City/State Audited By :
S.Srinivasan,Sr.Manager,CQE, Hosur 1
Country
Audit Type
Quality ### 69 50
Cost ### 69 50
Logistics ### 69 50
Development ### 69 50
Management 60 69 50
Commodity ### 69 50
Quality
100
50
Management Cost
Development Logistics
Quality
Section Cost Logistics Development Management Overall
Quality Commodity
Assurance Specific
Audit
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 60.00 #DIV/0!
Score
Min.score
50 50 50 50 50 50 70
to Qualify
Threshold Score: >=70 - Approved / Restricted Approval; 50~69 - To be Re-assessed; <50 - Rejected Approval Status
Prepared by S.Srinivasan
CC: R Purushothaman
1 No Compliance/Major Issues
3.0 Does evidence of supplier's current quality Current verifiable documentation showing quality levels to 5 ### NA
performance to existing customers meet the AL customer base meets / exceeds AL business requirements;
expectations? World Class
Supplier should have readily available data showing Current performance levels shows supplier capable of 3 ###
what they are capable of meeting AL requirements; May fall short in some areas or be
inconsistent
6.0 How does the supplier manage process changes? Fully integrated process change procedures & management 5 NA
mechanism. Full traceability of past changes with Production
Looking for a consistent managed process with risk Part Approval Process (PPAP) warrants available for process
identification and controls. Also notification t customers changes.
where required.
Limited experience of process change, draft process in 3
place, but require third party support.
No capability or process to support process change, can not 1
produce evidence of past changes.
7.0 Does the supplier have a NPD (New Product Clearly defined process for introduction of new products, 5 NA
Development) Process to manage introduction of including customer approval where required. Evidence of
new work / jobs? Quality? effective use. (APQP & PPAP or equiv)
NPD/ Product realization process mandatory - look for Meets customer requirements only - no formal process of 3
evidence of consistent use on more than one example. their own. Reactive.
8.0 How are Tier-II suppliers selected & managed? Defined objective process aimed at meeting business 5 NA
requirements. Regular performance reviews & metrics.
Looking for consistent objective process for selecting
and managing suppliers - not just price. QCLDM type Basic process for selection. Reactive management only. 3
approach and documented. Evidence of an overall strategy.
11.0 Is there a robust and effective tooling management Tooling management system well structured, managed and 5 NA
system? evidence of effectiveness demonstrated. capability, storage
and maintenance.
Recognition of how tooling performance changes over
time. Proactive monitoring and maintenance, Good Areas where tooling is managed, but needs discipline and 3
storage facilities and records. Amortization tracking traceability of effectiveness.
system?
13.0 How does the supplier manage design changes Fully integrated design change approval and implementation 5 NA
(customer or supplier initiated)? process. Full traceability of past changes with Production
Part Approval Process (PPAP) warrants available for
Change notification and PPAP process or equivalent - customer design changes.
communication and controls critical.
Limited experience of process change, draft process in 3
place, but require third party support.
If re-work or sorting were needed could supplier respond Limited capability. Coverage either not 100% of all facilities 3
adequately (either directly or via 3rd party service)? or response time longer than ideal (greater than 24 hours).
1 No Compliance/Major Issues
16.0 Does the supplier have and apply a record retention Documented, in place and shown to be compliant for all key 5 NA
policy? records.
Policy in place but not found to be 100% applied or some key 3
Shows if supplier recognizes importance of keeping
documents not covered.
records of important documents & data
No policy. 1
17.0 Does the supplier have a process in place to Documented with metrics and goals defined. Metrics up to 5 NA
continually improve quality? date and confirming meeting or exceeding goals.
Some proactive improvement activity. May not be fully 3
Requirement of ISO 9000(2000) and TS 16949. May be
embedded or not achieving desired goals.
achieved by high level initiative such as Lean or 6
Sigma, or more specific goals and metrics
No proactive improvement initiatives or goals. 1
18.0 Does the supplier use Visual Management - Clear visual communication to all employees of the business 5 NA
Performance goals / metrics? goals and metrics. Data up to date. Employees
knowledgeable.
Some performance metrics evident. May be out of date or 3
Every business should be showing all their employees
employees not aware of either goals or current status.
what their goals are and how they are performing both at
a business and department level. Often see charts that
are out of date - not good. No visual metrics evident. Business goals / metrics not 1
documented or shared with workforce.
19.0 Does the supplier have a Total Preventative TPM in place; Overall Equipment Effectiveness metrics in 5 ### NA
Maintenance (TPM) program? place and current; Capital investment plan linked to OEE and
capability metrics.
