1 MANDARINA ROBLE MADROÑO
UTILITY STORAGE
MANAGER OFFICE
WORKSHOP
OFFICE
GRIT REMOVAL
ENTRANCE BOX CONJUNCTION GENERAL NOTES:
OVERFLOW-BY PASS BOX SCREENS
THE PARALLEL GROWING STAGE SHOULD BE SCHEDULED AT THE CONSTRUCTION STAGE, TO ACHIEVE THE GARDENS AND THE GROUNDS
12 IN THE OPTIMUM CONDITIONS TO THE TIME OF DELIVERING THE PROJECT AND PROVIDING THE APPROPRIATE MAINTENANCE.
CONTROL ROOM
ENACAL
RECICLABLE
NO
LOBBY
ALL SHRUBS WILL HAVE A MINIMUM HEIGHT OF 600 mm AND THE TREES MUST HAVE A MINIMUM TRIM OF 1 1/2 " DIAMETER IN THE
13
TRANSFORMER AREA
GARDENS.
PLAN VIEW
ELECTRICAL ROOM GENERATOR ROOM
UP
LABORATORY
STORAGE
OVERFLOW
KITCHEN
COBBLESTONE
ACCESS ACCESS ACCESS ACCESS PAVEMENT
BIOGAS
FLARE
6 Influent channel
SPT-5 1 TREES 38
Influent channel
10 BEGONIAS SCHRUBS
ACCESS
ACCESS
2 9.2 m²
ELECTRICAL ROOM
Hypochlorite room
16 SPLITTER
4 CONCRETE BENCH 13
COBBLESTONE
4 BOX
PAVEMENT
COBBLESTONE
RED CONCRETE
PAVEMENT
ACCESS
UASB
ACCESS
SPT-3
COBBLESTONE
REACTOR
PAVEMENT
2
5 SPT-1 FUTURE AREA
CONTACT
SPT-4
Influent channel
FUTURE AREA
TANK
INDEX
Effluent channel
PARSHALL
SETTLING TANK NO. NAME
ACCESS
1 PRE- TREATMENT
COBBLESTONE COBBLESTONE
PAVEMENT PAVEMENT 2 UASB REACTOR TREE (2000mm HIGH)
9 3 RBC REACTOR
4 SETTLING TANK
WOOD STAKE (FOR TREE
5 CHLORINE CONTACT TANK SUPPORT)
6 THICKENING TANK
7 SLUDGE DRYING BEDS
850 150
8 CAKE STORAGE BUILDING
9 EFFLUENT MANHOLE ROOTBALL
10 FLARE PLACE THE ROOTBALL ON
FUTURE AREA 11 GUARD HOUSE MOUND OF TAMPED TOPSOIL
SPT-2
8 7 12 ADMINISTRATION BUILDING
CAKE STORAGE
LEACHATE
PUMPING STATION
DRYING BED
Code:
FINANCED BY : PROJECT : DESIGNED BY : SUBJECT : CHONTALES DEPARTMENT WWTP
A 66
THE WASTEWATER TR EATMEN T MUNICIPALITY/ CITY: