Cross Section
869
867
865
863
861
859
857
-45 -35 -25 -15 -5 5 15 25 35 45
OD STATE, LOT-3
Bridge at Chainage km. : 319+990(MJBR)
AT UP STREAM AT 200M
867
865
863
861
859
857
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
OD STATE, LOT-3
Bridge at Chainage km. : 319+990(MJBR)
AT BRIDGE SITE
Wetted
Relative Distance Offset Area(A) Perimetre
NSL (m)
Distance (m) (m) (m) (m²) (P)
(m)
-79.2089 867.29 27.817
-51.3923 867.45 19.302
-32.09 867.342 9.063
-23.0272 867.234 0.400
-22.6277 867.2 2.646 0.00
-19.982 863.491 6.513 3.30 4.37 4.23
-13.469 858.82 7.081 7.97 36.73 8.01
-6.3877 858.468 6.388 8.33 57.72 7.09
0 858.273 8.572 8.52 53.81 6.39
8.5722 858.34 12.137 8.45 72.77 8.57
20.7096 858.717 9.362 8.08 100.33 12.14
30.0717 863.512 10.872 3.28 53.18 10.52
40.944 867.824 11.535 0.00 17.85 11.36
52.4791 867.658 26.068
78.5469 867.516
Sum 396.76 68.32
Cross Section
867
865
863
861
859
857
-85 -75 -65 -55 -45 -35 -25 -15 -5 5 15 25 35 45 55 65 75
OD STATE, LOT-3
Bridge at Chainage km. : 319+990(MJBR)
AT DOWNSTREAM AT 200M
Wetted
Relative NSL Distance Offset Area(A) Perimetre
Distance (m) (m) (m) (m) (m²) (P)
(m)
-51.6908 869.207 8.8724
-42.8184 869.449 7.82
-34.9984 866.948 6.6679 0.00
-28.3305 866.308 6.6279 0.31 1.02 6.67
-21.7026 863.879 6.6074 2.74 10.08 7.06
-15.0952 862.905 2.8961 3.71 21.30 6.68
-12.1991 861.572 2.458 5.04 12.67 3.19
-9.7411 860.136 1.9429 6.48 14.16 2.85
-7.7982 858.361 3.3516 8.25 14.31 2.63
-4.4466 858.297 4.4466 8.32 27.77 3.35
0 857.747 3.9241 8.87 38.21 4.48
3.9241 857.854 6.4335 8.76 34.59 3.93
10.3576 857.923 2.1941 8.69 56.14 6.43
12.5517 858.463 3.338 8.15 18.48 2.26
15.8897 859.065 4.574 7.55 26.21 3.39
20.4637 861.571 7.898 5.04 28.80 5.22
28.3617 862.508 22.8898 4.11 36.14 7.95
51.2515 863.698 4.7687 2.92 80.39 22.92
56.0202 864.702 5.7597 1.91 11.52 4.87
61.7799 864.883 11.2856 1.73 10.50 5.76
73.0655 867.100 0.00 9.77 11.42
Sum 452.06 89.01
Cross Section
868
866
864
862
860
858
856
-60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80
OD STATE, LOT-3
Bridge at Chainage km. : 319+990(MJBR)
AT DOWNSTREAM AT 400M
Wetted
Relative NSL Distance Offset Area(A) Perimetre
Distance (m) (m) (m) (m) (m²) (P)
(m)
-55.5096 866.99 18.114 0.00
-37.3961 863.193 13.670 3.31 30.00 18.41
-23.726 861.529 1.017 4.98 56.65 13.77
-22.7094 860.76 4.159 5.75 5.45 1.27
-18.5501 860.225 3.524 6.28 25.01 4.19
-15.0266 859.836 4.592 6.67 22.81 3.54
-10.4343 858.667 4.512 7.84 33.31 4.74
-5.9226 858.056 5.923 8.45 36.74 4.55
0 857.436 5.922 9.07 51.88 5.95
5.9215 857.541 5.784 8.96 53.39 5.92
11.7054 858.63 4.262 7.88 48.70 5.89
15.9671 859.107 4.750 7.40 32.54 4.29
20.7173 860.611 11.547 5.89 31.57 4.98
32.2645 863.498 16.701 3.01 51.39 11.90
48.9652 865.302 8.869 1.20 35.15 16.80
57.8346 866.943 0.00 5.33 8.95
Sum 519.93 115.17
866
863
860
857
-60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60
CALCULATION OF DESIGN DISCHARGE
Chainage at km. : 319+990(MJBR)
D I S C H A R G E C A L C U LA T I O N S
P = 0.6
f = 0.950
A = 16391 Hectare
L = 9.181 km
H = 47.000 m
tc = 2.862 hr
Io = 56 mm
DESIGN DISCHARGE (As per clause no. 6.2.1, IRC SP 13 2004) = 1138.02 Cumec
SCOUR CALCULATION BY USING LACEY'S EQUATION
Chainage km. : 319+990(MJBR)
Existing linear water way = NA m
Proposed Bridge span = 11 x30 m
330 m
Effective linear waterway = 318 m
Highest ground level = 867.674 m
Highest Flood Level at the bridge site = 866.795 m
Lowest bed level at the bridge site = 858.273 m
Assuming a clear span = 30 m
Considering the number of spans at the bridge site = 11 No.
Length of Bridge Proposed = 330 m
FOR ABUTMENT
Maximum Depth of Scour for Abutment = 1.27 x dsm = 2.954 m
Grip length = 0.985 m
Maximum Scour Level for Abutment = 863.841 m
FOR PIER
Maximum Depth of Scour for Pier = 2.0 x 4.652 m
Grip length = 1.551 m
Maximum Scour Level for Pier = = 862.143 m
If the waterway is restricted as per Clause 106.5.2 of IRC:5-2015, it will cause afflux at the
bridge site and the designed HFL will raised accordingly.Afflux shall be calculated by using
any suitable method based on conservation of energy or momentum. In absence of any
rigorous method, afflux may be calculated using Molesworth formula as below:
H = ((V2/17.88)+ 0.015) x ((A/a)2-1))
where, H = afflux in m
V = average velocity of the water in the river prior to construction
(m/sec)
A = unobstructed sectional area of the river at the proposed site (sq. m)
a = constricted area of the river at the proposed site (sq. m)
H = 380.000 m
V = 4.17 m/sec
A = 396.76 sq. m
a = 376.31 sq. m
HFL after afflux = 1246.795 m