Another reflection of proactive improvement focused
culture as opposed to reactive Maintenance responsibilities clear and planned; Breakdowns 3 ###
measured & trends analyzed; Equipment clean and in good
order.
20.0 Are housekeeping and cleanliness (office and Clean & well organized work areas; Evidence of 5S or similar 5 ### NA
factory) satisfactory? improvement activities in place.
Generally clean and tidy work areas; No ongoing 3 ###
improvement initiatives.
Dirty , untidy work areas; No established storage locations 1 ###
for tools / equipment / materials.
21.0 Is all material identified and status clear? Identification and status of all materials clear and consistent. 5 NA
Clear segregation of non-conforming items. Procedures
Basic discipline. Nothing in the production area that is being followed 100%
not labeled or identified. Part number, job reference and
status (good , scrap or awaiting inspection) All material identified. Status may not be clear and / or poor 3
segregation of individual orders / non-conforming product.
1 No Compliance/Major Issues
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
2.0 Does supplier support Open Book costing ? Fully supportive of open book costing. Provide evidence of 5 ### NA
Assess willingness to provide elements of cost at part participation with customers.
number detail level to identify cost drivers and
Detail is available and willing to be shared with customers 3 ###
opportunities for improvement.
upon request.
No open book costing approach used with customers or Tier 1 ###
2 suppliers.
3.0 What is the supplier's current status of product Documented and managed process for developing 5 ### NA
costing? (Request for Quotation {RFQ} activities) quotations.
5.0 Does supplier have warranty recovery agreements Agreements are signed and active for components provided, 5 NA
with customers for components provided? funds recovered per agreements where appropriate.
Supplier proactively addresses delivery performance Slow to accept responsibility, reactive in nature 3
issues at receiving facility and accepts financial
responsibility for poor delivery at customer locations. Results are limited, no formal process for managing. 1
7.0 What cost improvement projects has the supplier Supplier has cost improvement projects equal to or greater 5 NA
identified to meet performance targets? than 200% of their annual performance target.
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
How effective is the supplier's program to control short No documented plan in-place, but have utilized sources in 3
term response to demand fluctuations (temporary the past as a reactive response to demand fluctuations.
sources of employees, contract services, manufacturing
operations, etc.).
Does not have a documented plan in place to manage cost 1
drivers during demand fluctuations.
10.0 Are there any opportunities to further leverage Tier 2 Leverage projects in place and active with Tier 2 suppliers. 5 NA
suppliers to improve cost and quality?
Evaluate the potential for including Tier 2 suppliers in Opportunities identified, require project definition and 3
cost and/or quality improvement projects. management.
Opportunities not investigated. 1
11.0 What is the supplier's approach to continuous cost Supplier demonstrates effective cost improvement programs 5 NA
improvement and optimization of the total value with detailed project management. Projects include
chain? application of lean manufacturing tools throughout value
chain.
Evaluate supplier's approach for both internal and
external implementation of lean manufacturing concepts. Implemented lean manufacturing concepts integrating 3
internal operations and customer requirements. Do not
include Tier 2 suppliers.
Supplier demonstrates limited application of lean 1
manufacturing concepts.
12.0 How does the supplier effectively manage Supplier utilizes forward contracts for the purchase of 5 NA
commodity hedging & price fluctuations and their material inputs.
effect on material costs?
Assess the impact of material cost changes (e.g., Supplier mitigates risk by purchasing in long-term contracts. 3
surcharges, metal market, etc.) on supplier's cost of
operations. Supplier utilizes limited life contracts (e.g., fixed quantity 1
Purchase Orders) for the purchase of material. Material
costs are subject to market fluctuations.
13.0 Does supplier have a repeatable make/buy sub- Defined process in-place with evidence of periodic review 5 NA
contract review of material, components & services? where all sourcing plans include make/buy studies.
14.0 Are sourcing guidelines for tooling and fixtures Full demonstration of cost and value contribution of tooling 5 NA
followed and are tooling costs competitively and fixture sources.
managed?
Demonstration of documented sourcing guidelines for Partial demonstration of cost and value contribution of 3
perishable and durable tooling / fixtures. Clear rationale tooling and fixture sources.
for sourcing decisions.
Unable to demonstrate cost and value contribution of tooling 1
and fixture sources.
15.0 What investment plans are in-place to optimize Investment plans to achieve best in class product & process 5 NA
operations to meet customer requirements? development to fulfill customer requirements.
