Professional Documents
Culture Documents
2V of 1.0m On Velpoor 4 4-6
2V of 1.0m On Velpoor 4 4-6
E.R to Reconstruction of 1V of 800mm dia HP Culvert on NH16 to Bheemgal (via) Vailpoor road at Km8/8-9/0 in Nizamabad District.
Km 0/0
NH16
Km34/0
Km 17/0 NH16 to Bheemgal via Vailpoor road
Location
Km15/0 Km8/8-9/0 Sand Quarry
Km35/2 Balkonda to NH16 via Vannael(B), Padgal road
Morthad - Bheemgal road Km0/0 Km10/8 Km299/8
Km6/0 Old NH7
NH16 Km298/0
0/0 44/4 Pipes
Morthad
Crusher Point
0.50Km
Km 56/6
AMOUNT OF ESTIMATE
Rs 6.00 Lakhs
Specification report accompanying the Estimate for "E.R to Reconstruction of 2V of 1000mm dia HP
Culvert on NH16 to Bheemgal via Velpoor road at Km4/4-6 in Nizamabad District."
NH16 to Bheemgal via Vailpoor road from Km0/0 to 13/4 is an important Major District
double lane B.T road. This road connects NH16 road at Km34/0 and Morthad-Bheemgal road at
Km15/0. This road connects Vaillpoor Mandal Head Quarter, Mothe village and Santoshnagar
Thanda.
On the NH16 to Bheemgal via Vailpoor road at Km4/4-6 the existing 2V of 0.8m Cuddy
stone culvert was badly damaged and pot hole formed on above pipes encasing and also the existing
vent was not sufficient to accommodate the water coming from Lift irrigation scheme. The culvert is
not accommodating the surplus water coming from the lift irrigation scheme and this surplus water
was overflowing on the road and damaging the road and berms. Hence it is causing very much
inconvenience to the commuters travelling on this road. Therefore it is essential to reconstruct the
culvert for smooth flow of traffic. Further it is to submit that the Hon'ble Minister of Transport,
Roads & Buildings, Legislative affairs and Housing orally instructed to reconstruct the above culvert.
Hence the estimate is prepared to reconstruct the existing damaged pipe culvert with 2V of 1000mm
dia Hume pipe culvert with the following provisions.
1 Earthwork excavation
2 Providing Plain Cement Concrete (1:3:6) for foundations
3 Vibrated cement concrete M 15 Grade
4 Providing, laying Reinforced cement concrete Hume pipes of 1000mm Dia.,
5 Filling in between body walls with gravel
Provision for GST @ 12%
6
Provision for Seigniorage charges
7
Provision for NAC @ 0.10%
8
9 L.S for other unforeseen items, variation in quantities rates and rounding off.
The rates in the estimate are worked out as per the common SSR 2018-19 applicable to all
Engineering Departments of Telangana.
1 2 3 4 5 6 7 8 9
unit
1 Earthwork excavation in soils up to SDR by mechanical means for foundations of
structures as per drawing and technical specification including setting out,
construction of shoring and bracing, removal of stumps and other deleterious
matter, dressing sides of bottom, back filling the excavation earth to the extent
required etc., complete including (excluding seigniorage) charges for finished
item of work as per MoRT&H specification 304(5th Revision) and as directed by
the Engineer-in-Charge
For foundation of
1 x 2 7.00 1.40 0.30 5.88
Body wall
Under pipes 1 x 1 7.20 3.50 0.30 7.56
(1.2+0.45)/
For Body walls 1 x 2 7.00 2
2.10 24.26
Filling in between body walls with gravel including cost ,conveyance and
(excluding seigniorage) of all materials to site etc., complete as per Clause
5 710.1.4 of IRC : 78and as per MoRT&H Specification No. 2200 & 2907(5th
Revision) and as per Drawing and technical specifications for finished item of
work
Filling in between
1 x 4 1.70 1.60 1.60 17.41 cum 625.00 1cum
body walls
PART-A Total :-
Part " B "
6 LS amount towards GST @ 12% 523264 @ 12.00% Rs:
7 LS amount towards Seigniorage charges
8 LS amount towards NAC .10% 523264 @ 0.10% Rs:
9 L.S for other unforeseen items, variation in quantities rates and rounding off. Rs:
Total :- Rs:
AMOUNT
10
11.1
8 9.7
2957.00 2.14 7.2
7.2 15.4
2.14
7.86
7.7 7.2
9 7.6
176887.00 7.8 0.98 -9.52
94.32
1.08
14.67 26.16
7.9 15.77
121400.00 0.825 0.705
16.05 5.8
211140.00
10880.00
523264.00
62792.00 28.08
8928.00 ###
523.00
4493.00
600000.00
600000.00 ###
-30000.00
`
Executive Engineer
B Division: Nizambad
-1.785
12.81
IOCL
Lead Distance Bitumen & Emulsion
S.No Item Km Location MUMBAI
Amount in Rs.
1 Metal 27.00 S.No Dated Item (Selling Price) Basic Rates Selling Price
2 Sand 18.00 1 1/5/2019 Bulk VG10 Grade 29590.00 22103 25197.42
3 Gravel 5.00 2 1/5/2019 Bulk VG 30 Grade 30390.00 22903 26109.42
4 Pipes 18.00 3 1/5/2019 Emulsion (Bulk) MS 0.00 20493 23362.02
5 concrete mix 1 4 16/04/2019 Emulsion (Bulk)-SS-I 41470.00 20523 23396.22
6 Borrewed earth 5 5 16/04/2019 Rapid Setting -I 24840.00 19443 22165.02
7 Sand for filling 18.00 Lead from MUMBAI 715.00Kms
(i) at Km4/4-6
(i) at Km4/4-6
a) Mumbai to Nizamabad 0.00 to km 676.00 = 676.00 km
b) On NH 16 road km 0.00 to km 34.00 = 34.00 km
c) On same road km 0.00 to km 4.50 = 4.50 km
Total Lead = 714.50 km
.WEIGHTED AVERAGE LEAD SAY = 715.00 km
(C). WEIGHTED AVERAGE LEAD FORSAND
(i) at Km4/4-6
a) Cart Track 1.10 x 0.20 = 0.22 km
b) On Morthad-Bheemgal road road km 6.00 kmto 15.00 = 9.00 km
c) On same road km 13.40 kmto 4.50 = 8.90 km
Total Lead = 18.12 km
.WEIGHTED AVERAGE LEAD SAY = 18.00 km
(E) .WEIGHTED AVERAGE LEAD FOR Gravel( Average lead of 5.00 Kms)
0
Assistant Executive Engineer Dy. Executive Engineer Executive Engineer (R&B)
R&B Section, Morthad R&B Sub-Division, Armoor (R&B)Division, Nizamabad
DETAILED CUM ABSTRACT ESTIMATE
Name of Work ::- E.R to Reconstruction of 2V of 1000mm dia HP Culvert on NH16 to Bheemgal via
Velpoor road at Km4/4-6 in Nizamabad District.
