Quantified L2 Schedule

Name of Agency :- Hari Construction & Associates Pvt. Ltd

Name of work :- Balance Work of Ash Slurry Pipe Road Embankment Work Pkg. St-1 for Barh STPP

LOA NO. :- BR/CS/15399/495-PO NO. :- 5500025363-029-1028 Date :- 13/01/2017

SL. No. Item Description Unit Qty. Duration Jan. 17 Feb. 17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug. 17 Sep. 17 Oct. 17 Nov. 17 Dec. 17

10.10 Surface stripping of 250 mm depth M2 81500 300 8150 8150 8150 8150 8150 8150 8150 8150 8150 8150

10.20 Earth work in filling for ash slurry pipe M3 71529.81 150 14306 14306 14306 14306 14306

10.30 Slope protection work removal of 300mm st M2 20000 180 3333 3333 3333 3333 3333 3333

10.40 Slope protection wk packing of 300mm Thk M2 175000 300 17500 17500 17500 17500 17500 17500 17500 17500 17500 17500

10.50 Supply & laying of Geo-Textile on slope M2 174528 270 19392 19392 19392 19392 19392 19392 19392 19392 19392

10.60 Laying of sub base course of 90-45mm stone M3 200 90 67 67 67

10.70 Laying of sub base course of 63-45mm stone M3 20 30 20

10.80 Laying of sub base course of 53-22.4mm stone M3 20 30 20

10.90 P/Laying of Bitumin. Pre-Mix carpet 25mm M2 28125 90 9375 9375 9375

10.100 Laying of plain cement concrete of M7.5 M3 1268.29 270 141 141 141 141 141 141 141 141 141

10.110 Design mix concrete Rcc M25-BGL M3 3020.1 270 336 336 336 336 336 336 336 336 336

10.120 Design mix concrete Rcc M25-AGL Me 5884.92 270 654 654 654 654 654 654 654 654 654

10.130 Placing Reinforcement : TMT-BGL MT 453.01 270 50 50 50 50 50 50 50 50 50

10.140 Placing Reinforcement : TMT-AGL MT 588.49 270 65 65 65 65 65 65 65 65 65

10.150 Formwork &Staging : BGL M2 9208.43 270 1023 1023 1023 1023 1023 1023 1023 1023 1023

10.160 Formwork &Staging : AGL M2 17191.39 270 1910 1910 1910 1910 1910 1910 1910 1910 1910

10.170 Excavation in foundation work M3 6815.68 210 974 974 974 974 974 974 974
Name of Agency :- Hari Construction & Associates Pvt. Ltd

Name of work :- Balance Work of Ash Slurry Pipe Road Embankment Work Pkg. St-1 for Barh STPP

LOA NO. :- BR/CS/15399/495-PO NO. :- 5500025363-029-1028 Date :- 13/01/2017

SL. No. Item Description Unit Qty. Duration Jan. 17 Feb. 17 Mar-17

10.10 Surface stripping of 250 mm depth M2 81500 870 128 128 128

10.20 Earth work in filling for ash slurry pipe M3 213120 330 15030 15030

10.30 Slope protection work removal of 300mm st M2 20000 120

10.40 Slope protection wk packing of 300mm Thk M2 175000 960 629

10.50 Supply & laying of Geo-Textile on slope M2 174528 930 503 503

10.60 Laying of sub base course of 90-45mm stone M3 200 60

10.70 Laying of sub base course of 63-45mm stone M3 20 60

10.80 Laying of sub base course of 53-22.4mm stone M3 20 60

10.90 P/Laying of Bitumin. Pre-Mix carpet 25mm M2 28125 180

10.100 Laying of plain cement concrete of M7.5 M3 1268.29 930 29 29

10.110 Design mix concrete Rcc M25-BGL M3 3020.1 690 65 65

10.120 Design mix concrete Rcc M25-AGL Me 5884.92 930 90 90

10.130 Placing Reinforcement : TMT-BGL MT 453.01 480 7 7

10.140 Placing Reinforcement : TMT-AGL MT 588.49 840 0.4 0.4

10.150 Formwork &Staging : BGL M2 9208.43 780 78 78

10.160 Formwork &Staging : AGL M2 17191.39 450 709 709

10.170 Excavation in foundation work M3 6815.68 390 305


*** Additional 141590m3 soil filing qty. has been awarded in sep-2018
Quantified L2 Schedule (Revised)

Apr-17 May-17 Jun-17 Jul-17 Aug. 17 Sep. 17 Oct. 17 Nov. 17 Dec. 17 JAN. 18 FEB. 18

128 128 439 439 439 439 761 761 761 941 941

15030 15030

629 629 1636 1636 1636 1636 2982 2982 2982 4556 4556

503 503 1744 1744 1744 1744 5798 5798 5798 7271 7271

29 29 29 29 29 29 63 63 63 71 71

65 65 15 15 15 15 16 16 16

90 90 92 92 92 92 188 188 188 262 262

7 7 2 2 2

0.4 0.4 8 8 8 8 10 10 10 11 11

78 78 204 204 204 204 156 156 156

709 709 639 639 639 639 1656 1656 1656 2096 2096

305 305 195 195 195


hedule (Revised)