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
2.0 Does the supplier distribute its customer logistic Customers' logistic documentation available for multiple 5 ### NA
documentation throughout their organization? required users & updated as needed.
Customers' logistic documentation is available and up-dated 3 ###
Assess customer documentation requirements & metrics
in one location.
by which supplier performance is measured
Some Customers' logistic documentation is available, but not 1 ###
current.
3.0 How does supplier manage rough material (steel, Automatic calculation of raw material requirements with 5 ### NA
forgings, castings, and/or components) used to automatic triggering of procurement orders.
manufacture product for customers?
Assess supplier processes to order/receive/track material Monthly review of raw material requirements with 3 ###
throughout manufacturing operations. procurement orders issued.
Quarterly review of raw material requirement and order of 1 ###
raw material.
4.0 How are bottlenecks managed to satisfy customer Strategic buffer in place with automatic review, evidence of 5 ### NA
requirements? projects to reduce bottlenecks.
Assess supplier's processes for identification and Strategic buffer in place with manual review, limited evidence 3 ###
reduction of bottlenecks including internal & Tier 2 of projects to reduce bottlenecks.
suppliers.
Some strategic buffer in place based on know-how, past 1 ###
experience.
5.0 What is the supplier's calculated delivery Delivery performance is 95% or greater, calculated by both 5 NA
performance to customer requirements? supplier and customers.
Review documentation of supplier's internal measure's) Delivery performance is at least 90%, but less than 95%, 3
of delivery performance. Reconcile supplier's delivery calculated by both supplier and customers.
performance with customer metrics.
Delivery performance is less than 90%, calculated by both 1
supplier and customers.
6.0 What is the impact of engineering changes on the Changes are made with no interruption of material flow and 5 NA
supplier's material management processes? no additional cost to customers.
Changes are made with some interruptions of material flow 3
Determine the supplier's ability to implement engineering and /or some additional costs to customers.
changes with material management transparency to
customers. Changes result in unexpected scrap or excess rework cost to 1
supplier and/or customers.
7.0 Does the supplier have a process that identifies and Process defined including reviews, management sign-off 5 NA
manages logistic impact of New Product and clear ownership of action items proactively managed.
Development (NPD) programs?
Assess the supplier processes to manage internal & Tier Process established, but without defined reviews. Progress 3
2 suppliers to ensure successful implementation of new on action items may be reactive.
products (logistic check list , process map, control plans,
etc.). Poor process definition. May jeopardize procurement of 1
production material.
8.0 How does supplier manage delivery performance of Supply chain management in-place with Tier 2 Suppliers with 5 NA
Tier 2 suppliers? 95% or greater performance.
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
11.0 Does the supplier have scheduled shut-down Supplier manages customer demand for continuous 5 NA
periods? shipments, with supporting evidence.
Evaluate the supplier's ability to fulfill customer demand Supplier manages customer demand for continuous 3
during shut-down periods with no effect on customer shipment by negotiating changes to customer requirements.
inventory levels nor delivery performance.
Assess supplier's processes for packaging product to Some, but not all, instructions are available, linked & updated 3
maintain cleanliness and prevent corrosion defects. with changes to customer requirements.
Some, but not all, instructions are available, no linkage 1
apparent to customer requirements.
13.0 Does the supplier have a process in-place to Defined processes are in-place linked to & updated with 5 NA
package & deliver components to customer changes to customer requirements.
specifications?
Assess supplier's processes for identifying packaging Some, but not all, instructions are available, linked & updated 3
material, returnable containers, and prevention of with changes to customer requirements.
shipping damages per customer requirements
Some, but not all, instructions are available, no linkage 1
apparent to customer requirements.
14.0 How does the supplier manage their manufacturing Supplier schedules and manages spare part requirements 5 NA
operations to support customer spare parts using production processes and mythologies. Delivery
business? performance equivalent to production parts performance.
15.0 Does the supplier participate in a customer charge- Supplier understands charge-back process with active 5 NA
back process for unacceptable delivery agreement in place with customers.
performance?
Supplier agrees on the principle to the charge back process. 3
Assess supplier's understanding of the use of charge-
Supplier willing to negotiate agreement.
backs to drive accountability & continuous improvement.
Supplier understand charge-back principles, but further 1
discussions are required.
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
2.0 Does the supplier have design capabilities to Full product and process design capabilities with customer 5 ### NA
support CPD? functional requirements fulfilled.
