Professional Documents
Culture Documents
River Protection Works (C)
River Protection Works (C)
Earthwork in filling and compaction for preparing the embankment and raising the embankment
height as per drawing with good quality sand with all material, lead and lift, labour, equipment,
machinery, tools and tackles complete
Prefabricated Revet Mattresses Installed under water
Revet Mattresses installed in dry condition
Anchor set up temporarily for launching portion
Trench to be filled with selected material
Non Woven Geotextile
Unit Length(m ) Breadth (m) Height (m) Quantity
1.2