Reference No: PC/Dasusite/TL-01/2019-0039 Date: Feb 22nd, 2019

Project Manager
Dasu Hydropower Consultants
DHC Field Office,
DC Road, Tehsil Dasu
District Kohistan, KPK, Pakistan
Tel : +92-998-407245-7 , Fax: 92-998-407246
Email: siteoffice@dasu-dhc.com

Contract : TL-132KV & Grid Station (ICB No. Dasu-TL-01)

SUBJECT : Submission of Control House Building Drawings of Grid Station

Dear Sir,

With reference to your letter, DHC/Dasu/PCCC/TL-01/mrz/18-262, dated November 12,


2018 for Remarks on Control House Building Drawings, We are submitting the drawings for
Control House Building after amendments for your kind approval.

Best Regards,

Attachment : Drawings for Control House Building

Power China Limited

(Cao Feng)
Contractor’s Representative
DASU HPP 132KV TRANSMISSION LINE PROJECT.

Cc :

1. Resident Engineer, DHC Dasu HPP (TL-01), District Kohistan

2. Office File

Local Office Add:House No.18, Street No.56, F-7/4, Islamabad, Pakistan


电话(Tel):92-51-2656316 传真(Fax):92-51-2656311 Email: Dasulines@gmail.com
Sr. # Ref. Letter # Document/ Dwg. Title:
1.
DHC/Dasu/PCCC/TL-01/mrz/18-262 November 12, 2018

Sr. # Drawing # Consultant Comments Contractor Reply


1 DASU-PCCC-C-041 Finish Floor level as per your drawings Noted and changed is revised
(Sheet 1 of 4) is 0.8m. As per our contract drawings drawings.
Ground Floor Plan this is 0.6m. With respect to 0.8m
F.F.L, steps in front veranda should be
more because riser is 200mm that is not
recommended. We recommend 150mm
step riser. Similarly the slope of Ramp
for Switchgear room should be
comfortable. In case of 0.8m F.F.L
more length will be required for
comfortable slope. The increase in
length of Ramp is not allowed due to
shorter space between Ramp and
boundary wall.
DASU-PCCC-C-041 Switchgear room should have three Noted and has been added in revised
2 (Sheet 1 of 4) exhaust fans drawing
Ground Floor Plan
Steel circular Stair outside the office The Steel Spiral stair has been added
DASU-PCCC-C-041
store room is not shown in your in revised drawing
3 (Sheet 1 of 4)
drawing.
Ground Floor Plan
4 DASU-PCCC-C-041 In front elevation view, the building is The Grid line B shown in drawing
(Sheet 3 of 4) showing two different elevations. It DASU-PCCC-C-041 (Sheet 1 of 4)
Elevations seems that the Control Room has the Ground Floor Plan is fixed as ridge
different height than rest of the line.
building. Please clarify the said Ref. to WAPDA / NTDC / DISCOs
difference in elevations. standard practice the minimum height
of wall / slab from F.F.L for 132kV
G/S Control House Building (CHB) is
3.6m. Keeping this height is fixed for
out periphery wall.
So the slope has been provided from
ridge line to out periphery wall on
both sides of ridge line.
5 DASU-PCCC-C-041 In back elevation ventilator name V3 Noted and changed in revised
(Sheet 3 of 4) having width of 1250mm, but that drawing
Elevations ventilator has name V4 in “Ground
Floor Plan” drawing.
6 DASU-PCCC-C-041 In right side elevation there should Noted and changed in revised
(Sheet 4 of 4) be a line shown for extended wall drawing
Elevations but in your drawing it was ended
with column lines
DASU-PCCC-C-041 In left elevation ramp was not Noted and changed in revised
(Sheet 4 of 4) shown. Similarly rolling shutter door drawing
7 Elevations was not shown.