Classification of the Road :- MDR
MANUFACTURING & SUPPLY (TRANSPORTATION) OF HM,KM & 5th KM Fixing charges Total cost for
STONES from next Total Rate Manufacture,
sheet for Painiting Supply and fixing
(a). Material:
40 mm Metal cu,m 8.10 1043.89 8455.52
20 mm Metal cu,m 4.05 1500.14 6075.57
10 mm Metal cu,m 1.35 1233.89 1665.75
Cement cu,m 4.13 5200.00 21476.00
Sand cu,m 6.75 807.12 5448.04
43120.88
(b). Labour:
Mate Day 0.86 450.00 387.00
Mason Day 1.50 450.00 675.00
Mazdoor Day 20.00 425.00 8500.00
9562.00
(c ). Machinery:
Concrete Mixer Hr. 6.00 534.30 3205.80
250 mm
200 mm
115 mm
1350mm
900 mm 1100 mm
1100mm
785 mm 900 mm
8mm
150mm
6mm
(i). HM STONES:
(ii). KM STONES:
(iii). 5 th KM STONES:
a). Labour:
Mazdoor for loading & Unloading; Day 7.00 425.00 2975.00
b). Machinery:
Tractor-trolley:(SSR 2018-19) Hr. 6.00 464.80 2788.80
a). Labour:
Mazdoor for loading & Unloading; Day 7.00 425.00 2975.00
b). Machinery:
Tractor-trolley:(SSR 2018-19) Hr. 6.00 464.80 2788.80
a). Labour:
Mazdoor for loading & Unloading; Day 6.00 425.00 2550.00
b). Machinery:
Tractor-trolley:(SSR 2018-19) Hr. 6.00 464.80 2788.80
a). Labour:
Mazdoor for loading & Unloading; Day 7.00 425.00 2975.00
b). Machinery:
Tractor-trolley:(SSR 2018-19) Hr. 6.00 464.80 2788.80
1 By MECHANICAL MEANS
1 Page 323 of MoRT&H SDB
1 Unit : Cum
1 Taking out put = 240 Cum
1 (A) Labour
1 0.32 day Mate 450.00 1.00 144.00
1 8.00 day Mazdoor unskilled 425.00 1.00 3400.00
1 3544.00
1 0.0 % Municipal Area Allowance 3544.00 0.00
1 TOTAL A= 3544.00
1 (B) Machinery
1 240.00 cum Rate as per G.I. Ms. No 10, Dt 26/7/2005 13.00 1.00 3120.00
1 TOTAL B= 3120.00
1 (A + B) 6664.00
1
1 5.00 % (C) Over Head Charges on (A+B) 6664.00 333.20
1
1 10.00 % (D) Contractors Profit on (A+B+C) 6997.20 699.72
1
1 (E ) Seigniorage charges
1 240.00 cum Earth 0.00 1.00 0.00
1
1 240.00 cum TOTAL Cost for 240 cum = (A+B+C+D+E) 7696.92
1 Rate per 1 cum 32.07
1 Rate per 1 cum 32.00
1 2 3 4 5 6 7
2 Providing Plain Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone aggregate
and fine aggregate conforming to table 1000-2 of MoRT&H including cost, (excluding
seigniorage) conveyance of all materials to site and labour charges, centering, machine mixing,
laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P
etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (5th
Revision) and as directed by the Engineer-in-Charge for foundations
Sand
cum
Quantity
10
0.00
40.00
0
e Engineer
on: Nizambad
GENERAL ABSTRACT
Name of Work: E.R to Reconstruction of 2V of 1000mm dia HP Culvert on NH16 to Bheemgal via
Velpoor road at Km4/4-6 in Nizamabad District.
Ref ::-For Emulsion (Bulk) :- IOCL Price List With Effect From Dt: 16-08-2018
For Bulk BitumenVG10, VG30:- HPCL Price List With Effect From Dt: 16-08-2018
Bulk VG30 Emulsion SS-1 Rapid setting
Bulk VG10 Grade Grade (Bulk) Emulsion
Mumbai/ Chennai Mumbai/ Mumbai/ Chennai Mumbai/ Chennai
IOCL Chennai IOCL IOCL IOCL
Lead from
Mumbai/ Chennai IOCL
715.00 kms 2145.00 2145.00 2145.00 2145.00
Superintending Engineer
R&B Circle: Nizambad
DETAILED CUM ABSTRACT ESTIMATE
Name of Work ::- E.R to Reconstruction of 2V of 1000mm dia HP Culvert on NH16 to Bheemgal via
Velpoor road at Km4/4-6 in Nizamabad District.
MEASUREMENTS
Sno Description Quantity Rate Per Amount
No LENT BRDT DPT
1 2 3 4 5 6 7 8 9 10
PART-'A' unit
1 Scarifying the existing B.T surface to a depth of 50 mm by Mechanical means and disposal of scarified material
with all leads and lifts up to 1000 m as per MoRT&H (5th Revision) Specn. No.305.4.3
SSR 2018-19
400.00
S.No.
440.00
520.00
156.00 1
152.00 2
152.00 3
156.00 4
129.00 5
112.00 6
131.00 7
179.00
52.00 Note: The lead & lift charges are inclusive of 13.6
90.00
520.00
790.00
821.00 4.29
700.00 27.21
620.00
S.No.
485.00 198.59
485.00
485.00 1
98.00 26.76 2
505.00 \ 3
830.00 4
870.00 5
781.00 6
657.00 7
505.00
760.00
Note: The lead & lift charges are excluding of 13.6
570.00
570.00
45000.00
45000.00
5200.00
47000.00
67.00
67
75.00
30.00
40
450.00
465.00
425.00 465.0
2661.20
3601.92
2967.90
1843.52
1004.40
2878.90
1342.30
698.88
464.80
472.64
568.232
588.40
1843.52
399.84
1677.76
963.20
27071.52
2518.88
2875.04
1843.52
1436.96
1280.16
2072.00
1478.40
1007.20
534.30
6.00
969.20 per hour
53.76 per hour
470
50
3426.6512
357
450
500
1379.728
1138.50
7391.4
1261.12
2072
2140.10
899.36
3248
98
73
540
sqm local
sqm local
kg SSR- p-30
kg local
sqm local
litre SSR- p-20
rate per m
Kg SSR- p-22
Lead Charge for Lead Charge for Rubble/size
Earth/Sand/Gravel/Murru stones/cut stones/Coarse
m/Lime/Surki/per cu.m aggregare per cu.meter
Distance
Note: The lead & lift charges are inclusive of 13.615% Contractor Profit and Over Head Charges
0.13615 1.13615
Note: The lead & lift charges are excluding of 13.615% Contractor Profit and Over Head Charges
380.00
NP-3 Class pipes
2017-18
1.13615
Unit = 10 sqm
Taking output = 1 hectare
Page 22 of MoRT&H SDB
(A) Labour
0.160 day Mate 450.00 day 72.00
4.000 day Mazdoor unskilled 425.00 day 1700.00
0% Agency area allowance 1700.00 0.00
1772.00
(B) Machinery
Dozer 80 HP with attachment for removal of trees &
10.00 Hr 2661.20 26612.00
stumps
1.00 Hr Tractor with trolley 3t 464.80 464.80
Total 28848.80
(C) Over head charges
5% Over head charges 5% on (A) + (B) 28848.80 1442.44
(D) Total of (A) + (B)+( C) 30291.24
(E) Add Contractors Profit at 10% on (D) 3029.12
Cost unit hectare (D) + (E) 33320.40
per Hec
S.No. Quantity Description of Item Rate per Amount (Rs.)
2 Earthwork excavation in soils upto SDR by mechanical means including trimming bottom and side slopes in
accordance with requirements of lines, grades and cross sections etc., complete including for finished item of
work for trench cutting as per MoRT&H specification 301(5th Revision) and as directed by the Engineer-in-Charge
(Payment based on levels only)
Unit : Cum
Taking out put = 180 Cum Page 50 of MoRT&H SDB
(A) Labour
0.08 day Mate 450.00 day 36.00
2.00 day Mazdoor unskilled 425.00 day 850.00
0% Agency area allowance 886.00 0.00
886.00
(B) Machinery
180.00 cum Rate as per G.O. Ms No 10, Dt 26/7/2005 13.00 cum 2340.00
(C) Over head charges
5% Over head charges 5% on (A) + (B) 3226.00 161.30
(D) Total of (A) + (B)+( C) 3387.30
(E) Add Contractors Profit at 10% on (D) 338.73
Cost per 180 cum (D) + (E) 3726.03
Rate per Cum 20.70
Rate per 1 cum 20.70
say 19.00
1 Cum
S.No. Quantity Description of Item Rate per Amount (Rs.)
