89 86.33 4.69 135.12 -64.24
C2 12.52 134.65 97.17 -12.52 96.10 -18.16
C3 17.73 113.92 87.94 -17.73 72.63 -3.30
C4 18.05 86.33 71.58 -18.05 46.92 9.22
C5 -17.11 107.37 48.98 17.11 123.38 -81.80
C6 -19.99 79.20 26.61 19.99 107.35 -84.30
C7 -0.81 68.97 40.91 0.81 64.28 -31.29
14-19 C1 -1.48 143.74 83.07 1.48 137.27 -69.80
C2 18.90 126.03 82.68 -18.90 104.72 -38.99
C3 24.28 105.25 72.31 -24.28 81.30 -23.20
C4 23.97 77.83 56.46 -23.97 55.42 -10.53
C5 -17.57 111.48 56.22 17.57 119.27 -72.20
C6 -22.14 86.73 38.64 22.14 99.82 -65.47
C7 0.76 68.57 39.62 -0.76 64.68 -31.67
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

15-20 C1 20.60 114.90 64.67 -20.60 102.08 -38.40


C2 28.26 94.65 57.05 -28.26 79.02 -25.01
C3 25.00 56.75 36.14 -25.00 45.43 -12.93
C4 21.71 41.45 27.59 -21.71 31.53 -7.27
C5 7.04 89.62 47.26 -7.04 84.05 -35.85
C6 -2.01 50.34 23.68 2.01 51.83 -26.73
C7 8.21 38.25 21.36 -8.21 34.73 -14.16

============================== STATISTICAL DATA ===============================

Weights of beam elements: (Not included in analysis)

Section Designation Total Mass


(kN) (kg)

COLUMN 300x300 RC 107.448 10952.9


PLINTH 300x300 RC 21.312 2172.5
BEAM 200*320 RC 70.416 7178.0
---------------------
199.176 20303.4

Total weight of structure = 0.00 kN

No. of real numbers in Stiffness matrix = 0 (0 bytes)


Time used to analyse = 0: 0:0.187 seconds
Total number of : Nodes = 20
Beam Elements = 28
Cable Elements = 0
Shell Elements = 0
Supports = 4
Section Properties = 3
Load Cases = 10
Load Combinations = 7

=============================== END OF OUTPUT =================================