Lookahead PJT - JUNIO-12-REV-A
Lookahead PJT - JUNIO-12-REV-A
Gestión de Riesgos
PROYECTO: PIQUE JACOB TIMMERS
Acumulado Eficiencia Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat
Avance
ITEM DESCRIPCION DE ACTIVIDAD Und
Mensual
Al dia Mensual 1-Jun 2-Jun 3-Jun 4-Jun 5-Jun 6-Jun 7-Jun 8-Jun 9-Jun 10-Jun 11-Jun 12-Jun 13-Jun 14-Jun 15-Jun 16-Jun 17-Jun 18-Jun 19-Jun 20-Jun 21-Jun 22-Jun 23-Jun 24-Jun 25-Jun 26-Jun 27-Jun 28-Jun 29-Jun 30-Jun RESPONSABLE IPER
11-Jun-12 Acumulada D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N
X X X X X X X X X X X X X X X X x x x x x x
1.00 PROFUNDIZACION DE PIQUE
Prog ml - -
1.01 Excavación. - DUMAS 8
Real ml -
Prog ml - -
1.02 Sostenimiento - DUMAS 8
Real ml -
Prog ml - -
1.03 Revestimiento. - DUMAS 8
Real ml -
Prog ml 6.00 - 1.00 1.00 1.00 1.00 1.00 1.00
1.04 Montaje de SET. - DUMAS 8
Real ml -
2.00 LOADING POCKT
Prog Hrs - -
3.01 FRONTIER. - PJT 13
Real Hrs -
Prog Hrs - -
3.02 CRYDERMAN . - DUMAS 8
Real Hrs -
Prog Hrs - -
3.03 TIMBERLAND 1. - PJT 13
Real Hrs -
Prog Hrs - -
3.04 TIMBERLAND 2. - PJT 13
Real Hrs -
Prog Hrs - -
3.05 TIMBERLAND 3. - PJT 13
Real Hrs -
Prog Hrs - -
3.06 COMPRESORA. - PJT 8
Real Hrs -
Prog % 0% 0%
5.01 Instalación de puerta en rampa en Nv. 121 -
Real % 0%
Prog % 0% 0% -
5.02 Voladura y sostenimiento de cámara de bombeo NV. 121.
Real % 0%
LOSA PARA UBICACIÓN TEMPORAL DE BAÑO Y COLOCADO DE Prog % 0% 0%
5.03 -
BAÑO QUÍMICO Nv. 121. Real % 0%
Prog % 0% 0%
5.04 Sostenimiento NV 121, (cámara de control) -
Real % 0%
Prog % 0% 0%
6.01 CORTES/HABILITACIONES EN CANALETA DE CASA DE WINCHES - PJT
Real % 0%
DEMOLICIÓN DE BASES DE CONCRETO PARA BASES METÁLICAS Prog % 0% 0%
6.02 - PJT
WINCHE NORDBERG Real % 0%
Prog % 0% 0%
6.03 CONSTRUCCIÓN DE MAN HOLE CASA WINCHES - PJT
Real % 0%
7.0 MONTAJE WINCHE NORDBERG 18
X X X X X X X X x x x #REF!
Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat #REF!
1-Jun 2-Jun 3-Jun 4-Jun 5-Jun 6-Jun 7-Jun 8-Jun 9-Jun 10-Jun 11-Jun 12-Jun 13-Jun 14-Jun 15-Jun 16-Jun 17-Jun 18-Jun 19-Jun 20-Jun 21-Jun 22-Jun 23-Jun 24-Jun 25-Jun 26-Jun 27-Jun 28-Jun 29-Jun 30-Jun #REF!
Prog 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Excavación Real 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Efic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #REF!
Prog 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Revestimiento Real 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Efic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #REF!
Prog 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 4.00 6.00 6.00 6.00 6.00
Montaje Set Real 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Efic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #REF!
3.25
3.00
2.75
2.50
2.25
2.00
1.75
1.50
1.25
1.00
0.75
0.50
0.25
0.00
3-Jun
5-Jun
#REF!