3.0 What is the supplier's product design capability? Fully compatible with Pro/E, evidence of communication and 5 ### NA
design activities with customers.
Evaluate the supplier's design system capabilities in
Some design applications, 3D CAD/CAM capability, not 3 ###
support of customer requirements.
compatible with Pro/E.
No 3D CAD/CAM modeling capability. 1 ###
4.0 What are the supplier's capabilities with Geometric All necessary personnel trained in GD&T, utilizing throughout 5 ### NA
Dimensional & Tolerance (GD&T)? facility and Tier 2 suppliers.
Evaluate the supplier's ability to use and interpret GD&T. Some employees trained in GD&T, not fully utilizing. 3 ###
Evaluate supplier's use of benchmarking studies. Using latest technology for their products; benchmarked with 3
Indicate which companies and processes were similar companies.
benchmarked in comments below.
Behind industry standards and competitors' technology. No 1
benchmarking data available.
6.0 What percent of sales does the supplier utilize for Greater than 4 % of sales is used for Research & 5 NA
research and development? Development.
Assess supplier's investment in research and 1 - 4 % of sales is used for Research & Development. 3
development for new product and/or process
developments.
7.0 What percentage of supplier Production Part PPAP documentation provided more than 95% on time. 5 NA
Approval Process (PPAP) information is submitted
on time and complete?
Assess the timeliness and completeness of supplier's PPAP documentation provided 90% - 95% on time. 3
PPAP submissions to their customers. On-time is
defined as receiving customer approval prior to first
production shipment.
PPAP documentation provided less than 90% on time. 1
8.0 Is there a documented product validation process in Tier 2 suppliers utilize PPAP's, which are submitted and 5 NA
place for Tier 2 suppliers? approved prior to production shipments.
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
11.0 What is the stability of suppliers' prototype costs? Prototype material provided at bulk order price. 5 NA
14.0 Does the supplier use process optimization tools Lean Assessment performed and improvement projects 5 NA
such as Lean Manufacturing Assessment and completed. Benefits documented.
Utilization?
Assess supplier's deployment of lean assessment; are Lean Assessment performed with improvement projects 3
lean tools being applied to production intent processes. identified, but not completed.
15.0 How are engineering changes managed within the Changes are made with no interruption of material flow and 5 NA
supplier's organization? no additional cost to customers.
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
Assess supplier's understanding of customer-specific All appropriate documentation received and reviewed 3
documentation and requirements. (PPAP/APQP throughout supplier organization. Information not shared
manuals, engineering specifications, GD&T manual, etc.) with Tier 2 suppliers.
Some documentation received and reviewed by some parts 1
of supplier organization.
17.0 For suppliers with full design (proprietary or Supplier willing to provide full dimensional drawings. 5 NA
designed products) capability, is the supplier willing
to supply full dimensional drawings to customers?
20.0 Does the supplier identify key (or critical) Key characteristics identified with customers. 5 NA
characteristics during product development? Characteristics are identified on shop floor drawings and
process capabilities tracked.
Evaluate evidence of key characteristics being identified
during product development and used in process control Key characteristics identified only by supplier. 3
techniques. Characteristics are identified on shop floor drawings and
process capabilities tracked.
ACTION PLAN
Date
Completed
ACTION PLAN
ACTION PLAN
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
Review registrar's latest certificate to insure components Quality Certification Status (ISO-9000) Maintained 3
and services provided to AL are covered in scope.
Review latest audit for issues pertaining to AL.
No Quality Certification Status 1
2.0 Has the supplier continued Code of Conduct training Code of Conduct is Fully Encoded; training programs and 5 ### NA
and compliance? compliance fully evident with documentation
3.0 Does the supplier maintain a balanced customer Mixed Customer Base; AL (<40%); Customer Growth Plans in 5 ### NA
base? Place
Mixed Customer Base; AL (40%-70%); Limited Plans to 3 ###
Determine diversity of customer sales as compared to
Expand Customer Base
potential business with AL
Heavily Dependent on AL (>70%); No Plans to Grow 1 ###
Customer Base.
4.0 Does the supplier demonstrate an encoded Vision, Vision, Mission, Strategy Fully Encoded; Significant 5 ### NA
Mission, and Business Strategy Supporting their Evidence of Corporate Improvement to Achieve Goals.
Critical Success Factors (CSF's)?
5.0 Does the supplier maintain an active environmental ISO 14001 or Equivalent Accredited 5 NA
awareness and management program?
