695013-D-A-Z-P-001-C00 - Priced BoQ - CONFIDENTIAL

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 994

CLIENT:

The Swiss Confederation, represented by the Swiss Federal Department of Foreign Affairs, acting through the
Swiss Agency for Development and Cooperation (SDC)
Embassy of Switzerland in Nepal

CONSULTANT:

PROJECT TITLE:
ROCKFALL PROTECTION ALONG SIDDHABABA SECTION OF
SIDDHARTHA HIGHWAY
Ch. 28+200 km – Ch. 30+600 km
DPR DESIGN

PROJECT CODE:
Credit Proposal no. 7F-03971.03.01

DOCUMENT TITLE:

Doc. n. Doc. n.
695013-D-A-Z-P-001 695013-D-A-Z-P-001-C00.DOC
Rev Date Description Prepared Checked Approved
C00 27/05/2019 First Issue BON/BRO FON/BAR MUB
SIDDHABABA ROCKFALL HAZARD – DPR Design -Priced BoQ

TABLE OF CONTENTS
1 EXECUTIVE SUMMARY .................................... 4
2 BILL OF QUANTITIES...................................... 5

Date: 27/05/2019 695013-D-A-Z-P-001-C00 - Priced BoQ -CONFIDENTIAL.docx Page 2


SIDDHABABA ROCKFALL HAZARD – DPR Design -Priced BoQ
File Info
file name version 695013-D-A-Z-P-001-C00.DOC C00 created 27/05/2019
replaces report of BAG, BON, BRO, FON saved 27/05/2019
author

approved by MUB
Recipients
Date name institution / company hard
copy
27/05/2019 Mr. Aman Jonchhe SDC Nepal -

Date: 27/05/2019 695013-D-A-Z-P-001-C00 - Priced BoQ -CONFIDENTIAL.docx Page 3


SIDDHABABA ROCKFALL HAZARD – DPR Design -Priced BoQ

1 EXECUTIVE SUMMARY
This report presents the BoQ and costs estimation for the rehabilitation and tunnel of the Siddhababa
the Siddhartha Highway, between Chainage 28+200 Km to 30+600 Km.
The cost estimates are based on applicable DoR norms and relevant district rates. In cases where DoR norms
available, especially for tunnel, new unit rates, based on European Swiss standards have been defined here.

The unit item rates for each item have been calculated on the basis of approved District rates of Rup
fiscal year 2075/76, but not for before mentioned additional items, for which new rates have been dev
derived from costs analysis.
The item rates are calculated by assuming that a qualified contractor will undertake construction follow
mechanized approach for road works and drill & blast approach for tunnel works (except for tunnel por

Date: 27/05/2019 695013-D-A-Z-P-001-C00 - Priced BoQ -CONFIDENTIAL.docx


SIDDHABABA ROCKFALL HAZARD – DPR Design -Priced BoQ

2 BILL OF QUANTITIES
In the following pages the BoQ of the project is presented. For estimating the cost of the project, de
estimation had been done for each item of works to be included in the project activities. The quantities of r
such as cutting, embankment filling, backfilling and pavement are calculated by design software.
Date: 27/05/2019 695013-D-A-Z-P-001-C00 - Priced BoQ -CONFIDENTIAL.docx
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
001 - Road Works
001 - Exavation, Filling and Paving
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

1 09.01.03.B Roadway Excavation in Ordinary Rock - Roadway Excavation in hard rock by 38


Mechanical Means . 3,
7049,03 49
Total cum Total 90 - Excavation NPR
CARRY FORWARD Exavation, Filling and Paving
CARRY FORWARD Road Works
7.049,03
CARRY FORWARD Road Alignement MR1 - Main Road -
7.049,03
...
CARRY FORWARD
-1-
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
001 - Road Works
001 - Exavation, Filling and Paving
175 - Embankment/Filling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

2 09.09.00.b AMOUNT CARRIED FORWARD 36


Construction of Embankment with Material Deposited from Roadway Cutting - With 4,
machine 83
626,33
Total cum Total 175 - Embankment/Filling NPR
CARRY FORWARD Exavation, Filling and Paving 626,33
CARRY FORWARD Road Works 626,33
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD
Construction of Embankment with Material Deposited from Roadway Cutting - With 4,
machine 83
626,33
Total cum Total 175 - Embankment/Filling NPR
CARRY FORWARD Exavation, Filling and Paving
CARRY FORWARD Road Works
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD

-2-
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
001 - Road Works
001 - Exavation, Filling and Paving
980 - Precast rectangular channeling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
3 NP.CW.20.01 AMOUNT CARRIED FORWARD 4.900,
Providing and laying concrete channeling - Laying (Joining) of Precast concrete panel 00
900,00
Total m Total 980 - Precast rectangular channeling NPR
CARRY FORWARD Exavation, Filling and Paving
CARRY FORWARD Road Works 900,00
CARRY FORWARD Road Alignement MR1 - Main Road - 900,00
...
CARRY FORWARD

-3-
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
001 - Road Works
001 - Exavation, Filling and Paving
1420 - Paving
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

4 12.01.00.a AMOUNT CARRIED FORWARD 1.996,11


5 13.03.00.0 Providing and laying Granular Sub-Base Material - By Mechanical means 1993,46 12.172,63
6 13.04.00.A Total cum 9.577,26
7 13.09.00.B.01 Bituminous Macadam 1504,5 73,42
Total cum 1.993,46
Bituminous Penetration Macadam - 50 mm thick 376,13 1.993,46
Total sqm
20 mm thick Open-Graded Premix Carpet using Bituminous (Paving bitumen / Modified
bitumen) Binder - By Mechanical Means - Mechanical method using Hot Mix Plant
50 mm 1.504,50
2,5 * 7522,60 1.504,50
Total sqm
Total 1420 - Paving NPR
Total 001 - Exavation, Filling and Paving NPR
CARRY FORWARD Road Works 376,13
CARRY FORWARD Road Alignement MR1 - Main Road - 376,13

...
CARRY FORWARD

18.806,50
18.806,50

-4-
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
001 - Road Works
004 - Signaling
1610 - Signaling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Road Marking with Hot Applied Thermoplastic Compound with Reflectorizing Glass Beads on
8 15.09.00.
Bituminous Surface
0.01
On smooth surface (similar to Asphalt concrete and rigid pavement) Road Marking
2 * 898,50 * 0,25
2 * 898,50 * 0,20
Painting Lines, Dashes, Arrows etc. 50,00
Total sqm 449,25
Total 1610 - Signaling NPR Total 004 - Signaling NPR Total 001 - Road Works NPR 359,40
CARRY FORWARD Road Alignement MR1 - Main Road - 50,00
... 858,65 1.745,
CARRY FORWARD 53
-5-
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
002 - Rockside rock excavation
005 - Tecco Mesh and Shotcrete CH 28+200 / CH 28+350
160 - Protezione scavi

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


9 NP.CW.01.02 150 mm thick shotcreting for excavated rock stabilisation for external areas

CH 0+050 / CH 0+070
20,00 * 5,00 100,00
20,00 * 1,00 20,00
CH 0+110
20,00 * 2,00 40,00
CH 0+170 / CH 0+370
20,00 * 3,50 70,00
20,00 * 8,00 160,00
20,00 * 7,00 140,00
20,00 * 2,00 40,00
20,00 * 5,00 100,00
20,00 * 7,50 150,00
20,00 * 6,00 120,00
20,00 * 5,50 110,00
20,00 * 7,50 150,00
20,00 * 9,00 180,00
20,00 * 1,00 20,00
CH 0+450 / CH 0+750
20,00 * 1,00 20,00
20,00 * 2,50 50,00
20,00 * 7,00 140,00
20,00 * 1,00 20,00
20,00 * 2,00 40,00
20,00 * 4,00 80,00
20,00 * 4,00 80,00
20,00 * 5,00 100,00
20,00 * 1,50 30,00
20,00 * 1,00 20,00
20,00 * 2,00 40,00
20,00 * 3,00 60,00
20,00 * 3,50 70,00
20,00 * 8,00 160,00
20,00 * 2,00 40,00
20,00 * 3,00 60,00
CH 0+790 / CH 0+830
20,00 * 3,00 60,00
20,00 * 1,50 30,00
20,00 * 2,00 40,00
Total sqm 2.540,00 8.500,
00
10 NP.CW.02.02 Wire mesh D. 6/100/100 for Shotcrete - external areas

CH 0+050 / CH 0+070
20,00 * 5,00 100,00
20,00 * 1,00 20,00

CARRY FORWARD Protezione scavi

CARRY FORWARD Tecco Mesh and Shotcrete CH 28+20...


CARRY FORWARD Rockside rock excavation
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD
-6-
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
002 - Rockside rock excavation
005 - Tecco Mesh and Shotcrete CH 28+200 / CH 28+350
160 - Protezione scavi

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


CH 0+110
20,00 * 2,00 40,00
CH 0+170 / CH 0+370
20,00 * 3,50 70,00
20,00 * 8,00 160,00
20,00 * 7,00 140,00
20,00 * 2,00 40,00
20,00 * 5,00 100,00
20,00 * 7,50 150,00
20,00 * 6,00 120,00
20,00 * 5,50 110,00
20,00 * 7,50 150,00
20,00 * 9,00 180,00
20,00 * 1,00 20,00
CH 0+450 / CH 0+750
20,00 * 1,00 20,00
20,00 * 2,50 50,00
20,00 * 7,00 140,00
20,00 * 1,00 20,00
20,00 * 2,00 40,00
20,00 * 4,00 80,00
20,00 * 4,00 80,00
20,00 * 5,00 100,00
20,00 * 1,50 30,00
20,00 * 1,00 20,00
20,00 * 2,00 40,00
20,00 * 3,00 60,00
20,00 * 3,50 70,00
20,00 * 8,00 160,00
20,00 * 2,00 40,00
20,00 * 3,00 60,00
CH 0+790 / CH 0+830
20,00 * 3,00 60,00
20,00 * 1,50 30,00
20,00 * 2,00 40,00
Total sqm 2.540,00 66
6,
11 NP.CW.04.01 Providing and driving of 25 mm dia rock bolt steel nails by drilling holes of 110
05
mm dia using cement grouting for fixing
CH 0+050 / CH 0+070
10 * 5,00 50,00
10 * 6,00 60,00
10 * 8,00 80,00
10 * 5,00 50,00
CH 0+110
10 * 5,00 50,00
CARRY FORWARD Protezione scavi
CARRY FORWARD Tecco Mesh and Shotcrete CH 28+20...
CARRY FORWARD Rockside rock excavation
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD
-7-
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
002 - Rockside rock excavation
005 - Tecco Mesh and Shotcrete CH 28+200 / CH 28+350
160 - Protezione scavi

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


CH 0+170 / CH 0+370
10 * 5,00 50,00
10 * 6,00 60,00
10 * 6,00 60,00
10 * 8,00 80,00
(10*2) * 10,00 200,00
10 * 12,00 120,00
10 * 6,00 60,00
10 * 8,00 80,00
(10*2) * 10,00 200,00
10 * 5,00 50,00

10 * 5,00 50,00
10 * 6,00 60,00
10 * 8,00 80,00
10 * 6,00 60,00
10 * 8,00 80,00
(10*2) * 10,00 200,00
10 * 5,00 50,00
10 * 6,00 60,00
(10*2) * 8,00 160,00
10 * 5,00 50,00
10 * 6,00 60,00
(10*2) * 8,00 160,00
10 * 6,00 60,00
10 * 8,00 80,00
(10*2) * 10,00 200,00
10 * 6,00 60,00
10 * 8,00 80,00
(10*2) * 10,00 200,00
10 * 12,00 120,00
10 * 5,00 50,00
CH 0+450 / CH 0+750
10 * 5,00 50,00
10 * 5,00 50,00

10 * 6,00 60,00
10 * 8,00 80,00
(10*2) * 10,00 200,00
10 * 5,00 50,00

10 * 5,00 50,00

10 * 5,00 50,00
10 * 6,00 60,00

CARRY FORWARD Protezione scavi

CARRY FORWARD Tecco Mesh and Shotcrete CH 28+20...


CARRY FORWARD Rockside rock excavation
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD
-8-
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
002 - Rockside rock excavation
005 - Tecco Mesh and Shotcrete CH 28+200 / CH 28+350
160 - Protezione scavi

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


10 * 5,00 50,00
10 * 6,00
60,00
10 * 5,00
10 * 6,00 50,00
10 * 8,00
10 * 5,00 60,00
10 * 5,00 80,00
10 * 5,00
50,00
10 * 5,00
10 * 6,00 50,00
10 * 5,00
10 * 6,00 50,00
10 * 6,00
10 * 8,00 50,00
(10*2) * 10,00 60,00
10 * 12,00
10 * 5,00
10 * 5,00
10 * 6,00
CH 0+790 / CH 0+830
10 * 5,00
10 * 6,00
10 * 5,00
10 * 6,00
10 * 5,00
10 * 6,00
10 * 6,00
10 * 8,00
(10*2) * 10,00
10 * 12,00
10 * 5,00 50,00
10 * 5,00 60,00
10 * 6,00
CH 0+790 / CH 0+830 60,00
10 * 5,00
80,00
10 * 6,00
10 * 5,00 200,00
10 * 5,00 120,00
Total m
Drainage pipes D.100 mm, wrapped into a geotextile non-woven layer, 4 m long, having a 50,00
gradient of 5 ° above horizontal plane, shall be installed on the shotcrete wall, having a pattern
50,00
of 3m x 3m
282 * 6,00 60,00
Total m
Total 160 - Protezione scavi NPR
50,00
Total 005 - Tecco Mesh and Shotcrete CH 28+200 / CH 28+350
NPR 60,00
Total 002 - Rockside rock excavation NPR 50,00
CARRY FORWARD Road Alignement MR1 - Main Road -
50,00
...
CARRY FORWARD 5.320,00 7.780,00
12 NP.CW.19.02

1.692,00

1.692,00 3.000,00

-9-
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
003 - Rockfall Protection Measures
006 - Tecco Mesh and Shotcrete CH 30+250 / CH 30+450
160 - Protezione scavi

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


150 mm thick shotcreting for excavated rock stabilisation for external areas A01
13 NP.CW.01.02
815,00 * (40%)
A02
2730,00 * (40%) A03
855,00 * (40%) A04 326,00
3225,00 * (40%) A05
355,00 * (40%)
1.092,00
Total sqm
Wire mesh D. 6/100/100 for Shotcrete - external areas A01
815,00 * (40%)
A02
2730,00 * (40%) A03
855,00 * (40%) A04
3225,00 * (40%) A05
355,00 * (40%)
Total sqm
A02
2730,00 * (40%) A03
855,00 * (40%) A04
3225,00 * (40%) A05
355,00 * (40%)
Total sqm
Wire mesh D. 6/100/100 for Shotcrete - external areas A01
815,00 * (40%) 342,00
A02
2730,00 * (40%) A03
855,00 * (40%) A04 1.290,00
3225,00 * (40%) A05
355,00 * (40%) 142,00
Total sqm
Providing and driving of 28 mm dia rock bolt steel nails by drilling holes of 110 mm dia using 3.192,00 8.500,00
14 NP.CW.02.02 cement grouting for fixing
A01
(1/(2,00*2,00)) * 815,00 * (40%) * 6,00
A02
(1/(2,00*2,00)) * 2730,00 * (40%) * 6,00 326,00
A03
(1/(2,00*2,00)) * 855,00 * (40%) * 6,00
1.092,00
A04
(1/(2,00*2,00)) * 3225,00 * (40%) * 6,00
A05 342,00
(1/(2,00*2,00)) * 355,00 * (40%) * 6,00
Total m
Providing and driving of 32 mm dia rock bolt steel (without double protection) nails by 1.290,00
drilling holes of 110 mm dia using cement grouting for fixing
A01
142,00
(1/(2,50*2,50)) * 815,00 * 6,00
A02 3.192,00 666,05
(1/(2,50*2,50)) * 2730,00 * 6,00
15 NP.CW.04.02
A03
CARRY FORWARD Protezione scavi CARRY FORWARD Tecco Mesh and Shotcrete
CH 30+25... CARRY FORWARD Rockfall Protection Measures
CARRY FORWARD Road Alignement MR1 - Main Road - 489,00
...
CARRY FORWARD
1.638,00

513,00

1.935,00

213,00
4.788,00 9.350,00
16 NP.CW.04.06

782,40

2.620,80

- 10 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
003 - Rockfall Protection Measures
006 - Tecco Mesh and Shotcrete CH 30+250 / CH 30+450
160 - Protezione scavi

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


(1/(2,50*2,50)) * 855,00 * 6,00 820,80
A04
(1/(2,50*2,50)) * 3225,00 * 6,00
A05 3.096,00
(1/(2,50*2,50)) * 355,00 * 6,00
Total m
Installation of Wiremesh system as per design and specification including the
construction at site, and use of helicopter or the crane, whichever is feasible & equivalent to
Geobrugg TECCO G65/3 high tensile steel wire mesh
A01 815,00 A02 2730,00 A03 855,00 A04 3225,00 A05 355,00
Total sqm
AMOUNT CARRIED FORWARD
(1/(2,50*2,50)) * 855,00 * 6,00
A04
(1/(2,50*2,50)) * 3225,00 * 6,00
A05
(1/(2,50*2,50)) * 355,00 * 6,00
Total m 340,80
Installation of Wiremesh system as per design and specification including the
construction at site, and use of helicopter or the crane, whichever is feasible & equivalent to 7.660,80 8.200,00
Geobrugg TECCO G65/3 high tensile steel wire mesh
17 NP.CW.06.01
A01 815,00 A02 2730,00 A03 855,00 A04 3225,00 A05 355,00
Total sqm
Drainage pipes D.100 mm, wrapped into a geotextile non-woven layer, 4 m long, having a
gradient of 5 ° above horizontal plane, shall be installed on the shotcrete wall, having a pattern
of 3m x 3m 815,00
355 * 6,00
Total m
Total 160 - Protezione scavi NPR
2.730,00
Total 006 - Tecco Mesh and Shotcrete CH 30+250 / CH 30+450
NPR
CARRY FORWARD Rockfall Protection Measures 855,00
CARRY FORWARD Road Alignement MR1 - Main Road -
... 3.225,00
CARRY FORWARD
355,00
7.980,00 6.000,00
18 NP.CW.19.02

2.130,00

2.130,00 3.000,00

- 11 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
003 - Rockfall Protection Measures
009 - ROCKFALL BARRIER
160 - Protezione scavi

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE


DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Installation of Rocknet Works to withstand 2000kJ R02
19 NP.CW.07.01
124,00 * 4,00
Total sqm
Installation of Rocknet Works to withstand 5000kJ R01 496,00
255,50 * 5,00
Total sqm 496,00 34.500,00
Total 160 - Protezione scavi NPR
20 NP.CW.07.03
Total 009 - ROCKFALL BARRIER NPR
CARRY FORWARD Rockfall Protection Measures
CARRY FORWARD Road Alignement MR1 - Main Road - 1.277,50
... 1.277,50 53.000,00
CARRY FORWARD

- 12 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
003 - Rockfall Protection Measures
010 - Scaling of unstable blocks
160 - Protezione scavi

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

21 NP.CW.08.01 AMOUNT CARRIED FORWARD 1.900,


Purge of unstable blocks S01 00
10400,00
S02 3800,00 S03 823,00
Total sqm 10.400,00
Total 160 - Protezione scavi NPR 3.800,00
Total 010 - Scaling of unstable blocks NPR 823,00
Total 003 - Rockfall Protection Measures NPR
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD
15.023,0
0
- 13 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
006 - Hydraulic Works
019 - Culvert 1
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

22 09.04.01.B.01 AMOUNT CARRIED FORWARD 11


Excavation for Structures Foundation - Ordinary soil - Mechanical Means - Depth upto 3 m 9,
2,50 * 2,50 * 3,00 93
11,00 * 1,30 * 3,00 18,7
Total cum Total 90 - Excavation NPR 5
CARRY FORWARD Culvert 1 42,9
CARRY FORWARD Hydraulic Works 0
CARRY FORWARD Road Alignement MR1 - Main Road - 61,6
... 5
CARRY FORWARD
- 14 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
006 - Hydraulic Works
019 - Culvert 1
180 - Filling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

23 09.09.00.b AMOUNT CARRIED FORWARD 36


Construction of Embankment with Material Deposited from Roadway Cutting - With 4,
machine 83
28,86
Total cum Total 180 - Filling NPR
CARRY FORWARD Culvert 1 28,86
CARRY FORWARD Hydraulic Works 28,86
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD
Construction of Embankment with Material Deposited from Roadway Cutting - With 4,
machine 83
28,86
Total cum Total 180 - Filling NPR
CARRY FORWARD Culvert 1
CARRY FORWARD Hydraulic Works
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD

- 15 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
006 - Hydraulic Works
019 - Culvert 1
1005 - culverts

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
24 07.02.00.D AMOUNT CARRIED FORWARD 16.857,39
25 20.02.00.A Providing and Laying Reinforced Cement Concrete Flush jointed Pipe for culverts - 900 mm 11.539,20
26 20.02.00.G internal dia. 13.966,07
27 20.03.00.0 11,70 110.464,93
28 20.04.00.G.0p Total m 14.843,16
29 20.05.00.0 Plain/Reinforced Cement Concrete in Foundation - PCC Grade M 15 2,50 * 2,50 * 0,20 11,70 110.464,93
30 22.01.00.A 11,00 * 1,30 * 0,20 11,70 437.000,00
Total cum
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 2,10 * 2,10 * 0,30
Total cum 1,25
Providing and laying , fitting and placing un-coated Mild steel / HYSD 2,86
reinforcement complete in foundation
stell ratio 1,32 * 0,100 4,11
Total tonne
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 30 - Height upto 5 m
2 * 1,50 * 2,50 * 0,30
2,10 * 2,50 * 0,30 1,32
2,10 * 4,00 * 0,30 1,32
Total cum
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure stell ratio
6,35 * 0,100
Total tonne
Providing, Fabricating, assembling and erecting structural steel
components/elements
steel grating cover 0,150 0,1320
Total tonne 0,1320
Total 1005 - culverts NPR
Total 019 - Culvert 1 NPR
CARRY FORWARD Hydraulic Works
2,25
CARRY FORWARD Road Alignement MR1 - Main Road - 1,58
... 2,52
CARRY FORWARD

6,35

0,6350
0,6350

0,1500
0,1500

- 16 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
006 - Hydraulic Works
020 - Culvert 2
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

31 09.04.01.B.01 AMOUNT CARRIED FORWARD 11


Excavation for Structures Foundation - Ordinary soil - Mechanical Means - Depth upto 3 m 9,
174,28 93
Total cum Total 90 - Excavation NPR
CARRY FORWARD Culvert 2
CARRY FORWARD Hydraulic Works 174,28
CARRY FORWARD Road Alignement MR1 - Main Road - 174,28
...
CARRY FORWARD
- 17 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
006 - Hydraulic Works
020 - Culvert 2
180 - Filling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

32 09.09.00.b AMOUNT CARRIED FORWARD 36


Construction of Embankment with Material Deposited from Roadway Cutting - With 4,
machine 83
51,04
Total cum Total 180 - Filling NPR
CARRY FORWARD Culvert 2 51,04
CARRY FORWARD Hydraulic Works 51,04
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD
Construction of Embankment with Material Deposited from Roadway Cutting - With 4,
machine 83
51,04
Total cum Total 180 - Filling NPR
CARRY FORWARD Culvert 2
CARRY FORWARD Hydraulic Works
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD

- 18 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
006 - Hydraulic Works
020 - Culvert 2
1005 - culverts

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
33 20.02.00.A AMOUNT CARRIED FORWARD 11.539,20
34 20.02.00.G Plain/Reinforced Cement Concrete in Foundation - PCC Grade M 15 culvert 13.966,07
35 20.03.00.0 13,25 * 2,10 * 0,10 110.464,93
36 20.04.00.G.0p shaft 14.843,16
2,78
37 20.05.00.0 2,60 * 2,60 * 0,20 110.464,93
1,35
38 22.01.00.A Total cum 437.000,00
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 culvert
8,35
shaft 2,03
Total cum 4,13
Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation
stell ratio 10,38 * 0,100
Total tonne 8,35
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 30 - Height upto 5 m 2,03
culvert 24,35
shaft 11,84
Total cum
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure stell ratio 10,38
36,19 * 0,100
Total tonne
Providing, Fabricating, assembling and erecting structural steel
components/elements
steel grating cover 0,250
Total tonne
Total 1005 - culverts NPR 1,0380
Total 020 - Culvert 2 NPR 1,0380
CARRY FORWARD Hydraulic Works
CARRY FORWARD Road Alignement MR1 - Main Road -
... 24,3
CARRY FORWARD 5
11,8
4

36,19

3,6190
3,6190

0,2500
0,2500

- 19 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
006 - Hydraulic Works
021 - Culvert A1
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

39 09.04.01.B.01 AMOUNT CARRIED FORWARD 11


Excavation for Structures Foundation - Ordinary soil - Mechanical Means - Depth upto 3 m 9,
2,50 * 2,50 * 3,00 93
14,20 * 1,70 * 3,00 18,7
Total cum Total 90 - Excavation NPR 5
CARRY FORWARD Culvert A1 72,4
CARRY FORWARD Hydraulic Works 2
CARRY FORWARD Road Alignement MR1 - Main Road - 91,1
... 7
CARRY FORWARD
- 20 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
006 - Hydraulic Works
021 - Culvert A1
180 - Filling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

40 09.09.00.b AMOUNT CARRIED FORWARD 36


Construction of Embankment with Material Deposited from Roadway Cutting - With 4,
machine 83
35,77
Total cum Total 180 - Filling NPR
CARRY FORWARD Culvert A1 35,77
CARRY FORWARD Hydraulic Works 35,77
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD
Construction of Embankment with Material Deposited from Roadway Cutting - With 4,
machine 83
35,77
Total cum Total 180 - Filling NPR
CARRY FORWARD Culvert A1
CARRY FORWARD Hydraulic Works
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD

- 21 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
006 - Hydraulic Works
021 - Culvert A1
1005 - culverts

