Comment Resolution Sheet (CRS) : Document No. REV E1121-240-PS-DS-101437 - 7 0
Comment Resolution Sheet (CRS) : Document No. REV E1121-240-PS-DS-101437 - 7 0
REV
CODE
Engineering Services
E1121-240-PS-DS-101437_7 0
A Comment Resolution Sheet (CRS)
SR. NO. PAGE NO./Reference CLIENT COMMENTS COMMENTS RESOLUTION CLIENT COMMENTS COMMENTS RESOLUTION
SHEET 1 OF 1
Project No. E-1121
This document contains confidential and/or proprietary information of LTHE and its affiliated companies. No part of this document,
data, or information, issued for the captioned project or purpose, shall be used for other than the purpose for which this has been
provided or disclosed to others or reproduced in any manner, except with the prior written permission of LTHE.
E1121-240-PS-DS-101437_7 Page 1 of 5
Project Document Title : PROCESS DATASHEET FOR ME
EPCM Services for 100KTPA Chloromethane
SA MIST SEPARATOR (FL-2401 )
Plant
Doc. No.:E1121-240-PS-DS-101437_7 Rev. 0 25-Apr-19
Yes No NA Note: This approval does not relive the document ORIGINATOR any of
his obligations and responsibilities under this Contract.
E1121-240-PS-DS-101437_7 Page 2 of 5
Project Document Title : PROCESS DATASHEET FOR ME
EPCM Services for 100KTPA Chloromethane
SA MIST SEPARATOR (FL-2401 )
Plant
Doc. No.:E1121-240-PS-DS-101437_7 Rev. 0 25-Apr-19
Revision Record
Notes:
• Revised text in Blue colour’ identifies changes in the latest revision of document with revision mark (B,C.. etc) in right
most side of the sheet.
• Revision description A, B, C..... etc. identifies document during development stage for review, approval and enquiry;
Revision description 0,1 ,2…..etc. identifies document if issued for information, or after approval if issued for purchase,
construction, commissioning, etc.
E1121-240-PS-DS-101437_7 Page 3 of 5
Project Document Title : PROCESS DATASHEET FOR ME SA MIST SEPARATOR (FL-2401 )
EPCM Services for 100KTPA Chloromethane Plant
Doc. No.:E1121-240-PS-DS-101437_7 Rev. 0 25-Apr-2019
CONSTRUCTION MATERIALS
WORKING CONDITIONS
JIS standard ASME Equivalent
JACKET
WORKING PRESS. 1.5 kg/cm2G GASKET PACKING T#9007LC Silica Filled PTFE
INTERNAL PARTS
CORROSIVITY NO
MAT'L
MARK SIZE Q'TY RATING SERVICE Remarks
DESIGN PRESS. 4.0 kg/cm2G JIS ASME EQUIVALENT
BUFFING NO
HEAT INSULATION NO
INSIDE FINISHING NO
LOCATION OUTDOOR
1 Design shall be in accordance with the requirments of ASME Section VIII Div.I.
2 All exterior carbon steel surfaces are smoothly prepared and coated with the anti-corrosive paints.
3 Final specification and dimension should be determined and confirm by the information from element manufacturer.
6 Allowable pressure drop across Mist Separator shall be 200 mmAq Maximum.
7 All nozzles -top, side and bottom shall be of minimum 150 mm length unless otherwise specified.
E1121-240-PS-DS-101437_7 Page 4 of 5
Project Document Title : PROCESS DATASHEET FOR ME SA MIST SEPARATOR (FL-2401 )
EPCM Services for 100KTPA Chloromethane Plant
Doc. No.:E1121-240-PS-DS-101437_7 Rev. 0 25-Apr-2019
SKETCH
(*)
(*)
(*)
E1121-240-PS-DS-101437_7 Page 5 of 5