3 Forming embankment with excavated Side earth by mechanical means upto SDR including pre-watering of soil,
removal of top soil, excavation of soils, depositing the soils on the embankment, spreading soil, breaking clods,
sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of
table 300-2 of MoRT&H, including all hire and operational charges of T&P and complete for finished item of
work as per MoRT&H specification 305 (5th revision).(Payment based on levels only) The Sub grade soil &
shoulders soil CBR value > 10%, Plasticity index not more than 18 and Maximum dry density > 1.8 gm/cc.
Unit : Cum
Taking out put = 100 Cum Page 70 of MoRT&H SDB
(A) Labour
0.02 day Mate 450.00 day 9.00
0.50 day Mazdoor unskilled 425.00 day 212.50
0% Agency area allowance 0.00
221.50
(B) Machinery
1.00 hr Motor Grador for Grading @ 100 cum per hour 3601.92 hr 3601.92
4.00 hr Water tanker 6 KL 698.88 hr 2795.52
1.00 hr Vibratory roller 8T 2878.90 hr 2878.90
9276.34
(C) Over head charges
5% Over head charges 5% on (A) + (B) 9497.84 474.89
(D) Total of (A) + (B)+( C) 9972.73
(E) Add Contractors Profit at 10% on (D) 997.27
Cost per 100 cum (D) + (E) 10970.01
Rate per Cum 109.70
Rate per 1 cum 110.00
1 Cum
S.No. Quantity Description of Item Rate per Amount (Rs.)
2.04 Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and
loading in tippers, transporting to embankment site within all lifts and lead upto 1000 m, trimming bottom and side
slopes in accordance with requirements of lines, grades and cross sections.(Payment based on levels only)
4 Forming embankment, Subgrade and Shoulders with borrowed useful earth from outside road boundary by
mechanical means up to SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top
soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading
soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to
meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and (excluding
seigniorage) charges, complete for finished item of work as per MoRT&H specification 305. The Sub grade soil
& shoulders soil CBR value > 10%, Plasticity index not more than 18 and Maximum dry density > 1.8
gm/cc. (Payment will be based on levels for finished item of works)
Unit : Cum
Taking out put = 100 Cum Page 68,69 of MoRT&H SDB
(A) Labour
0.04 day Mate 450.00 day 18.00
1.00 day Mazdoor unskilled 425.00 day 425.00
0% Agency area allowance 0.00
443.00
(B) Machinery
100.00 cum Rate as per G.O. Ms No 10, Dt 26/7/2005 13.00 cum 1300.00
800.00 t.km Tipper (for 5Kms=160x5=800) 6.00 t.km 4800.00
Add 10% of cost of carriage to cover cost of loading
480.00
and unloading
0.50 hr Dozer 80 HP for spreading @ 200 cum per hour 2661.20 hr 1330.60
1.00 hr Motor Grador for Grading @ 100 cum per hour 3601.92 hr 3601.92
4.00 hr Water tanker 6 KL 698.88 hr 2795.52
1.00 hr Vibratory roller 8T 2878.90 hr 2878.90
17186.94
(C) Over head charges
5% Over head charges 5% on (A) + (B) 17629.94 881.50
(D) Total of (A) + (B)+( C) 18511.44
5 Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H Table 400-
1 including cost, (excluding seigniorage charges) and conveyance of all materials to work site and spreading in
uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with
Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc.,
complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the
Engineer-in-charge. (Payment based on levels only)
Unit = cum
Taking output = 300 cum Page 94 of MoRT&H SDB
(A) Labour
0.48 day Mate 450.00 day 216.00
2.00 day Mazdoor skilled 465.00 day 930.00
10.00 day Mazdoor unskilled 425.00 day 4250.00
0% Agency area allowance 0.00
Total 5396.00
(B) Machinery
6.00 hr Motor grader 3.35 M Blade @50 cum/Hr 3601.92 hr 21611.52
12.00 hr Tractor with Rotavator 472.64 hr 5671.68
6.00 hr Vibratory roller 8T 2878.90 hr 17273.40
3.00 hr Water tanker 6 KL 698.88 hr 2096.64
Total 46653.24
(C) Material
Coarse graded Granular sub-base material as per
Table 400-1 (Grading -VI) of MORT&H
3.02 Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix Macadem
specification including cost of all materials and including premixing the material with water at OMC in mixing plant
carriage of mixed material by tipper to site, laying in uniform layers with hydrostatic sensor paver in base courses
on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by
the Engineer-in-Charge and as per MoRT&H specification 406 (5th revision) for finished item of work. (Payment
based on levels only)
Scarifying the existing B.T surface to a depth of 50 mm by Mechanical means and disposal of scarified material
7
with all leads and lifts upto 1000 Mtrs as per MoRT&H (5th Revision) Specn. No.305.4.3
Total 645.17
(C) Over head charges
5.00% Over head charges 5% on (A) + (B) 755.92 37.80
Add Contractors Profit at 10% on (A)+(B)+© 79.37
Cost per 100 sqm 873.09
Rate per 1 sqm 8.73
Rate to be adopted 8.70
1 Sqm
S.No. Quantity Description of Item Rate per Amount (Rs.)
8 Providing and applying tack coat with VG-10 (Bulk) using Bitumen pressure distributor at the rate of 0.20 kgs per
sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per
MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.
9 Providing and applying prime coat with bitumen Emulsion (Slow Settting-1) (Bulk) using Emulsion pressure
distributor on prepared surface of Granular base including cleaning of road surface and spraying emulsion at the
rate of 0.70 kgs per sqm using emulsion pressure distributtor for finished item of work as per MoRT&H
Specification 502 (5th revision) and as directed by the Engineer-in-Charge.
10 Providing and laying surface dressing in single coat using 10 mm nominal size IRC HBG/HBT machine crushed
stone aggregates @ 0.008 cum / sqm on a layer of bitumen binder of RS Emulsion @1.3 Kg/sqm including cost,
(excluding seigniorage) and conveyance of all materials to work site and laid on prepared surface and rolling with
8-10 T Pneumatic roller etc., complete for finished item of work as per MoRT&H Specification 510 (5th Revision)
and as directed by the Engineer-in-charge.
Unit = Sqm
Taking output =9000 Sqm Page 138,139 of MoRT&H SDB
(A) Labour
0.44 nos. Mate 450.00 day 198.00
9.00 nos. Mazdoor working with HMP, Mechanical broom, 425.00 day 3825.00
2.00 nos. Skilled Mazdoor for checking line and levels. 465.00 day 930.00
0% Agency area allowance 0.00
Total 4953.00
(B) Machinary
7.20 hr Mechanical broom @ 1250 sqm/hr. 399.84 hr 2878.85
7.20 hr Air compressor 250 cfm 588.40 hr 4236.48
6.00 hr chip spreader @ 1500 sqm/hr. 2875.04 17250.24
6.00 hr from stock pile on road side to chip spreader 1004.40 6026.40
6.00 hr Front end loader 1 cum capacity 1843.52 11061.12
6.00 hr Emulsion pressure distributor @1750 sqm/hr. 963.20 5779.20
6.00 hr Pneumatic Tyred Roller for intermediate rolling 1436.96 8621.76
Total 55854.05
(C) Material
11.7 MT RS Emulsion @1.3 Kg/sqm #REF! #REF!
Crushed stone chippings 10 mm
72 cum nominal size @0.008 cum/sqm 1187.64 85510.15
Total #REF!
11 Providing 30 mm thick compacted Bituminous Concrete with 100-120 TPH batch mix plant using HBG crushed
aggregates of Grading – 2 as per table 500-17 of specification 507 of MoRT&H (5th revision), premixed with
bitumen VG-30 grade @ 5.4% of mix and filler, transporting the hot mix to work site, laying with Hydrostatic
sensor paver to the required grade, level and alignment, rolling with smooth wheeled, Pneumatic Tyred and
tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for
finished item of work in all respects as directed by Engineer-in-Charge
Unit = cum
Taking output = 191 cum (450 tonnes.) Page 138,139 of MoRT&H SDB
(A) Labour
0.84 nos. Mate 450.00 day 378.00
nos. Mazdoor working with HMP, Mechanical broom,
14.00 paver,roller,asphalt cutter and assistance for setting 425.00 day 5950.00
outlines,levels and layout of construction.