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
41 07.02.00.F AMOUNT CARRIED FORWARD 21.807,99
42 20.02.00.A Providing and Laying Reinforced Cement Concrete Flush jointed Pipe for culverts - 1200 mm 11.539,20
43 20.02.00.G internal dia. 13.966,07
44 20.03.00.0 14,50 110.464,93
45 20.04.00.G.0p Total m 14.843,16
46 20.05.00.0 Plain/Reinforced Cement Concrete in Foundation - PCC Grade M 15 2,50 * 2,50 * 0,20 14,50 110.464,93
47 22.01.00.A 14,20 * 1,70 * 0,20 14,50 437.000,00
Total cum
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 2,10 * 2,10 * 0,30
Total cum 1,25
Providing and laying , fitting and placing un-coated Mild steel / HYSD 4,83
reinforcement complete in foundation
stell ratio 1,32 * 0,100 6,08
Total tonne
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 30 - Height upto 5 m
2 * 1,50 * 2,50 * 0,30
2,10 * 2,50 * 0,30 1,32
2,10 * 4,00 * 0,30 1,32
Total cum
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure stell ratio
6,35 * 0,100
Total tonne
Providing, Fabricating, assembling and erecting structural steel
components/elements
steel grating cover 0,150 0,1320
Total tonne 0,1320
Total 1005 - culverts NPR
Total 021 - Culvert A1 NPR
CARRY FORWARD Hydraulic Works
2,25
CARRY FORWARD Road Alignement MR1 - Main Road - 1,58
... 2,52
CARRY FORWARD

6,35

0,6350
0,6350

0,1500
0,1500

- 22 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
006 - Hydraulic Works
022 - Culvert 3
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

48 09.04.01.B.01 AMOUNT CARRIED FORWARD 11


Excavation for Structures Foundation - Ordinary soil - Mechanical Means - Depth upto 3 m 9,
2,50 * 2,50 * 3,00 93
16,50 * 1,70 * 3,00 18,7
Total cum Total 90 - Excavation NPR 5
CARRY FORWARD Culvert 3 84,1
CARRY FORWARD Hydraulic Works 5
CARRY FORWARD Road Alignement MR1 - Main Road - 102,
... 90
CARRY FORWARD
- 23 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
006 - Hydraulic Works
022 - Culvert 3
180 - Filling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

49 09.09.00.b AMOUNT CARRIED FORWARD 36


Construction of Embankment with Material Deposited from Roadway Cutting - With 4,
machine 83
51,50
Total cum Total 180 - Filling NPR
CARRY FORWARD Culvert 3 51,50
CARRY FORWARD Hydraulic Works 51,50
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD
Construction of Embankment with Material Deposited from Roadway Cutting - With 4,
machine 83
51,50
Total cum Total 180 - Filling NPR
CARRY FORWARD Culvert 3
CARRY FORWARD Hydraulic Works
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD

- 24 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
006 - Hydraulic Works
022 - Culvert 3
1005 - culverts

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
50 07.02.00.F AMOUNT CARRIED FORWARD 21.807,99
51 20.02.00.A Providing and Laying Reinforced Cement Concrete Flush jointed Pipe for culverts - 1200 mm 11.539,20
52 20.02.00.G internal dia. 13.966,07
53 20.03.00.0 16,80 110.464,93
54 20.04.00.G.0p Total m 14.843,16
55 20.05.00.0 Plain/Reinforced Cement Concrete in Foundation - PCC Grade M 15 2,50 * 2,50 * 0,20 16,80 110.464,93
56 22.01.00.A 16,50 * 1,70 * 0,20 16,80 437.000,00
Total cum
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 2,10 * 2,10 * 0,30
Total cum 1,25
Providing and laying , fitting and placing un-coated Mild steel / HYSD 5,61
reinforcement complete in foundation
stell ratio 1,32 * 0,100 6,86
Total tonne
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 30 - Height upto 5 m
2 * 1,50 * 2,50 * 0,30
2,10 * 2,50 * 0,30 1,32
2,10 * 4,00 * 0,30 1,32
Total cum
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure stell ratio
6,35 * 0,100
Total tonne
Providing, Fabricating, assembling and erecting structural steel
components/elements
steel grating cover 0,150 0,1320
Total tonne 0,1320
Total 1005 - culverts NPR
Total 022 - Culvert 3 NPR
CARRY FORWARD Hydraulic Works
2,25
CARRY FORWARD Road Alignement MR1 - Main Road - 1,58
... 2,52
CARRY FORWARD

6,35

0,6350
0,6350

0,1500
0,1500

- 25 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
006 - Hydraulic Works
023 - Culvert A2
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

57 09.04.01.B.01 AMOUNT CARRIED FORWARD 11


Excavation for Structures Foundation - Ordinary soil - Mechanical Means - Depth upto 3 m 9,
189,96 93
Total cum Total 90 - Excavation NPR
CARRY FORWARD Culvert A2
CARRY FORWARD Hydraulic Works 189,96
CARRY FORWARD Road Alignement MR1 - Main Road - 189,96
...
CARRY FORWARD
- 26 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
006 - Hydraulic Works
023 - Culvert A2
180 - Filling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

58 09.09.00.b AMOUNT CARRIED FORWARD 36


Construction of Embankment with Material Deposited from Roadway Cutting - With 4,
machine 83
32,74
Total cum Total 180 - Filling NPR
CARRY FORWARD Culvert A2 32,74
CARRY FORWARD Hydraulic Works 32,74
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD
Construction of Embankment with Material Deposited from Roadway Cutting - With 4,
machine 83
32,74
Total cum Total 180 - Filling NPR
CARRY FORWARD Culvert A2
CARRY FORWARD Hydraulic Works
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD

- 27 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
006 - Hydraulic Works
023 - Culvert A2
1005 - culverts

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
59 20.02.00.A AMOUNT CARRIED FORWARD 11.539,20
60 20.02.00.G Plain/Reinforced Cement Concrete in Foundation - PCC Grade M 15 culvert 13.966,07
61 20.03.00.0 15,50 * 2,10 * 0,10 110.464,93
62 20.04.00.G.0p shaft 14.843,16
3,26
63 20.05.00.0 2,60 * 2,60 * 0,20 110.464,93
1,35
64 22.01.00.A Total cum 437.000,00
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 culvert
9,77
shaft 2,03
Total cum 4,61
Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation
stell ratio 11,80 * 0,100
Total tonne 9,77
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 30 - Height upto 5 m 2,03
culvert 23,72
shaft 10,37
Total cum
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure stell ratio 11,80
34,09 * 0,100
Total tonne
Providing, Fabricating, assembling and erecting structural steel
components/elements
steel grating cover 0,250
Total tonne
Total 1005 - culverts NPR 1,1800
Total 023 - Culvert A2 NPR 1,1800
CARRY FORWARD Hydraulic Works
CARRY FORWARD Road Alignement MR1 - Main Road -
... 23,7
CARRY FORWARD 2
10,3
7

34,09

3,4090
3,4090

0,2500
0,2500

- 28 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
006 - Hydraulic Works
024 - Culvert 4
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

65 09.04.01.B.01 AMOUNT CARRIED FORWARD 11


Excavation for Structures Foundation - Ordinary soil - Mechanical Means - Depth upto 3 m 9,
126,09 93
Total cum Total 90 - Excavation NPR
CARRY FORWARD Culvert 4
CARRY FORWARD Hydraulic Works 126,09
CARRY FORWARD Road Alignement MR1 - Main Road - 126,09
...
CARRY FORWARD
- 29 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
006 - Hydraulic Works
024 - Culvert 4
180 - Filling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

66 09.09.00.b AMOUNT CARRIED FORWARD 36


Construction of Embankment with Material Deposited from Roadway Cutting - With 4,
machine 83
58,58
Total cum Total 180 - Filling NPR
CARRY FORWARD Culvert 4 58,58
CARRY FORWARD Hydraulic Works 58,58
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD
Construction of Embankment with Material Deposited from Roadway Cutting - With 4,
machine 83
58,58
Total cum Total 180 - Filling NPR
CARRY FORWARD Culvert 4
CARRY FORWARD Hydraulic Works
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD

- 30 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
006 - Hydraulic Works
024 - Culvert 4
1005 - culverts

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
67 20.02.00.A AMOUNT CARRIED FORWARD 11.539,20
68 20.02.00.G Plain/Reinforced Cement Concrete in Foundation - PCC Grade M 15 culvert 13.966,07
69 20.03.00.0 12,90 * 4,90 * 0,10 110.464,93
70 20.04.00.G.0p shaft 14.843,16
6,32
71 20.05.00.0 2,60 * 2,60 * 0,20 110.464,93
1,35
72 22.01.00.A Total cum 437.000,00
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 culvert
18,96
shaft 2,03
Total cum 7,67
Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation
stell ratio 20,99 * 0,100
Total tonne 18,96
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 30 - Height upto 5 m 2,03
culvert 42,18
shaft 20,52
Total cum
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure stell ratio 20,99
62,70 * 0,100
Total tonne
Providing, Fabricating, assembling and erecting structural steel
components/elements
steel grating cover 0,250
Total tonne
Total 1005 - culverts NPR 2,0990
Total 024 - Culvert 4 NPR 2,0990
CARRY FORWARD Hydraulic Works
CARRY FORWARD Road Alignement MR1 - Main Road -
... 42,1
CARRY FORWARD 8
20,5
2

62,70

6,2700
6,2700

0,2500
0,2500

- 31 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
006 - Hydraulic Works
025 - Culvert 5
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

73 09.04.01.B.01 AMOUNT CARRIED FORWARD 11


Excavation for Structures Foundation - Ordinary soil - Mechanical Means - Depth upto 3 m 9,
77,12 93
Total cum Total 90 - Excavation NPR
CARRY FORWARD Culvert 5
CARRY FORWARD Hydraulic Works 77,12
CARRY FORWARD Road Alignement MR1 - Main Road - 77,12
...
CARRY FORWARD
- 32 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
006 - Hydraulic Works
025 - Culvert 5
1005 - culverts

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

74 20.02.00.A AMOUNT CARRIED FORWARD 11.539,20


75 20.02.00.G Plain/Reinforced Cement Concrete in Foundation - PCC Grade M 15 culvert 13.966,07
76 20.03.00.0 8,65 * 2,60 * 0,10 110.464,93
77 20.04.00.G.0p shaft 14.843,16
2,25
78 20.05.00.0 2,60 * 2,60 * 0,20 110.464,93
1,35
79 22.01.00.A Total cum 437.000,00
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 culvert
6,75
shaft 2,03
Total cum 3,60
Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation
stell ratio 8,78 * 0,100
Total tonne 6,75
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 30 - Height upto 5 m 2,03
culvert 17,13
shaft 10,03
Total cum
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure stell ratio 8,78
27,16 * 0,100
Total tonne
Providing, Fabricating, assembling and erecting structural steel
components/elements
steel grating cover 0,250
Total tonne
Total 1005 - culverts NPR Total 025 - Culvert 5 NPR Total 006 - Hydraulic Works 0,8780
NPR 0,8780
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD 17,1
3
10,0
3

27,16

2,7160
2,7160

0,2500
0,2500
- 33 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
007 - Civil Works
050 - Wall CH 0+050 / CH 0+110
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

80 09.04.02.B.01 AMOUNT CARRIED FORWARD 31


Excavation for Structures Foundation - Ordinary Rock (not requiring blasting) - 9,
Mechanical Means 82
80,00 * ((1,60+1,20)/2) * 1,30
Total cum Total 90 - Excavation NPR
CARRY FORWARD Wall CH 0+050 / CH 0+110 145,60
CARRY FORWARD Civil Works 145,60
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD
Excavation for Structures Foundation - Ordinary Rock (not requiring blasting) - 9,
Mechanical Means 82
80,00 * ((1,60+1,20)/2) * 1,30
Total cum Total 90 - Excavation NPR
CARRY FORWARD Wall CH 0+050 / CH 0+110
CARRY FORWARD Civil Works
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD

- 34 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
007 - Civil Works
050 - Wall CH 0+050 / CH 0+110
560 - Structures

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
81 20.01.00.0 AMOUNT CARRIED FORWARD 9.893,01
82 20.03.00.0 Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal mix) in Foundation 110.464,93
83 20.05.00.0 80,00 * 0,70 * 0,10 110.464,93
84 NP.CW.04.01 Total cum 7.780,00
85 NP.CW.04.03 Providing and laying , fitting and placing un-coated Mild steel / HYSD 11.720,00
86 NP.CW.16.01 reinforcement complete in foundation 5,60 16.220,39
87 NP.CW.18.01 steel rate 12,00 * 0,080 5,60 15.188,18
88 NP.CW.19.01 Total tonne 2.900,00
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure steel ratio
25,57 * 0,080
Total tonne
Providing and driving of 25 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
sub-horizontal bolts 27 * 3,50 0,9600
Total m 0,9600
Providing and driving of 32 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
vertical bolts 32 * 4,50
Total m
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item
2,0456
20.04.00.H.0p + 7%)
wall 2,0456
80,00 * 1,00 * 0,30
protection cap
27 * ((0,70*0,70+0,30*0,30)/2) * 0,20
Total cum
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 40 (item
20.02.00.h + 7%) 80,00 * 0,50 * 0,30
94,50
Total cum
Drainage holes (weep holes f 100 mm) shall be provided in the walls every 3 m (longitudinal 94,50
step) and in multiple rows as indicated below, as well as a longitudinal drainage pipe f
100 mm shall be installed at the wall foot, wrapped into a geotextile
33 * 5,00
Total m
Total 560 - Structures NPR
Total 050 - Wall CH 0+050 / CH 0+110 NPR 144,00
CARRY FORWARD Civil Works
144,00
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD
24,00
1,57

25,57

12,00

12,00

165,00
165,00

- 35 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
007 - Civil Works
051 - Wall CH 0+150 / CH 0+250
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Excavation for Structures Foundation - Ordinary Rock (not requiring blasting) -
89 09.04.02.
Mechanical Means
B.01
70 * ((1,60+1,20)/2) * 1,30
20,00 * ((1,60+1,20)/2) * 1,30 127,40
30 * ((1,60+1,30)/2) * 2,30
Total cum Total 90 - Excavation NPR 36,40
CARRY FORWARD Wall CH 0+150 / CH 0+250 100,05
CARRY FORWARD Civil Works 263,85 31
CARRY FORWARD Road Alignement MR1 - Main Road - 9,
... 82
CARRY FORWARD
- 36 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
007 - Civil Works
051 - Wall CH 0+150 / CH 0+250
560 - Structures

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal mix) in Foundation
90 20.01.00.0
120,00 * 0,70 * 0,10
Total cum
Providing and laying , fitting and placing un-coated Mild steel / HYSD 8,40
reinforcement complete in foundation
steel rate 18,00 * 0,080 8,40 9.893,01
91 20.03.00.0 Total tonne
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure steel ratio
63,48 * 0,080
Total tonne
Providing and driving of 25 mm dia rock bolt steel nails by drilling holes of 110 mm dia using 1,4400
cement grouting for fixing
sub-horizontal bolts 60 * 3,50 1,4400 110.464,93
Total m
92 20.05.00.0
Providing and driving of 32 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
vertical bolts 28 * 4,50
5,0784
33 * 7,00
Total m 5,0784 110.464,93
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item
93 NP.CW.04.01 20.04.00.H.0p + 7%)
wall
70,00 * 1,00 * 0,30
20,00 * 2,00 * 0,30
210,00
30,00 * 3,00 * 0,30
protection cap
60 * ((0,70*0,70+0,30*0,30)/2) * 0,20 210,00 7.780,00
Total cum
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 40 (item
20.02.00.h + 7%) 120,00 * 0,50 * 0,30
Total cum
Drainage holes (weep holes f 100 mm) shall be provided in the walls every 3 m (longitudinal
step) and in multiple rows as indicated below, as well as a longitudinal drainage pipe f
100 mm shall be installed at the wall foot, wrapped into a geotextile
20.04.00.H.0p + 7%)
wall
70,00 * 1,00 * 0,30
20,00 * 2,00 * 0,30
30,00 * 3,00 * 0,30
protection cap
60 * ((0,70*0,70+0,30*0,30)/2) * 0,20
94 NP.CW.04.03 Total cum
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 40 (item
20.02.00.h + 7%) 120,00 * 0,50 * 0,30
Total cum
Drainage holes (weep holes f 100 mm) shall be provided in the walls every 3 m (longitudinal 126,00
step) and in multiple rows as indicated below, as well as a longitudinal drainage pipe f
100 mm shall be installed at the wall foot, wrapped into a geotextile 231,00
40 * 5,00 357,00 11.720,00
Total m
95 NP.CW.16.01 CARRY FORWARD Civil Works
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD 21,00

12,00
27,00

3,48
63,48 16.220,39
96 NP.CW.18.01

18,00

18,00 15.188,18
97 NP.CW.19.01

200,00

200,00 2.900,00

- 37 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
007 - Civil Works
051 - Wall CH 0+150 / CH 0+250
560 - Structures

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
AMOUNT CARRIED FORWARD
Total 560 - Structures NPR
Total 051 - Wall CH 0+150 / CH 0+250 NPR
CARRY FORWARD Civil Works
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD

- 38 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
007 - Civil Works
052 - Wall CH 0+350
90 - Excavation
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

98 09.04.02.B.01 AMOUNT CARRIED FORWARD 31


Excavation for Structures Foundation - Ordinary Rock (not requiring blasting) - 9,
Mechanical Means 82
20,00 * ((1,60+1,20)/2) * 1,30
Total cum Total 90 - Excavation NPR
CARRY FORWARD Wall CH 0+350 36,40
CARRY FORWARD Civil Works 36,40
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD

- 39 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
007 - Civil Works
052 - Wall CH 0+350
560 - Structures

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

99 20.01.00.0 AMOUNT CARRIED FORWARD 9.893,01


100 20.03.00.0 Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal mix) in Foundation 110.464,93
101 20.05.00.0 20,00 * 0,70 * 0,10 110.464,93
102 NP.CW.04.01 Total cum 7.780,00
103 NP.CW.04.03 Providing and laying , fitting and placing un-coated Mild steel / HYSD 11.720,00
104 NP.CW.16.01 reinforcement complete in foundation 1,40 16.220,39
105 NP.CW.18.01 steel rate 3,00 * 0,080 1,40 15.188,18
106 NP.CW.19.01 Total tonne 2.900,00
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure steel ratio
12,58 * 0,080
Total tonne
Providing and driving of 25 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
sub-horizontal bolts 10 * 3,50 0,2400
Total m 0,2400
Providing and driving of 32 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
vertical bolts 14 * 7,00
Total m
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item
1,0064
20.04.00.H.0p + 7%)
wall 1,0064
20,00 * 2,00 * 0,30
protection cap
10 * ((0,70*0,70+0,30*0,30)/2) * 0,20
Total cum
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 40 (item
20.02.00.h + 7%) 20,00 * 0,50 * 0,30
35,00
Total cum
Drainage holes (weep holes f 100 mm) shall be provided in the walls every 3 m (longitudinal 35,00
step) and in multiple rows as indicated below, as well as a longitudinal drainage pipe f
100 mm shall be installed at the wall foot, wrapped into a geotextile
6 * 5,00
Total m
Total 560 - Structures NPR
Total 052 - Wall CH 0+350 NPR 98,00
CARRY FORWARD Civil Works
98,00
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD
12,00
0,58

12,58

3,00

3,00

30,00
30,00
- 40 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
007 - Civil Works
053 - Wall CH 0+390
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

107 09.04.02.B.01 AMOUNT CARRIED FORWARD 31


Excavation for Structures Foundation - Ordinary Rock (not requiring blasting) - 9,
Mechanical Means 82
20,00 * ((1,60+1,20)/2) * 1,30
Total cum Total 90 - Excavation NPR
CARRY FORWARD Wall CH 0+390 36,40
CARRY FORWARD Civil Works 36,40
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD
Excavation for Structures Foundation - Ordinary Rock (not requiring blasting) - 9,
Mechanical Means 82
20,00 * ((1,60+1,20)/2) * 1,30
Total cum Total 90 - Excavation NPR
CARRY FORWARD Wall CH 0+390
CARRY FORWARD Civil Works
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD

- 41 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
007 - Civil Works
053 - Wall CH 0+390
560 - Structures

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
108 20.01.00.0 AMOUNT CARRIED FORWARD 9.893,01
109 20.03.00.0 Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal mix) in Foundation 110.464,93
110 20.05.00.0 20,00 * 0,70 * 0,10 110.464,93
111 NP.CW.04.01 Total cum 7.780,00
112 NP.CW.04.03 Providing and laying , fitting and placing un-coated Mild steel / HYSD 11.720,00
113 NP.CW.16.01 reinforcement complete in foundation 1,40 16.220,39
114 NP.CW.18.01 steel rate 3,00 * 0,080 1,40 15.188,18
115 NP.CW.19.01 Total tonne 2.900,00
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure steel ratio
12,41 * 0,080
Total tonne
Providing and driving of 25 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
sub-horizontal bolts 7 * 8,00 0,2400
Total m 0,2400
Providing and driving of 32 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
vertical bolts 14 * 7,50
Total m
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item
0,9928
20.04.00.H.0p + 7%)
wall 0,9928
20,00 * 2,00 * 0,30
protection cap
7 * ((0,70*0,70+0,30*0,30)/2) * 0,20
Total cum
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 40 (item
20.02.00.h + 7%) 20,00 * 0,50 * 0,30
56,00
Total cum
Drainage holes (weep holes f 100 mm) shall be provided in the walls every 3 m (longitudinal 56,00
step) and in multiple rows as indicated below, as well as a longitudinal drainage pipe f
100 mm shall be installed at the wall foot, wrapped into a geotextile
6 * 5,00
Total m
Total 560 - Structures NPR
Total 053 - Wall CH 0+390 NPR 105,00
CARRY FORWARD Civil Works
105,00
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD
12,00
0,41

12,41

3,00

3,00

30,00
30,00

- 42 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
007 - Civil Works
054 - Wall CH 0+450
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

116 09.04.02.B.01 AMOUNT CARRIED FORWARD 31


Excavation for Structures Foundation - Ordinary Rock (not requiring blasting) - 9,
Mechanical Means 82
20,00 * ((1,60+1,20)/2) * 1,30
Total cum Total 90 - Excavation NPR
CARRY FORWARD Wall CH 0+450 36,40
CARRY FORWARD Civil Works 36,40
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD
- 43 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
007 - Civil Works
054 - Wall CH 0+450
560 - Structures

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

117 20.01.00.0 AMOUNT CARRIED FORWARD 9.893,01


118 20.03.00.0 Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal mix) in Foundation 110.464,93
119 20.05.00.0 20,00 * 0,70 * 0,10 110.464,93
120 NP.CW.04.01 Total cum 7.780,00
121 NP.CW.04.03 Providing and laying , fitting and placing un-coated Mild steel / HYSD 11.720,00
122 NP.CW.16.01 reinforcement complete in foundation 1,40 16.220,39
123 NP.CW.18.01 steel rate 3,00 * 0,080 1,40 15.188,18
124 NP.CW.19.01 Total tonne 2.900,00
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure steel ratio
6,58 * 0,080
Total tonne
Providing and driving of 25 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
sub-horizontal bolts 7 * 8,00 0,2400
Total m 0,2400
Providing and driving of 32 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
vertical bolts 8 * 7,50
Total m
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item
0,5264
20.04.00.H.0p + 7%)
wall 0,5264
20,00 * 1,00 * 0,30
protection cap
10 * ((0,70*0,70+0,30*0,30)/2) * 0,20
Total cum
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 40 (item
20.02.00.h + 7%) 20,00 * 0,50 * 0,30
56,00
Total cum
Drainage holes (weep holes f 100 mm) shall be provided in the walls every 3 m (longitudinal 56,00
step) and in multiple rows as indicated below, as well as a longitudinal drainage pipe f
100 mm shall be installed at the wall foot, wrapped into a geotextile
6 * 5,00
Total m
Total 560 - Structures NPR
Total 054 - Wall CH 0+450 NPR 60,00
CARRY FORWARD Civil Works
60,00
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD
6,00
0,58

6,58
3,00

3,00

30,00
30,00

- 44 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
007 - Civil Works
055 - Wall CH 0+530 / CH 0+550
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

125 09.04.02.B.01 AMOUNT CARRIED FORWARD 31


Excavation for Structures Foundation - Ordinary Rock (not requiring blasting) - 9,
Mechanical Means 82
40,00 * ((1,60+1,20)/2) * 1,30
Total cum Total 90 - Excavation NPR
CARRY FORWARD Wall CH 0+530 / CH 0+550 72,80
CARRY FORWARD Civil Works 72,80
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD
Excavation for Structures Foundation - Ordinary Rock (not requiring blasting) - 9,
Mechanical Means 82
40,00 * ((1,60+1,20)/2) * 1,30
Total cum Total 90 - Excavation NPR
CARRY FORWARD Wall CH 0+530 / CH 0+550
CARRY FORWARD Civil Works
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD

- 45 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
007 - Civil Works
055 - Wall CH 0+530 / CH 0+550
560 - Structures

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
126 20.01.00.0 AMOUNT CARRIED FORWARD 9.893,01
127 20.03.00.0 Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal mix) in Foundation 110.464,93
128 20.05.00.0 40,00 * 0,70 * 0,10 110.464,93
129 NP.CW.04.01 Total cum 7.780,00
130 NP.CW.04.03 Providing and laying , fitting and placing un-coated Mild steel / HYSD 11.720,00
131 NP.CW.16.01 reinforcement complete in foundation 2,80 16.220,39
132 NP.CW.18.01 steel rate 6,00 * 0,080 2,80 15.188,18
133 NP.CW.19.01 Total tonne 2.900,00
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure steel ratio
24,81 * 0,080
Total tonne
Providing and driving of 25 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
sub-horizontal bolts 14 * 8,00 0,4800
Total m 0,4800
Providing and driving of 32 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
vertical bolts 27 * 7,50
Total m
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item
1,9848
20.04.00.H.0p + 7%)
wall 1,9848
40,00 * 2,00 * 0,30
protection cap
14 * ((0,70*0,70+0,30*0,30)/2) * 0,20
Total cum
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 40 (item
20.02.00.h + 7%) 40,00 * 0,50 * 0,30
112,00
Total cum
Drainage holes (weep holes f 100 mm) shall be provided in the walls every 3 m (longitudinal 112,00
step) and in multiple rows as indicated below, as well as a longitudinal drainage pipe f
100 mm shall be installed at the wall foot, wrapped into a geotextile
13 * 5,00
Total m
Total 560 - Structures NPR
Total 055 - Wall CH 0+530 / CH 0+550 NPR 202,50
CARRY FORWARD Civil Works
202,50
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD
24,00
0,81