1-Jun
2-Jun
4-Jun
6-Jun
7-Jun
8-Jun
9-Jun
10-Jun
11-Jun
12-Jun
13-Jun
14-Jun
15-Jun
16-Jun
17-Jun
19-Jun
20-Jun
21-Jun
22-Jun
23-Jun
24-Jun
26-Jun
28-Jun
29-Jun
30-Jun
18-Jun
25-Jun
27-Jun
FECHA
TIPO PARADA
Tue, 01-May-12 T/Dia: Celebracion por el dia del trabajo de 2:00pm a 7:00pm 5.0 Otros
Tue, 01-May-12 T/Noche: Reparacion de manija de valvula de cryderman de 2:00 am a 3:15 am 1.3 Falla Mecánica
Thu, 03-May-12 T/Noche:Demora al desencofrar la forma metalica "C" debido a que el shotcrete lanzado por CIA se impregno en dicha forma de 1:00am a 7:00am 6.0 Falla Operativa
Fri, 04-May-12 T/Noche:Winche timberland N° 2 inoperativo por ploblemas en el freno de 2:00 am a 6:00 am 4.0 Falla Mecánica
Thu, 10-May-12 T/Noche:Winche Paro de operaciones Por corte de energia de 6:30 am a 7:00 am 0.5 Falla Eléctrica
Fri, 11-May-12 T/Dia Paro de operaciones Por corte de energia de 8:00 am a 11:30 am 3.5 Falla Eléctrica
Fri, 11-May-12 T/Noche:Prolongacion de tuberia para agua y aire 8:00 pm a 10:30 pm 2.5 Otros
Sat, 12-May-12 T/Dia: Cambio e instalacion de manguera de cuchareo del cryderman de 8:00 am a 9:00 am 1.0 Falla Mecánica
Sat, 12-May-12 T/Noche:problemas con la alimetacion en el comedor arenales, no hubo insumos para hacer los alimentos de 7:30 pm a 9:00 pm 1.5 Otros
Mon, 14-May-12 T/Día: Se reemplazo manga de ventilacion en el Nv 310. 1.5 Mantenimiento
Tue, 15-May-12 T/Noche:problemas con el cryderman cambio del piston del cuchareo 4.4 Falla Mecánica
Wed, 16-May-12 T/Día: Por mantenimiento progeamado del cryderman 2.0 Mantenimiento
Wed, 16-May-12 T/Noche: Por retira de bomba hidraulica malograda 0.7 Falla Mecánica
Fri, 18-May-12 T/Día: Por reparacion de manga de ventilacion en el Nv 155 1.1 Mantenimiento
Sat, 19-May-12 T/Día: Instalacion de electrobomba en el fondo del pique. 1.2 Otros
Mon, 21-May-12 T/Día: Instalacion de electrobomba en el fondo del pique. 3.8 Otros
39.8
Falla Eléctrica 4.0 10%
Falla Mecánica 11.3 28%
Mantenimiento 4.6 11%
Falla Operativa 6.0 15%
Inspección 0.0 0%
Otros 13.9 35%
FECHA TURNO HORAS DESCRIPCION
10-Apr D 2.50 Problemas con el personal de DUMAS por reclamo de utilidades.
11-Apr D 4.00 TD: Reunion de trabajadores Dumas y N. Dube (4.0 hrs)
TD: Bomba inoperativa en el fondo del pique (1.5 hrs), reparacion de la bomba (1.0 hrs)
TD: Bombeo de agua del fondo del pique (1.5 hrs)
11-Apr D/N 5.33 TN: Reparacion de bomba del fondo del pique (1.33 hrs)
15-Apr D 11.00 TD: Capacitacion del ISEM a personal (11.00 hrs)
16-Apr N 9.67 TN: Orden y limpieza del Nv. 155 (5.67 hrs) TN: Orden y limpieza del Nv. 310 (4.00 hrs)
17-Apr D 3.00 mantenimiento de galloway (Limpieza de concreto adherido)
17-Apr D 2.50 Desmontaje y retiro de winche JOY del galloway (deteriorado), e Instalacion de winche INGERSOL RAND
18-Apr D 8.00 Sostenimioento con shotcrete en comunicación realizado por Mina chungar
20-Apr D 2.00 parada de profundizacion por espera de sostenimiento en comunicación e instalacion de aire en el Nv.150
21-Apr D 11.00 Colocacion de desmonte para tener altura de perforacion para cables bolting (hecho por cia)
21-Apr N 6.00 Colocacion de desmonte para tener altura de perforacion para cables bolting (hecho por cia)
semana 3 53.17