Notif.date Notification Functional Loc.

20200926 104507601 1035-S1U01-AHS-BOT-GA2


20200926 104507613 1035-S1U01-AHS-BOT-GB1
20200926 104507609 1035-S1U01-BLR-ATP-SHR
20200926 104507608 1035-S1U01-BLR-CHM-NOX
20200926 104507622 1035-S1U01-BLR-ESP-EPC
20200926 104507606 1035-S1U01-BLR-MIL-00D
20200926 104507648 1035-S1U01-BLR-MIL-00D-OPA
20200926 104507596 1035-S1U01-BLR-MIL-00D-OPB
20200926 104507607 1035-S1U01-BLR-MIL-00H
20200926 104507610 1035-S1U01-BLR-RCF-00E
20200926 104507599 1035-S1U01-TUR-CND-VP1
20200926 104507611 1035-S1U01-TUR-CON-CEA
20200925 104506745 1035-S1U01-BLR-MIL-00B
20200925 104506666 1035-S1U01-TUR-FWS-H5A
20200925 104506819 1035-S1U01-BLR-MIL-00F
20200925 104506829 1035-S1U01-AHS-BOT-GB2
Description Main WorkCtr Planner group Status
CG-A2 FC oil got drained, M300AHP AHD pending
CG-B1 DE & NDE seal water lkg M300AHP AHD pending
SH spray valve S-115 fault persisting E1001802 EMD pending
lue gas sox, nox, CO are not working I101BLR C&I pending
ESP pass-C I/L gate open feedback not co E1001802 EMD pending
Mill-D bowl DP showing wrong I101BLR C&I pending
Mill-D CAG not operating I101BLR C&I pending
Mill-D LOP-B gland leakage M101RM BMD pending
Mill-H cor-2 & 3 coal pipe temp showing I101BLR C&I pending
Feeder-E back door coal dust lkg M101RM BMD pending
Vacuum pump-1 seperator tank low level switch detached I101TG C&I pending
CEP-A pump gland leakage M201TM TMD pending
MILL-B PV-1 NOT OPERATING M101RM BMD pending
HPH-5A DRIP MAN V/V DR-14,16 HARD TO OPE M201TM TMD pending
MILL-F HAG OPEN FEEDBACK NOT COMING I101BLR C&I pending
CG-B2 DISCH GATE NOT OPERATING I101AHP C&I pending