24,81

6,00

6,00

65,00
65,00

- 46 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
007 - Civil Works
056 - Wall CH 0+630 / CH 0+650
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

134 09.04.02.B.01 AMOUNT CARRIED FORWARD 31


Excavation for Structures Foundation - Ordinary Rock (not requiring blasting) - 9,
Mechanical Means 82
40,00 * ((1,60+1,20)/2) * 1,30
Total cum Total 90 - Excavation NPR
CARRY FORWARD Wall CH 0+630 / CH 0+650 72,80
CARRY FORWARD Civil Works 72,80
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD
- 47 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
007 - Civil Works
056 - Wall CH 0+630 / CH 0+650
560 - Structures

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

135 20.01.00.0 AMOUNT CARRIED FORWARD 9.893,01


136 20.03.00.0 Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal mix) in Foundation 110.464,93
137 20.05.00.0 40,00 * 0,70 * 0,10 110.464,93
138 NP.CW.04.01 Total cum 7.780,00
139 NP.CW.04.03 Providing and laying , fitting and placing un-coated Mild steel / HYSD 11.720,00
140 NP.CW.16.01 reinforcement complete in foundation 2,80 16.220,39
141 NP.CW.18.01 steel rate 6,00 * 0,080 2,80 15.188,18
142 NP.CW.19.01 Total tonne 2.900,00
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure steel ratio
24,81 * 0,080
Total tonne
Providing and driving of 25 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
sub-horizontal bolts 14 * 8,00 0,4800
Total m 0,4800
Providing and driving of 32 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
vertical bolts 27 * 7,50
Total m
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item
1,9848
20.04.00.H.0p + 7%)
wall 1,9848
40,00 * 2,00 * 0,30
protection cap
14 * ((0,70*0,70+0,30*0,30)/2) * 0,20
Total cum
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 40 (item
20.02.00.h + 7%) 40,00 * 0,50 * 0,30
112,00
Total cum
Drainage holes (weep holes f 100 mm) shall be provided in the walls every 3 m (longitudinal 112,00
step) and in multiple rows as indicated below, as well as a longitudinal drainage pipe f
100 mm shall be installed at the wall foot, wrapped into a geotextile
13 * 5,00
Total m
Total 560 - Structures NPR
Total 056 - Wall CH 0+630 / CH 0+650 NPR 202,50
CARRY FORWARD Civil Works
202,50
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD
24,00
0,81

24,81
6,00

6,00

65,00
65,00

- 48 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
007 - Civil Works
057 - Wall CH 0+790
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

143 09.04.02.B.01 AMOUNT CARRIED FORWARD 31


Excavation for Structures Foundation - Ordinary Rock (not requiring blasting) - 9,
Mechanical Means 82
20,00 * ((1,60+1,20)/2) * 1,30
Total cum Total 90 - Excavation NPR
CARRY FORWARD Wall CH 0+790 36,40
CARRY FORWARD Civil Works 36,40
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD
Excavation for Structures Foundation - Ordinary Rock (not requiring blasting) - 9,
Mechanical Means 82
20,00 * ((1,60+1,20)/2) * 1,30
Total cum Total 90 - Excavation NPR
CARRY FORWARD Wall CH 0+790
CARRY FORWARD Civil Works
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD

- 49 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
007 - Civil Works
057 - Wall CH 0+790
560 - Structures

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
144 20.01.00.0 AMOUNT CARRIED FORWARD 9.893,01
145 20.03.00.0 Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal mix) in Foundation 110.464,93
146 20.05.00.0 20,00 * 0,70 * 0,10 110.464,93
147 NP.CW.04.01 Total cum 7.780,00
148 NP.CW.04.03 Providing and laying , fitting and placing un-coated Mild steel / HYSD 11.720,00
149 NP.CW.16.01 reinforcement complete in foundation 1,40 16.220,39
150 NP.CW.18.01 steel rate 3,00 * 0,080 1,40 15.188,18
151 NP.CW.19.01 Total tonne 2.900,00
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure steel ratio
6,58 * 0,080
Total tonne
Providing and driving of 25 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
sub-horizontal bolts 10 * 3,50 0,2400
Total m 0,2400
Providing and driving of 32 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
vertical bolts 8 * 4,50
Total m
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item
0,5264
20.04.00.H.0p + 7%)
wall 0,5264
20,00 * 1,00 * 0,30
protection cap
10 * ((0,70*0,70+0,30*0,30)/2) * 0,20
Total cum
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 40 (item
20.02.00.h + 7%) 20,00 * 0,50 * 0,30
35,00
Total cum
Drainage holes (weep holes f 100 mm) shall be provided in the walls every 3 m (longitudinal 35,00
step) and in multiple rows as indicated below, as well as a longitudinal drainage pipe f
100 mm shall be installed at the wall foot, wrapped into a geotextile
6 * 5,00
Total m
Total 560 - Structures NPR
Total 057 - Wall CH 0+790 NPR 36,00
CARRY FORWARD Civil Works
36,00
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD
6,00
0,58

6,58

3,00

3,00

30,00
30,00

- 50 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
007 - Civil Works
058 - Wall CH 0+870 / CH 0+890
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

152 09.04.02.B.01 AMOUNT CARRIED FORWARD 31


Excavation for Structures Foundation - Ordinary Rock (not requiring blasting) - 9,
Mechanical Means 82
40,00 * (6,50*5,40/2)
Total cum Total 90 - Excavation NPR
CARRY FORWARD Wall CH 0+870 / CH 0+890 702,00
CARRY FORWARD Civil Works 702,00
CARRY FORWARD Road Alignement MR1 - Main Road -
...
CARRY FORWARD
- 51 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
007 - Civil Works
058 - Wall CH 0+870 / CH 0+890
560 - Structures

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

153 20.01.00.0 AMOUNT CARRIED FORWARD 9.893,01


154 20.03.00.0 Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal mix) in Foundation 110.464,93
155 20.05.00.0 40,00 * ((2,40+2,10)/2) * 0,10 110.464,93
156 NP.CW.04.01 Total cum 7.780,00
157 NP.CW.04.03 Providing and laying , fitting and placing un-coated Mild steel / HYSD 11.720,00
158 NP.CW.16.01 reinforcement complete in foundation 9,00 16.220,39
159 NP.CW.18.01 steel rate 49,20 * 0,080 9,00 15.188,18
160 NP.CW.19.01 Total tonne 2.900,00
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure steel ratio
130,73 * 0,080
Total tonne
Providing and driving of 25 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
sub-horizontal bolts 14 * 10,00 3,9360
20 * 10,00 3,9360
20 * 10,00
Total m
Providing and driving of 32 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
vertical bolts 80 * 8,00
10,4584
Total m
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item 10,4584
20.04.00.H.0p + 7%)
wall 140,
40,00 * ((7,00+4,00)/2) * ((0,30+0,85)/2)
00
protection cap
200,
54 * ((0,70*0,70+0,30*0,30)/2) * 0,20
00
Total cum
200,
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 40 (item
00
20.02.00.h + 7%)
40,00 * ((2,20+1,90)/2) * 0,60
Total cum 540,00
Drainage holes (weep holes f 100 mm) shall be provided in the walls every 3 m (longitudinal
step) and in multiple rows as indicated below, as well as a longitudinal drainage pipe f
100 mm shall be installed at the wall foot, wrapped into a geotextile
25 * 5,00
Total m Total 560 - Structures NPR
CARRY FORWARD
640,00
640,00

127,60
3,13

130,73
49,20

49,20

125,00
125,00

- 52 -
Priced Bill of Quantities
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904
007 - Civil Works
058 - Wall CH 0+870 / CH 0+890
560 - Structures

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
AMOUNT CARRIED FORWARD
Total 058 - Wall CH 0+870 / CH 0+890 NPR
Total 007 - Civil Works NPR
Total 01 - Road Alignement MR1 - Main Road - South
Stretch - CH 0+000 to 0+904 NPR
CARRY FORWARD

- 53 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
001 - Road Works
001 - Exavation, Filling and Paving
1420 - Paving
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

161 13.03.00.0 AMOUNT CARRIED FORWARD 12.172,63


162 13.04.00.A Bituminous Macadam 1388,41 9.577,26
163 13.09.00.B.01 Total cum 73,42
Bituminous Penetration Macadam - 50 mm thick 461,38
Total sqm 1.388,41
20 mm thick Open-Graded Premix Carpet using Bituminous (Paving bitumen / Modified 1.388,41
bitumen) Binder - By Mechanical Means - Mechanical method using Hot Mix Plant
50 mm
2,5 * 9227,60
Total sqm 461,38
Total 1420 - Paving NPR 461,38
Total 001 - Exavation, Filling and Paving NPR
CARRY FORWARD Road Works
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

23.069,00
23.069,00

- 54 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
001 - Road Works
004 - Signaling
1610 - Signaling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Road Marking with Hot Applied Thermoplastic Compound with Reflectorizing Glass Beads on
164 15.09.00.
Bituminous Surface
0.01
On smooth surface (similar to Asphalt concrete and rigid pavement) Road Marking
2 * 1126,00 * 0,25
2 * 1126,00 * 0,20
Painting Lines, Dashes, Arrows etc. 10,00
Total sqm 563,00
Led "cats eye" devices 2 * (1126,00/10,00) 450,40
Total no.
10,00
Total 1610 - Signaling NPR Total 004 - Signaling NPR Total 001 - Road Works NPR
CARRY FORWARD Road Alignement TU – Tunnel - CH 1.023,40 1.745,53
165 NP.CW.1 0...
3.01 CARRY FORWARD
225,20
225,20 600,00
- 55 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
101 - Main Tunnel - South portal -Technological Building
005 - Tecco Mesh and Shotcrete CH 28+200 / CH 28+350
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

166 09.01.03.B AMOUNT CARRIED FORWARD 38


Roadway Excavation in Ordinary Rock - Roadway Excavation in hard rock by 3,
Mechanical Means . 49
8998,66
Total cum Total 90 - Excavation NPR
CARRY FORWARD Tecco Mesh and Shotcrete CH 28+20... 8.998,66
CARRY FORWARD Main Tunnel - South portal -Technological Building 8.998,66
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
Roadway Excavation in Ordinary Rock - Roadway Excavation in hard rock by 3,
Mechanical Means . 49
8998,66
Total cum Total 90 - Excavation NPR
CARRY FORWARD Tecco Mesh and Shotcrete CH 28+20...
CARRY FORWARD Main Tunnel - South portal -Technological Building
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 56 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
101 - Main Tunnel - South portal -Technological Building
005 - Tecco Mesh and Shotcrete CH 28+200 / CH 28+350
175 - Embankment/Filling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing suitable material and Back filling behind abutment, wing wall and return wall -
Granular Material
filling material - ME ≥ 50 MN/m² 191,25
filling material - ME ≥ 40 MN/m² 2385,50
Top Soil (20 cm) 140,00
Total cum
Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal mix) in Foundation
Filling under the building and between the artificial tunnel and the building 135,00
Total cum Total 175 - Embankment/Filling NPR
AMOUNT CARRIED FORWARD
Providing suitable material and Back filling behind abutment, wing wall and return wall -
167 09.11.00.A
Granular Material
filling material - ME ≥ 50 MN/m² 191,25
filling material - ME ≥ 40 MN/m² 2385,50
Top Soil (20 cm) 140,00
191,25
Total cum
Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal mix) in Foundation
Filling under the building and between the artificial tunnel and the building 135,00
2.385,50
Total cum Total 175 - Embankment/Filling NPR
CARRY FORWARD Tecco Mesh and Shotcrete CH 28+20...
CARRY FORWARD Main Tunnel - South portal -Technological Building 140,00
CARRY FORWARD Road Alignement TU – Tunnel - CH 2.716,75 1.500,45
168 20.01.00.0 0...
CARRY FORWARD

135,00

135,00 9.893,01

- 57 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
101 - Main Tunnel - South portal -Technological Building
005 - Tecco Mesh and Shotcrete CH 28+200 / CH 28+350
600 - Protezione imbocchi in ingresso gallerie in presenza di marciapiedi

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying , fitting and placing un-coated Mild steel / HYSD
169 20.03.00.0
reinforcement complete in foundation
steel ratio 37,98 * 0,070
Total tonne
Sub-Surface Drains with Perforated Pipe 226 * 5,00 2,6586
Total m
200 mm thick shotcreting for excavated rock stabilisation for external areas section "A" 2,6586 110.464,93
5,60 * 5,77
170 24.22.00.0 section "B" 3,80 * 11,85
6,42 * 1,50
1.130,00
6,90 * 4,20
section "C" 18,58 * 11,85 1.130,00 1.272,98
18,58 * 1,50
171 NP.CW.01.03
18,58 * 7,50
section "D" 12,64 * 13,65
12,64 * 1,50
12,64 * 11,84 32,31
section "E" 9,06 * 13,65
12,82 * 1,50 45,03
14,45 * 13,65
19,42 * 3,00 9,63
20,32 * 8,00 28,98
section "F" 13,87 * 13,65
13,61 * 1,50
13,52 * 8,10 220,17
section "G" 6,77 * 12,25 27,87
Total sqm
Wire mesh D. 12/150/150 for Shotcrete - external areas section "A" 139,35
2 * 5,60 * 5,77
section "B" 172,54
2 * 3,80 * 11,85
2 * 6,42 * 1,50 18,96
2 * 6,90 * 4,20 149,66
section "C"
CARRY FORWARD Protezione imbocchi in ingresso gallerie in presenza d... CARRY
123,67
FORWARD Tecco Mesh and Shotcrete CH 28+20... CARRY FORWARD Main
Tunnel - South portal -Technological Building 19,23
CARRY FORWARD Road Alignement TU – Tunnel - CH 197,24
0... 58,26
CARRY FORWARD
162,56

189,33
20,42
109,51

82,93
1.807,65 11.300,00
172 NP.CW.02.03

64,62

90,06
19,26
57,96
- 58 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
101 - Main Tunnel - South portal -Technological Building
005 - Tecco Mesh and Shotcrete CH 28+200 / CH 28+350
600 - Protezione imbocchi in ingresso gallerie in presenza di marciapiedi

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


2 * 18,58 * 11,85 440,35
2 * 18,58 * 1,50
2 * 18,58 * 7,50 55,74
section "D" 278,70
2 * 12,64 * 13,65
2 * 12,64 * 1,50
345,07
2 * 12,64 * 11,84
section "E" 37,92
2 * 9,06 * 13,65
299,32
2 * 12,82 * 1,50
2 * 14,45 * 13,65
2 * 19,42 * 3,00 247,34
2 * 20,32 * 8,00
38,46
section "F"
2 * 13,87 * 13,65 394,49
2 * 13,61 * 1,50 116,52
2 * 13,52 * 8,10
section "G" 325,12
2 * 6,77 * 12,25
Total sqm 378,65
Providing and driving of 32 mm dia rock bolt steel nails by drilling holes of 120 mm dia using
cement grouting for fixing 40,83
section "A" 2 * 2 * 6,00 219,02
section "B"
2 * 5 * 15,00
section "C" 165,87
9 * 5 * 15,00 3.615,30 1.494,15
9 * 3 * 15,00
173 NP.CW.04.04 section "D"
6 * 2 * 15,00
6 * 5 * 15,00
section "E"
4 * 2 * 15,00 24,00
7 * 6 * 15,00
10 * 4 * 15,00
section "F" 150,00
7 * 6 * 15,00
7 * 3 * 15,00 675,00
section "G"
3 * 6 * 15,00 405,00
test rock bolt 5 * 15,00
Total m 180,00
Providing and driving of 43 mm dia rock bolt steel nails by drilling holes of 120 CARRY
FORWARD Protezione imbocchi in ingresso gallerie in presenza d... CARRY FORWARD 450,00
Tecco Mesh and Shotcrete CH 28+20...
CARRY FORWARD Main Tunnel - South portal -Technological Building 120,00
CARRY FORWARD Road Alignement TU – Tunnel - CH
630,00
0...
CARRY FORWARD 600,00

630,00
315,00

270,00

75,00
4.524,00 11.990,00
174 NP.CW.04.05
- 59 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
101 - Main Tunnel - South portal -Technological Building
005 - Tecco Mesh and Shotcrete CH 28+200 / CH 28+350
600 - Protezione imbocchi in ingresso gallerie in presenza di marciapiedi

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


mm dia using cement grouting for fixing section "D"
6 * 4 * 15,00
section "E"
4 * 4 * 15,00 360,00
section "F" 13,87 * 13,65
13,61 * 1,50
13,52 * 8,10 240,00
section "G" 6,77 * 12,25
test rock bolt 5 * 15,00 189,33
Total m
Providing and driving of pre-tensioned anchors (5 strands) by drilling holes of 200 mm dia 20,42
level 211.60 109,51
29 * 20,00
level 225.10
10 * 20,00 82,93
test
3 * 20,00
75,00
Total m
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 40 (item 1.077,19 20.140,00
20.02.00.h + 7%) level 211.60
175 NP.CW.05.01
58,00 * 0,70 * 0,70
level 225.10
19,50 * 0,70 * 0,70
Total cum
Total 600 - Protezione imbocchi in ingresso gallerie in presenza di marciapiedi 580,00
NPR
Total 005 - Tecco Mesh and Shotcrete CH 28+200 / CH 28+350
200,00
NPR
CARRY FORWARD Main Tunnel - South portal -Technological Building
60,00
CARRY FORWARD Road Alignement TU – Tunnel - CH
0... 840,00 15.000,00
176 NP.CW.18.01 CARRY FORWARD

28,42

9,56
37,98 15.188,18
- 60 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
101 - Main Tunnel - South portal -Technological Building
102 - Technological Building South
280 - Foundation Slabs

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


177 20.01.00.0 Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal mix) in

Foundation
((13,56+7,70)/2) * 19,25 * 0,10 20,46
(1/2) * 13,56 * 4,70 * 0,10 3,19
(1/2) * 14,00 * 3,13 21,91
1,90 * 0,60 1,14
Total cum 46,70 9.893,01
178 20.03.00.0 Providing and laying , fitting and placing un-coated Mild steel / HYSD

reinforcement complete in foundation


Steel ratio 70.00 kg/mc
134,19 * 0,070 9,3933
Total tonne 9,3933 110.464,93
179 NP.CW.18.01 Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 40 (item

20.02.00.h + 7%)
((13,34+7,52)/2) * 19,11 * 0,40 79,73
(1/2) * 13,34 * 4,71 * 0,40 12,57
(1/2) * 13,83 * 3,00 * 0,40 8,30
6,32 * 0,80 * 0,30 1,52
6,16 * 0,30 * (0,30/2) 0,28
6,49 * 0,30 * (0,30/2) 0,29
11,28 * 0,80 * 0,30 2,71
11,11 * 0,30 * (0,30/2) 0,50
11,53 * 0,80 * (0,80/2) 3,69
11,33 * 0,50 * 0,55 3,12
9,06 * 0,80 * 0,30 2,17
8,89 * 0,30 * (0,30/2) 0,40
9,26 * 0,50 * (0,50/2) 1,16
9,10 * 0,55 * 0,20 1,00
(16,53+1,16+5,96+11,35) * 0,80 * 0,30 8,40
(15,85+1,16+5,96+10,40) * 0,30 * (0,30/2) 1,50
slab +0.00
((8,29+6,93)/2) * 4,50 * 0,20 6,85
Total cum 134,19 15.188,18
Total 280 - Foundation Slabs NPR

CARRY FORWARD Technological Building South


CARRY FORWARD Main Tunnel - South portal -Technological Building
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
- 61 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
101 - Main Tunnel - South portal -Technological Building
102 - Technological Building South
300 - Vertical Elements

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


180 20.05.00.0 Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure

Steel ratio 95.00 kg/mc


108,15 * 0,095 10,2743
Steel ratio 100.00 kg/mc
144,91 * 0,10 14,4910
Total tonne 24,7653 110.464,93
181 NP.CW.16.01 Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item

20.04.00.H.0p + 7%)
Over ground floor
7,23 * 0,40 * 4,00 11,57
7,63 * 0,40 * 4,50 13,73
5,12 * 0,40 * 4,70 9,63
6,93 * 0,40 * 4,70 13,03
4,90 * 0,30 * 4,70 6,91
7,30 * 0,30 * 4,50 9,86
11,63 * 0,30 * 4,00 13,96
3,00 * 0,30 * 4,00 3,60
11,75 * 0,40 * 4,00 18,80
8,38 * 0,30 * 4,50 11,31
2 * 2,50 * 0,30 * 4,00 6,00
7,10 * 0,30 * 4,00 8,52
5,45 * 0,30 * 4,00 6,54
1,20 * 0,30 * 4,00 1,44
5,95 * 0,30 * 4,00 7,14
-2 * 2,00 * 0,30 * 2,30 -2,76
-1 * 1,20 * 0,30 * 2,30 -0,83
-1 * 4,00 * 0,30 * 3,00 -3,60
((1,48+0,90)/2) * 0,40 * (4,40+0,70+0,70) 2,76
Over first floor
19,98 * 0,40 * 3,00 23,98
6,93 * 0,40 * 3,00 8,32
23,82 * 0,30 * 3,00 21,44
3,00 * 0,30 * 3,00 2,70
11,75 * 0,40 * 3,00 14,10
5,93 * 0,30 * 3,00 5,34
4,73 * 0,30 * 3,00 4,26
4,78 * 0,30 * 3,00 4,30
1,75 * 0,20 * 3,00 1,05
5,33 * 0,30 * 3,00 4,80
0,80 * 0,20 * 3,00 0,48
1,24 * 0,30 * 3,00 1,12
6,01 * 0,20 * 3,00 3,61
2,99 * 0,20 * 3,00 1,79
4,28 * 0,20 * 3,00 2,57
1,86 * 0,20 * 3,00 1,12
CARRY FORWARD Vertical Elements
CARRY FORWARD Technological Building South
CARRY FORWARD Main Tunnel - South portal -Technological Building
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
- 62 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
101 - Main Tunnel - South portal -Technological Building
102 - Technological Building South
300 - Vertical Elements

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


2,51 * 0,20 * 3,00 1,51
0,25 * 0,20 * 3,00 0,15
1,63 * 0,20 * 3,00 0,98
2,28 * 0,20 * 3,00 1,37
0,54 * 0,20 * 3,00 0,32
-5 * 2,00 * 0,30 * 1,30 -3,90
((1,82+1,48)/2) * 0,40 * 3,40 2,24
Over slab +7.80
35,00 * 0,40 * 0,80 11,20
((1,82+1,90)/2) * 0,40 * 0,80 0,60
Total cum 253,06 16.220
,39
Total 300 - Vertical Elements NPR

CARRY FORWARD Technological Building South


CARRY FORWARD Main Tunnel - South portal -Technological Building
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
- 63 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
101 - Main Tunnel - South portal -Technological Building
102 - Technological Building South
680 - Slabs

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying , fitting and placing HYSD bar reinforcement in super- structure
182 20.09.00.0
Steel ratio 110.00 kg/mc 99,62 * 0,110
Steel ratio 105.00 kg/mc 100,52 * 0,105
Total tonne
Reinforced/ Pre-stressed cement concrete in super-structure. RCC/PSC Grade M 40 - For solid
slab super-structure. (item 20.04.00.H.0p + 2,75%)
Floor +4.40
((13,34+7,50)/2) * 19,11 * 0,40
(1/2) * 13,34 * 4,71 * 0,40
(1/2) * 13,83 * 3,00 * 0,40
-1,50 * 1,50 * 0,40
Floor +7.80
AMOUNT CARRIED FORWARD
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure
Steel ratio 110.00 kg/mc 99,62 * 0,110
Steel ratio 105.00 kg/mc 100,52 * 0,105
Total tonne
Reinforced/ Pre-stressed cement concrete in super-structure. RCC/PSC Grade M 40 - For solid
10,9582
slab super-structure. (item 20.04.00.H.0p + 2,75%)
Floor +4.40
((13,34+7,50)/2) * 19,11 * 0,40 10,5546
(1/2) * 13,34 * 4,71 * 0,40
(1/2) * 13,83 * 3,00 * 0,40 21,5128 112.276,18
183 NP.CW.17.01 -1,50 * 1,50 * 0,40
Floor +7.80
((13,34+7,50)/2) * 19,11 * 0,40
(1/2) * 13,34 * 4,71 * 0,40
(1/2) * 13,83 * 3,00 * 0,40 79,65
Total cum Total 680 - Slabs NPR
CARRY FORWARD Technological Building South 12,57
CARRY FORWARD Main Tunnel - South portal -Technological Building 8,30
CARRY FORWARD Road Alignement TU – Tunnel - CH -0,90
0...
CARRY FORWARD
79,65
12,57
8,30
200,14 17.501,69

- 64 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
101 - Main Tunnel - South portal -Technological Building
102 - Technological Building South
685 - Completion work
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and installing HVAC plants in all floors of the building, in accordance to relevant
184 NP.CMW.01.0
Nepalese laws
1
1
Total amount 1,00
Providing and installing fire emergency and estinguishing system, according to relevant
Nepalese codes and standards 1,00 5.000.000,00
185 NP.CMW.02.0 1
1 Total amount
Providing doors according to nepalese standards and to requirements in tender drawings
1,00
4
Total no.
1,00 4.400.000,00
Providing windows according to nepalese standards and to requirements in tender drawings
186 NP.CMW.03.0 5
1 Total no.
Total 685 - Completion work NPR 4,00
Total 102 - Technological Building South NPR
Total 101 - Main Tunnel - South portal -Technological Building NPR 4,00 50.000,00
187 NP.CMW.04.0 CARRY FORWARD Road Alignement TU – Tunnel - CH
1 0...
CARRY FORWARD 5,00

5,00 25.000,00

- 65 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
102 - Main Tunnel - North portal -Technological Building
006 - Tecco Mesh and Shotcrete CH 30+250 / CH 30+450
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