7.0 Does the supplier have a formal succession planning Existing Succession Planning Programs for All Levels of the 5 NA
program in encoded? Work Force.
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
7.0 Does the supplier have a formal succession planning NA
program in encoded?
1 No Compliance/Major Issues
Assess supplier's programs for key personnel
development and replacement.
Assess the business risk Country Specific Business Risk Medium Risk 3
and current political situations.
Growing Risk 1
9.0 Does the supplier maintain language competency? Language Competent; No Communication Issues; Good 5 NA
Understanding.
Are the appropriate contacts fluent in the language of
their customers worldwide. Language Competent; Occasional Communication Issues; 3
10.0 Does the supplier conduct formal training programs Formal training program requirements throughout the 5 NA
throughout the organization? organization; evidence of >90% accomplishment
What is the degree of capital resources available to meet Closely Held Multiple Owners. 3
customer requirements (capacity, technology, etc).
Sole Proprietorship. 1
12.0 Is the supplier management structure in line with Lean Management Structure; Each Level Exhibits 5 NA
meeting customer business requirements? Accountability and Responsibility.
15.0 Does the supplier have a process in place to validate Actively meeting agreement / policy conditions; yearly 5 NA
its warranty agreements with customers? reviews conducted; no instances of non-conformance
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
19.0 Does the supplier maintain an active safety program Excellent: Training Materials & Log; Injury & Illness Log; 5 NA
(Hazardous Materials)? Industry Comparison; Prevention & Enforcement Activities
20.0 Does the supplier maintain an active safety program Excellent: Training Materials & Log; Injury & Illness Log; 5 NA
(Forklift Operations)? Industry Comparison; Prevention & Enforcement Activities
Evaluate training procedures and records for forklift
operators
21.0 Does the supplier have customer / market knowledge Voice of the customer is known and translated into critical 5 NA
driving its improvement methodology? customer requirements regarding product or service.
22.0 Does the supplier have full-time improvement Fulltime improvement employees in place throughout the 5 NA
leaders for its problem solving methodologies? organization, leading projects, and producing gains
Fulltime improvement employees located in some 3
Identify the fulltime positions and formal roles of all
departments, leading projects, and demonstrating some
employees across the organization.
gains
23.0 Does the supplier have quantifiable measures for There are clear project benefits directly traced to the bottom 5 NA
project results? line.
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
Supplier Name: 0
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
Partial controls 3
1.0 Scrap yard
Check for capacity, Slag control, tap to tap time, Furnace 5 ### NA
lining type, O2 lancing type, Scrap mix, Tap Chemistry &
Temperature control while tapping and records adequacy. Is
Is there eccentric bottom tapping in Steel Melting Facilities and controls are available but partial 3 ###
3.0 there a documented procedure for controlling all the these
Shop (SMS) parameters
No evidence for all of the above. 1 ###
5.0 Ladle refining furnace Facilities and controls are available but partial 3
Supplier Name: 0
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
NA
1 No Compliance/Major Issues
8.0 CCM
10.0 Rolling mill Facilities and controls are available but partial 3
11.0 Laboratory
Facilities and controls are available but partial 3
Supplier Name: 0
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
NA
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
NA
1 No Compliance/Major Issues
Supplier Name: 0
5 Full Compliance/Performing Well
Audit Date: 0
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
3 ###
Raw Material (metal i.e. Pig Iron, MS Scrap, Alloys Raw Material TCs from supplier but no in-house / outsourced
1
like FeSi, FeCr, FeMgSi : only cmposition inspection) raw material validation.
1 ###
Neither Raw material TCs from suppler nor any in-house /
outsourced raw material validation
5 ###
Received with Supplier TCs and in-house/outsourced raw
material validation thro wet analysis or Spectro.
Raw Material (Sand : Only AFS no. inspection and
2 visual inspection for lumps & foreign particles, also Raw Material TCs from supplier but no in-house / outsourced 3 ###
for Bentonite, Coal dust, NASio2 etc) raw material validation.
Neither Raw material TCs from suppler nor any in-house / 1 ###
outsourced raw material validation
Is written raw material inspection plan available and 5 ###
validation carried out as per the same.
Raw material Validation (metal i.e. Pig Iron, MS Raw material validation records available but there is no 3 ###
3 Scrap, Alloys like FeSi, FeCr, FeMgSi : only controlled raw material inspection plan available.
composition inspection)
Neither the raw material inspection plan nor the raw material 1 ###
inspection records available.