5.00 nos. Skilled Mazdoor for checking line and levels. 465.00 day 2325.00
0% Agency area allowance 0.00
Total 8653.00
(B) Machinary
6.00 hr Batch mix HMP 27071.52 hr 162429.12
6.00 hr Hydrostatic sensor paver 100 TPH 3426.65 hr 20559.91
6.00 hr Generator 250 KVA 2072.00 hr 12432.00
6.00 hr Front end loader 1 cum capacity 1843.52 hr 11061.12
3.90 hr Power road roller 8 tonne for initial break down rolling 1342.30 hr 5234.97
3.90 hr Pneumatic Tyred Roller for intermediate rolling 1436.96 hr 5604.14
3.90 hr Finish rolling with 6-8 tonne smooth wheeled tandem 1843.52 hr 7189.73
roller.
Total 224510.99
(C) Material
Total weight of mix = 450 tonnes
weight of bitumen - 450*5.4%=24.30 tonnes
Weight of aggregate = 450-24.30= 425.70 tonnes
Taking density of aggregate = 1.5 tonne/cum
Volume of aggregate = 283.80 cum
24.30 M.T (I) VG-30 Bitumen @ 5.4 % by weight of mix #REF! MT #REF!
(ii) Aggregate
For Grading II(nominal size 13mm)
56.76 Cum of 13.2 to 10 m @ 20%
56.76 cum Avarage of 12 to 14mm, 9.5 to 11.2 mm IRC HBGM/C 1237.64 70248.50
70.95 Cum of 10-5 mmmm @ 25%
70.95 cum Avarage of 9.5 to 11.20 mm, 5 to 7 mm IRC HBGM/C 1103.27 cum 78276.72
150.41 Cum of 5mm and below mm @ 53 %
150.41 cum Avarage of 2.36 to 5mm & 2.36 and below IRC 924.77 cum 139094.05
2.838 cum Filler @ 1% of weight of aggregates. 830.64 cum 2357.36
4.257 MT Cement Filler @ 1% of weight of aggregates. 5200.00 MT 22136.40
280.96 Total #REF!
4.07
Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and fine
aggregate conforming to table 1000-2 of MoRT&H including cost, seigniorage conveyance of all materials to site
and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and
operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700,
2100 (5th Revision) and as directed by the Engineer-in-Charge for base coarse below CC Pavement.
Unit = cum
Taking output = 15 cum
(A) Labour
0.64 Day Mate 450.00 day 288.00
1.00 Day Mason 465.00 day 465.00
15.00 Day Mazdoor 425.00 day 6375.00
Total 7128.00
(B) Material
13.50 cum Cost of 40mm SS-5 HBG M/C metal 1043.89 cum 14092.53
6.75 cum Sand at site 702.64 cum 4742.83
2.43 MT Cement at site 5200.00 MT 12636.00
Total 31471.36
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 534.30 hr 3205.80
6.00 hr Generator set 35 KVA 1007.20 hr 6043.20
2.00 hr Water tanker 6 KL 698.88 hr 1397.76
Total 10646.76
(D) Over head charges
5.00% Over head charges 5% on (A) + (B)+(C) 49246.12 2462.31
(E) Total of (A) + (B)+( C)+(D) 51708.43
(F) Add Contractors Profit at 10% on (E) 5170.84
Cost per 15 cum (E)+(F) 56879.27
Rate for 1 cum 3791.95
Rate to be adopted 3792.00
1 Cum
4.08 Construction of dry lean cement concrete Sub-base over a prepares sub-grade with coarse and fine aggregate
conforming to IS:383, the size of coarse aggregate not exceeding 25mm, aggregate cement ratio not to exceed
15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150kg/cum,
optimum moisture content to be determined during trial length conctruction, concrete strength not to be less than
10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor,
compacting with 8-10 tonne vibratory roller, finishing and curing as per MoRT&H specification 601 (5th Revision)
and as directed by the Engineer-in-Charge for C.C Pavement.
Total 12644.00
(B) Material
202.50 cum Cost of 25mm SS-5 HBG M/C metal 1450.14 cum 293653.55
202.50 cum Cost of 12.5mm SS-5 HBG M/C metal 1388.89 cum 281250.42
203.00 cum C oarse Sand at site 702.64 cum 142636.12
67.50 MT Cement at site 5200.00 MT 351000
Total 1068540.09
© Machinery
6.00 hr Batching Plant @ 20 cum/hour 1138.50 hr 6831
6.00 hr Generator 100 KVA 1261.12 hr 7566.72
6.00 hr Loader 1 cum capacity 1 cum 1843.52 hr 11061.12
DATA-PIPE CULVERTS
Name of Work
#REF!
Amount
S.No. Quantity Description of Item Rate per
(Rs.)
1 Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as
per drawing and technical specification including setting out, construction of shoring and
bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling
the excavation earth to the extent required etc., complete excluding seignioarge charges for
finished item of work as per MoRT&H specification 304(5 th Revision) and as directed by the
Engineer-in-Charge.
2 Plain cement concrete (1:3:6) mix using 40mm size HBG crushed stone aggregate (Coarse
aggregate and fine aggregate conforming to table 1000-2 of MORTH including cost, (excluding
seigniorage) and conveyance of all materials to site and all labour charges ,centering,
machine mixing, laying in position, Compacting , Vibrating and curing including all other
incidental and all other operational charges of T&P required etc., complete as per MoRT&H
Specification 1500,1700, 2100 (5th Revision) for foundation .
3 Vibrated cement concrete M20 Grade Concrete using 40mm , 20mm and 10mm size HBG
crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate
conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all
materials to site and all labour charges , centering, machine mixing, laying in position,
Compacting, Vibrating and curing including all other incidental and all other operational
charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200 (5th
Revision) for Foundation
5.0% (E) Over head charges 5% on (A) + (B)+(C ) +(D) 67477.61 3373.88
(F) Total of (A) + (B)+( C)+(D) 70851.49
(G) Add Contractors Profit at 10% on (E) 7085.15
Cost per 15 cum (E)+(F) 77936.64
Rate for 1 cum 5195.78
Rate to be adopted 5196.00
1 Cum
Amount
S.No. Quantity Description of Item Rate per
(Rs.)
4 Vibrated cement concrete M20 Grade Concrete using 40mm , 20mm and 10mm size HBG
crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate
conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all
materials to site and all labour charges , centering, machine mixing, laying in position,
Compacting, Vibrating and curing including all other incidental and all other operational
charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200 (5th
Revision) for Sub structure .
5.0% (E) Over head charges 5% on (A) + (B)+(C ) +(D) 74225.37 3711.27
(F) Total of (A) + (B)+( C)+(D) 77936.64
(G) Add Contractors Profit at 10% on (E) 7793.66
Cost per 15 cum (E)+(F) 85730.30
Rate for 1 cum 5715.35
Rate to be adopted 5715.00
1 Cum
Amount
S.No. Quantity Description of Item Rate per
(Rs.)
5.05 Providing, laying Reinforced cement concrete Hume pipes of 800 mm Dia., NP-4 class for pipe
culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying,
jointing of 1000mm dia. R.C.C Hume pipes in position including lifting, aligning, lowering and
hoisting etc., as per drawing and as per MoRT&H Specification 2900, 2905 and 2906 (5th
Revision) and IRC Special Publication No: 13 and as directed by the Engineer-in-Charge for
finished item of work.
6 Providing, laying Reinforced cement concrete Hume pipes of 1000 mm Dia., NP-4 class for
pipe culverts including cost and conveyance of Pipes etc., complete and Labour charges for
laying, jointing of 1000mm dia. R.C.C Hume pipes in position including lifting, aligning,
lowering and hoisting etc., as per drawing and as per MoRT&H Specification 2900, 2905 and
2906 (5th Revision) and IRC Special Publication No: 13 and as directed by the Engineer-in-
Charge for finished item of work.