188 09.01.03.B AMOUNT CARRIED FORWARD 38


Roadway Excavation in Ordinary Rock - Roadway Excavation in hard rock by 3,
Mechanical Means . 49
7524,68
Total cum Total 90 - Excavation NPR
CARRY FORWARD Tecco Mesh and Shotcrete CH 30+25... 7.524,68
CARRY FORWARD Main Tunnel - North portal -Technological Building 7.524,68
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
- 66 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
102 - Main Tunnel - North portal -Technological Building
006 - Tecco Mesh and Shotcrete CH 30+250 / CH 30+450
175 - Embankment/Filling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing suitable material and Back filling behind abutment, wing wall and return wall -
189 09.11.00.A
Granular Material
filling material - ME ≥ 50 MN/m² 530,00
filling material - ME ≥ 40 MN/m² 1820,00
Top Soil (20 cm) 115,00
530,00
Total cum
Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal mix) in Foundation
Filling under the building and between the artificial tunnel and the building 230,00
1.820,00
Total cum Total 175 - Embankment/Filling NPR
CARRY FORWARD Tecco Mesh and Shotcrete CH 30+25...
CARRY FORWARD Main Tunnel - North portal -Technological Building 115,00
CARRY FORWARD Road Alignement TU – Tunnel - CH 2.465,00 1.500,45
190 20.01.00.0 0...
CARRY FORWARD

230,00

230,00 9.893,01
- 67 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
102 - Main Tunnel - North portal -Technological Building
006 - Tecco Mesh and Shotcrete CH 30+250 / CH 30+450
600 - Protezione imbocchi in ingresso gallerie in presenza di marciapiedi

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 19,50 * 0,70 * 0,70
191 20.02.00.G
Total cum
Providing and laying , fitting and placing un-coated Mild steel / HYSD 9,56
reinforcement complete in foundation
steel ratio 9,56 * 0,070 9,56 13.966,07
192 20.03.00.0 Total tonne
Sub-Surface Drains with Perforated Pipe 168 * 5,00
Total m
200 mm thick shotcreting for excavated rock stabilisation for external areas section "A"
11,70 * 10,80 0,6692
section "B-C" 19,70 * 13,65
23,12 * 1,50 0,6692 110.464,93
24,30 * ((6,40+14,00)/2)
193 24.22.00.0
section "D" 11,39 * 13,65
11,39 * 1,50 840,00
11,39 * 9,10
section "E" 4,73 * 15,95 840,00 1.272,98
194 NP.CW.01.03 4,73 * 1,50
4,73 * 7,05
section "F" 20,20 * 13,90
Total sqm
Wire mesh D. 12/150/150 for Shotcrete - external areas section "A" 126,36
2 * 11,70 * 10,80
section "B-C" 268,91
2 * 19,70 * 13,65
2 * 23,12 * 1,50 34,68
section "D" 247,86
2 * 11,39 * 13,65
2 * 11,39 * 1,50
155,47
section "E"
2 * 4,73 * 15,95 17,09
2 * 4,73 * 1,50
103,65
section "F"
2 * 20,20 * 13,90
CARRY FORWARD Protezione imbocchi in ingresso gallerie in presenza d... CARRY
FORWARD Tecco Mesh and Shotcrete CH 30+25... CARRY FORWARD Main
Tunnel - North portal -Technological Building
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
2 * 11,39 * 13,65
2 * 11,39 * 1,50
section "E"
2 * 4,73 * 15,95
2 * 4,73 * 1,50
section "F"
2 * 20,20 * 13,90
CARRY FORWARD Protezione imbocchi in ingresso gallerie in presenza d... CARRY 75,44
FORWARD Tecco Mesh and Shotcrete CH 30+25... CARRY FORWARD Main 7,10
Tunnel - North portal -Technological Building
33,35
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
280,78
CARRY FORWARD
1.350,69 11.300,00
195 NP.CW.02.03

252,72

537,81
69,36

310,95
34,17

150,89
14,19

561,56

- 68 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
102 - Main Tunnel - North portal -Technological Building
006 - Tecco Mesh and Shotcrete CH 30+250 / CH 30+450
600 - Protezione imbocchi in ingresso gallerie in presenza di marciapiedi

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Total sqm 1.931,65 1.494,15
Wire mesh D. 14/150/150 for Shotcrete - external areas section "B-C"
196 NP.CW.02.04 2 * 24,30 * ((6,40+14,00)/2)
section "D"
2 * 11,39 * 9,10
section "E" 495,72
2 * 4,73 * 7,05
Total sqm
Providing and driving of 32 mm dia rock bolt steel nails by drilling holes of 120 mm dia using 207,30
cement grouting for fixing
section "A" 66,69
6 * 3 * 15,00
section "B-C" 10 * 4 * 15,00 769,71 1.958,27
197 NP.CW.04.04 12 * ((3+6)/2) * 15,00
section "D"
6 * 4 * 15,00
6 * 4 * 15,00
section "E" 270,00
2 * 3 * 15,00
section "F" 20,20 * 13,90
test rock bolt 5 * 15,00 600,00
Total m
Providing and driving of 43 mm dia rock bolt steel nails by drilling holes of 120 mm dia using 810,00
cement grouting for fixing
section "A" 360,00
6 * 2 * 15,00
section "B-C" 10 * 2 * 15,00 360,00
section "D"
6 * 2 * 15,00
section "E"
2 * 7 * 15,00
section "F"
10 * 6 * 15,00
test rock bolt 5 * 15,00
Total m
Providing and driving of pre-tensioned anchors (5 strands) by drilling holes of 200 mm dia
Total m
Providing and driving of 43 mm dia rock bolt steel nails by drilling holes of 120 mm dia using
cement grouting for fixing
section "A"
6 * 2 * 15,00
section "B-C" 10 * 2 * 15,00
section "D"
6 * 2 * 15,00
section "E" 90,00
2 * 7 * 15,00
section "F" 280,78
10 * 6 * 15,00
test rock bolt 5 * 15,00
Total m 75,00
Providing and driving of pre-tensioned anchors (5 strands) by drilling holes of 200 mm dia
2.845,78 11.990,00
20 * 20,00
198 NP.CW.04.05 CARRY FORWARD Protezione imbocchi in ingresso gallerie in presenza d... CARRY
FORWARD Tecco Mesh and Shotcrete CH 30+25... CARRY FORWARD Main
Tunnel - North portal -Technological Building
CARRY FORWARD Road Alignement TU – Tunnel - CH 180,00
0...
CARRY FORWARD
300,00

180,00

210,00

900,00

75,00
1.845,00 20.140,00
199 NP.CW.05.01

400,00

- 69 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
102 - Main Tunnel - North portal -Technological Building
006 - Tecco Mesh and Shotcrete CH 30+250 / CH 30+450
600 - Protezione imbocchi in ingresso gallerie in presenza di marciapiedi

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD 15.000


test ,00
3 * 20,00
Total m 60,00
Total 600 - Protezione imbocchi in ingresso gallerie in presenza di marciapiedi 460,00
NPR
Total 006 - Tecco Mesh and Shotcrete CH 30+250 / CH 30+450
NPR
CARRY FORWARD Main Tunnel - North portal -Technological Building
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
AMOUNT CARRIED FORWARD 15.000
test ,00
3 * 20,00
Total m
Total 600 - Protezione imbocchi in ingresso gallerie in presenza di marciapiedi
NPR
Total 006 - Tecco Mesh and Shotcrete CH 30+250 / CH 30+450
NPR
CARRY FORWARD Main Tunnel - North portal -Technological Building
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 70 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
102 - Main Tunnel - North portal -Technological Building
103 - Technological Building North
280 - Foundation Slabs

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
200 20.01.00.0 AMOUNT CARRIED FORWARD 9.893,01
201 20.03.00.0 Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal mix) in Foundation 110.464,93
202 NP.CW.18.01 (1/2) * 15,60 * 15,60 * 0,10 15.188,18
4,10 * 15,60 * 0,10 12,17
6,40
19,70 * 2,10 * 0,10
Total cum 4,14
Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation
Steel ratio 95.00 kg/mc 162,01 * 0,095 22,71
Total tonne
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 40 (item
20.02.00.h + 7%)
(1/2) * 15,50 * 15,50 * 0,30
4,00 * 15,50 * 0,30
(14,70+17,30) * 0,30 * (0,30/2)
(15,50+18,00) * 0,80 * 0,30 15,3910
19,50 * 2,00 * 2,51 15,3910
Total cum Total 280 - Foundation Slabs NPR
CARRY FORWARD Technological Building North 36,04
CARRY FORWARD Main Tunnel - North portal -Technological Building 18,60
1,44
CARRY FORWARD Road Alignement TU – Tunnel - CH 8,04
0... 97,89
CARRY FORWARD

162,01

- 71 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
102 - Main Tunnel - North portal -Technological Building
103 - Technological Building North
300 - Vertical Elements

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


203 20.05.00.0 Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure

Steel ratio 100.00 kg/mc


70,75 * 0,10 7,0750
Steel ratio 95.00 kg/mc
146,33 * 0,095 13,9014
Total tonne 20,9764 110.464,93
204 NP.CW.16.01 Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item

20.04.00.H.0p + 7%)
Over underground floor
1,75 * 0,30 * (3,60+0,30+0,30+0,30) 2,36
15,50 * 0,40 * 3,60 22,32
7,74 * 0,30 * 3,60 8,36
11,76 * 0,30 * 3,40 12,00
0,50 * (0,50/2) * 3,40 0,43
9,02 * 0,30 * 3,40 9,20
12,90 * 0,30 * 3,60 13,93
3,60 * 0,30 * 3,60 3,89
3 * 4,42 * 0,20 * 3,60 9,55
11,74 * 0,30 * 3,60 12,68
1,45 * 0,30 * 3,60 1,57
1,12 * 0,30 * 3,60 1,21
3,98 * 0,20 * 3,60 2,87
1,76 * 0,20 * 3,60 1,27
0,71 * (0,71/2) * 3,60 0,92
4,96 * 0,30 * 3,40 5,06
5,78 * 0,30 * 3,40 5,90
0,50 * (0,50/2) * 3,40 0,43
-5 * 0,80 * 0,30 * 0,60 -0,72
-1 * 0,80 * 0,20 * 0,60 -0,10
Over ground floor
1,75 * 0,30 * (4,50+0,40) 2,57
15,50 * 0,40 * 4,50 27,90
8,04 * 0,30 * 4,50 10,85
4,96 * 0,30 * 4,70 6,99
5,78 * 0,30 * 4,70 8,15
0,42 * 0,30 * 4,50 0,57
12,73 * 0,30 * 4,50 17,19
3,60 * 0,30 * 4,50 4,86
3,10 * 0,20 * 4,50 2,79
6,38 * 0,30 * 4,50 8,61
2,40 * 0,30 * 4,50 3,24
1,45 * 0,30 * 4,50 1,96
5,78 * 0,30 * 4,50 7,80
1,32 * 0,30 * 4,50 1,78
1,61 * 0,20 * 4,50 1,45
CARRY FORWARD Vertical Elements
CARRY FORWARD Technological Building North
CARRY FORWARD Main Tunnel - North portal -Technological Building
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
- 72 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
102 - Main Tunnel - North portal -Technological Building
103 - Technological Building North
300 - Vertical Elements

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


1,24 * 0,20 * 4,50 1,12
1,76 * 0,20 * 4,50 1,58
3,78 * 0,30 * 4,50 5,10
-3 * 2,00 * 0,30 * 2,30 -4,14
Over slab +4.40
(6,50+12,73+4,00) * 0,30 * 0,80 5,58
1,75 * 0,30 * 0,80 0,42
Total cum 229,50 16.220
,39
Total 300 - Vertical Elements NPR
CARRY FORWARD Technological Building North
CARRY FORWARD Main Tunnel - North portal -Technological Building
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
- 73 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
102 - Main Tunnel - North portal -Technological Building
103 - Technological Building North
680 - Slabs

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying , fitting and placing HYSD bar reinforcement in super- structure
205 20.09.00.0
Steel ratio 95.00 kg/mc 123,65 * 0,095
Total tonne
Reinforced/ Pre-stressed cement concrete in super-structure. RCC/PSC Grade M 40 - For solid
slab super-structure. (item 20.04.00.H.0p + 2,75%) 11,7468
Floor +0.00
(1/2) * 15,50 * 15,50 * 0,30 11,7468 112.276,18
4,00 * 15,50 * 0,30
206 NP.CW.17.01 4,66 * 5,78 * 0,20
-1 * 2,00 * 1,30 * 0,30
Floor +4.40
((6,50+15,50)/2) * 9,00 * 0,40
36,04
4,00 * 15,50 * 0,40
Total cum Total 680 - Slabs NPR
18,60
CARRY FORWARD Technological Building North
CARRY FORWARD Main Tunnel - North portal -Technological Building 5,39
CARRY FORWARD Road Alignement TU – Tunnel - CH -0,78
0...
CARRY FORWARD 39,60
24,80
123,65 17.501,69
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 74 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
102 - Main Tunnel - North portal -Technological Building
103 - Technological Building North
685 - Completion work

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and installing HVAC plants in all floors of the building, in accordance to relevant
207 NP.CMW.01.0
Nepalese laws
2
1
Total amount 1,00
Providing doors according to nepalese standards and to requirements in tender drawings
3 1,00 2.000.000,00
208 NP.CMW.03.0 Total no.
1 Total 685 - Completion work NPR
Total 103 - Technological Building North NPR 3,00
Total 102 - Main Tunnel - North portal -Technological Building NPR
CARRY FORWARD Road Alignement TU – Tunnel - CH 3,00 50.000,00
0...
CARRY FORWARD
Total 685 - Completion work NPR
Total 103 - Technological Building North NPR
Total 102 - Main Tunnel - North portal -Technological Building NPR
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 75 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
110 - Main Tunnel - section type 0 straight line (only excavation and lining)
180 - Filling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
209 12.01.00.a AMOUNT CARRIED FORWARD 1.996,
Providing and laying Granular Sub-Base Material - By Mechanical means section type 0 11
54,5 * 14,86
Total cum Total 180 - Filling NPR
CARRY FORWARD Main Tunnel - section type 0 straight ...
CARRY FORWARD Main Tunnel 809,87
CARRY FORWARD Road Alignement TU – Tunnel - CH 809,87
0...
CARRY FORWARD

- 76 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
110 - Main Tunnel - section type 0 straight line (only excavation and lining)
800 - Tunnel excavation
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

210 NP.UW.02.02 AMOUNT CARRIED FORWARD 6.753,


Rock Excavations for underground works - with hammer or drill&blast section type 0 42
54,5 * 107,00
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD Main Tunnel - section type 0 straight ...
CARRY FORWARD Main Tunnel 5.831,50
CARRY FORWARD Road Alignement TU – Tunnel - CH 5.831,50
0...
CARRY FORWARD

- 77 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
110 - Main Tunnel - section type 0 straight line (only excavation and lining)
810 - Pre-Support

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

211 NP.UW.04.01 AMOUNT CARRIED FORWARD 3.043,88


212 NP.UW.05.01 50 mm thick shotcreting with steel fibers for underground works section type 0 2.652,95
213 NP.UW.06.01 54,5 * 27,15 581,39
Total sqm
50 mm thick shotcreting for underground works section type 0
54,5 * 27,00
1.479,68
Total sqm
Wire mesh ∅5mm/100x100 for Shotcrete - underground works section type 0 1.479,68
54,5 * 27,07
Total sqm Total 810 - Pre-Support NPR
CARRY FORWARD Main Tunnel - section type 0 straight ...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH 1.471,50
0... 1.471,50
CARRY FORWARD

1.475,32
1.475,32
CARRY FORWARD

- 78 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
110 - Main Tunnel - section type 0 straight line (only excavation and lining)
820 - Rock Reinforcement

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

214 NP.UW.08.02 AMOUNT CARRIED FORWARD 7.352,


Swellex rock bolts (yield load >200 kN - L=4,00) for underground works section type 0 36
54,5
Total no. Total 820 - Rock Reinforcement NPR
CARRY FORWARD Main Tunnel - section type 0 straight ...
CARRY FORWARD Main Tunnel 54,50
CARRY FORWARD Road Alignement TU – Tunnel - CH 54,50
0...
CARRY FORWARD
Swellex rock bolts (yield load >200 kN - L=4,00) for underground works section type 0 36
54,5
Total no. Total 820 - Rock Reinforcement NPR
CARRY FORWARD Main Tunnel - section type 0 straight ...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 79 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
110 - Main Tunnel - section type 0 straight line (only excavation and lining)
845 - Waterproofing system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Waterproofing system for underground works: composite drainage sheet, PVC
membrane, protection sheet, including granular draining material around the pipe
section type 0
54,5 * 27,10
Total sqm
Drainage pipe f 200 HDPE micro-slotted for drainage underground works section type 0
54,5 * 2,00
Total m Total 845 - Waterproofing system NPR
CARRY FORWARD Main Tunnel - section type 0 straight ...
AMOUNT CARRIED FORWARD
Waterproofing system for underground works: composite drainage sheet, PVC
215 NP.UW.13.01
membrane, protection sheet, including granular draining material around the pipe
section type 0
54,5 * 27,10
Total sqm 1.476,95
Drainage pipe f 200 HDPE micro-slotted for drainage underground works section type 0
54,5 * 2,00 1.476,95 4.500,00
Total m Total 845 - Waterproofing system NPR
216 NP.UW.14.01
CARRY FORWARD Main Tunnel - section type 0 straight ...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH 109,00
0...
CARRY FORWARD 109,00 3.019,03

- 80 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
110 - Main Tunnel - section type 0 straight line (only excavation and lining)
850 - Lining bottom side / Inver

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying of Plain Cement Concrete M 10 - for underground works (item
217 NP.UW.20.01
20.01.00.0 + NP.UW.01.00)
section type 0
2 * 54,5 * 2,00 * 0,10
Total cum 21,80
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground
works (item 20.02.00.G + NP.UW.01.00) 21,80 10.981,24
section type 0
218 NP.UW.21.01 54,5 * 1,77
Total cum
Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
96,47
+ NP.UW.01.00)
section type 0
54,5 * 0 96,47 15.549,15
219 NP.UW.22.01 Total tonne Total 850 - Lining bottom side / Inver NPR
CARRY FORWARD Main Tunnel - section type 0 straight ...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD 0,0000
0,0000 122.616,07
- 81 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
110 - Main Tunnel - section type 0 straight line (only excavation and lining)
853 - Lining upper side

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Form work for vault (Class F1 Finish) - Using steel section type 0
220 NP.UW.17.01
54,5 * 24,12
Total sqm
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for 1.314,54
underground works (item 20.08.00.D.1q + NP.UW.01.00)
section type 0 1.314,54 2.550,00
54,5 * 10,31
221 NP.UW.23.01
Total cum
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00)
section type 0 561,90
54,5 * 0
Total tonne 561,90 19.445,72
Total 853 - Lining upper side NPR
222 NP.UW.24.01 Total 110 - Main Tunnel - section type 0 straight line (only
excavation and lining) NPR
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH 0,0000
0...
CARRY FORWARD 0,0000 124.626,56
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 82 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
111 - Main Tunnel - section type 1 straight line (only excavation and lining)
180 - Filling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

223 12.01.00.a AMOUNT CARRIED FORWARD 1.996,


Providing and laying Granular Sub-Base Material - By Mechanical means section type 1 11
54,5 * 14,86
Total cum Total 180 - Filling NPR
CARRY FORWARD Main Tunnel - section type 1 straight ...
CARRY FORWARD Main Tunnel 809,87
CARRY FORWARD Road Alignement TU – Tunnel - CH 809,87
0...
CARRY FORWARD
Providing and laying Granular Sub-Base Material - By Mechanical means section type 1 11
54,5 * 14,86
Total cum Total 180 - Filling NPR
CARRY FORWARD Main Tunnel - section type 1 straight ...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 83 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
111 - Main Tunnel - section type 1 straight line (only excavation and lining)
800 - Tunnel excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
224 NP.UW.02.02 AMOUNT CARRIED FORWARD 6.753,
Rock Excavations for underground works - with hammer or drill&blast section type 1 42
137 * 108,36
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD Main Tunnel - section type 1 straight ...
CARRY FORWARD Main Tunnel 14.845,32
CARRY FORWARD Road Alignement TU – Tunnel - CH 14.845,32
0...
CARRY FORWARD

- 84 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
111 - Main Tunnel - section type 1 straight line (only excavation and lining)
810 - Pre-Support
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

225 NP.UW.04.01 AMOUNT CARRIED FORWARD 3.043,88


226 NP.UW.05.02 50 mm thick shotcreting with steel fibers for underground works section type 1 4.452,45
227 NP.UW.06.01 lining 581,39
137 * 27,31
excavation face ((137)/2,50) * 108,36 3.741,47
Total sqm 5.938,13
100 mm thick shotcreting for underground works section type 1
137 * 27,07
Total sqm
Wire mesh ∅5mm/100x100 for Shotcrete - underground works section type 1
137 * 27,22 9.679,60
Total sqm Total 810 - Pre-Support NPR
CARRY FORWARD Main Tunnel - section type 1 straight ...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0... 3.708,59
CARRY FORWARD 3.708,59

3.729,14
3.729,14

- 85 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
111 - Main Tunnel - section type 1 straight line (only excavation and lining)
820 - Rock Reinforcement

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

228 NP.UW.08.02 AMOUNT CARRIED FORWARD 7.352,


Swellex rock bolts (yield load >200 kN - L=4,00) for underground works section type 1 36
137 * ((14+15)/2) * (1/((1,50+2,00)/2))
Total no. Total 820 - Rock Reinforcement NPR
CARRY FORWARD Main Tunnel - section type 1 straight ...
CARRY FORWARD Main Tunnel 1.132,31
CARRY FORWARD Road Alignement TU – Tunnel - CH 1.132,31
0...
CARRY FORWARD
- 86 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
111 - Main Tunnel - section type 1 straight line (only excavation and lining)
845 - Waterproofing system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Waterproofing system for underground works: composite drainage sheet, PVC
229 NP.UW.13.01
membrane, protection sheet, including granular draining material around the pipe
section type 1
137 * 27,10
Total sqm 3.712,70
Drainage pipe f 200 HDPE micro-slotted for drainage underground works section type 1
137 * 2,00 3.712,70 4.500,00
Total m Total 845 - Waterproofing system NPR
230 NP.UW.14.01
CARRY FORWARD Main Tunnel - section type 1 straight ...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH 274,00
0...
CARRY FORWARD 274,00 3.019,03
- 87 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
111 - Main Tunnel - section type 1 straight line (only excavation and lining)
850 - Lining bottom side / Inver

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying of Plain Cement Concrete M 10 - for underground works (item
231 NP.UW.20.01
20.01.00.0 + NP.UW.01.00)
section type 1
2 * 137 * 2,00 * 0,10
Total cum 54,80
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground
works (item 20.02.00.G + NP.UW.01.00) 54,80 10.981,24
section type 1
232 NP.UW.21.01 137 * 1,77
Total cum
Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
242,49
+ NP.UW.01.00)
section type 1
137 * 0 242,49 15.549,15
233 NP.UW.22.01 Total tonne Total 850 - Lining bottom side / Inver NPR
CARRY FORWARD Main Tunnel - section type 1 straight ...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD 0,0000
0,0000 122.616,07
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 88 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
111 - Main Tunnel - section type 1 straight line (only excavation and lining)
853 - Lining upper side

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Form work for vault (Class F1 Finish) - Using steel section type 1
234 NP.UW.17.01
137 * 24,12
Total sqm
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for 3.304,44
underground works (item 20.08.00.D.1q + NP.UW.01.00)
section type 1 3.304,44 2.550,00
137 * 10,31
235 NP.UW.23.01
Total cum
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00)
section type 1 1.412,47
137 * 0
Total tonne 1.412,47 19.445,72
Total 853 - Lining upper side NPR
Total 111 - Main Tunnel - section type 1 straight line (only
excavation and lining) NPR
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
Total cum
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00)
section type 1
137 * 0
Total tonne
Total 853 - Lining upper side NPR
236 NP.UW.24.01 Total 111 - Main Tunnel - section type 1 straight line (only
excavation and lining) NPR
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH 0,0000
0...
CARRY FORWARD 0,0000 124.626,56

- 89 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
112 - Main Tunnel - section type 2 straight line (only excavation and lining)
180 - Filling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

237 12.01.00.a AMOUNT CARRIED FORWARD 1.996,


Providing and laying Granular Sub-Base Material - By Mechanical means section type 2 11
54,5 * 14,86
Total cum Total 180 - Filling NPR
CARRY FORWARD Main Tunnel - section type 2 straight ...
CARRY FORWARD Main Tunnel 809,87
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
237 12.01.00.a AMOUNT CARRIED FORWARD 1.996,
Providing and laying Granular Sub-Base Material - By Mechanical means section type 2 11
54,5 * 14,86
Total cum Total 180 - Filling NPR
CARRY FORWARD Main Tunnel - section type 2 straight ...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH 809,87
0...
CARRY FORWARD

- 90 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
112 - Main Tunnel - section type 2 straight line (only excavation and lining)
800 - Tunnel excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
238 NP.UW.02.02 AMOUNT CARRIED FORWARD 6.753,
Rock Excavations for underground works - with hammer or drill&blast section type 2 42
75,5 * 109,74
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD Main Tunnel - section type 2 straight ...
CARRY FORWARD Main Tunnel 8.285,37
CARRY FORWARD Road Alignement TU – Tunnel - CH 8.285,37
0...
CARRY FORWARD

- 91 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
112 - Main Tunnel - section type 2 straight line (only excavation and lining)
810 - Pre-Support
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

239 NP.UW.04.01 AMOUNT CARRIED FORWARD 3.043,88


240 NP.UW.04.02 50 mm thick shotcreting with steel fibers for underground works section type 2 5.234,30
241 NP.UW.05.01 lining 2.652,95
242 NP.UW.05.02 75,5 * 27,47 4.452,45
243 NP.UW.06.01 excavation face 2.073,99 581,39
(50%) * ((75,5)/1,75) * 109,74 2.367,09
Total sqm
100 mm thick shotcreting with steel fibers for underground works section type 2
excavation face
(50%) * 75,5 * 109,74 * (1/1,75)
Total sqm 4.441,08
50 mm thick shotcreting for underground works section type 2
75,5 * 27,15
Total sqm
100 mm thick shotcreting for underground works section type 2
75,5 * 27,15
Total sqm
Wire mesh ∅5mm/100x100 for Shotcrete - underground works section type 2 2.361,33
75,5 * 27,39
2.361,33
75,5 * 27,07
Total sqm Total 810 - Pre-Support NPR
CARRY FORWARD Main Tunnel - section type 2 straight ...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
2.049,83
0... 2.049,83
CARRY FORWARD