5 Raw Material Storage (metal) Raw material storage with traceability only . 3
7 Raw material Movement to Furnace/ sand mill Raw material weighed properly for melting but no written 3
plan available for melting grade wise.
Neither raw material weighing system not the written 1
weighing scale melting grade wise available.
Supplier Name: 0
5 Full Compliance/Performing Well
Audit Date: 0
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
10 Maintenance of Furnace Periodic change of lining with partial records but no written 3
procedure/ frequency & material sheet.
Supplier Name: 0
5 Full Compliance/Performing Well
Audit Date: 0
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
16 Lab facilities Calibration Lab facility calibration records available with above stated 3
plan and vice versa.
Neither plan nor any calibartion records avialble. 1
Avialability in working condition of weighing syetm on laddle 5
/ pretreatment laddle / Alarm sytem in pouring line/ pyrometer
thermocouple / Overhead Conveyor system etc.
CASTING FACILITY
Supplier Name: 0
5 Full Compliance/Performing Well
Audit Date: 0
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
CO2 core and shell core with Proper Pressure control / time 5
control / hardness control and Almen gas pressure control,
time control temperature control/ hardness control with
written procedure & records respectively.
CO2 core and shell core with Proper Pressure control / time 3
25 Core Line control / hardness control and Almen gas pressure control,
time control temperature control/ hardness control with no
written procedure & records.
CO2 core and shell core process without any of the above 1
said facilities.
Pattern by Cad-Cam method inhouse . 5
Supplier Name: 0
5 Full Compliance/Performing Well
Audit Date: 0
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
28 Fettling : Inhouse
30 Marking facility Facilities with surface table, height gauges/ BP/ cube / L 3
block/ screw jaws etc.
Facilities ie.. Only. height gauges/ BP/ cube / L block 1
Supplier Name: 0
5 Full Compliance/Performing Well
Audit Date: 0
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
Casted - Raw Material (To be purchased from AL Raw Material TCs from Casting Sources no inhouse / ###
31 3
approved Casting Sources.) outsourced raw material validation.
###
Neither Raw material TCs from Casting / casting Sources nor
1
any inhouse / outsourced raw material validation
32 Raw Material Storage Castings identified with codes / punching / tags and stored 3 ###
in Safe place - FIFO not followed
Niether raw material traceability nor FIFO followed. 1 ###
Process Sheet / Control Plan / WI effectively Process followed as per Process sheet / control plan / WI, 3
34 Few Deviations found
Followed
All process followed not as per Process sheet / control plan / 1
WI
Fixture Validation system followed and periodically wear 5
parts replaced.(records available)
Fixture Validation system followed(records available). But 3
periodically wear parts not replaced.
35 Fixture Validation
Supplier Name: 0
5 Full Compliance/Performing Well
Audit Date: 0
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
39 Machine Maintainance & setting Machine Maintanence when ever required - Records 3
available.
No records / traceability over Machine Maitanance 1
Supplier Name: 0
5 Full Compliance/Performing Well
Audit Date: 0
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
ACTION PLAN
Date
Completed
ACTION PLAN
ACTION PLAN
ACTION PLAN
ACTION PLAN
ACTION PLAN
ACTION PLAN
ACTION PLAN
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
Raw material storage material /supplier wise with color code/ 5 ### NA
punching / tags in the racks. Standard color code system to
be displayed at Gemba.
2 Raw Material Storage Raw material storage with color code/ punching / tags but 3 ###
standard color code display not available at Gemba.
Neither raw material color code/ tags / punching traceability 1 ###
available.
Cutting with Shearing machine/ power hacksaw having 5 ### NA
weight or length inspection at particular frequency with
records based upon the written procedure per component
wise.
Rod for Cutting itself or billet not marked by color code but 3
4 Billet Storage & Identification stored in standard color coded or tagged pallet.
First Cutted Billet inspection before mass billet Inspection by supervisior based upon standard weight or 3
5
cutting. length as per procedure and cleared for mass cutting without
records
First sheared piece not inspected by Supervisior before 1
realising for mass production.
Advanced Die Design Software such as catia, ideas etc. 5 NA
using and manufacturing inhouse with skill Manpower /
facility
Advanced Die Design Software such as catia, ideas etc. 3
6 Die Preparation inhouse but manufacturing outsourced with skill Manpower /
facility
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
NA
1 No Compliance/Major Issues
7 Die Inspection
9. Forging - Commodity Audit Worksheet ACTION PLAN
No Die inspection other than visual. 1
11 Temperature control over furnace Manual Temperature control with thermocouple pyrometer. 3
16 Lab facilities Calibration Lab facility calibration records available with above stated 3
plan and vice versa.