9 Providing and filling bedding of Granular material around the pipes of Hume pipe culverts
suitably compacted / rammed including cost, (excluding seigniorage) and conveyance of
materials to site etc., complete as per drawing and MoRT&H Specification 2900 ( 5th
Revision) and as directed by the Engineer-in-Charge.
Unit = cum Page 462 of MoRT&H SDB
Taking output = 10 cum
(A) Labour
0.28 No. Mate 450.00 day 126.00
7.00 No. Mazdoor 425.00 day 2975.00
0% Agency area allowance 3101.00 0.00
Total 3101.00
(B) Material
12.00 cum Cost of Granular material 178.36 cum 2140.31
Total 2140.31
© Machinery
2.50 hr Plate compactor/Power rammer/road roller 53.76 hr 134.40
0.05 hr Water tanker 6 KL capacity 698.88 hr 34.94
Total 169.34
(D) Over head charges @ 5%
5.0% Over head charges 5% on (A) + (B) 5410.65 270.53
(E) Total of (A) + (B)+( C)+(D) 5681.18
(F) Add Contractors Profit at 10% on (E) 568.12
Cost per 10 cum (E)+(F) 6249.30
Rate for 1 cum 624.93
Rate to be adopted 625.00
1 Cum
Amount
S.No. Quantity Description of Item Rate per
(Rs.)
8 Providing dry rough stone revetment 300 mm thick with HBG stone of not less than 300 mm
size including cost, (excluding seigniorage) charges and conveyance of materials to site and
including labour charges for packing the stones for revetment etc., complete for finished item of
work as per MoRT&H specification 2504 ( 5th revision ) and as directed by the Engineer-in-
Charge for Pitching of slopes
(B) Material
1.00 cum Cost of Rough stone HBG 300mm thick 568.64 cum 568.64
0.20 cum Cost of stone spalls 397.64 cum 79.53
Total 648.17
(D) Over head charges @ 5%
5.0% Over head charges 5% on (A) + (B) 1147.67 57.38
(E) Total of (A) + (B)+( C)+(D) 1205.05
(F) Add Contractors Profit at 10% on (E) 120.51
Cost per 1 cum (E)+(F) 1325.56
Rate to be adopted 1326.00
1 Cum
GENERAL ABSTRACT
#REF!
2 PART( B-II)- R.M work after completion of DLP for 3 years 1530000
#REF!
Sl. No.
Description of work Quantity Rate Per Amount (Rs.)
1 2 3 4 5 6
Part I A: Road Portion
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes,
shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and
disposal of unserviceable materials and stacking of serviceable material to be used or
auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil
not exceeding 150 mm in thickness.
58588.55
58589.00 19.00 1 1,113,191
cum cum
5 Forming embankment with excavated Side earth by mechanical means upto SDR including
pre-watering of soil, removal of top soil, excavation of soils, depositing the soils on the
embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8
to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of
MoRT&H, including all hire and operational charges of T&P and complete for finished
item of work as per MoRT&H specification 305 (5th revision).(Payment based on levels
only) The Sub grade soil & shoulders soil CBR value > 10%, Plasticity index not more than
18 and Maximum dry density > 1.8 gm/cc.
1 2 3 4 5 6
6 Forming embankment, Subgrade and Shoulders with borrowed useful earth from outside
road boundary by mechanical means up to SDR with all leads and lifts including pre-
watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area,
conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods,
sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to
meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of
T&P and (excluding seigniorage) charges, complete for finished item of work as per
MoRT&H specification 305. The Sub grade soil & shoulders soil CBR value > 10%,
Plasticity index not more than 18 and Maximum dry density > 1.8 gm/cc. (Payment will be
based on levels for finished item of works)
Subgrade 15451.62
Shoulder
15451.6154
15452.00 204.00 1 3,152,208
cum cum
16364.29
16365.00 1830.00 1 29,947,950
cum cum
8 Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet
Mix Macadem specification including cost of all materials and including premixing the
material with water at OMC in mixing plant carriage of mixed material by tipper to site,
laying in uniform layers with hydrostatic sensor paver in base courses on well prepared
surface and compacting with Vibratory roller to acheive the desired density etc., as
directed by the Engineer-in-Charge and as per MoRT&H specification 406 (5th revision) for
finished item of work. (Payment based on levels only)
24955.01
24956.00 2067.00 1 51,584,052
cum cum
9 Providing and applying prime coat with bitumen Emulsion (Slow Settting-1) (Bulk) using
Emulsion pressure distributor on prepared surface of Granular base including cleaning of
road surface and spraying emulsion at the rate of 0.70 kgs per sqm using emulsion
pressure distributtor for finished item of work as per MoRT&H Specification 502 (5th
revision) and as directed by the Engineer-in-Charge.
122086.69
122087.00 #REF! 1 #REF!
sqm sqm
10 Providing and applying tack coat with VG-10 (Bulk) using Bitumen pressure distributor at
the rate of 0.20 kgs per sqm on the prepared bituminous/granular surface cleaned with
mechanical broom for finished item of work as per MoRT&H Specification 503 (5th
revision) and as directed by the Engineer-in-Charge.
118035.95
118036.00 #REF! 1 #REF!
sqm sqm
Sl. No.
Description of work Quantity Rate Per Amount (Rs.)
1 2 3 4 5 6
11 Providing and laying surface dressing in single coat using 10 mm nominal size IRC
HBG/HBT machine crushed stone aggregates @ 0.008 cum / sqm on a layer of bitumen
binder of RS Emulsion @1.3 Kg/sqm including cost, (excluding seigniorage) and
conveyance of all materials to work site and laid on prepared surface and rolling with 8-10
T Pneumatic roller etc., complete for finished item of work as per MoRT&H Specification
510 (5th Revision) and as directed by the Engineer-in-charge.
118035.95
118036.00 #REF! 1 #REF!
sqm sqm
12 Providing 30 mm thick compacted Bituminous Concrete with 100-120 TPH batch mix plant
using HBG crushed aggregates of Grading – 2 as per table 500-17 of specification 507 of
MoRT&H (5th revision), premixed with bitumen VG-30 grade @ 5.4% of mix and filler,
transporting the hot mix to work site, laying with Hydrostatic sensor paver to the required
grade, level and alignment, rolling with smooth wheeled, Pneumatic Tyred and tandem
rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision)
complete for finished item of work in all respects as directed by Engineer-in-Charge
3541.08
3541.00 #REF! 1 #REF!
cum cum
DRAIN
16 Earthwork excavation in soils upto SDR by mechanical means for foundations of structures
as per drawing and technical specification including setting out, construction of shoring
and bracing, removal of stumps and other deleterious matter, dressing sides of bottom,
back filling the excavation earth to the extent required etc., complete excluding
seignioarge charges for finished item of work as per MoRT&H specification 304(5th
Revision) and as directed by the Engineer-in-Charge.
0
0.00 4065.00 1 -
cum cum
18 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG
crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine
aggregate conforming to table 1000-2) including cost, (excluding seigniorage) and
conveyance of all materials to site and all labour charges ,centering, machine mixing,
laying in position, Compacting , Vibrating and curing including all other incidental and all
other operational charges of T&P required etc., complete as per MoRT&H Specification
1500,1700, 2100 (5th Revision) for footings and Raft foundation .
1 2 3 4 5 6
PART -I (B) - Routine MAINTENACE WORK within the Defects Laibility Period
i.e., 2 YEARS
1 Routine Maintenance for Jungle clearance / tree and shrub trimming and culvert repairs /
vents maintenance / parapet wall repairs / retaining wall repairs etc within DLP i.e., 2
years.