2.049,83
2.049,83

2.067,95
2.043,79

4.111,74
- 92 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
112 - Main Tunnel - section type 2 straight line (only excavation and lining)
820 - Rock Reinforcement

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Injected rock bolts L=7,00 (Ftk >350 kN), incl. injections for underground works section type 2
244 NP.UW.09.05
75,5 * ((14+15)/2) * (1/1,50)
Total no.
Fiberglass dowels/bolts (ultimate load >350 kN) section type 2 733,48
(50%) * 75,5 * (8*7,00/6,00)
Total m Total 820 - Rock Reinforcement NPR 733,48 16.001,24
245 NP.UW.11.01 CARRY FORWARD Main Tunnel - section type 2 straight ...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0... 352,21
CARRY FORWARD 352,21 11.800,00
CARRY FORWARD Main Tunnel - section type 2 straight ...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 93 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
112 - Main Tunnel - section type 2 straight line (only excavation and lining)
845 - Waterproofing system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Waterproofing system for underground works: composite drainage sheet, PVC
membrane, protection sheet, including granular draining material around the pipe
section type 2
75,5 * 27,10
Total sqm
Drainage pipe f 200 HDPE micro-slotted for drainage underground works section type 2
75,5 * 2,00
Total m Total 845 - Waterproofing system NPR
CARRY FORWARD Main Tunnel - section type 2 straight ...
AMOUNT CARRIED FORWARD
Waterproofing system for underground works: composite drainage sheet, PVC
246 NP.UW.13.01
membrane, protection sheet, including granular draining material around the pipe
section type 2
75,5 * 27,10
Total sqm 2.046,05
Drainage pipe f 200 HDPE micro-slotted for drainage underground works section type 2
75,5 * 2,00 2.046,05 4.500,00
Total m Total 845 - Waterproofing system NPR
247 NP.UW.14.01
CARRY FORWARD Main Tunnel - section type 2 straight ...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH 151,00
0...
CARRY FORWARD 151,00 3.019,03

- 94 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
112 - Main Tunnel - section type 2 straight line (only excavation and lining)
850 - Lining bottom side / Inver

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying of Plain Cement Concrete M 10 - for underground works (item
248 NP.UW.20.01
20.01.00.0 + NP.UW.01.00)
section type 2
2 * 75,5 * 2,00 * 0,10
Total cum 30,20
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground
works (item 20.02.00.G + NP.UW.01.00) 30,20 10.981,24
section type 2
249 NP.UW.21.01 75,5 * 1,77
Total cum
Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
133,64
+ NP.UW.01.00)
section type 2
75,5 * 0,250 133,64 15.549,15
250 NP.UW.22.01 Total tonne Total 850 - Lining bottom side / Inver NPR
CARRY FORWARD Main Tunnel - section type 2 straight ...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD 18,8750
18,8750 122.616,07
- 95 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
112 - Main Tunnel - section type 2 straight line (only excavation and lining)
853 - Lining upper side

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Form work for vault (Class F1 Finish) - Using steel section type 2
251 NP.UW.17.01
75,5 * 24,12
Total sqm
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for 1.821,06
underground works (item 20.08.00.D.1q + NP.UW.01.00)
section type 2 1.821,06 2.550,00
75,5 * 10,31
252 NP.UW.23.01
Total cum
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00)
section type 2 778,41
75,5 * 1,00
Total tonne 778,41 19.445,72
Total 853 - Lining upper side NPR
253 NP.UW.24.01 Total 112 - Main Tunnel - section type 2 straight line (only
excavation and lining) NPR
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH 75,5000
0...
CARRY FORWARD 75,5000 124.626,56
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 96 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
113 - Main Tunnel - section type 3 straight line (only excavation and lining)
180 - Filling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

254 12.01.00.a AMOUNT CARRIED FORWARD 1.996,


Providing and laying Granular Sub-Base Material - By Mechanical means section type 3 11
54,5 * 14,86
Total cum Total 180 - Filling NPR
CARRY FORWARD Main Tunnel - section type 3 straight ...
CARRY FORWARD Main Tunnel 809,87
CARRY FORWARD Road Alignement TU – Tunnel - CH 809,87
0...
CARRY FORWARD
Providing and laying Granular Sub-Base Material - By Mechanical means section type 3 11
54,5 * 14,86
Total cum Total 180 - Filling NPR
CARRY FORWARD Main Tunnel - section type 3 straight ...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 97 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
113 - Main Tunnel - section type 3 straight line (only excavation and lining)
800 - Tunnel excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
255 NP.UW.02.02 AMOUNT CARRIED FORWARD 6.753,
Rock Excavations for underground works - with hammer or drill&blast section type 3 42
103 * 111,40
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD Main Tunnel - section type 3 straight ...
CARRY FORWARD Main Tunnel 11.474,20
CARRY FORWARD Road Alignement TU – Tunnel - CH 11.474,20
0...
CARRY FORWARD

- 98 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
113 - Main Tunnel - section type 3 straight line (only excavation and lining)
810 - Pre-Support
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

256 NP.UW.03.02 AMOUNT CARRIED FORWARD 108.379,99


257 NP.UW.04.01 Lattice Girders for underground works section type 3 3.043,88
258 NP.UW.04.02 lattice girders - weigth 17.40 kg/m 5.234,30
259 NP.UW.05.04 103 * (27,34*17,40/1000) 48,9 8.904,90
260 NP.UW.06.01 plates & link chains - 45% 971 581,39
103 * (27,34*17,40*45%/1000) 22,0
Total tonne 523
50 mm thick shotcreting with steel fibers for underground works section type 3
lining
103 * 27,47
excavation face (50%) * 103 * 111,40 71,0494
Total sqm
100 mm thick shotcreting with steel fibers for underground works section type 3
excavation face
(50%) * 103 * 111,40
Total sqm 2.829,41
200 mm thick shotcreting for underground works section type 3 5.737,10
103 * 27,23
Total sqm
Wire mesh ∅5mm/100x100 for Shotcrete - underground works section type 3
103 * 27,54
103 * 27,14 8.566,51
Total sqm Total 810 - Pre-Support NPR
CARRY FORWARD Main Tunnel - section type 3 straight ...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD 5.737,10
5.737,10

2.804,69
2.804,69

2.836,62
2.795,42

5.632,04
- 99 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
113 - Main Tunnel - section type 3 straight line (only excavation and lining)
820 - Rock Reinforcement

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

261 NP.UW.09.03 AMOUNT CARRIED FORWARD 11.721


262 NP.UW.10.01 Injected rock bolts L=5,00 (Ftk >350 kN), incl. injections for underground works section type 3 ,36
263 NP.UW.11.01 103 * 2 8.033,
Total no. 67
Self-drilling anchors L=3,00 (yield load > 550 kN) for underground works section type 3 11.800
103 * 35 ,00
206,00
Total no.
Fiberglass dowels/bolts (ultimate load >350 kN) section type 3 206,00
(50%) * 103 * (8*7,00/6,00)
Total m Total 820 - Rock Reinforcement NPR
CARRY FORWARD Main Tunnel - section type 3 straight ...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH 3.605,00
0... 3.605,00
CARRY FORWARD

480,50
480,50
CARRY FORWARD

- 100 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
113 - Main Tunnel - section type 3 straight line (only excavation and lining)
845 - Waterproofing system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Waterproofing system for underground works: composite drainage sheet, PVC
264 NP.UW.13.01
membrane, protection sheet, including granular draining material around the pipe
section type 3
103 * 27,10
Total sqm 2.791,30
Drainage pipe f 200 HDPE micro-slotted for drainage underground works section type 3
103 * 2,00 2.791,30 4.500,00
Total m Total 845 - Waterproofing system NPR
265 NP.UW.14.01
CARRY FORWARD Main Tunnel - section type 3 straight ...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH 206,00
0...
CARRY FORWARD 206,00 3.019,03
Total m Total 845 - Waterproofing system NPR
CARRY FORWARD Main Tunnel - section type 3 straight ...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 101 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
113 - Main Tunnel - section type 3 straight line (only excavation and lining)
850 - Lining bottom side / Inver

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying of Plain Cement Concrete M 10 - for underground works (item
266 NP.UW.20.01
20.01.00.0 + NP.UW.01.00)
section type 3
2 * 103 * 2,00 * 0,10
Total cum
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground
works (item 20.02.00.G + NP.UW.01.00)
section type 3
103 * 1,77
Total cum
Providing and laying , fitting and placing un-coated Mild steel / HYSD
AMOUNT CARRIED FORWARD
Providing and laying of Plain Cement Concrete M 10 - for underground works (item
20.01.00.0 + NP.UW.01.00)
section type 3
2 * 103 * 2,00 * 0,10
Total cum 41,20
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground
works (item 20.02.00.G + NP.UW.01.00) 41,20 10.981,24
section type 3
267 NP.UW.21.01 103 * 1,77
Total cum
Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
182,31
+ NP.UW.01.00)
section type 3
103 * 0,250 182,31 15.549,15
268 NP.UW.22.01 Total tonne Total 850 - Lining bottom side / Inver NPR
CARRY FORWARD Main Tunnel - section type 3 straight ...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD 25,7500
25,7500 122.616,07

- 102 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
113 - Main Tunnel - section type 3 straight line (only excavation and lining)
853 - Lining upper side
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Form work for vault (Class F1 Finish) - Using steel section type 3
269 NP.UW.17.01
103 * 24,12
Total sqm
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for 2.484,36
underground works (item 20.08.00.D.1q + NP.UW.01.00)
section type 3 2.484,36 2.550,00
103 * 10,31
270 NP.UW.23.01
Total cum
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00)
section type 3 1.061,93
103 * 1,00
Total tonne 1.061,93 19.445,72
Total 853 - Lining upper side NPR
271 NP.UW.24.01 Total 113 - Main Tunnel - section type 3 straight line (only
excavation and lining) NPR
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH 103,0000
0...
CARRY FORWARD 103,0000 124.626,56
- 103 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
114 - Main Tunnel - section type 4 straight line (only excavation and lining)
180 - Filling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

272 12.01.00.a AMOUNT CARRIED FORWARD 1.996,


Providing and laying Granular Sub-Base Material - By Mechanical means section type 4 11
54,5 * 14,86
Total cum Total 180 - Filling NPR
CARRY FORWARD Main Tunnel - section type 4 straight ...
CARRY FORWARD Main Tunnel 809,87
CARRY FORWARD Road Alignement TU – Tunnel - CH 809,87
0...
CARRY FORWARD
- 104 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
114 - Main Tunnel - section type 4 straight line (only excavation and lining)
800 - Tunnel excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

273 NP.UW.02.02 AMOUNT CARRIED FORWARD 6.753,


Rock Excavations for underground works - with hammer or drill&blast section type 4 42
91 * ((115,75+133,20)/2)
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD Main Tunnel - section type 4 straight ...
CARRY FORWARD Main Tunnel 11.327,68
CARRY FORWARD Road Alignement TU – Tunnel - CH 11.327,68
0...
CARRY FORWARD
Rock Excavations for underground works - with hammer or drill&blast section type 4 42
91 * ((115,75+133,20)/2)
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD Main Tunnel - section type 4 straight ...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 105 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
114 - Main Tunnel - section type 4 straight line (only excavation and lining)
810 - Pre-Support

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
274 NP.UW.03.01 AMOUNT CARRIED FORWARD 277.778,00
275 NP.UW.04.01 Armor whit steel ribs for underground works section type 4 3.043,88
276 NP.UW.04.02 HEB 180 - weigth 51.20 kg/m 5.234,30
277 NP.UW.05.05 91 * ((27,70+29,59)/2*51,20/1000) 11.131,12
133,460
278 NP.UW.06.01 plates & link chains - 45% 581,39
6
91 * ((27,70+29,59)/2*51,20*45%/1000)
60,0600
Total tonne
50 mm thick shotcreting with steel fibers for underground works section type 4
lining
91 * ((28,06+29,95)/2)
excavation face (50%) * 91 * 133,20 193,5206
Total sqm
100 mm thick shotcreting with steel fibers for underground works section type 4
excavation face
(50%) * 91 * 133,20
Total sqm 2.639,91
250 mm thick shotcreting for underground works section type 4 6.060,60
91 * ((27,62+29,51)/2)
Total sqm
Wire mesh ∅5mm/100x100 for Shotcrete - underground works section type 4
91 * ((27,39+29,27)/2)
91 * ((28,02+29,90)/2) 8.700,51
Total sqm Total 810 - Pre-Support NPR
CARRY FORWARD Main Tunnel - section type 4 straight ...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD 6.060,60
6.060,60

2.599,87
2.599,87

2.578,03
2.635,36

5.213,39

- 106 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
114 - Main Tunnel - section type 4 straight line (only excavation and lining)
820 - Rock Reinforcement

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

279 NP.UW.07.03 AMOUNT CARRIED FORWARD 3.229,18


280 NP.UW.09.04 Rock drillings (diameter >100 mm) for underground works section type 4 16.466,26
281 NP.UW.11.01 91 * (35*15,00/10,00) 11.800,00
282 NP.UW.12.01 Total m 250.000,00
Injected rock bolts L=5,50 (Ftk >460 kN), incl. injections for underground works section type 4
91 * 2
4.777,50
Total no.
Fiberglass dowels/bolts (ultimate load >350 kN) section type 4 4.777,50
91 * (18*16,00/8,00)
Total m
Steel tubes forepoling umbrella, S355, for underground works section type 4
tube 114.3 th 16mm - weigth 38.60 kg/m
91 * (35*15,00/10,00) * (38,60/1000) 182,00
Total tonne Total 820 - Rock Reinforcement NPR
182,00
CARRY FORWARD Main Tunnel - section type 4 straight ...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD 3.276,00
3.276,00

184,4115
184,4115
- 107 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
114 - Main Tunnel - section type 4 straight line (only excavation and lining)
845 - Waterproofing system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Waterproofing system for underground works: composite drainage sheet, PVC
283 NP.UW.13.01
membrane, protection sheet, including granular draining material around the pipe
section type 4
91 * 27,57
Total sqm 2.508,87
Drainage pipe f 200 HDPE micro-slotted for drainage underground works section type 4
91 * 2,00 2.508,87 4.500,00
Total m Total 845 - Waterproofing system NPR
284 NP.UW.14.01
CARRY FORWARD Main Tunnel - section type 4 straight ...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH 182,00
0...
CARRY FORWARD 182,00 3.019,03
Total m Total 845 - Waterproofing system NPR
CARRY FORWARD Main Tunnel - section type 4 straight ...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 108 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
114 - Main Tunnel - section type 4 straight line (only excavation and lining)
850 - Lining bottom side / Inver

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground
285 NP.UW.21.01
works (item 20.02.00.G + NP.UW.01.00)
section type 4
2 * 91 * 2,20 * 0,10
Total cum
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground
works (item 20.02.00.G + NP.UW.01.00)
section type 4
91 * 2,00
Total cum
Providing and laying , fitting and placing un-coated Mild steel / HYSD
AMOUNT CARRIED FORWARD
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground
works (item 20.02.00.G + NP.UW.01.00)
section type 4
2 * 91 * 2,20 * 0,10
Total cum 40,04
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground
works (item 20.02.00.G + NP.UW.01.00) 40,04 15.549,15
section type 4
286 NP.UW.21.01 91 * 2,00
Total cum
Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
182,00
+ NP.UW.01.00)
section type 4
91 * 0,450 182,00 15.549,15
287 NP.UW.22.01 Total tonne Total 850 - Lining bottom side / Inver NPR
CARRY FORWARD Main Tunnel - section type 4 straight ...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD 40,9500
40,9500 122.616,07

- 109 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
114 - Main Tunnel - section type 4 straight line (only excavation and lining)
853 - Lining upper side
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Form work for vault (Class F1 Finish) - Using steel section type 4
288 NP.UW.17.01
91 * 24,12
Total sqm
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for 2.194,92
underground works (item 20.08.00.D.1q + NP.UW.01.00)
section type 4 2.194,92 2.550,00
91 * 12,84
289 NP.UW.23.01
Total cum
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00)
section type 4 1.168,44
91 * 1,400
Total tonne 1.168,44 19.445,72
Total 853 - Lining upper side NPR
290 NP.UW.24.01 Total 114 - Main Tunnel - section type 4 straight line (only
excavation and lining) NPR
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH 127,4000
0...
CARRY FORWARD 127,4000 124.626,56
- 110 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
115 - Main Tunnel - section type 5 straight line (only excavation and lining)
180 - Filling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

291 12.01.00.a AMOUNT CARRIED FORWARD 1.996,


Providing and laying Granular Sub-Base Material - By Mechanical means section type 5 11
54,5 * 21,97
Total cum Total 180 - Filling NPR
CARRY FORWARD Main Tunnel - section type 5 straight ...
CARRY FORWARD Main Tunnel 1.197,37
CARRY FORWARD Road Alignement TU – Tunnel - CH 1.197,37
0...
CARRY FORWARD
- 111 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
115 - Main Tunnel - section type 5 straight line (only excavation and lining)
800 - Tunnel excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

292 NP.UW.02.02 AMOUNT CARRIED FORWARD 6.753,


Rock Excavations for underground works - with hammer or drill&blast section type 5 42
164 * (119,31+16,78)
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD Main Tunnel - section type 5 straight ...
CARRY FORWARD Main Tunnel 22.318,76
CARRY FORWARD Road Alignement TU – Tunnel - CH 22.318,76
0...
CARRY FORWARD
Rock Excavations for underground works - with hammer or drill&blast section type 5 42
164 * (119,31+16,78)
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD Main Tunnel - section type 5 straight ...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 112 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
115 - Main Tunnel - section type 5 straight line (only excavation and lining)
810 - Pre-Support

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
293 NP.UW.03.01 AMOUNT CARRIED FORWARD 277.778,00
294 NP.UW.04.01 Armor whit steel ribs for underground works section type 5 3.043,88
295 NP.UW.04.02 HEB 180 - weigth 51.20 kg/m 5.234,30
296 NP.UW.05.06 vault 13.357,34
297 NP.UW.06.01 164 * (29,08*51,20/1000) 244,179 581,39
invert 6
164 * (12,56*51,20/1000) 105,468
plates & link chains - 45% 4
164 * ((29,08+12,56)*51,20*45%/1000) 157,341
Total tonne 6
50 mm thick shotcreting with steel fibers for underground works section type 5
lining vault
164 * 29,50
lining invert 164 * 11,90
excavation face (50%) * 164 * 119,31
Total sqm 506,9896
100 mm thick shotcreting with steel fibers for underground works section type 5
excavation face
(50%) * 164 * 119,31
Total sqm
300 mm thick shotcreting for underground works section type 5
lining vault 4.838,00
164 * 28,96 1.951,60
lining invert 164 * 12,26 9.783,42
Total sqm
Wire mesh ∅5mm/100x100 for Shotcrete - underground works section type 5
164 * (28,75+12,77)
164 * (29,42+12,33)
Total sqm Total 810 - Pre-Support NPR 16.573,02
CARRY FORWARD Main Tunnel - section type 5 straight ...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
9.783,42
9.783,42

4.749,44
2.010,64

6.760,08

6.809,28
6.847,00

13.656,28

- 113 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
115 - Main Tunnel - section type 5 straight line (only excavation and lining)
820 - Rock Reinforcement

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

298 NP.UW.11.01 AMOUNT CARRIED FORWARD 11.800


Fiberglass dowels/bolts (ultimate load >350 kN) section type 5 ,00
164 * ((40+20)*18,00/9,00)
Total m Total 820 - Rock Reinforcement NPR
CARRY FORWARD Main Tunnel - section type 5 straight ...
CARRY FORWARD Main Tunnel 19.680,00
CARRY FORWARD Road Alignement TU – Tunnel - CH 19.680,00
0...
CARRY FORWARD
- 114 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
115 - Main Tunnel - section type 5 straight line (only excavation and lining)
845 - Waterproofing system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Waterproofing system for underground works: composite drainage sheet, PVC
299 NP.UW.13.01
membrane, protection sheet, including granular draining material around the pipe
section type 5
164 * 28,44
Total sqm 4.664,16
Drainage pipe f 200 HDPE micro-slotted for drainage underground works section type 5
164 * 2,00 4.664,16 4.500,00
Total m Total 845 - Waterproofing system NPR
300 NP.UW.14.01
CARRY FORWARD Main Tunnel - section type 5 straight ...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH 328,00
0...
CARRY FORWARD 328,00 3.019,03
- 115 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
115 - Main Tunnel - section type 5 straight line (only excavation and lining)
850 - Lining bottom side / Inver

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground
301 NP.UW.21.01
works (item 20.02.00.G + NP.UW.01.00)
section type 5
164 * 7,96
Total cum 1.305,44
Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0 1.305,44 15.549,15
+ NP.UW.01.00)
302 NP.UW.22.01 section type 5
164 * 1,450
Total tonne Total 850 - Lining bottom side / Inver NPR
CARRY FORWARD Main Tunnel - section type 5 straight ...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH 237,8000
0... 237,8000 122.616,07
CARRY FORWARD
164 * 1,450
Total tonne Total 850 - Lining bottom side / Inver NPR
CARRY FORWARD Main Tunnel - section type 5 straight ...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 116 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
115 - Main Tunnel - section type 5 straight line (only excavation and lining)
853 - Lining upper side

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Form work for vault (Class F1 Finish) - Using steel section type 5
303 NP.UW.17.01
164 * 24,12
Total sqm
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for 3.955,68
underground works (item 20.08.00.D.1q + NP.UW.01.00)
section type 5 3.955,68 2.550,00
164 * 14,46
Total cum
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00)
section type 5
164 * 1,850
Total tonne
Form work for vault (Class F1 Finish) - Using steel section type 5
164 * 24,12
Total sqm
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for
underground works (item 20.08.00.D.1q + NP.UW.01.00)
section type 5
164 * 14,46
304 NP.UW.23.01
Total cum
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00)
section type 5 2.371,44
164 * 1,850
Total tonne 2.371,44 19.445,72
Total 853 - Lining upper side NPR
305 NP.UW.24.01 Total 115 - Main Tunnel - section type 5 straight line (only
excavation and lining) NPR
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH 303,4000
0...
CARRY FORWARD 303,4000 124.626,56

- 117 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
117 - Main Tunnel - section type 0 widened section (only excavation and lining)
180 - Filling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
306 12.01.00.a AMOUNT CARRIED FORWARD 1.996,
Providing and laying Granular Sub-Base Material - By Mechanical means section type 0 curve 11
section
54,5 * 16,10
Total cum Total 180 - Filling NPR
CARRY FORWARD Main Tunnel - section type 0 widened sec... 877,45
CARRY FORWARD Main Tunnel
877,45
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 118 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
117 - Main Tunnel - section type 0 widened section (only excavation and lining)
800 - Tunnel excavation
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

307 NP.UW.02.02 AMOUNT CARRIED FORWARD 6.753,


Rock Excavations for underground works - with hammer or drill&blast section type 0 curve 42
section
52 * 113,00
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD Main Tunnel - section type 0 widened sec... 5.876,00
CARRY FORWARD Main Tunnel
5.876,00
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 119 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
117 - Main Tunnel - section type 0 widened section (only excavation and lining)
810 - Pre-Support

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

308 NP.UW.04.01 AMOUNT CARRIED FORWARD 3.043,88


309 NP.UW.05.01 50 mm thick shotcreting with steel fibers for underground works section type 0 curve section 2.652,95
310 NP.UW.06.01 52 * 27,75 581,39
Total sqm
50 mm thick shotcreting for underground works section type 0 curve section
52 * 27,60
1.443,00
Total sqm
Wire mesh ∅5mm/100x100 for Shotcrete - underground works section type 0 curve section 1.443,00
52 * 27,67
Total sqm Total 810 - Pre-Support NPR
CARRY FORWARD Main Tunnel - section type 0 widened sec...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH 1.435,20
0... 1.435,20
CARRY FORWARD

1.438,84
1.438,84
CARRY FORWARD

- 120 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
117 - Main Tunnel - section type 0 widened section (only excavation and lining)
820 - Rock Reinforcement

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

311 NP.UW.08.02 AMOUNT CARRIED FORWARD 7.352,


Swellex rock bolts (yield load >200 kN - L=4,00) for underground works section type 0 curve 36
section
52
Total no. Total 820 - Rock Reinforcement NPR
CARRY FORWARD Main Tunnel - section type 0 widened sec... 52,00
CARRY FORWARD Main Tunnel
52,00
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
Swellex rock bolts (yield load >200 kN - L=4,00) for underground works section type 0 curve 36
section
52
Total no. Total 820 - Rock Reinforcement NPR
CARRY FORWARD Main Tunnel - section type 0 widened sec...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 121 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
117 - Main Tunnel - section type 0 widened section (only excavation and lining)
845 - Waterproofing system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Waterproofing system for underground works: composite drainage sheet, PVC
membrane, protection sheet, including granular draining material around the pipe
section type 0 curve section 52 * 27,71
Total sqm
Drainage pipe f 200 HDPE micro-slotted for drainage underground works section type 0 curve
section
52 * 2,00
Total m Total 845 - Waterproofing system NPR
CARRY FORWARD Main Tunnel - section type 0 widened sec...
AMOUNT CARRIED FORWARD
Waterproofing system for underground works: composite drainage sheet, PVC
312 NP.UW.13.01
membrane, protection sheet, including granular draining material around the pipe
section type 0 curve section 52 * 27,71
Total sqm
Drainage pipe f 200 HDPE micro-slotted for drainage underground works section type 0 curve 1.440,92
section
52 * 2,00 1.440,92 4.500,00
Total m Total 845 - Waterproofing system NPR
313 NP.UW.14.01
CARRY FORWARD Main Tunnel - section type 0 widened sec...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH 104,00
0...
CARRY FORWARD 104,00 3.019,03

- 122 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
117 - Main Tunnel - section type 0 widened section (only excavation and lining)
850 - Lining bottom side / Inver