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
NA 1 No Compliance/Major Issues
20 Forging Die Lubrication. By application with cotton waste and other manual method. 3
No lubrication 1
22 First off Inspection With Suitable instruments as per drawing of component and 3
records not available.
No control 1
25 Fettling : Inhouse
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
NA
27 Normalising Furnace Continous Type furnace / Roller Hearth furnace / Batch type 3
with solenoid control for fuel flow with soaking time and
temperature control and records not maintained
29 Marking facility Facilities with surface table, height gauges/ BP/ cube / L 3
block/ screw jaws etc.
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
Process Sheet / Control Plan / WI effectively Process followed as per Process sheet / control plan / WI, 3
33 Few Deviations found
Followed
All process followed not as per Process sheet / control plan / 1
WI
Fixture Validation system followed and periodically wear 5 NA
parts replaced.(records available)
Fixture Validation system followed(records available). But 3
34 Fixture Validation periodically wear parts not replaced.
Fixture Validation system not followed and periodically wear 1
parts not replaced.(records not available)
37 Tool Maintainance / setting Tools replaced / Grinded / corners changed / Setted when 3
ever required - Records available.
No traceability over Tools. 1
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
NA
9. Forging - Commodity Audit Worksheet ACTION PLAN
Machine Maintanence when ever required - Records 3
38 Machine Maintainance & setting available.
No records / traceability over Machine Maitanance 1
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
###
Raw Material TCs from supplier but no in-house / outsourced
1.0 Raw Material Inspection 3
raw material validation.
###
Neither Raw material TCs from suppler nor any in-house /
1
outsourced raw material validation
Raw material properly identified with tags/ color coding with 5 ### NA
rack no for easy identification.
2.0 Raw Material Storage Raw material properly identified with tags/ color coding 3 ###
without rack no for easy identification.
Raw material stored without any traceability 1 ###
No in-house facility 1
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
Supplier Name: 0
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
###
Raw Material (To be purchased as per the IS Raw Material TCs from supplier but no in-house / outsourced
1 3
specified in the drg or from AL approved Suppliers) raw material validation.
###
Neither Raw material TCs from suppler nor any in-house /
1
outsourced raw material validation
All raw materials were inspected as per the inspection plan 5 ### NA
and system / evidence for recording the concerns, feed back
to suppliers, and CAPA.
2 Receipt of raw materials from suppliers All raw materials were inspected as per the inspection plan 3 ###
and no evidence for feed back and corrective action
Inspected for limited parameters and no evidence for feed 1 ###
back and corrective action.
Raw material storage material /supplier wise with color code/ 5 ### NA
punching / tags in the racks. Standard color code system to
be displayed at Gemba.
Raw Material Storage - UV resistant storage for wires Raw material storage with color code/ punching / tags but 3 ###
3
and covered sheds for terminals and connectors. standard color code display not available at Gemba.
Wires and cables cut in to lengths with striping and Cutting , Striping and crimping done with automated facility 3
4 as per the Specification. Written procedure and Records
crimping
available.
Supplier Name: 0
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
7 Main assy Lay board for assy. fitment of subassy by Team of peoples. 3
Length control by stoppers.
No Lay board for assy. Fitment all subassy by group of 1
operators.
PLC controlled inspection facility with checker board for 5 NA
each part nos. Automated tag out put on passing.
Traceability of mfg date, person, Shift and suppliers.
8 Process inspection NC/ Electrical controlled inspection facility - common for all 3
parts. With out automated traceability stickers.
Supplier Name: 0
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
NA
11. Harness - Commodity Audit Worksheet ACTION PLAN
13 Lab facilities Calibration Written calibration plan / procedure/ facilities available and 3
evidence for testing not available
Neither plan nor any calibration records available. 1
No Inspection. 1
Supplier Name: 0
5 Full Compliance/Performing Well
Audit Date: 0
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
###
Neither Raw material TCs from Bar Supplier/ Mills nor any
1
inhouse / outsourced raw material validation
Bar identified with codes / punching / tags and stored in Safe 3 ###
2 Raw Material Storage place - FIFO not followed
Process Sheet / Control Plan / WI effectively Process followed as per Process sheet / control plan / WI, 3
4
Followed Few Deviations found
Supplier Name: 0
5 Full Compliance/Performing Well
Audit Date: 0
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
9 Machine Maintainance & setting Machine Maintanence when ever required - Records 3
available.