MAR. 18 APR. 18 MAY. 18 JUN. 18 JUL. 18 AUG. 18 SEP. 18 OCT. 18 NOV. 18 DEC. 18 JAN. 19

500 500 28 28 80 80 80 261 261 261 2789

***
2500 2500

3626 3626 3619 3619 2327 2327 2327 2078 2078 2078 215

5582 5582 3124 3124 2530 2530 2530 2184 2184 2184 1049

1125 1125

20 20 20 20 6 6 6 20 20 20 4

45 45 80 80 20 20 20

184 184 26 26 22 22 22 50 50 50 16

1 1 8 8

13 13 2 2 4 4 4 2

50 50 169 169 660 660 660 129

1320 1320

280 280 601 601


FEB. 19 MAR. 19 APR. 19 MAY. 19 JUN. 19 JUL. 19 AUG. 19 SEP. 19 OCT. 19

2789 2789 32247 32247

12028 12028 41315 41315 41315

5000 5000 5000 5000

215 215 17166 17166 17166 17166 17166 17166 17166

1049 1049 19781 19781 19781 19781 19781

100 100

10 10

10 10

6469 6469 6469 6469

4 4 108 108 108 108 108

468 468 468 468 468

16 16 677 677 677 677 677

80 80 80 80 80

2 2 91 91 91 91 91

129 129 961 961 961 961 961

0 0 0 0 0

1185 1185 1185


Liability
(20.02.2017
SL. No. Item Description Unit to
31.03.2017)

10.10 Surface stripping of 250 mm depth M2

10.20 Earth work in filling for ash slurry pipe M3 35490

10.30 Slope protection work removal of 300mm st M2

10.40 Slope protection wk packing of 300mm Thk M2

10.50 Supply & laying of Geo-Textile on slope M2

10.60 Laying of sub base course of 90-45mm stone M3

10.70 Laying of sub base course of 63-45mm stone M3

10.80 Laying of sub base course of 53-22.4mm stone M3

10.90 P/Laying of Bitumin. Pre-Mix carpet 25mm M2

10.100 Laying of plain cement concrete of M7.5 M3

10.110 Design mix concrete Rcc M25-BGL M3

10.120 Design mix concrete Rcc M25-AGL Me

10.130 Placing Reinforcement : TMT-BGL MT

10.140 Placing Reinforcement : TMT-AGL MT

10.150 Formwork &Staging : BGL M2

10.160 Formwork &Staging : AGL M2

10.170 Excavation in foundation work M3


3rd RA Bill Liability for
1st RA Bill 2nd RA Bill (for liability 3rd RA Bill 4th RA Bil the month of
(16.01.2017 (01.07.2017 upto dec) (01.10.2017 (01.01.2018 march
to to (01.10.2017 to to (01.01.2018
31.05.2017) 30.09.2017) to 31.12.2017) 28.02.2018) to
31.12.2017) 31.03.2018)

638.75 1755.79 990 1292.56 1882.2 1000

24630.531

1886.625 6543.713 6224 2722.598 9112.35 4000

2010 6976.5 7126 10268 14541.275 4000

114.45 114.508 120 67.534 141.6

261.67 60.05 29.67 17.332

360.625 367.346 426.937 138.549 524 25

28 7.287

1.75 32.014 25 4.491 21.212 5

313.12 816.88 91.605 377.185

2836.25 2555.56 4000 967.3 4192 100

914.64 110 475.6


5th RA Bill Liability upto Liability upto 7th RA Bill
(01.04.2018 june 2018 6th RABill 30th september (16.04.2018
to (27.04.2018 to (27.04.2018 to (16.05.2018 to to
15.05.2018)
26.04.2018) 30.06.2018) 30.09.2018) 30.09.2018)

50 6.8 240.9

5000

3251.54 7000 238.89 5000 1981.92

7164.53 6000 248.95 5000 2590.41

40.07 30 9.31 10 8.07

89.45 150 10.66

342.05 50 2.25 50 15.17

1.61 14 1.127

21.88 3 1.497

100 300 38.93

2540.28

560.1 1000 202.17


Liability upto 9th RA Bill
31.12.2018 8th RA Bill (01.01.2019
(1.10.2018 to (01.10.2018 to to
31.12.2018)
31.12.2018) 25.03.2019)

782.16 8367.24 17006.4

24055.58 89176.111

5000 1234.75 643.5 54839.886

5500 1050.52 3147.19 75623.375

2250 2250

58.66 13.29 727.492

60 678.832

60 90.66 48.23 2500.817

52.024

11.21 6.92 133.974

1978.55 385.86 4402.13

17191.39

3262.51