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying of Plain Cement Concrete M 10 - for underground works (item
314 NP.UW.20.01
20.01.00.0 + NP.UW.01.00)
section type 0 curve section 2 * 52 * 2,00 * 0,10
Total cum
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground 20,80
works (item 20.02.00.G + NP.UW.01.00)
section type 0 curve section 52 * 1,77 20,80 10.981,24
Total cum
315 NP.UW.21.01 Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
+ NP.UW.01.00)
section type 0 curve section 52 * 0,250
92,04
Total tonne Total 850 - Lining bottom side / Inver NPR
CARRY FORWARD Main Tunnel - section type 0 widened sec...
92,04 15.549,15
CARRY FORWARD Main Tunnel
316 NP.UW.22.01 CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

13,0000
13,0000 122.616,07
- 123 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
117 - Main Tunnel - section type 0 widened section (only excavation and lining)
853 - Lining upper side

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Form work for vault (Class F1 Finish) - Using steel section type 0 curve section
317 NP.UW.17.01
52 * 24,72
Total sqm
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for 1.285,44
underground works (item 20.08.00.D.1q + NP.UW.01.00)
section type 0 curve section 52 * 10,55 1.285,44 2.550,00
Total cum
318 NP.UW.23.01
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00)
section type 0 curve section 52 * 1,050
Total tonne 548,60
Total 853 - Lining upper side NPR
Total 117 - Main Tunnel - section type 0 widened section (only 548,60 19.445,72
excavation and lining) NPR
319 NP.UW.24.01
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD 54,6000

54,6000 124.626,56
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 124 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
118 - Main Tunnel - section type 1 widened section (only excavation and lining)
180 - Filling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

320 12.01.00.a AMOUNT CARRIED FORWARD 1.996,


Providing and laying Granular Sub-Base Material - By Mechanical means section type 1 curve 11
section
54,5 * 16,10
Total cum Total 180 - Filling NPR
CARRY FORWARD Main Tunnel - section type 1 widened sec... 877,45
CARRY FORWARD Main Tunnel
877,45
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
Providing and laying Granular Sub-Base Material - By Mechanical means section type 1 curve 11
section
54,5 * 16,10
Total cum Total 180 - Filling NPR
CARRY FORWARD Main Tunnel - section type 1 widened sec...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 125 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
118 - Main Tunnel - section type 1 widened section (only excavation and lining)
800 - Tunnel excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
321 NP.UW.02.02 AMOUNT CARRIED FORWARD 6.753,
Rock Excavations for underground works - with hammer or drill&blast section type 1 curve 42
section
141 * 114,40
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD Main Tunnel - section type 1 widened sec... 16.130,40
CARRY FORWARD Main Tunnel
16.130,40
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 126 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
118 - Main Tunnel - section type 1 widened section (only excavation and lining)
810 - Pre-Support
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

322 NP.UW.04.01 AMOUNT CARRIED FORWARD 3.043,88


323 NP.UW.05.02 50 mm thick shotcreting with steel fibers for underground works section type 1 curve section 4.452,45
324 NP.UW.06.01 lining 581,39
141 * 27,91
excavation face ((141)/2,50) * 114,40 3.935,31
Total sqm 6.452,16
100 mm thick shotcreting for underground works section type 1 curve section
141 * 27,67
Total sqm
Wire mesh ∅5mm/100x100 for Shotcrete - underground works section type 1 curve section
141 * 27,83 10.387,47
Total sqm Total 810 - Pre-Support NPR
CARRY FORWARD Main Tunnel - section type 1 widened sec...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0... 3.901,47
CARRY FORWARD 3.901,47

3.924,03
3.924,03

- 127 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
118 - Main Tunnel - section type 1 widened section (only excavation and lining)
820 - Rock Reinforcement

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

325 NP.UW.08.02 AMOUNT CARRIED FORWARD 7.352,


Swellex rock bolts (yield load >200 kN - L=4,00) for underground works section type 1 curve 36
section
141 * 15 * (1/((1,50+2,00)/2))
Total no. Total 820 - Rock Reinforcement NPR
CARRY FORWARD Main Tunnel - section type 1 widened sec... 1.205,55
CARRY FORWARD Main Tunnel
1.205,55
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
- 128 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
118 - Main Tunnel - section type 1 widened section (only excavation and lining)
845 - Waterproofing system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Waterproofing system for underground works: composite drainage sheet, PVC
326 NP.UW.13.01
membrane, protection sheet, including granular draining material around the pipe
section type 1 curve section 141 * 27,71
Total sqm
Drainage pipe f 200 HDPE micro-slotted for drainage underground works section type 1 curve 3.907,11
section
141 * 2,00 3.907,11 4.500,00
Total m Total 845 - Waterproofing system NPR
327 NP.UW.14.01
CARRY FORWARD Main Tunnel - section type 1 widened sec...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH 282,00
0...
CARRY FORWARD 282,00 3.019,03
- 129 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
118 - Main Tunnel - section type 1 widened section (only excavation and lining)
850 - Lining bottom side / Inver

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying of Plain Cement Concrete M 10 - for underground works (item
328 NP.UW.20.01
20.01.00.0 + NP.UW.01.00)
section type 1 curve section 2 * 141 * 2,00 * 0,10
Total cum
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground 56,40
works (item 20.02.00.G + NP.UW.01.00)
section type 1 curve section 141 * 1,77 56,40 10.981,24
Total cum
329 NP.UW.21.01 Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
+ NP.UW.01.00)
section type 1 curve section 141 * 0,250
249,57
Total tonne Total 850 - Lining bottom side / Inver NPR
CARRY FORWARD Main Tunnel - section type 1 widened sec...
249,57 15.549,15
CARRY FORWARD Main Tunnel
330 NP.UW.22.01 CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

35,2500
35,2500 122.616,07
0...
CARRY FORWARD

- 130 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
118 - Main Tunnel - section type 1 widened section (only excavation and lining)
853 - Lining upper side

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Form work for vault (Class F1 Finish) - Using steel section type 1 curve section
331 NP.UW.17.01
141 * 24,72
Total sqm
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for 3.485,52
underground works (item 20.08.00.D.1q + NP.UW.01.00)
section type 1 curve section 141 * 10,55 3.485,52 2.550,00
Total cum
332 NP.UW.23.01
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00)
section type 1 curve section 141 * 1,050
Total tonne 1.487,55
Total 853 - Lining upper side NPR
Total 118 - Main Tunnel - section type 1 widened section (only 1.487,55 19.445,72
excavation and lining) NPR
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00)
section type 1 curve section 141 * 1,050
Total tonne
Total 853 - Lining upper side NPR
Total 118 - Main Tunnel - section type 1 widened section (only
excavation and lining) NPR
333 NP.UW.24.01
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD 148,0500

148,0500 124.626,56

- 131 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
119 - Main Tunnel - section type 2 widened section (only excavation and lining)
180 - Filling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

334 12.01.00.a AMOUNT CARRIED FORWARD 1.996,


Providing and laying Granular Sub-Base Material - By Mechanical means section type 2 curve 11
section
54,5 * 16,10
Total cum Total 180 - Filling NPR
CARRY FORWARD Main Tunnel - section type 2 widened sec... 877,45
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
334 12.01.00.a AMOUNT CARRIED FORWARD 1.996,
Providing and laying Granular Sub-Base Material - By Mechanical means section type 2 curve 11
section
54,5 * 16,10
Total cum Total 180 - Filling NPR
CARRY FORWARD Main Tunnel - section type 2 widened sec...
CARRY FORWARD Main Tunnel
877,45
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 132 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
119 - Main Tunnel - section type 2 widened section (only excavation and lining)
800 - Tunnel excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
335 NP.UW.02.02 AMOUNT CARRIED FORWARD 6.753,
Rock Excavations for underground works - with hammer or drill&blast section type 2 curve 42
section
120 * 115,81
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD Main Tunnel - section type 2 widened sec... 13.897,20
CARRY FORWARD Main Tunnel
13.897,20
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 133 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
119 - Main Tunnel - section type 2 widened section (only excavation and lining)
810 - Pre-Support
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

336 NP.UW.04.01 AMOUNT CARRIED FORWARD 3.043,88


337 NP.UW.04.02 50 mm thick shotcreting with steel fibers for underground works section type 2 curve section 5.234,30
338 NP.UW.05.01 lining 2.652,95
339 NP.UW.05.02 120 * 28,07 4.452,45
340 NP.UW.06.01 excavation face 3.368,40 581,39
(50%) * ((120)/1,75) * 115,81 3.970,55
Total sqm
100 mm thick shotcreting with steel fibers for underground works section type 2 curve section
excavation face
(50%) * 120 * 115,81 * (1/1,75)
Total sqm 7.338,95
50 mm thick shotcreting for underground works section type 2 curve section
120 * 27,75
Total sqm
100 mm thick shotcreting for underground works section type 2 curve section
120 * 27,75
Total sqm
Wire mesh ∅5mm/100x100 for Shotcrete - underground works section type 2curve section 3.960,70
120 * 27,99
3.960,70
120 * 27,67
Total sqm Total 810 - Pre-Support NPR
CARRY FORWARD Main Tunnel - section type 2 widened sec...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
3.330,00
0... 3.330,00
CARRY FORWARD

3.330,00
3.330,00

3.358,80
3.320,40

6.679,20
- 134 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
119 - Main Tunnel - section type 2 widened section (only excavation and lining)
820 - Rock Reinforcement

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Injected rock bolts L=7,00 (Ftk >350 kN), incl. injections for underground works section type 2
341 NP.UW.09.05
curve section
120 * 15 * (1/1,50)
Total no. 1.206,00
Fiberglass dowels/bolts (ultimate load >350 kN) section type 2 curve section
(50%) * 120 * (8*7,00/6,00) 1.206,00 16.001,24
Total m Total 820 - Rock Reinforcement NPR
342 NP.UW.11.01
CARRY FORWARD Main Tunnel - section type 2 widened sec...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH 559,80
0... 559,80 11.800,00
CARRY FORWARD
Total m Total 820 - Rock Reinforcement NPR
CARRY FORWARD Main Tunnel - section type 2 widened sec...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 135 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
119 - Main Tunnel - section type 2 widened section (only excavation and lining)
845 - Waterproofing system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Waterproofing system for underground works: composite drainage sheet, PVC
membrane, protection sheet, including granular draining material around the pipe
section type 2 curve section 120 * 27,71
Total sqm
Drainage pipe f 200 HDPE micro-slotted for drainage underground works section type 2 curve
section
120 * 2,00
Total m Total 845 - Waterproofing system NPR
CARRY FORWARD Main Tunnel - section type 2 widened sec...
AMOUNT CARRIED FORWARD
Waterproofing system for underground works: composite drainage sheet, PVC
343 NP.UW.13.01
membrane, protection sheet, including granular draining material around the pipe
section type 2 curve section 120 * 27,71
Total sqm
Drainage pipe f 200 HDPE micro-slotted for drainage underground works section type 2 curve 3.325,20
section
120 * 2,00 3.325,20 4.500,00
Total m Total 845 - Waterproofing system NPR
344 NP.UW.14.01
CARRY FORWARD Main Tunnel - section type 2 widened sec...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH 240,00
0...
CARRY FORWARD 240,00 3.019,03

- 136 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
119 - Main Tunnel - section type 2 widened section (only excavation and lining)
850 - Lining bottom side / Inver

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying of Plain Cement Concrete M 10 - for underground works (item
345 NP.UW.20.01
20.01.00.0 + NP.UW.01.00)
section type 2 curve section 2 * 120 * 2,00 * 0,10
Total cum
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground 48,00
works (item 20.02.00.G + NP.UW.01.00)
section type 2 curve section 120 * 1,77 48,00 10.981,24
Total cum
346 NP.UW.21.01 Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
+ NP.UW.01.00)
section type 2 curve section 120 * 0,250
212,40
Total tonne Total 850 - Lining bottom side / Inver NPR
CARRY FORWARD Main Tunnel - section type 2 widened sec...
212,40 15.549,15
CARRY FORWARD Main Tunnel
347 NP.UW.22.01 CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

30,0000
30,0000 122.616,07
- 137 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
119 - Main Tunnel - section type 2 widened section (only excavation and lining)
853 - Lining upper side

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Form work for vault (Class F1 Finish) - Using steel section type 2 curve section
348 NP.UW.17.01
120 * 24,72
Total sqm
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for 2.966,40
underground works (item 20.08.00.D.1q + NP.UW.01.00)
section type 2 curve section 120 * 10,55 2.966,40 2.550,00
Total cum
349 NP.UW.23.01
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00)
section type 2 curve section 120 * 1,050
Total tonne 1.266,00
Total 853 - Lining upper side NPR
Total 119 - Main Tunnel - section type 2 widened section (only 1.266,00 19.445,72
excavation and lining) NPR
350 NP.UW.24.01
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD 126,0000

126,0000 124.626,56
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 138 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
120 - Main Tunnel - section type 3 widened section (only excavation and lining)
180 - Filling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

351 12.01.00.a AMOUNT CARRIED FORWARD 1.996,


Providing and laying Granular Sub-Base Material - By Mechanical means section type 3 curve 11
section
54,5 * 16,10
Total cum Total 180 - Filling NPR
CARRY FORWARD Main Tunnel - section type 3 widened sec... 877,45
CARRY FORWARD Main Tunnel
877,45
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
Providing and laying Granular Sub-Base Material - By Mechanical means section type 3 curve 11
section
54,5 * 16,10
Total cum Total 180 - Filling NPR
CARRY FORWARD Main Tunnel - section type 3 widened sec...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 139 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
120 - Main Tunnel - section type 3 widened section (only excavation and lining)
800 - Tunnel excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
352 NP.UW.02.02 AMOUNT CARRIED FORWARD 6.753,
Rock Excavations for underground works - with hammer or drill&blast section type 3 - curve 42
section
66 * 117,51
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD Main Tunnel - section type 3 widened sec... 7.755,66
CARRY FORWARD Main Tunnel
7.755,66
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 140 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
120 - Main Tunnel - section type 3 widened section (only excavation and lining)
810 - Pre-Support
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

353 NP.UW.03.02 AMOUNT CARRIED FORWARD 108.379,99


354 NP.UW.04.01 Lattice Girders for underground works section type 3 - curve section 3.043,88
355 NP.UW.04.02 lattice girders - weigth 17.40 kg/m 5.234,30
356 NP.UW.05.04 66 * (27,94*17,40/1000) 32,0 8.904,90
357 NP.UW.06.01 plates & link chains - 45% 892 581,39
66 * (27,94*17,40*45%/1000) 14,4
Total tonne 408
50 mm thick shotcreting with steel fibers for underground works section type 3 - curve section
lining
66 * 28,20
excavation face (50%) * 66 * 117,51 46,5300
Total sqm
100 mm thick shotcreting with steel fibers for underground works section type 3 - curve section
excavation face
(50%) * 66 * 117,51
Total sqm 1.861,20
200 mm thick shotcreting for underground works section type 3 - curve section 3.877,83
66 * 27,83
Total sqm
Wire mesh ∅5mm/100x100 for Shotcrete - underground works section type 3 - curve section
66 * 28,14
66 * 27,74 5.739,03
Total sqm Total 810 - Pre-Support NPR
CARRY FORWARD Main Tunnel - section type 3 widened sec...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD 3.877,83
3.877,83

1.836,78
1.836,78

1.857,24
1.830,84

3.688,08
- 141 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
120 - Main Tunnel - section type 3 widened section (only excavation and lining)
820 - Rock Reinforcement

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

358 NP.UW.09.03 AMOUNT CARRIED FORWARD 11.721


359 NP.UW.10.01 Injected rock bolts L=5,00 (Ftk >350 kN), incl. injections for underground works section type 3 ,36
360 NP.UW.11.01 - curve section 8.033,
66 * 2 67
Total no. 11.800
Self-drilling anchors L=3,00 (yield load > 550 kN) for underground works section type 3 - curve ,00
132,00
section
66 * 33 132,00
Total no.
Fiberglass dowels/bolts (ultimate load >350 kN) section type 3 - curve section
(50%) * 66 * (8*7,00/6,00)
Total m Total 820 - Rock Reinforcement NPR
CARRY FORWARD Main Tunnel - section type 3 widened sec... 2.178,00
CARRY FORWARD Main Tunnel 2.178,00
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

307,89
307,89
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 142 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
120 - Main Tunnel - section type 3 widened section (only excavation and lining)
845 - Waterproofing system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Waterproofing system for underground works: composite drainage sheet, PVC
361 NP.UW.13.01
membrane, protection sheet, including granular draining material around the pipe
section type 3 - curve section 66 * 27,71
Total sqm
Drainage pipe f 200 HDPE micro-slotted for drainage underground works section type 3 - curve 1.828,86
section
66 * 2,00 1.828,86 4.500,00
Total m Total 845 - Waterproofing system NPR
362 NP.UW.14.01
CARRY FORWARD Main Tunnel - section type 3 widened sec...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH 132,00
0...
CARRY FORWARD 132,00 3.019,03
Total m Total 845 - Waterproofing system NPR
CARRY FORWARD Main Tunnel - section type 3 widened sec...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 143 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
120 - Main Tunnel - section type 3 widened section (only excavation and lining)
850 - Lining bottom side / Inver

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying of Plain Cement Concrete M 10 - for underground works (item
363 NP.UW.20.01
20.01.00.0 + NP.UW.01.00)
section type 3 - curve section 2 * 66 * 2,00 * 0,10
Total cum
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground
works (item 20.02.00.G + NP.UW.01.00)
section type 3 - curve section 66 * 1,77
Total cum
Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
+ NP.UW.01.00)
AMOUNT CARRIED FORWARD
Providing and laying of Plain Cement Concrete M 10 - for underground works (item
20.01.00.0 + NP.UW.01.00)
section type 3 - curve section 2 * 66 * 2,00 * 0,10
Total cum
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground 26,40
works (item 20.02.00.G + NP.UW.01.00)
section type 3 - curve section 66 * 1,77 26,40 10.981,24
Total cum
364 NP.UW.21.01 Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
+ NP.UW.01.00)
section type 3 - curve section 66 * 0,250
116,82
Total tonne Total 850 - Lining bottom side / Inver NPR
CARRY FORWARD Main Tunnel - section type 3 widened sec...
116,82 15.549,15
CARRY FORWARD Main Tunnel
365 NP.UW.22.01 CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

16,5000
16,5000 122.616,07

- 144 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
120 - Main Tunnel - section type 3 widened section (only excavation and lining)
853 - Lining upper side
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Form work for vault (Class F1 Finish) - Using steel section type 3 - curve section
366 NP.UW.17.01
66 * 24,72
Total sqm
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for 1.631,52
underground works (item 20.08.00.D.1q + NP.UW.01.00)
section type 3 - curve section 66 * 10,55 1.631,52 2.550,00
Total cum
367 NP.UW.23.01
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00)
section type 3 - curve section 66 * 1,050
Total tonne 696,30
Total 853 - Lining upper side NPR
Total 120 - Main Tunnel - section type 3 widened section (only 696,30 19.445,72
excavation and lining) NPR
368 NP.UW.24.01
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD 69,3000

69,3000 124.626,56
- 145 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
122 - Main Tunnel - section type 0 lay-by (only excavation and lining)
180 - Filling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

369 12.01.00.a AMOUNT CARRIED FORWARD 1.996,


Providing and laying Granular Sub-Base Material - By Mechanical means section type 0 - lay by 11
54,5 * 20,42
Total cum Total 180 - Filling NPR
CARRY FORWARD Main Tunnel - section type 0 lay-by (only...
CARRY FORWARD Main Tunnel 1.112,89
CARRY FORWARD Road Alignement TU – Tunnel - CH 1.112,89
0...
CARRY FORWARD
- 146 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
122 - Main Tunnel - section type 0 lay-by (only excavation and lining)
800 - Tunnel excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

370 NP.UW.02.02 AMOUNT CARRIED FORWARD 6.753,


Rock Excavations for underground works - with hammer or drill&blast section type 0 - lay by 42
17 * 144,96
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD Main Tunnel - section type 0 lay-by (only...
CARRY FORWARD Main Tunnel 2.464,32
CARRY FORWARD Road Alignement TU – Tunnel - CH 2.464,32
0...
CARRY FORWARD
Rock Excavations for underground works - with hammer or drill&blast section type 0 - lay by 42
17 * 144,96
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD Main Tunnel - section type 0 lay-by (only...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 147 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
122 - Main Tunnel - section type 0 lay-by (only excavation and lining)
810 - Pre-Support

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
371 NP.UW.04.01 AMOUNT CARRIED FORWARD 3.043,88
372 NP.UW.05.01 50 mm thick shotcreting with steel fibers for underground works section type 0 - lay by 2.652,95
373 NP.UW.06.01 17 * 30,74 581,39
Total sqm
50 mm thick shotcreting for underground works section type 0 - lay by
17 * 30,58
522,58
Total sqm
Wire mesh ∅5mm/100x100 for Shotcrete - underground works section type 0 - lay by 522,58
17 * 30,66
Total sqm Total 810 - Pre-Support NPR
CARRY FORWARD Main Tunnel - section type 0 lay-by (only...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH 519,86
0... 519,86
CARRY FORWARD

521,22
521,22

- 148 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
122 - Main Tunnel - section type 0 lay-by (only excavation and lining)
820 - Rock Reinforcement
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

374 NP.UW.08.02 AMOUNT CARRIED FORWARD 7.352,


Swellex rock bolts (yield load >200 kN - L=4,00) for underground works section type 0 - lay by 36
17
Total no. Total 820 - Rock Reinforcement NPR
CARRY FORWARD Main Tunnel - section type 0 lay-by (only...
CARRY FORWARD Main Tunnel 17,00
CARRY FORWARD Road Alignement TU – Tunnel - CH 17,00
0...
CARRY FORWARD

- 149 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
122 - Main Tunnel - section type 0 lay-by (only excavation and lining)
845 - Waterproofing system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Waterproofing system for underground works: composite drainage sheet, PVC
375 NP.UW.13.01
membrane, protection sheet, including granular draining material around the pipe
section type 0 - lay by 17 * 30,71
Total sqm
Drainage pipe f 200 HDPE micro-slotted for drainage underground works section type 0 - lay by 522,07
17 * 2,00
Total m Total 845 - Waterproofing system NPR 522,07 4.500,00
CARRY FORWARD Main Tunnel - section type 0 lay-by (only...
376 NP.UW.14.01
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0... 34,00
CARRY FORWARD
34,00 3.019,03
- 150 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
122 - Main Tunnel - section type 0 lay-by (only excavation and lining)
850 - Lining bottom side / Inver

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying of Plain Cement Concrete M 10 - for underground works (item
377 NP.UW.20.01
20.01.00.0 + NP.UW.01.00)
section type 0 - lay by 2 * 17 * 2,55 * 0,10
Total cum
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground 8,67
works (item 20.02.00.G + NP.UW.01.00)
section type 0 - lay by 17 * 2,27 8,67 10.981,24
Total cum
378 NP.UW.21.01 Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
+ NP.UW.01.00)
section type 0 - lay by 17 * 0,450
38,59
Total tonne Total 850 - Lining bottom side / Inver NPR
CARRY FORWARD Main Tunnel - section type 0 lay-by (only...
38,59 15.549,15
CARRY FORWARD Main Tunnel
379 NP.UW.22.01 CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

7,6500
7,6500 122.616,07
0...
CARRY FORWARD

- 151 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
122 - Main Tunnel - section type 0 lay-by (only excavation and lining)
853 - Lining upper side

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Form work for vault (Class F1 Finish) - Using steel section type 0 - lay by
380 NP.UW.17.01
17 * 27,45
Total sqm
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for 466,65
underground works (item 20.08.00.D.1q + NP.UW.01.00)
section type 0 - lay by 17 * 15,33 466,65 2.550,00
closing wall 1,55 * 31,10
381 NP.UW.23.01
12,00 * 31,10
Total cum
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00)
260,61
section type 0 - lay by 17 * 1,700
closing wall - 105 kg/cum 421,41 * 0,105
Total tonne
Total 853 - Lining upper side NPR
Total 122 - Main Tunnel - section type 0 lay-by (only
excavation and lining) NPR
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
closing wall 1,55 * 31,10
12,00 * 31,10
Total cum
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00)
section type 0 - lay by 17 * 1,700
closing wall - 105 kg/cum 421,41 * 0,105
Total tonne 48,21
Total 853 - Lining upper side NPR
Total 122 - Main Tunnel - section type 0 lay-by (only 373,20
excavation and lining) NPR 682,02 19.445,72
CARRY FORWARD Main Tunnel
382 NP.UW.24.01
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
28,9000

44,2481
73,1481 124.626,56

- 152 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
123 - Main Tunnel - section type 1 lay-by (only excavation and lining)
180 - Filling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

383 12.01.00.a AMOUNT CARRIED FORWARD 1.996,


Providing and laying Granular Sub-Base Material - By Mechanical means section type 1 - lay by 11
54,5 * 20,42
Total cum Total 180 - Filling NPR
CARRY FORWARD Main Tunnel - section type 1 lay-by (only...
CARRY FORWARD Main Tunnel 1.112,89
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
383 12.01.00.a AMOUNT CARRIED FORWARD 1.996,
Providing and laying Granular Sub-Base Material - By Mechanical means section type 1 - lay by 11
54,5 * 20,42
Total cum Total 180 - Filling NPR
CARRY FORWARD Main Tunnel - section type 1 lay-by (only...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH 1.112,89
0...
CARRY FORWARD

- 153 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
123 - Main Tunnel - section type 1 lay-by (only excavation and lining)
800 - Tunnel excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
384 NP.UW.02.02 AMOUNT CARRIED FORWARD 6.753,
Rock Excavations for underground works - with hammer or drill&blast section type 1 - lay by 42
43 * 146,50
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD Main Tunnel - section type 1 lay-by (only...
CARRY FORWARD Main Tunnel 6.299,50
CARRY FORWARD Road Alignement TU – Tunnel - CH 6.299,50
0...
CARRY FORWARD

- 154 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
123 - Main Tunnel - section type 1 lay-by (only excavation and lining)
810 - Pre-Support
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