Supplier Name: 0
5 Full Compliance/Performing Well
Audit Date: 0
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
NA
16 Inspection facilities and Calibration Inspection Equipments Calibration System followed not as 3
per Schedules
Surface Protection- Painting/ Plating/powder coating Process Recorded and Periodic checks not done by supplier, 3
19
(Out sourced) Components Verified at incoming inspections-Record
Available
Supplier Name: 0
5 Full Compliance/Performing Well
Audit Date: 0
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
Supplier Name: 0
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
Raw material storage material /supplier wise with color code. 5 ### NA
Standard color code system to be displayed at the storage
area.
2 Raw Material (Polymer& Chemical) Storage Raw material storage with color code , standard color code 3 ###
not displayed.
Raw material color code traceability not available. 1 ###
Mixing with out any evidence of written procedure & SAE 1 ###
standard requirements
Storage as per the written procedure ( considering Period & 5 NA
temperature )
5 NA
Received with Supplier TCs and in-house/outsourced raw
material testing.
3
5 Raw Material (Metal parts) Raw Material TCs from supplier but no in-house / outsourced
raw material validation.
Supplier Name: 0
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
9 Instrument calibration Written calibration plan / procedure with external lab (eg: 3
Traceability certificate available)
Neither plan nor any calibration records available. 1
Supplier Name: 0
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
###
Raw Material (To be purchased from Reputed Raw Material TCs from supplier but no in-house / outsourced
1 3
Manufatures like EMS & Deggussa,vestinide ) raw material validation.
###
Neither Raw material TCs from suppler nor any in-house /
1
outsourced raw material validation
Raw material storage material /supplier wise with color code. 5 ### NA
Standard color code system to be displayed at the storage
area.
2 Raw Material Storage Raw material storage with color code , standard color code 3 ###
not displayed.
Raw material color code traceability not available. 1 ###
3
4 End fitting (Metal parts) Raw Material TCs from supplier but no in-house / outsourced
raw material validation but dimensional report evident
Supplier Name: 0
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
NA
Supplier Name: 0
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
3 ###
Raw Material TCs from supplier but no inhouse / outsourced
1 Raw Material
raw material validation.
1 ###
Neither Raw material TCs from suppler nor any inhouse /
outsourced raw material validation
Mannual Assembly 1
7 Standards Room
Supplier Name: 0
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
NA
8 Stage / Final Inspection Method Individual comparator,Dail gauges, width fixture, calibrartion 3
plan & schedule.evidence of calibration,SOP for inspection of
parts.
No evidence for all of the above. 1
Supplier Name: 0
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
1 ###
Neither Raw material TCs from suppler nor any
inhouse / outsourced raw material validation
2 Raw Material Storage Raw material storage with color code/ tages but 3 ###
standard color code display not available at Gemba
& No FIFO.
Supplier Name: 0
0
Audit Type Partial Compliance/Marginal
NA 3
Acceptance with Action Plan
1 No Compliance/Major Issues
Process Inspection Control method
5 ( Defects like short mould,flow line,black
mark) Flash trimming,
16. Trims Audit Worksheet ACTION PLAN
No evidence for all of the above. 1
7 Traceablity & Identification Part No & Name ( Lh, RH), supp code,date, month , 3
year.No Material spec,
No evidence for all of the above. 1
10 Finished Goods storage FIFO, No proper racks, Mix up with other parts 3
Supplier Name: 0
5 Full Compliance/Performing Well
Audit Date: 0
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
2 Storage of Raw material Raw material storage with traceability only and FIFO 3
maintained and however open yard
Raw material storage without any of traceability. 1
Supplier Name: 0
5 Full Compliance/Performing Well
Audit Date: 0
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
16 In process/ Final Inspection Inspection carried out but partial records available. 3
17 Dies/ Tool Room facility Tool room facility with preventive maintenance system in 3
place but partial
Tool room facility outsourced & no preventive maintenance 1
system
Rev.: 4 / 21 Jun 2009 Page67 of 68
ALCQE025
Supplier Evaluation Audit
Supplier Name: 0
5 Full Compliance/Performing Well
Audit Date: 0
0
Audit Type Partial Compliance/Marginal
3
Acceptance with Action Plan
1 No Compliance/Major Issues
20 Customer Specific Reqt. No ISI/BIS markings & willing provide upon confirmed 3
business reqts.
No plan to obtain ISI/BIS markings 1