17 Kms - DL 17.000 Kms 3,600.00 2.00 122,400
Foot note:
The data for the Routine Maintenance items to be covered will be prepared with SSR with
which Plan Work Estimate is sanctioned and the items of Routine Maintenance will be
carried out these rates duly operating the quoted percentage. Payment shall be made for
the items to be recorded in M.Book. The overall amount shall be for Routine Maintenance
for 3 years after DLP and for Routine Maintenance of culverts & Jungle Clearance for 2
years after completion of Plan Work shall be limited maximum to amounts indicated at Part
I (B) & Part I (C)
#REF!
Sl. No.
Description of work Quantity Rate Per Amount (Rs.)
1 2 3 4 5 6
Part I B: Box Culverts 1 Nos
A. Foundation
1 #REF!
141.50
141.00 #REF! 1 #REF!
cum cum
2 #REF!
13.79
14.00 #REF! 1 #REF!
cum cum
B. Sub Structure
3 #REF!
63.84
64.00 #REF! 1 #REF!
cum cum
4 #REF!
8.30
Sl. No.
Description of work Quantity Rate Per Amount (Rs.)
1 2 3 4 5 6
8.00 #REF! 1 #REF!
MT MT
5 #REF!
6 #REF!
40.59
41.00 #REF! 1 #REF!
Cum cum
C.Super Structure
7 #REF!
25.12
25.00 #REF! 1 #REF!
cum cum
8 #REF!
3.27
3.00 #REF! 1 #REF!
MT MT
9 Providing and applying tack coat with VG-10 (Bulk) using Bitumen pressure
distributor at the rate of 0.20 kgs per sqm on the prepared bituminous/granular
surface cleaned with mechanical broom for finished item of work as per MoRT&H
Specification 503 (5th revision) and as directed by the Engineer-in-Charge.
45.86
Sl. No.
Description of work Quantity Rate Per Amount (Rs.)
1 2 3 4 5 6
46.00 #REF! 1 #REF!
Sqm Sqm
2.98
3.00 #REF! 1 #REF!
cum cum
11 #REF!
10.08
10.00 #REF! 1 #REF!
RM RM
12 #REF!
8.00
8.00 #REF! 1 #REF!
each each
D. Protection Work
13 #REF!
74.25
74.00 #REF! 1 #REF!
cum cum
14 #REF!
Sl. No.
Description of work Quantity Rate Per Amount (Rs.)
1 2 3 4 5 6
75.65
76.00 #REF! 1 #REF!
cum cum
16 #REF!
304.06
304.00 #REF! 1 #REF!
Cum Cum
#REF!
Sl.
Description of work Quantity Rate Per Amount (Rs.)
No.
1 2 3 4 5 6
Part I B: Pipe Culverts (54 No.s)
1 Earthwork excavation in soils upto SDR by mechanical means for
foundations of structures as per drawing and technical specification
including setting out, construction of shoring and bracing, removal of
stumps and other deleterious matter, dressing sides of bottom, back
filling the excavation earth to the extent required etc., complete
excluding seignioarge charges for finished item of work as per
MoRT&H specification 304(5th Revision) and as directed by the
Engineer-in-Charge.
6857.811
6858.00 32.00 1 219,456
cum cum
2 Plain cement concrete (1:3:6) mix using 40mm size HBG crushed stone
aggregate (Coarse aggregate and fine aggregate conforming to table
1000-2 of MORTH including cost, (excluding seigniorage) and
conveyance of all materials to site and all labour charges ,centering,
machine mixing, laying in position, Compacting , Vibrating and curing
including all other incidental and all other operational charges of T&P
required etc., complete as per MoRT&H Specification 1500,1700, 2100
(5th Revision) for foundation .
156.24
157.00 4065.00 1 638,205
cum cum
823.944
824.00 4905.00 1 4,041,720
Sl.
Description of work Quantity Rate Per Amount (Rs.)
No.
1 2 3 4 5 6
cum cum
994.989
995.00 5196.00 1 5,170,020
cum cum
215.188
216.00 5715.00 1 1,234,440
cum cum
765.00
765.00 #VALUE! 1 #VALUE!
RM RM
Sl.
Description of work Quantity Rate Per Amount (Rs.)
No.
1 2 3 4 5 6
7 #REF!
85.37
86.00 #REF! 1 #REF!
cum cum
8 Providing dry rough stone revetment 300 mm thick with HBG stone of
not less than 300 mm size including cost, (excluding seigniorage)
charges and conveyance of materials to site and including labour
charges for packing the stones for revetment etc., complete for finished
item of work as per MoRT&H specification 2504 ( 5th revision ) and as
directed by the Engineer-in-Charge for Pitching of slopes
506.40
507.00 1326.00 1 672,282
cum cum
we have reduce the pipe culvert from 62 to 54 as per the direction of E-in c
ABSTRACT ESTIMATE FOR MINOR BRIDGE
#REF!
Sl. No.
Description of work Quantity Rate Per Amount (Rs.)
1 2 3 4 5 6
Part : Minor Bridge (3 No.s) at km 27+802, 32+039 and 32+511
7.01 Earthwork excavation in soils upto SDR by mechanical means for foundations of
structures as per drawing and technical specification including setting out, construction
of shoring and bracing, removal of stumps and other deleterious matter, dressing sides
of bottom, back filling the excavation earth to the extent required etc., complete
excluding seignioarge charges for finished item of work as per MoRT&H specification
304(5th Revision) and as directed by the Engineer-in-Charge.
7.02 Filling in between body walls with gravel including cost ,conveyance and (excluding
seigniorage) of all materials to site etc., complete as per Clause 710.1.4 of IRC :
78and as per MoRT&H Specification No. 2200 & 2907(5th Revision) and as per
Drawing and technical specifications for finished item of work
1 2 3 4 5 6
7.06 Vibrated reinforced cement concrete M 35grade using 20mm & 10mm HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate
conforming to table 1000-2) including cost, (excluding seigniorage) conveyance of all
materials to site and labour charges, centering, machine mixing, laying, vibrating,
curing etc., including other incidental hire and operational charges of all T&P as per
approved drawings and as directed during execution but excluding cost of steel and its
fabrication charges for finished item as per SBD specification as directed by the
Engineer-in-Charge for foundations
881.43 #REF! 1 #REF!
cum cum
7.07 Vibrated reinforced cement concrete M 35 grade using 20mm & 10mm HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate
conforming to table 1000-2) including cost, (excluding seigniorage) conveyance of all
materials to site and labour charges, centering, machine mixing, laying, vibrating,
curing etc., including other incidental hire and operational charges of all T&P as per
approved drawings and as directed during execution but excluding cost of steel and its
fabrication charges for finished item as per SBD specification as directed by the
Engineer-in-Charge for Sub structure
435.91 #REF! 1 #REF!
cum cum
7.08 Vibrated reinforced cement concrete M 35 grade using 20mm & 10mm HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate
conforming to table 1000-2) including cost, (excluding seigniorage) conveyance of all
materials to site and labour charges, centering, machine mixing, laying, vibrating,
curing etc., including other incidental hire and operational charges of all T&P as per
approved drawings and as directed during execution but excluding cost of steel and its
fabrication charges for finished item as per SBD specification as directed by the
Engineer-in-Charge for superstructure (slab )
7.09 Providing HYSD bars ( Fe-415 ) of different diameters, wrought and put up bars of all
diameters including cost and conveyance of steel to site and all labour charges for
fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing
them in position etc., complete including cost and conveyance of binding wire and all
handling charges and operational charges etc., and including over lapping welding if
required etc., complete for all R.C.C items for finished item of work as per standard
drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H
specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for foundations
of R.C.C items.
1 2 3 4 5 6
7.11 Providing HYSD bars ( Fe-415 ) of different diameters, wrought and put up bars of all
diameters including cost and conveyance of steel to site and all labour charges for
fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing
them in position etc., complete including cost and conveyance of binding wire and all
handling charges and operational charges etc., and including over lapping welding if
required etc., complete for all R.C.C items for finished item of work as per standard
drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H
specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for Super
structure of R.C.C items.
