Choose the correct answer (S)

1. Can support several rigs and from which development drilling and petroleum
production is carried out

a. Jack-up rigs
b. semi-submersible rigs.
c. Land rigs.
d. Platform rigs

2- The functions of hoisting system

a. Supporting the weight of the drillstring.


b. Lifting the drillstring in and out of the hole.
c. Maintaining the force, or weight, applied to the bit during drilling.
d. All of the above.

3- The drilling line goes down from the crown block to the drill floor and attached to the
Draw work is known as

a. Fast line.
b. Dead line
c. Rotating line
d. Drum line

4- Company has the licence to drilling in

a. Operating company
b. Logistical support services.
c. Drilling contractor.
d. Drilling service companies.

5- At which the pipe is laid to be lifted to the rig floor

a. Cat walk.
b. Pipe ramp
c. Elevator
d. Hook

6- Rigs does not need marine risers (Select all that apply)
a. Jack-up rigs
b. semi-submersible rigs.
c. Land rigs.
d. Drill ship

7- A pair of special type of spanners is used to breakout and or to tighten the pipe
connection is known as

a. Slips.
b. Elevators
c. Tongs
d. Hook

8- System contain a Diesel engines drive large electric generators that in turn, produce
electricity that is sent through cables to electric switches and control gears

a. Hoisting system
b. Rotating system
c. Power system
d. Circulating system

9- A hole on the rig floor in which joints of drill pipe are suspended for the drill string
connection .

a. Rat Hole
b. Mouse Hole
c. Open Hole
d. Rat hole

10- What is the name of the instrument in the picture below

a. Kelly.
b. Elevator.
c. Slips.
d. Tongs