Generator Protection Relay Panels: Protection and Instrumentation Section Daily Check Sheet Power House

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 7

HYDRO TECH PAK (PVT) LTD

MALAKAND-III POWER COMPLEX (SHYDO)


PROTECTION AND INSTRUMENTATION SECTION
DAILY CHECK SHEET POWER HOUSE
SP-Tag no………. Dated……………….
Time………………
Generator Protection Relay Panels
REG 216 C (System A) YES NO U1 U2 U3
1) Check that Red LED PSV on all modules is off
2) Check that green LED is ON at power supply module 216NG63
3) Check that LED MST is ON at processor module 216VC63
4) Check that LED 1 & 2 are ON at output module 216AC61
5) Check that LED RUN is ON at analog in put module 216EA61
6) Note down (ON) features of protection on Input/Output module 216 DB 61
U1
U2
U3
87G 46-1 64F 64S2 24-1 50 BF-1 21G-1 59-1 GCB
ON ON ON ON ON ON ON ON ON
Note down trip output (if any)
U1
U2
U3
Trip Trip Trip Close Trip Initiate Initiate
EQ1 GCB FCB Intake UAT EQ1 Q3
EQ3 Valve LV(CB) BFP BFP
5) Note down Flag on any target relay ……………………………………………
6) Note down alarm output signal (if any) on module 216AB61………………………..
REG 216 C (System B) U1 U2 U3
1) Check that Red LED PSV on all modules is off
2) Check that green LED is ON at power supply module 216NG63
3) Check that LED MST is ON at processor module 216VC6
4) Check that LED 1 & 2 are ON at output module 216AC61
4) Check that LED RUN is ON at analog in put module 216EA61
5) Note down (ON) feature of protection on Input/Output module 216 DB 61
U1
U2
U3
21G-2 46-2 59-2 64S1 21-T 51N 24-2 50BFP-2 32G GCB
ON ON ON ON ON ON ON ON ON Closed
ON
Page#2
Note down trip output (if any)
U1
U2
U3
Trip Trip Trip Close Trip Initiate Initiate 32G
EQ1 GCB FCB Intake UAT EQ1 Q3 Signal
EQ3 Valve LV(CB) BFP BFP

5) Note down Flag on any target relay ………………………………………………………………

6) Note down alarm output signal (if any) on module 216AB61………………………....................

Transformer protection Relay RET 521.


1) Check that auxiliary power supply switch is on position 2 and LED is glowing
2) Check that there is no alarm or trip indication on relay (if any) then note down the disturbance
time.date,trigger signal and trip output ……………………………………………………….

GOVERNOR SYSTEM
1) Check that AC input supply MCB1& MCB3 and DC input supply MCB2&MCB4 are ON
2) Check that green lights are flashing on power supply PS1&PS2
3) Check for any alarm/trip indication on governor panel
4) Check for governor mode selection. U1
U2
U3
Local Remote Manual Auto

U1 U2 U3
5) Check that mechanical over speed device is reset.
6) Check the emergence shut down valve is in normal position.
7) Check at actuator assembly that Dither is in continues Vibration

AIR GAP AND VIBRATION MONITORING SYSTEM TN 8000

1) Check the power supply switches are ON and green light is glowing on power supply modules.

Air gap Vibration


Page#3

2) Check that input channel light is glowing and SL light is blinking on module TN8001-7
Air Gap U#1
U#2
U#3
CH1 CH2
CH3 CH4 SL
Vibration
U#1
U#2
U#3
CH1 CH2
CH3 CH4 SL

3) Check that green LED is blinking on key phase module TN8001-3


4) Check that green LED is blinking on store module unit TN8001-2

UNIT AUXILIARY TRANSFORMER AND 11KV SWITCH GEAR PROTECTION

1) Check that auxiliary supply green light is glowing on the following protection relays.
i) Differential protection (SPAD)
ii) Over current protection (SPAJ)
2) Check that there is no trip or alarm indication on relays