7.12 Providing and laying 25 mm thick mastic asphalt wearing course with paving grade
bitumen meeting the requirements given in table 500-29, prepared by using mastic
cooker and laid to required level and slope after cleaning the surface, including
providing antiskid surface with bitumen precoated finegrained hard stone chipping of
13.2 mm nominal size at the rate of 0.005cum per 10 sqm and at an approximate
spacing of 10 cm center to center in both directions, pressed into surface when the
temperature of surfaces is not less than 1000C, protruding 1 mm to 4 mm over mastic
surface, all complete as per clause 515.
7.13 Drainage spouts complete as per drawing and technical specifications Clause 1209
MORD & 2705 MORTH at complete and as directed by the Engineer-in-Charge
21.00 2837.00 1 59,577
no. no.
7.14 Providing and fixing bearings complete as per drawing and Technical Specification
2000,2200 and 2300. a) Kraft Paper / Tar Paper bearings
7.15 Providing 25.4 mm mastic pads for Longitudinal joints, Transversal expansion joints and
Construction joints of approved quality including cost, conveyance and placing in
position, etc., complete as directed by the Engineer-in-charge.
72.00 991.00 1 71,352
sqm sqm
7.16 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size
HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine
aggregate conforming to table 1000-2) including cost, (excluding seigniorage) and
conveyance of all materials to site and all labour charges ,centering, machine mixing,
laying in position, Compacting , Vibrating and curing including all other incidental and
all other operational charges of T&P required etc., complete as per MoRT&H
Specification 2700 (5th Revision) for levelling course below approach slab.
7.17 Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate
conforming to table 1000-2) including cost, (excluding seigniorage) conveyance of all
materials to site and labour charges, centering, machine mixing, laying, vibrating,
curing etc., including other incidental hire and operational charges of all T&P as per
approved drawings and as directed during execution with including cost of steel and its
fabrication charges for finished item as per SBD specification as directed by the
Engineer-in-Charge for approach slab.
Sl. No.
Description of work Quantity Rate Per Amount (Rs.)
1 2 3 4 5 6
75.60 #REF! 1 #REF!
cum cum
7.18 Providing and laying filter material with Gravel underneath pitching in slopes including
cost, (excluding seigniorage) charges and conveyance of materials to site including
labour charges etc., complete for finished item of work as per MoRT&H Specification
2504 (5th Revision) and as directed by the Engineer-in-Charge
7.19 Providing dry rough stone revetment 300 mm thick with HBG stone of not less than 300
mm size including cost, (excluding seigniorage) charges and conveyance of materials
to site and including labour charges for packing the stones for revetment etc., complete
for finished item of work as per MoRT&H specification 2504 ( 5th revision ) and as
directed by the Engineer-in-Charge for Pitching of slopes
27.91 1326.00 1 37,009
cum cum
7.2 Providing Weep holes in VCC Abutment/ Wing wall/return wall with 100mm Diameter
AC pipe extending through the full width of the structure at 1.00m C/C in both
horizontal and vertical direction so that the weep holes in each horizontal direction is
staggered from the weep holes laying above and below lines as shown in drawing
including cost and conveyance of the A.C pipes and labour charges for cutting to
required length, placing the pipe with a slope of about 1V : 20H towards stream side
face etc., complete for finished item of work for weep holes as per SSR Data
7.21 Provision of an Reinforced cement concrete crash barrier at the edges of the road,
approaches to bridge structures and medians, constructed with M-40 grade concrete
with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm
long at expansion joints filled with pre-moulded asphalt filler board, keyed to the
structure on which it is built and installed as per design given in the enclosure to MOST
circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per dimensions in the
approved drawing and at locations directed by the Engineer, all as specified
7.22 Providing dry rough stone revetment 300 mm thick with HBG stone of not less than 300
mm (boulder weighing not less than 40kg) size including cost, (excluding seigniorage)
charges and conveyance of materials to site and including labour charges for packing
the stones for revetment etc., complete for finished item of work as per MoRT&H
specification 2504 ( 5th revision ) and as directed by the Engineer-in-Charge for
Pitching of slopes
7.23 A Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone
aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost,
(excluding seigniorage) conveyance of all materials to site and labour charges,
centering, machine mixing, laying, Vibrating, curing etc., including all other incidental
and operational charges of all T&P etc., complete for finished item of work as per
MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed by the
Engineer-in-Charge(5th Revision) for filling for bed protection.
Sl. No.
Description of work Quantity Rate Per Amount (Rs.)
1 2 3 4 5 6
109.35 #REF! 1 #REF!
cum cum
7.23 B Providing and laying Boulders apron for bed protection against scour with stone
boulders weighing not less than 40Kg each complete as per Drawings and Technical
Specifications Clause 2503 and 150mm Thk. flat stone apron embedded in 300mm
thick concrete (VCC 1:4:8) ( 5th revision ) and as directed by the Engineer-in-Charge
for Pitching of slopes
218.71 #REF! 1 #REF!
cum cum
7.24 Providing and applying 2 coats of water based cement paint to unplastered concrete
surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying
paint @ of 1 litre for 2 sqm as per Tech Specification 800 MORTH.
Amount
S.No. Quantity Description of Item Rate per
(Rs.)
7.01 Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per
drawing and technical specification including setting out, construction of shoring and bracing,
removal of stumps and other deleterious matter, dressing sides of bottom, back filling the
excavation earth to the extent required etc., complete excluding seignioarge charges for finished
item of work as per MoRT&H specification 304(5th Revision) and as directed by the Engineer-in-
Charge.
(B) Material
12.00 cum Cost of Gravel 178.36 cum 2140.31
Total 2140.31
© Machinery
2.50 hr Plate compactor/Power rammer/road roller 53.76 hr 134.40
0.05 hr Water tanker 6 KL capacity 698.88 hr 34.94
Total 169.34
(D) Over head charges @ 5%
5.00% Add for Over head charges @ 5% on (A)+(B)+( C) 5410.65 270.53
(E) Total of (A) + (B)+( C)+(D) 5681.18
(F) Add Contractors Profit at 10% on (E) 568.12
Cost per 10 cum (E)+(F) 6249.30
Rate for 1 cum 624.93
Amount
S.No. Quantity Description of Item Rate per
(Rs.)
Rate to be adopted 625.00
1 Cum
7.03 Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40 mm
HBG metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to a
thickness of not less than 600mm with smaller size towards the soil and bigger size towards the
wall and provided over the entire surface behind the abutment, wing wall and return wall to the full
height compacted to a firm condition including cost and conveyance of all metal (excluding
seigniorage) charges ,and all labour charges as directed by the departmental officers as per
drawing and Technical specifications as per clause 710.1.1 of IRC:78 and Clause 2200 of
MoRT&H (5th Revision) for finished item of work.
7.1 Providing HYSD bars ( Fe-415 ) of different diameters, wrought and put up bars of all diameters
including cost and conveyance of steel to site and all labour charges for fabrication of
reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc.,
complete including cost and conveyance of binding wire and all handling charges and operational
charges etc., and including over lapping welding if required etc., complete for all R.C.C items for
finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge
and as per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for
Sub structure of R.C.C items.
7.11 Providing HYSD bars ( Fe-415 ) of different diameters, wrought and put up bars of all diameters
including cost and conveyance of steel to site and all labour charges for fabrication of
reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc.,
complete including cost and conveyance of binding wire and all handling charges and operational
charges etc., and including over lapping welding if required etc., complete for all R.C.C items for
finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge
and as per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for
Super structure of R.C.C items.