385 NP.UW.04.01 AMOUNT CARRIED FORWARD 3.043,88


386 NP.UW.05.02 50 mm thick shotcreting with steel fibers for underground works section type 1 - lay by 4.452,45
387 NP.UW.06.01 lining 581,39
141 * 30,90
excavation face ((43)/2,00) * 146,50 4.356,90
Total sqm 3.149,75
100 mm thick shotcreting for underground works section type 1 - lay by
43 * 30,66
Total sqm
Wire mesh ∅5mm/100x100 for Shotcrete - underground works section type 1 - lay by
43 * 30,82 7.506,65
Total sqm Total 810 - Pre-Support NPR
CARRY FORWARD Main Tunnel - section type 1 lay-by (only...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0... 1.318,38
CARRY FORWARD 1.318,38

1.325,26
1.325,26

- 155 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
123 - Main Tunnel - section type 1 lay-by (only excavation and lining)
820 - Rock Reinforcement

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

388 NP.UW.08.02 AMOUNT CARRIED FORWARD 7.352,


Swellex rock bolts (yield load >200 kN - L=4,00) for underground works section type 1 - lay by 36
43 * 18 * (1/1,50)
Total no. Total 820 - Rock Reinforcement NPR
CARRY FORWARD Main Tunnel - section type 1 lay-by (only...
CARRY FORWARD Main Tunnel 518,58
CARRY FORWARD Road Alignement TU – Tunnel - CH 518,58
0...
CARRY FORWARD
- 156 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
123 - Main Tunnel - section type 1 lay-by (only excavation and lining)
845 - Waterproofing system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Waterproofing system for underground works: composite drainage sheet, PVC
389 NP.UW.13.01
membrane, protection sheet, including granular draining material around the pipe
section type 1 - lay by 43 * 30,71
Total sqm
Drainage pipe f 200 HDPE micro-slotted for drainage underground works section type 1 - lay by 1.320,53
43 * 2,00
Total m Total 845 - Waterproofing system NPR 1.320,53 4.500,00
CARRY FORWARD Main Tunnel - section type 1 lay-by (only...
390 NP.UW.14.01
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0... 86,00
CARRY FORWARD
86,00 3.019,03
- 157 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
123 - Main Tunnel - section type 1 lay-by (only excavation and lining)
850 - Lining bottom side / Inver

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying of Plain Cement Concrete M 10 - for underground works (item
391 NP.UW.20.01
20.01.00.0 + NP.UW.01.00)
section type 1 - lay by 2 * 43 * 2,55 * 0,10
Total cum
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground 21,93
works (item 20.02.00.G + NP.UW.01.00)
section type 1 - lay by 43 * 2,27 21,93 10.981,24
Total cum
392 NP.UW.21.01 Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
+ NP.UW.01.00)
section type 1 - lay by 43 * 0,450
97,61
Total tonne Total 850 - Lining bottom side / Inver NPR
CARRY FORWARD Main Tunnel - section type 1 lay-by (only...
97,61 15.549,15
CARRY FORWARD Main Tunnel
393 NP.UW.22.01 CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

19,3500
19,3500 122.616,07
0...
CARRY FORWARD

- 158 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
123 - Main Tunnel - section type 1 lay-by (only excavation and lining)
853 - Lining upper side

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Form work for vault (Class F1 Finish) - Using steel section type 1 - lay by
394 NP.UW.17.01
43 * 27,45
Total sqm
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for 1.180,35
underground works (item 20.08.00.D.1q + NP.UW.01.00)
section type 1 - lay by 43 * 15,33 1.180,35 2.550,00
closing wall 1,55 * 31,10
395 NP.UW.23.01
12,00 * 31,10
Total cum
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00)
659,19
section type 1 - lay by 43 * 1,700
closing wall - 105 kg/cum 421,41 * 0,105
Total tonne
Total 853 - Lining upper side NPR
Total 123 - Main Tunnel - section type 1 lay-by (only
excavation and lining) NPR
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
closing wall 1,55 * 31,10
12,00 * 31,10
Total cum
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00)
section type 1 - lay by 43 * 1,700
closing wall - 105 kg/cum 421,41 * 0,105
Total tonne 48,21
Total 853 - Lining upper side NPR
Total 123 - Main Tunnel - section type 1 lay-by (only 373,20
excavation and lining) NPR 1.080,60 19.445,72
CARRY FORWARD Main Tunnel
396 NP.UW.24.01
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
73,1000

44,2481
117,3481 124.626,56

- 159 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
124 - Main Tunnel - section type 2 lay-by (only excavation and lining)
180 - Filling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

397 12.01.00.a AMOUNT CARRIED FORWARD 1.996,


Providing and laying Granular Sub-Base Material - By Mechanical means section type 2 - lay by 11
54,5 * 20,42
Total cum Total 180 - Filling NPR
CARRY FORWARD Main Tunnel - section type 2 lay-by (only...
CARRY FORWARD Main Tunnel 1.112,89
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
397 12.01.00.a AMOUNT CARRIED FORWARD 1.996,
Providing and laying Granular Sub-Base Material - By Mechanical means section type 2 - lay by 11
54,5 * 20,42
Total cum Total 180 - Filling NPR
CARRY FORWARD Main Tunnel - section type 2 lay-by (only...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH 1.112,89
0...
CARRY FORWARD

- 160 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
124 - Main Tunnel - section type 2 lay-by (only excavation and lining)
800 - Tunnel excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
398 NP.UW.02.02 AMOUNT CARRIED FORWARD 6.753,
Rock Excavations for underground works - with hammer or drill&blast section type 2 - lay by 42
17 * 148,06
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD Main Tunnel - section type 2 lay-by (only...
CARRY FORWARD Main Tunnel 2.517,02
CARRY FORWARD Road Alignement TU – Tunnel - CH 2.517,02
0...
CARRY FORWARD

- 161 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
124 - Main Tunnel - section type 2 lay-by (only excavation and lining)
810 - Pre-Support
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

399 NP.UW.04.01 AMOUNT CARRIED FORWARD 3.043,88


400 NP.UW.04.02 50 mm thick shotcreting with steel fibers for underground works section type 2 - lay by 5.234,30
401 NP.UW.05.01 lining 2.652,95
402 NP.UW.05.02 17 * 31,06 528, 4.452,45
403 NP.UW.06.01 excavation face 02 581,39
(50%) * ((17)/1,75) * 148,06 718,
Total sqm 83
100 mm thick shotcreting with steel fibers for underground works section type 2 - lay by
excavation face
(50%) * 17 * 148,06 * (1/1,75)
Total sqm 1.246,85
50 mm thick shotcreting for underground works section type 2 - lay by
17 * 30,74
Total sqm
100 mm thick shotcreting for underground works section type 2 - lay by
17 * 30,74
Total sqm
Wire mesh ∅5mm/100x100 for Shotcrete - underground works section type 2 - lay by 717,35
17 * 30,98
717,35
17 * 30,66
Total sqm Total 810 - Pre-Support NPR
CARRY FORWARD Main Tunnel - section type 2 lay-by (only...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
522,58
0... 522,58
CARRY FORWARD

522,58
522,58

526,
66
521,
22

1.047,88
- 162 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
124 - Main Tunnel - section type 2 lay-by (only excavation and lining)
820 - Rock Reinforcement

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Injected rock bolts L=7,00 (Ftk >350 kN), incl. injections for underground works section type 2
404 NP.UW.09.05
- lay by
17 * 18 * (1/1,50)
Total no. 205,02
Fiberglass dowels/bolts (ultimate load >350 kN) section type 2 - lay by
(50%) * 17 * (8*7,00/6,00) 205,02 16.001,24
Total m Total 820 - Rock Reinforcement NPR
405 NP.UW.11.01
CARRY FORWARD Main Tunnel - section type 2 lay-by (only...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH 79,31
0... 79,31 11.800,00
CARRY FORWARD
Total m Total 820 - Rock Reinforcement NPR
CARRY FORWARD Main Tunnel - section type 2 lay-by (only...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 163 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
124 - Main Tunnel - section type 2 lay-by (only excavation and lining)
845 - Waterproofing system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Waterproofing system for underground works: composite drainage sheet, PVC
membrane, protection sheet, including granular draining material around the pipe
section type 2 - lay by 17 * 30,71
Total sqm
Drainage pipe f 200 HDPE micro-slotted for drainage underground works section type 2 - lay by
17 * 2,00
Total m Total 845 - Waterproofing system NPR
CARRY FORWARD Main Tunnel - section type 2 lay-by (only...
CARRY FORWARD Main Tunnel
AMOUNT CARRIED FORWARD
Waterproofing system for underground works: composite drainage sheet, PVC
406 NP.UW.13.01
membrane, protection sheet, including granular draining material around the pipe
section type 2 - lay by 17 * 30,71
Total sqm
Drainage pipe f 200 HDPE micro-slotted for drainage underground works section type 2 - lay by 522,07
17 * 2,00
Total m Total 845 - Waterproofing system NPR 522,07 4.500,00
CARRY FORWARD Main Tunnel - section type 2 lay-by (only...
407 NP.UW.14.01
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0... 34,00
CARRY FORWARD
34,00 3.019,03

- 164 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
124 - Main Tunnel - section type 2 lay-by (only excavation and lining)
850 - Lining bottom side / Inver

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying of Plain Cement Concrete M 10 - for underground works (item
408 NP.UW.20.01
20.01.00.0 + NP.UW.01.00)
section type 2 - lay by 2 * 17 * 2,55 * 0,10
Total cum
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground 8,67
works (item 20.02.00.G + NP.UW.01.00)
section type 2 - lay by 17 * 2,27 8,67 10.981,24
Total cum
409 NP.UW.21.01 Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
+ NP.UW.01.00)
section type 2 - lay by 17 * 0,450
38,59
Total tonne Total 850 - Lining bottom side / Inver NPR
CARRY FORWARD Main Tunnel - section type 2 lay-by (only...
38,59 15.549,15
CARRY FORWARD Main Tunnel
410 NP.UW.22.01 CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

7,6500
7,6500 122.616,07
- 165 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
124 - Main Tunnel - section type 2 lay-by (only excavation and lining)
853 - Lining upper side

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Form work for vault (Class F1 Finish) - Using steel section type 2 - lay by
411 NP.UW.17.01
17 * 27,45
Total sqm
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for 466,65
underground works (item 20.08.00.D.1q + NP.UW.01.00)
section type 2 - lay by 17 * 15,33 466,65 2.550,00
closing wall 1,55 * 31,10
412 NP.UW.23.01
12,00 * 31,10
Total cum
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00)
260,61
section type 2 - lay by 17 * 1,700
closing wall - 105 kg/cum 421,41 * 0,105
Total tonne 48,21
Total 853 - Lining upper side NPR
Total 124 - Main Tunnel - section type 2 lay-by (only 373,20
excavation and lining) NPR 682,02 19.445,72
CARRY FORWARD Main Tunnel
413 NP.UW.24.01
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
28,9000

44,2481
73,1481 124.626,56
- 166 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
125 - Main Tunnel - section type 3 lay-by (only excavation and lining)
180 - Filling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

414 12.01.00.a AMOUNT CARRIED FORWARD 1.996,


Providing and laying Granular Sub-Base Material - By Mechanical means section type 3 - lay by 11
54,5 * 20,42
Total cum Total 180 - Filling NPR
CARRY FORWARD Main Tunnel - section type 3 lay-by (only...
CARRY FORWARD Main Tunnel 1.112,89
CARRY FORWARD Road Alignement TU – Tunnel - CH 1.112,89
0...
CARRY FORWARD
Providing and laying Granular Sub-Base Material - By Mechanical means section type 3 - lay by 11
54,5 * 20,42
Total cum Total 180 - Filling NPR
CARRY FORWARD Main Tunnel - section type 3 lay-by (only...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 167 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
125 - Main Tunnel - section type 3 lay-by (only excavation and lining)
800 - Tunnel excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
415 NP.UW.02.02 AMOUNT CARRIED FORWARD 6.753,
Rock Excavations for underground works - with hammer or drill&blast section type 3 - lay by 42
9 * 151,56
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD Main Tunnel - section type 3 lay-by (only...
CARRY FORWARD Main Tunnel 1.364,04
CARRY FORWARD Road Alignement TU – Tunnel - CH 1.364,04
0...
CARRY FORWARD

- 168 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
125 - Main Tunnel - section type 3 lay-by (only excavation and lining)
810 - Pre-Support
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

416 NP.UW.03.02 AMOUNT CARRIED FORWARD 108.379,99


417 NP.UW.04.01 Lattice Girders for underground works section type 3 - lay by 3.043,88
418 NP.UW.04.02 lattice girders - weigth 17.40 kg/m 5.234,30
419 NP.UW.05.05 9 * (31,01*17,40/1000) 4,85 11.131,12
420 NP.UW.06.01 plates & link chains - 45% 64 581,39
9 * (31,01*17,40*45%/1000) 2,18
Total tonne 52
50 mm thick shotcreting with steel fibers for underground works section type 3 - lay by
lining
9 * 31,37
excavation face (50%) * 9 * 151,56 7,0416
Total sqm
100 mm thick shotcreting with steel fibers for underground works section type 3 - lay by
excavation face
(50%) * 9 * 151,56 282,
Total sqm 33
250 mm thick shotcreting for underground works section type 3 - lay by 682,
9 * 30,90 02
Total sqm
Wire mesh ∅5mm/100x100 for Shotcrete - underground works section type 3 - lay by
9 * 31,29
9 * 30,73 964,35
Total sqm Total 810 - Pre-Support NPR
CARRY FORWARD Main Tunnel - section type 3 lay-by (only...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD 682,02
682,02

278,10
278,10

281,
61
276,
57

558,18
- 169 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
125 - Main Tunnel - section type 3 lay-by (only excavation and lining)
820 - Rock Reinforcement

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Self-drilling anchors L=3,00 (yield load > 550 kN) for underground works section type 3 - lay
421 NP.UW.10.01
by
9 * 30
Total no. 270,00
Fiberglass dowels/bolts (ultimate load >350 kN) section type 3 - lay by
(50%) * 9 * (8*7,00/6,00) 270,00 8.033,67
Total m Total 820 - Rock Reinforcement NPR
422 NP.UW.11.01
CARRY FORWARD Main Tunnel - section type 3 lay-by (only...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH 41,99
0... 41,99 11.800,00
CARRY FORWARD
Total m Total 820 - Rock Reinforcement NPR
CARRY FORWARD Main Tunnel - section type 3 lay-by (only...
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 170 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
125 - Main Tunnel - section type 3 lay-by (only excavation and lining)
845 - Waterproofing system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Waterproofing system for underground works: composite drainage sheet, PVC
membrane, protection sheet, including granular draining material around the pipe
section type 3 - lay by 9 * 30,71
Total sqm
Drainage pipe f 200 HDPE micro-slotted for drainage underground works section type 3 - lay by
9 * 2,00
Total m Total 845 - Waterproofing system NPR
CARRY FORWARD Main Tunnel - section type 3 lay-by (only...
CARRY FORWARD Main Tunnel
AMOUNT CARRIED FORWARD
Waterproofing system for underground works: composite drainage sheet, PVC
423 NP.UW.13.01
membrane, protection sheet, including granular draining material around the pipe
section type 3 - lay by 9 * 30,71
Total sqm
Drainage pipe f 200 HDPE micro-slotted for drainage underground works section type 3 - lay by 276,39
9 * 2,00
Total m Total 845 - Waterproofing system NPR 276,39 4.500,00
CARRY FORWARD Main Tunnel - section type 3 lay-by (only...
424 NP.UW.14.01
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0... 18,00
CARRY FORWARD
18,00 3.019,03

- 171 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
125 - Main Tunnel - section type 3 lay-by (only excavation and lining)
850 - Lining bottom side / Inver

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying of Plain Cement Concrete M 10 - for underground works (item
425 NP.UW.20.01
20.01.00.0 + NP.UW.01.00)
section type 3 - lay by 2 * 9 * 2,55 * 0,10
Total cum
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground 4,59
works (item 20.02.00.G + NP.UW.01.00)
section type 3 - lay by 9 * 2,27 4,59 10.981,24
Total cum
426 NP.UW.21.01 Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
+ NP.UW.01.00)
section type 3 - lay by 9 * 0,450
20,43
Total tonne Total 850 - Lining bottom side / Inver NPR
CARRY FORWARD Main Tunnel - section type 3 lay-by (only...
20,43 15.549,15
CARRY FORWARD Main Tunnel
427 NP.UW.22.01 CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

4,0500
4,0500 122.616,07
- 172 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
125 - Main Tunnel - section type 3 lay-by (only excavation and lining)
853 - Lining upper side

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Form work for vault (Class F1 Finish) - Using steel section type 3 - lay by
428 NP.UW.17.01
9 * 27,45
Total sqm
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for 247,05
underground works (item 20.08.00.D.1q + NP.UW.01.00)
section type 3 - lay by 9 * 15,33 247,05 2.550,00
closing wall 1,55 * 31,10
429 NP.UW.23.01
12,00 * 31,10
Total cum
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00)
137,97
section type 3 - lay by 9 * 1,700
closing wall - 105 kg/cum 421,41 * 0,105
Total tonne 48,21
Total 853 - Lining upper side NPR
Total 125 - Main Tunnel - section type 3 lay-by (only 373,20
excavation and lining) NPR 559,38 19.445,72
CARRY FORWARD Main Tunnel
430 NP.UW.24.01
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
15,3000

44,2481
59,5481 124.626,56
- 173 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
126 - Main Tunnel - Cut&Cover Stretch South
870 - Portal

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 30 - For solid slab
431 20.08.00.C.1q
super-structure. Height above 5 m to 10 m
95,00 * 0,50
Total cum 47,50
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure
Steel ratio 195.00 kg/mc 47,50 * 0,195 47,50 16.967,86
432 20.09.00.0 Total tonne
Form work for vault (Class F1 Finish) - Using steel 16,26 * 24,12
Total sqm
Providing and laying of Plain Cement Concrete M 10 - for underground works (item
20.01.00.0 + NP.UW.01.00) 9,2625
(16,98+1,90) * 2,40 * 0,10
(11,81+1,90) * 2,15 * 0,10 9,2625 112.276,18
Total cum
433 NP.UW.17.01
Providing and laying of Plain Cement Concrete M 10 - for underground works (item
20.01.00.0 + NP.UW.01.00) 392,19
0,60 * 3,00 * 0,10
0,60 * 2,50 * 0,10 392,19 2.550,00
434 NP.UW.20.01 Total cum
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground
works (item 20.02.00.G + NP.UW.01.00)
(16,98+1,90) * 2,40 * ((0,85+1,05)/2) 4,53
(11,81+1,90) * 2,10 * 0,85
Total cum
Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
+ NP.UW.01.00)
Steel ratio 240.00 kg/mc 67,52 * 0,240
Total tonne
0,60 * 3,00 * 0,10
0,60 * 2,50 * 0,10
Total cum
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground
works (item 20.02.00.G + NP.UW.01.00)
(16,98+1,90) * 2,40 * ((0,85+1,05)/2)
(11,81+1,90) * 2,10 * 0,85
Total cum 2,95
Providing and laying , fitting and placing un-coated Mild steel / HYSD 7,48 10.981,24
reinforcement complete in foundation - for underground works (item 20.03.00.0
435 NP.UW.20.01
+ NP.UW.01.00)
Steel ratio 240.00 kg/mc 67,52 * 0,240
Total tonne 0,18
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for
underground works (item 20.08.00.D.1q + NP.UW.01.00) 0,15
(14,36+1,90) * 18,82 0,33 10.981,24
11,81 * 2,55
436 NP.UW.21.01 Total cum
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00) 43,05
Steel ratio 140.00 kg/mc 336,13 * 0,140
Total tonne 24,47
CARRY FORWARD Main Tunnel 67,52 15.549,15
CARRY FORWARD Road Alignement TU – Tunnel - CH
437 NP.UW.22.01
0...
CARRY FORWARD

16,2048
16,2048 122.616,07
438 NP.UW.23.01

306,01

30,12
336,13 19.445,72
439 NP.UW.24.01

47,0582

47,0582 124.626,56

- 174 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
126 - Main Tunnel - Cut&Cover Stretch South
870 - Portal

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
AMOUNT CARRIED FORWARD
Total 870 - Portal NPR
Total 126 - Main Tunnel - Cut&Cover Stretch South NPR
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 175 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
127 - Main Tunnel - Cut&Cover Stretch North
870 - Portal
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

440 20.08.00.C.1q AMOUNT CARRIED FORWARD 16.967,86


441 20.09.00.0 Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 30 - For solid slab 112.276,18
442 NP.UW.17.01 super-structure. Height above 5 m to 10 m 2.550,00
443 NP.UW.20.01 50,90 * 0,50 10.981,24
444 NP.UW.21.01 Total cum 15.549,15
445 NP.UW.22.01 Providing and laying , fitting and placing HYSD bar reinforcement in super- structure 25,45 122.616,07
446 NP.UW.23.01 Steel ratio 230.00 kg/mc 25,45 * 0,230 25,45 19.445,72
447 NP.UW.24.01 Total tonne 124.626,56
Form work for vault (Class F1 Finish) - Using steel 20,00 * 24,12
Total sqm
Providing and laying of Plain Cement Concrete M 10 - for underground works (item
20.01.00.0 + NP.UW.01.00)
20,00 * 2,40 * 0,10
20,00 * 2,10 * 0,10 5,8535
Total cum 5,8535
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground
works (item 20.02.00.G + NP.UW.01.00)
20,00 * 2,40 * ((0,85+1,05)/2)
20,00 * 2,10 * 0,85 482,40
Total cum 482,40
Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
+ NP.UW.01.00) 4,80
Steel ratio 240.00 kg/mc 81,30 * 0,240 4,20
Total tonne
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for
underground works (item 20.08.00.D.1q + NP.UW.01.00) 9,00
20,00 * 18,80
18,50 * 0,89
45,6
5,80 * 0,50 * 2,20
0
Total cum
35,7
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
0
for underground works (item 20.09.00.0 + NP.UW.01.00)
Steel ratio 160.00 kg/mc 398,85 * 0,160
81,30
Total tonne
Total 870 - Portal NPR
Total 127 - Main Tunnel - Cut&Cover Stretch North NPR
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
19,5120
19,5120

376,00
16,47
6,38

398,85

63,8160
63,8160
- 176 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
130 - Main Tunnel - Completation work
250 - Drenaggi

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

448 NP.CW.11.01 AMOUNT CARRIED FORWARD 114.300,00


449 NP.CW.11.02 Shafts 155x100x208 Flushing niches 139.000,00
450 NP.CW.11.05 16 80.600,00
451 NP.CW.11.08 Total no. 46.000,00
452 NP.CW.12.01 Shafts 155x100x252 Flushing niches 200.000,00
453 NP.CW.12.02 16 150.000,00
16,00
454 NP.UW.15.01 Total no. 1.618,68
455 NP.UW.15.02 Double chamber siphoned wells 29 16,00
Total no.
Shafts 80x80x100 BY-PASS
12
EXTERNAL CONNECTIONS 6
Total no. 16,00
Water discharge basin outside the carriageway: 150 cum 1
16,00
Total no.
Water discharge basin outside the carriageway: 50 cum 1
Total no.
Drainage pipe f 100 for underground works Hydrant wells drainage 29,00
101,00 29,00
BY-PASS 1
connection to water drainage 4,10
BY-PASS 2
connection to water drainage 4,10
12,00
BY-PASS 3
6,00
connection to water drainage 4,10
Total m
Drainage pipe f 200 for underground works NORTH DIRECTION
1133,00
18,00
under the carriageway 495,90
CARRY FORWARD Drenaggi
CARRY FORWARD Main Tunnel - Completation work
CARRY FORWARD Main Tunnel 1,00
CARRY FORWARD Road Alignement TU – Tunnel - CH 1,00
0...
CARRY FORWARD
1,00
1,00
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

101,00
4,10
4,10
4,10

113,30
1.133,00
495,90

- 177 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
130 - Main Tunnel - Completation work
250 - Drenaggi

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD 81,1


SOUTH DIRECTION 81,15 5
under the carriageway 360,50 360,
BY-PASS 1 50
connection to water drainage 3,80+3,80+3,10 10,7
connection to river 67,00 0
BY-PASS 2 67,0
connection to water drainage 3,80+3,80+3,10 0
conection to river 52,00 10,7
BY-PASS 3 0
connection to water drainage 3,80+3,80+3,10 52,0
connection to river 54,00 0
Total m 10,7
Drainage pipe f 300 for underground works SOUTH DIRECTION 0
1158,20 54,0
NORTH DIRECTION 1078,50 0
EXTERNAL CONNECTIONS 20,00
132,20+105,60+60,30+107,40+12,00+23,00+70,00+2,00
Total m
Sewage pipe f 400 for underground works SOUTH DIRECTION
650,00
NORTH DIRECTION 735,00
to the local sewage system 100,00+100,00
Water discharge outside 100,00
Connection to the local water supply system 100,00
Total m
Concrete Kerb Drainage Channel - inner diameter: 200 x 300 mm; drainage cross section: 514
cm²
1126,00
2.275,65
CARRY FORWARD Drenaggi
CARRY FORWARD Main Tunnel - Completation work
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
2.549,
0...
15
456 NP.UW.15.03 CARRY FORWARD
5.725,
457 NP.UW.15.04
82
Water discharge outside 100,00
Connection to the local water supply system 100,00
Total m
Concrete Kerb Drainage Channel - inner diameter: 200 x 300 mm; drainage cross section: 514
cm²
1126,00
CARRY FORWARD Drenaggi
CARRY FORWARD Main Tunnel - Completation work
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0... 2.549,
1.158,20
15
456 NP.UW.15.03 CARRY FORWARD 1.078,50
5.725,
457 NP.UW.15.04 20,00
82
458 NP.UW.18.01 512,50
8.872,
38

2.769,20
650,
00
735,
00
200,
00
100,
00
100,
00

1.785,00

1.126,00

- 178 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
130 - Main Tunnel - Completation work
250 - Drenaggi

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Total m 1.126,00 10.715,51
Concrete Drainage Channel whit cast iron grill - inner section: 200 x 200 mm BY-PASS
459 NP.UW.18.02 Transversal water channel
3 * 3,10
Total m Total 250 - Drenaggi NPR
CARRY FORWARD Main Tunnel - Completation work
CARRY FORWARD Main Tunnel 9,30
CARRY FORWARD Road Alignement TU – Tunnel - CH
9,30 33.500,00
0...
CARRY FORWARD
3 * 3,10
Total m Total 250 - Drenaggi NPR
CARRY FORWARD Main Tunnel - Completation work
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 179 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
130 - Main Tunnel - Completation work
700 - Marciapiedi e cordoli