3) Check that there is no indication on target relays (if any note down)………………………
4) Check that there is no trip indication on 11KV breakers protection

EXCITATION SYSTEM
1) Check that all MCB are ON.
2) Check that 220V AC&DC Control supply indications are glowing
3) Check that there is no fault indication on HMI
4) Check that cooling fan are running and there is no abnormal noise
5) Note down excitation control mode
U1
U2
U3
Current Voltage Reactive Power
REG REG Power Factor
REG REG
6) Note down the field voltage and field current page#4

UNIT#1 UNIT#2 UNIT#3


Voltage Current Voltage Current Voltage Current

7) Note down the temperature of excitation transformer

Phase UNIt#1 UNIT#2 UNIT#3


A C’ C’ C’
B C’ C’ C’
C C’ C’ C’
SWICHT YARD
LINE PROTECTION RELAYS

1) Check the auxiliary DC supply switch is on position 2 and green light (ready) is glowing on relay
REL561& REL531 LINE#1
LINE#2
REL561 REL531
2) Check that there is no alarm or trip indication on line protection relays REL561&REL531 (if any)
note down disturbance time with date, trigger signal, alarm and trip indications.……………………
………………………………………………………………………………………………………..
3) Note down the selector switches position.
LINE#1
LINE#3
SA4 SA5 SA6 SA7 SA8 SA9

BREAKER AND BUS BAR PROTECTION RELAYS

1) Check that REB500 central unit (ready) indication is ON


2) Check that individual breaker failure protection REB500 (ready) indication is ON

3) Check that there is no alarm or error appearing on any relay (if any) note down ……………….
…………………………………………………………………

Remarks (If Any): ……………………………………………………………………………..


……………………………………………………………………………
CHECKED BY: ___________ FOREMAN(P):__________

A.P.M(P): _______________ D.P.M(P):________________

I.T.R.E: _____________

HYDRO TECH PAK (PVT) LTD


MALAKAND-III POWER COMPLEX (SHYDO)
PROTECTION AND INSTRUMENTATION SECTION
DAILY CHECK SHEET POWER HOUSE
SP-Tag no………. Dated……………….
Time………………

POWER LINE CARRIER TERMINAL


Line#1 Line#2
1) Check the power supply switches position is on /off
2) Check the key switch position is Normal (N)/Blocking (B)
3) Check the power failure indication on power supply module
4) Check for alarm indication (if any) note down
5) Check that Green LED light run normally on DSP module
6) Check that Tx & Rx Yellow LED lights blinking normally
7) Check that Green LED (MU) on MUA/MUB module twinkles
with brightness and darkness ratio 1.1
8) Note down if any indication on DCS module is OFF
9) Check that there is no indication light on PAM module
10) Check that GUARD RCV LED (local and remote)
is glowing normally
11) Check that Signal Loss LED (local and remote) is remains off
12) Check that S/N Alarm LED (local and remote) is remains off
13) Check that Terminal Alarm LED (local and remote) is remains off
14) Check the signal level position on IFM module

15) Note down the Transmit and Receive command (Counter reading)

LINE #1 LINE#2
COMMANDA Tx Rx
Rx Tx
COMMAND B Tx Tx
Rx Rx Page#2
PAX & CONNAND C Tx Tx PABX EXCHANGE
Rx Rx SYSTEM
1) Check that DC charging supply is
ON for both modules.
2) Check that Run LED is blinking on CPU module.
3) Check that status display green LED is glowing on MEX IP module
4) Check if there is any fault (RED) LED is glowing.
5) Check Fan supply is ON.
6) Check for any abnormal noise of Fan.
COMMUNICATION BATTERY CHARGING SYSTEM
1) Check that input power supply LED is ON in all units.
2) Check for any alarm indication on battery charging units.
3) Note down the voltage of communication batteries.

Remarks (If Any):.. ……………………………………………………………………………..


……………………………………………………………………………

CHECKED BY: ___________ ASST ENGR (COMM):__________

A.P.M (P): _______________ D.P.M (P):________________

I.T.R.E: _____________