Unit = sqm
Taking output =35.00 Sqm (0.87 cum) assuming a Page 151 of MoRT&H SDB
density of 2.3 tonn/cum
(A) Labour
0.44 nos. Mate 450.00 day 198.00
10.00 nos. Mazdoor working with HMP, Mechanical 425.00 day 4250.00
1.00 nos. Skilled Mazdoor for checking line and levels. 465.00 day 465.00
0% Agency area allowance 0.00
Total 4913.00
(B) Machinary
0.06 hr Mechanical broom @ 1250 sqm per hour 399.84 hr 23.99
0.06 hr Air compressor 250 cfm 588.40 hr 35.30
6.00 hr Mastic cooker 1 tonne capacity 65.00 hr 390.00
6.00 hr Bitumen boiler 1500 litres capacity 209.00 hr 1254.00
hr Tractor for towing and positioning of mastic
1.00 cooker and bitumen boiler 415.00 hr 415.00
Total 2118.29
(C) Material
Base mastic (without coarse aggregates) =
60 per cent
Coarse aggregate (6.3mm to 13.2 mm) = 40
per cent .
Proportion of material required for mastic
asphalt with coarse aggregates (based on
mix design done by CRRI for a specific
case)
Unit = Sqm
Rate 60.00
Providing 25.4 mm mastic pads for Longitudinal joints, Transversal expansion joints and
7.13 Construction joints of approved quality including cost, conveyance and placing in position, etc.,
complete as directed by the Engineer-in-charge.
Unit = Sqm
Rate as per Building SSR Item No.197 991.00
7.14 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG
crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate
conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all
materials to site and all labour charges ,centering, machine mixing, laying in position, Compacting ,
Vibrating and curing including all other incidental and all other operational charges of T&P required
etc., complete as per MoRT&H Specification 2700 (5th Revision) for levelling course below
approach slab.
7.16 Providing and laying filter material with Gravel underneath pitching in slopes including cost,
(excluding seigniorage) charges and conveyance of materials to site including labour charges
etc., complete for finished item of work as per MoRT&H Specification 2504 (5th Revision) and as
directed by the Engineer-in-Charge
Unit = cum Page 523of MoRT&H SDB
Taking output = 1 cum
(A) Labour
0.05 Day Mate 450.00 day 22.50
0.25 Day Mazdoor skilled 357.00 day 89.25
1.00 Day Mazdoor 425.00 day 425.00
0% Agency area allowance 536.75 0.00
Total 536.75
(B) Material
1.20 cum Cost of Gravel 178.36 cum 214.03
Total 214.03
(D) Over head charges @ 5%
5.00% Add for Over head charges @ 5% on (A)+(B)+( C) 750.78 37.54
(E) Total of (A) + (B)+( C)+(D) 788.32
(F) Add Contractors Profit at 10% on (E) 78.83
Cost per 10 cum (E)+(F) 867.15
Rate for 1 cum 867.15
Rate to be adopted 867.00
1 Cum
7.17 Providing dry rough stone revetment 300 mm thick with HBG stone of not less than 300 mm size
including cost, (excluding seigniorage) charges and conveyance of materials to site and including
labour charges for packing the stones for revetment etc., complete for finished item of work as per
MoRT&H specification 2504 ( 5th revision ) and as directed by the Engineer-in-Charge for
Pitching of slopes
(B) Material
1.00 cum Cost of Rough stone HBG 300mm thick 568.64 cum 568.64
0.20 cum Cost of stone spalls 397.64 cum 79.53
Total 648.17
(D) Over head charges @ 5%
Amount
S.No. Quantity Description of Item Rate per
(Rs.)
7.19 Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to
bridge structures and medians, constructed with M-40 grade concrete with HYSD reinforcement
conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-
moulded asphalt filler board, keyed to the structure on which it is built and installed as per design
given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as
per dimensions in the approved drawing and at locations directed by the Engineer, all as specified
Unit = RM
Taking output = 10 RM
M40 Grade concrete
Unit = cum Page 237 & 482 of MoRT&H SDB
Taking output = 120cum
(A) Labour
0.94 Day Mate 450.00 day 423
3.50 Day Mason 465.00 day 1627.50
20.00 Day Mazdoor 425.00 day 8500.00
0% Agency area allowance 10127.50 0.00
Total 10550.50
(B) Material
64.80 cum Cost of 20mm SS-5 HBG M/C metal 1500.14 cum 97209.14
43.20 cum Cost of 10mm SS-5 HBG M/C metal 1233.89 cum 53304.09
54.00 cum Sand at site #REF! cum #REF!
51.600 MT Cement at site 5200.00 MT 268320.00
Total #REF!
(C) Machinery
6.00 hr Batching Plant @ 20 cum/hour 1138.50 hr 6831.00
6.00 hr Generator 100 KVA 1261.12 hr 7566.72
6.00 hr Loader 1 cum capacity 1 cum 1843.52 hr 11061.12
15.00 hr Transit Mixer 4 cum capacity for lead upto 1 2140.10 hr 32101.50
Transit Mixer 4 cum capacity lead beyond 1
300.00 L 3.14 hr 942.00
Km, L - lead in Kilometer
6.00 hr Concrete Pump 899.36 hr 5396.16
Total 63898.50
(D) Form work
18.00 % Form work @ 18 on (A)+(B)+( C) #REF! Cum #REF!
(E) Over head charges @ 5%
Amount
S.No. Quantity Description of Item Rate per
(Rs.)
0.00% Add for Over head charges @ 5% on (A)+(B)+( C)+(D) #REF!
(F) Total of (A) + (B)+( C)+(D)+(E) #REF!
#REF!
Cost per 120 cum #REF!
Rate for 1 cum #REF!
Rate to be adopted #REF!
1 Cum
Page 237 of MoRT&H SDB
(A) M40 grade concrete
3.00 Cum M 40 #REF! 1.00 #REF!
(B) Labour
0.04 no Mate 450.00 1.00 18.00
1.00 no Mazdoor 425.00 1.00 425.00
0% Agency area allowance 0.00
TOTAL A= 443.00
(B) Material
0.28 MT HYSD bars including overlaps 45000.00 1.00 12600.00
0.32 Kg Pre-moulded asphalt filler board 724.90 1.00 231.97
TOTAL B= 12831.97
(A + B ) #REF!
5.00% % (C) Over Head Charges on (A+B) #REF! #REF!
7.2 Providing dry rough stone revetment 300 mm thick with HBG stone of not less than 300 mm
(boulder weighing not less than 40kg) size including cost, (excluding seigniorage) charges and
conveyance of materials to site and including labour charges for packing the stones for revetment
etc., complete for finished item of work as per MoRT&H specification 2504 ( 5th revision ) and as
directed by the Engineer-in-Charge for Pitching of slopes
(B) Material
1.00 cum Cost of Rough stone HBG 300mm thick 568.64 cum 568.64
0.20 cum Cost of stone spalls 397.64 cum 79.53
Total 648.17
(D) Over head charges @ 5%
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 1147.67 57.38
(E) Total of (A) + (B)+( C)+(D) 1205.05
(F) Add Contractors Profit at 10% on (E) 120.51
Amount
S.No. Quantity Description of Item Rate per
(Rs.)
Cost per 1 cum (E)+(F) 1325.56
Rate to be adopted 1326.00
7.21 Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate
and fine aggregate conforming to table 1000-2 of MoRT&H including cost, (excluding seigniorage)
conveyance of all materials to site and labour charges, centering, machine mixing, laying,
Vibrating, curing etc., including all other incidental and operational charges of all T&P etc.,
complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (5th Revision)
and as directed by the Engineer-in-Charge(5th Revision) for filling for bed protection.
7.22 Providing and applying 2 coats of water based cement paint to unplastered concrete surface after
cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm
as per Tech Specification 800 MORTH.
Unit : Sqm
Taking out put = 10 Sqm Page 505 of MoRT&H SDB
(A) Labour
0.01 day Mate 450.00 day 4.50
0.25 day painter 450.00 day 112.50
0.25 day Mazdoor Unskilled 425.00 day 106.25
0% Agency area allowance 218.75 0.00
223.25
(B) Material
Amount
S.No. Quantity Description of Item Rate per
(Rs.)
8.02 #REF!
70 #REF! 1 #REF!
Nos Nos
8.03 #REF!
98 3210.0 1 314580.0
Nos Nos
8.04 #REF!
2 #REF! 1 #REF!
Nos Nos
Manufacturing Supplying and fixing
6 #REF!