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Plain/Reinforced Cement Concrete in Foundation - PCC Grade M 25 Main road
1126,60 * 1,07
1126,60 * 2,62
SOS/Hydrant niches 8 * 1,80 * 4,50
-8 * 0,72
Hydrant niches 8 * 1,15 * 2,08
-8 * 0,60
AMOUNT CARRIED FORWARD
Plain/Reinforced Cement Concrete in Foundation - PCC Grade M 25 Main road
460 20.02.00.D
1126,60 * 1,07
1126,60 * 2,62
SOS/Hydrant niches 8 * 1,80 * 4,50 1.205,46
-8 * 0,72
Hydrant niches 8 * 1,15 * 2,08 2.951,69
-8 * 0,60
Flushing niches 16 * 2,70 * 3,54
64,80
-16 * 3,25
16 * 2,70 * 4,00 -5,76
-16 * 3,71
Total cum
19,14
Sidewalk Curb 15x25 cm 2 * 1126,60
Total m -4,80
Total 700 - Marciapiedi e cordoli NPR
CARRY FORWARD Main Tunnel - Completation work
152,93
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH -52,00
0... 172,80
CARRY FORWARD -59,36
4.444,90 12.463,60
461 NP.CW.14.01

2.253,20
2.253,20 1.950,00

- 180 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
130 - Main Tunnel - Completation work
1980 - Antincendio

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Shafts 60x60x102 Hydrant niches
462 NP.CW.11.03
7
Total no.
Shafts 60x60x159 SOS/Hydrant niches 9 7,00
Total no.
Water supply steel pipe f 200 for underground works WATER SUPPLY 7,00 40.300,00
1232,30
463 NP.CW.11.04
130,00
13,50
Total m
9,00
Water supply steel pipe f 100 for underground works External connection water supply basin
70,00 9,00 47.650,00
Total m
464 NP.UW.16.01 Hydrant 20
Total no.
Providing and installing of pumping system at the North Portal Building to keep required
pressure in the system, including n.5 pumps and all devices and components required 1.232,30
to make the system properly work and fulfilling requirements as per design sp 130,00
1
Total no. 13,50
Water supply system to collect water from the river and supply it to the water tank of the fire 1.375,80 20.000,00
estinguishing system at the north portal, including all necessary components and basements
465 NP.UW.16.02
and accordingly to requirements specified in technical tender d
1
Total no. Total 1980 - Antincendio NPR
70,00
CARRY FORWARD Main Tunnel - Completation work
CARRY FORWARD Main Tunnel 70,00 10.000,00
466 NP.UW.32.01 CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD 20,00
20,00 280.000,00
467 NP.UW.32.02

1,00

1,00 12.000.000,00
468 NP.UW.32.03

1,00

1,00 10.000.000,00
- 181 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
130 - Main Tunnel - Completation work
1982 - Doors for by-pass and niches

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and installing sliding doors (120x210 cm), fulfilling design requirements specified in
469 NP.UW.33.01
the technical tender documents, for both entrance of emergency exit tunnel and at the air lock
entrance (n.3 for each emergency escape tunnel)
9
Total no. 9,00
Providing and installing doors (80x210 cm), fulfilling design requirements specified
in the technical tender documents, for the entrance at each SOS niche 9,00 1.900.000,00
470 NP.UW.33.02 9
Total no. Total 1982 - Doors for by-pass and niches NPR
CARRY FORWARD Main Tunnel - Completation work
9,00
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH 9,00 500.000,00
0...
CARRY FORWARD
- 182 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
130 - Main Tunnel - Completation work
1983 - Metallic horizontal support for traffic lights

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

471 NP.UW.34.01 AMOUNT CARRIED FORWARD 5.500.000,00


Providing and installation of metallic horizontal support for traffic lights to be fixed to the inner
lining at the tunnel crown at the portal entrances
2
Total no. Total 1983 - Metallic horizontal support for traffic lights NPR
CARRY FORWARD Main Tunnel - Completation work 2,00
CARRY FORWARD Main Tunnel 2,00
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
Providing and installation of metallic horizontal support for traffic lights to be fixed to the inner
lining at the tunnel crown at the portal entrances
2
Total no. Total 1983 - Metallic horizontal support for traffic lights NPR
CARRY FORWARD Main Tunnel - Completation work
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 183 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
130 - Main Tunnel - Completation work
1985 - Painting and internal surfaces finishing

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
472 NP.UW.35.01 AMOUNT CARRIED FORWARD 5.500,00
473 NP.UW.35.02 Painting and internal surface treatment of both sides of tunnel lining (up to 4 m above 110.000,00
474 NP.UW.35.03 walkways), accordingly to tender deisgn requirements, 220.000,00
9600
Total sqm
Painting and internal surface treatment around SOS niches, accordingly to tender deisgn 9.600,00
requirements, 9.600,00
9
Total no.
Painting and internal surface treatment around escape route tunnels entrance, 9,00
accordingly to tender deisgn requirements,
3
Total no. Total 1985 - Painting and internal surfaces finishing NPR 9,00
CARRY FORWARD Main Tunnel - Completation work
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH 3,00
0...
CARRY FORWARD 3,00

- 184 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
130 - Main Tunnel - Completation work
2100 - Vie cavi
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

475 NP.CW.11.06 AMOUNT CARRIED FORWARD 21.900,00


476 NP.CW.15.01 Shafts 45x45x40 BY-PASS 1.000.000,00
477 NP.UW.30.01 2 1.601,34
478 NP.UW.30.02 Total no. 1.890,91
479 NP.UW.31.01 Buried electrical sub-station
Connection to the medium voltage network 1
2,00
Medium and Low voltage room connection 1
Total no. 2,00
Electrical conduits/pipes f 120 mm for underground works NORTH DIRECTION
4 * 1196,50
6 * 116,70
6 * 200,00 1,00
(2+2+2) * 2,85 1,00
SOUTH DIRECTION 4 * 1196,50
6 * 51,30
6 * 200,00
CONNECTIONS 2,00
10 * (10,00+50,00) 4.786,00
10 * (10,00+10,00) CONNECTION SOS (9*3) * 3,15 700,20
BY-PASS 1.200,00
2 * (161,11+149,26+135,40) 17,10
(2*2*3) * 5,40 4.786,00
3 * 3,85 307,80
Total m 1.200,00
Electrical conduits/pipes f 150 mm for underground works NORTH DIRECTION 600,00
2 * 1196,50 200,00
SOUTH DIRECTION 2 * 1196,50 CONNECTIONS 85,05
2 * (10,00+50,00) 891,54
2 * (10,00+10,00) 64,80
CONNECTION TO THE MEDIUM VOLTAGE NETWORK 3 * 200,00 11,55
Total m
Shaft covers (cast iron) 45 x 190 cm for underground works NORTH DIRECTION
CARRY FORWARD Vie cavi
CARRY FORWARD Main Tunnel - Completation work
CARRY FORWARD Main Tunnel
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

14.850,04
2.393,00
2.393,00
120,00
40,00
600,00

5.546,00

- 185 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
103 - Main Tunnel
130 - Main Tunnel - Completation work
2100 - Vie cavi

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


18 18,00
SOUTH DIRECTION 15
Total no.
Shaft covers (cast iron) 45 x 290 cm for underground works NORTH DIRECTION 15,00
2 33,00 48.000,00
Total no.
480 NP.UW.31.02 Total 2100 - Vie cavi NPR
Total 130 - Main Tunnel - Completation work NPR
Total 103 - Main Tunnel NPR
2,00
CARRY FORWARD Road Alignement TU – Tunnel - CH
0... 2,00 73.600,00
CARRY FORWARD
- 186 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
104 - By-Pass #1
150 - By-Pass - section type 0 (only excavation and lining)
800 - Tunnel excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

481 NP.UW.02.02 AMOUNT CARRIED FORWARD 6.753,


Rock Excavations for underground works - with hammer or drill&blast section type 0 - by-pass 42
11,5 * 18,63
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD By-Pass - section type 0 (only excavatio...
CARRY FORWARD By-Pass #1 214,25
CARRY FORWARD Road Alignement TU – Tunnel - CH 214,25
0...
CARRY FORWARD
Rock Excavations for underground works - with hammer or drill&blast section type 0 - by-pass 42
11,5 * 18,63
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD By-Pass - section type 0 (only excavatio...
CARRY FORWARD By-Pass #1
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 187 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
104 - By-Pass #1
150 - By-Pass - section type 0 (only excavation and lining)
810 - Pre-Support

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
482 NP.UW.04.01 AMOUNT CARRIED FORWARD 3.043,88
483 NP.UW.05.01 50 mm thick shotcreting with steel fibers for underground works section type 0 - by-pass 2.652,95
484 NP.UW.06.01 11,5 * 11,69 581,39
Total sqm
50 mm thick shotcreting for underground works section type 0 - by-pass
11,5 * 11,53
134,44
Total sqm
Wire mesh ∅5mm/100x100 for Shotcrete - underground works section type 0 - by-pass 134,44
11,5 * 11,61
Total sqm Total 810 - Pre-Support NPR
CARRY FORWARD By-Pass - section type 0 (only excavatio...
CARRY FORWARD By-Pass #1
CARRY FORWARD Road Alignement TU – Tunnel - CH 132,60
0... 132,60
CARRY FORWARD

133,52
133,52

- 188 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
104 - By-Pass #1
150 - By-Pass - section type 0 (only excavation and lining)
820 - Rock Reinforcement
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

485 NP.UW.08.02 AMOUNT CARRIED FORWARD 7.352,


Swellex rock bolts (yield load >200 kN - L=4,00) for underground works section type 0 - by- 36
pass
11,5
Total no. Total 820 - Rock Reinforcement NPR
CARRY FORWARD By-Pass - section type 0 (only excavatio... 11,50
CARRY FORWARD By-Pass #1
11,50
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 189 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
104 - By-Pass #1
150 - By-Pass - section type 0 (only excavation and lining)
845 - Waterproofing system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Waterproofing system for underground works: composite drainage sheet, PVC
486 NP.UW.13.01
membrane, protection sheet, including granular draining material around the pipe
section type 0 - by-pass 11,5 * 11,90
Total sqm
Drainage pipe f 200 HDPE micro-slotted for drainage underground works section type 0 - by- 136,85
pass
11,5 * 2,00 136,85 4.500,00
Total m Total 845 - Waterproofing system NPR
487 NP.UW.14.01
CARRY FORWARD By-Pass - section type 0 (only excavatio...
CARRY FORWARD By-Pass #1
CARRY FORWARD Road Alignement TU – Tunnel - CH 23,00
0...
CARRY FORWARD 23,00 3.019,03
- 190 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
104 - By-Pass #1
150 - By-Pass - section type 0 (only excavation and lining)
850 - Lining bottom side / Inver

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying of Plain Cement Concrete M 10 - for underground works (item
488 NP.UW.20.01
20.01.00.0 + NP.UW.01.00)
section type 0 - by-pass 11,5 * 4,10 * 0,10
Total cum
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground 4,72
works (item 20.02.00.G + NP.UW.01.00)
section type 0 - by-pass 11,5 * 0,66 4,72 10.981,24
Total cum
489 NP.UW.21.01 Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
+ NP.UW.01.00)
section type 0 - by-pass 11,5 * 0,200
7,59
Total tonne
Plain/Reinforced Cement Concrete in Foundation - PCC Grade M 20 - for underground
works (item 20.02.00.B + NP.UW.01.00) 7,59 15.549,15
490 NP.UW.22.01 section type 0 - by-pass 11,5 * 2,39 * 0,50
Total cum Total 850 - Lining bottom side / Inver NPR
CARRY FORWARD By-Pass - section type 0 (only excavatio...
CARRY FORWARD By-Pass #1
CARRY FORWARD Road Alignement TU – Tunnel - CH
0... 2,3000
CARRY FORWARD 2,3000 122.616,07
491 NP.UW.25.01

13,74
13,74 14.258,95

- 191 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
104 - By-Pass #1
150 - By-Pass - section type 0 (only excavation and lining)
853 - Lining upper side

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Form work for vault (Class F1 Finish) - Using steel section type 0 - by-pass
492 NP.UW.17.01
11,5 * 9,63
Total sqm
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for 110,75
underground works (item 20.08.00.D.1q + NP.UW.01.00)
section type 0 - by-pass 11,5 * 3,11 110,75 2.550,00
Total cum
493 NP.UW.23.01
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00)
section type 0 - by-pass 11,5 * 0,250
Total tonne 35,77
Total 853 - Lining upper side NPR
Total 150 - By-Pass - section type 0 (only excavation and 35,77 19.445,72
lining) NPR
494 NP.UW.24.01
CARRY FORWARD By-Pass #1
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD 2,8750
lining) NPR
CARRY FORWARD By-Pass #1
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

2,8750 124.626,56

- 192 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
104 - By-Pass #1
151 - By-Pass - section type 1 (only excavation and lining)
800 - Tunnel excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

495 NP.UW.02.02 AMOUNT CARRIED FORWARD 6.753,


Rock Excavations for underground works - with hammer or drill&blast section type 1 - by-pass 42
34 * 19,22
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD By-Pass - section type 1 (only excavatio...
CARRY FORWARD By-Pass #1 653,48
CARRY FORWARD Road Alignement TU – Tunnel - CH 653,48
0...
CARRY FORWARD
Rock Excavations for underground works - with hammer or drill&blast section type 1 - by-pass 42
34 * 19,22
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD By-Pass - section type 1 (only excavatio...
CARRY FORWARD By-Pass #1
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 193 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
104 - By-Pass #1
151 - By-Pass - section type 1 (only excavation and lining)
810 - Pre-Support

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
496 NP.UW.04.01 AMOUNT CARRIED FORWARD 3.043,88
497 NP.UW.05.02 50 mm thick shotcreting with steel fibers for underground works section type 1 - by-pass 4.452,45
498 NP.UW.06.01 lining 581,39
34 * 11,85 402,
excavation face ((34)/2,50) * 19,22 90
Total sqm 261,
100 mm thick shotcreting for underground works section type 1 - by-pass 39
34 * 11,61
Total sqm
Wire mesh ∅5mm/100x100 for Shotcrete - underground works section type 1 - by-pass
34 * 11,77 664,29
Total sqm Total 810 - Pre-Support NPR
CARRY FORWARD By-Pass - section type 1 (only excavatio...
CARRY FORWARD By-Pass #1
CARRY FORWARD Road Alignement TU – Tunnel - CH
0... 394,74
CARRY FORWARD 394,74

400,18
400,18

- 194 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
104 - By-Pass #1
151 - By-Pass - section type 1 (only excavation and lining)
820 - Rock Reinforcement

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

499 NP.UW.08.02 AMOUNT CARRIED FORWARD 7.352,


Swellex rock bolts (yield load >200 kN - L=4,00) for underground works section type 1 - by- 36
pass
34 * ((7+6)/2) * (1/(2,00/2))
Total no. Total 820 - Rock Reinforcement NPR
CARRY FORWARD By-Pass - section type 1 (only excavatio... 221,00
CARRY FORWARD By-Pass #1
221,00
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
- 195 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
104 - By-Pass #1
151 - By-Pass - section type 1 (only excavation and lining)
845 - Waterproofing system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Waterproofing system for underground works: composite drainage sheet, PVC
500 NP.UW.13.01
membrane, protection sheet, including granular draining material around the pipe
section type 1 - by-pass 34 * 11,90
Total sqm
Drainage pipe f 200 HDPE micro-slotted for drainage underground works section type 1 - by- 404,60
pass
34 * 2,00 404,60 4.500,00
Total m Total 845 - Waterproofing system NPR
501 NP.UW.14.01
CARRY FORWARD By-Pass - section type 1 (only excavatio...
CARRY FORWARD By-Pass #1
CARRY FORWARD Road Alignement TU – Tunnel - CH 68,00
0...
CARRY FORWARD 68,00 3.019,03
- 196 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
104 - By-Pass #1
151 - By-Pass - section type 1 (only excavation and lining)
850 - Lining bottom side / Inver

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying of Plain Cement Concrete M 10 - for underground works (item
502 NP.UW.20.01
20.01.00.0 + NP.UW.01.00)
section type 1 - by-pass 34 * 4,10 * 0,10
Total cum
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground 13,94
works (item 20.02.00.G + NP.UW.01.00)
section type 1 - by-pass 34 * 0,66 13,94 10.981,24
Total cum
503 NP.UW.21.01 Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
+ NP.UW.01.00)
section type 1 - by-pass 34 * 0,200
22,44
Total tonne
Plain/Reinforced Cement Concrete in Foundation - PCC Grade M 20 - for underground
works (item 20.02.00.B + NP.UW.01.00) 22,44 15.549,15
504 NP.UW.22.01 section type 1 - by-pass 34 * 2,39 * 0,50
Total cum Total 850 - Lining bottom side / Inver NPR
CARRY FORWARD By-Pass - section type 1 (only excavatio...
CARRY FORWARD By-Pass #1
CARRY FORWARD Road Alignement TU – Tunnel - CH
0... 6,8000
CARRY FORWARD 6,8000 122.616,07
505 NP.UW.25.01

40,63
40,63 14.258,95

- 197 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
104 - By-Pass #1
151 - By-Pass - section type 1 (only excavation and lining)
853 - Lining upper side

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Form work for vault (Class F1 Finish) - Using steel section type 1 - by-pass
506 NP.UW.17.01
34 * 9,63
Total sqm
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for 327,42
underground works (item 20.08.00.D.1q + NP.UW.01.00)
section type 1 - by-pass 34 * 3,11 327,42 2.550,00
Total cum
507 NP.UW.23.01
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00)
section type 1 - by-pass 34 * 0,250
Total tonne 105,74
Total 853 - Lining upper side NPR
Total 151 - By-Pass - section type 1 (only excavation and 105,74 19.445,72
lining) NPR
508 NP.UW.24.01
CARRY FORWARD By-Pass #1
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD 8,5000
lining) NPR
CARRY FORWARD By-Pass #1
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

8,5000 124.626,56

- 198 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
104 - By-Pass #1
152 - By-Pass - section type 2 (only excavation and lining)
800 - Tunnel excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

509 NP.UW.02.02 AMOUNT CARRIED FORWARD 6.753,


Rock Excavations for underground works - with hammer or drill&blast section type 2 - by-pass 42
45,5 * 19,82
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD By-Pass - section type 2 (only excavatio...
CARRY FORWARD By-Pass #1 901,81
CARRY FORWARD Road Alignement TU – Tunnel - CH 901,81
0...
CARRY FORWARD
Rock Excavations for underground works - with hammer or drill&blast section type 2 - by-pass 42
45,5 * 19,82
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD By-Pass - section type 2 (only excavatio...
CARRY FORWARD By-Pass #1
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 199 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
104 - By-Pass #1
152 - By-Pass - section type 2 (only excavation and lining)
810 - Pre-Support

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
510 NP.UW.04.01 AMOUNT CARRIED FORWARD 3.043,88
511 NP.UW.04.02 50 mm thick shotcreting with steel fibers for underground works section type 2 - by-pass 5.234,30
512 NP.UW.05.01 lining 2.652,95
513 NP.UW.05.02 45,5 * 12,00 546, 4.452,45
514 NP.UW.06.01 excavation face 00 581,39
(50%) * ((45,5)/1,75) * 19,82 257,
Total sqm 66
100 mm thick shotcreting with steel fibers for underground works section type 2 - by-pass
excavation face
(50%) * 45,5 * 19,82 * (1/1,75)
Total sqm 803,66
50 mm thick shotcreting for underground works section type 2 - by-pass
45,5 * 11,69
Total sqm
100 mm thick shotcreting for underground works section type 2 - by-pass
45,5 * 11,69
Total sqm
Wire mesh ∅5mm/100x100 for Shotcrete - underground works section type 2 - by-pass 257,02
45,5 * 11,93
257,02
45,5 * 11,61
Total sqm Total 810 - Pre-Support NPR
CARRY FORWARD By-Pass - section type 2 (only excavatio...
CARRY FORWARD By-Pass #1
CARRY FORWARD Road Alignement TU – Tunnel - CH 531,90
0... 531,90
CARRY FORWARD

531,90
531,90

542,
82
528,
26

1.071,08

- 200 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
104 - By-Pass #1
152 - By-Pass - section type 2 (only excavation and lining)
820 - Rock Reinforcement

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Injected rock bolts L=4,50 (Ftk >250 kN), incl. injections for underground works section type 2
515 NP.UW.09.02
- by-pass
45,5 * ((7+6)/2) * (1/1,50)
Total Cadauno 198,15
Fiberglass dowels/bolts (ultimate load >350 kN) section type 2 - by-pass
(50%) * 45,5 * (4*4,50/3,50) 198,15 8.212,36
Total m Total 820 - Rock Reinforcement NPR
516 NP.UW.11.01
CARRY FORWARD By-Pass - section type 2 (only excavatio...
CARRY FORWARD By-Pass #1
CARRY FORWARD Road Alignement TU – Tunnel - CH 116,94
0... 116,94 11.800,00
CARRY FORWARD
- 201 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
104 - By-Pass #1
152 - By-Pass - section type 2 (only excavation and lining)
845 - Waterproofing system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Waterproofing system for underground works: composite drainage sheet, PVC
517 NP.UW.13.01
membrane, protection sheet, including granular draining material around the pipe
section type 2 - by-pass 45,5 * 11,90
Total sqm
Drainage pipe f 200 HDPE micro-slotted for drainage underground works section type 2 - by- 541,45
pass
45,5 * 2,00 541,45 4.500,00
Total m Total 845 - Waterproofing system NPR
518 NP.UW.14.01
CARRY FORWARD By-Pass - section type 2 (only excavatio...
CARRY FORWARD By-Pass #1
CARRY FORWARD Road Alignement TU – Tunnel - CH 91,00
0...
CARRY FORWARD 91,00 3.019,03
Total m Total 845 - Waterproofing system NPR
CARRY FORWARD By-Pass - section type 2 (only excavatio...
CARRY FORWARD By-Pass #1
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 202 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
104 - By-Pass #1
152 - By-Pass - section type 2 (only excavation and lining)
850 - Lining bottom side / Inver

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying of Plain Cement Concrete M 10 - for underground works (item
519 NP.UW.20.01
20.01.00.0 + NP.UW.01.00)
section type 2 - by-pass 45,5 * 4,10 * 0,10
Total cum
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground
works (item 20.02.00.G + NP.UW.01.00)
section type 2 - by-pass 45,5 * 0,66
Total cum
Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
+ NP.UW.01.00)
AMOUNT CARRIED FORWARD
Providing and laying of Plain Cement Concrete M 10 - for underground works (item
20.01.00.0 + NP.UW.01.00)
section type 2 - by-pass 45,5 * 4,10 * 0,10
Total cum
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground 18,66
works (item 20.02.00.G + NP.UW.01.00)
section type 2 - by-pass 45,5 * 0,66 18,66 10.981,24
Total cum
520 NP.UW.21.01 Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
+ NP.UW.01.00)
section type 2 - by-pass 45,5 * 0,200
30,03
Total tonne
Plain/Reinforced Cement Concrete in Foundation - PCC Grade M 20 - for underground
works (item 20.02.00.B + NP.UW.01.00) 30,03 15.549,15
521 NP.UW.22.01 section type 2 - by-pass 45,5 * 2,39 * 0,50
Total cum Total 850 - Lining bottom side / Inver NPR
CARRY FORWARD By-Pass - section type 2 (only excavatio...
CARRY FORWARD By-Pass #1
CARRY FORWARD Road Alignement TU – Tunnel - CH
0... 9,1000
CARRY FORWARD 9,1000 122.616,07
522 NP.UW.25.01

54,37

54,37 14.258,95

- 203 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
104 - By-Pass #1
152 - By-Pass - section type 2 (only excavation and lining)
853 - Lining upper side
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Form work for vault (Class F1 Finish) - Using steel section type 2 - by-pass
523 NP.UW.17.01
45,5 * 9,63
Total sqm
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for 438,17
underground works (item 20.08.00.D.1q + NP.UW.01.00)
section type 2 - by-pass 45,5 * 3,11 438,17 2.550,00
Total cum
524 NP.UW.23.01
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00)
section type 2 - by-pass 45,5 * 0,250
Total tonne 141,51
Total 853 - Lining upper side NPR
Total 152 - By-Pass - section type 2 (only excavation and 141,51 19.445,72
lining) NPR
525 NP.UW.24.01
CARRY FORWARD By-Pass #1
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD 11,3750

11,3750 124.626,56
- 204 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
104 - By-Pass #1
153 - By-Pass - section type 3 (only excavation and lining)
800 - Tunnel excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

526 NP.UW.02.02 AMOUNT CARRIED FORWARD 6.753,


Rock Excavations for underground works - with hammer or drill&blast section type 3 - by-pass 42
47,6 * 19,82
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD By-Pass - section type 3 (only excavatio...
CARRY FORWARD By-Pass #1 943,43
CARRY FORWARD Road Alignement TU – Tunnel - CH 943,43
0...
CARRY FORWARD
- 205 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
104 - By-Pass #1
153 - By-Pass - section type 3 (only excavation and lining)
810 - Pre-Support

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

527 NP.UW.03.02 AMOUNT CARRIED FORWARD 108.379,99


528 NP.UW.04.01 Lattice Girders for underground works section type 3 - by-pass 3.043,88
529 NP.UW.04.02 lattice girders - weigth 10.30 kg/m 5.234,30
530 NP.UW.05.01 9 * (11,77*10,30/1000) 1,09 2.652,95
531 NP.UW.05.02 plates & link chains - 45% 08 4.452,45
532 NP.UW.06.01 9 * (11,77*10,30*45%/1000) 0,49 581,39
Total tonne 14
50 mm thick shotcreting with steel fibers for underground works section type 3 - by-pass
lining
47,6 * 12,00
excavation face (50%) * 47,6 * 19,82 1,5822
Total sqm
100 mm thick shotcreting with steel fibers for underground works section type 3 - by-pass
excavation face
(50%) * 47,6 * 19,82 571,
Total sqm 20
50 mm thick shotcreting for underground works section type 3 - by-pass 471,
47,6 * 11,69 72
Total sqm
100 mm thick shotcreting for underground works section type 3 - by-pass
47,6 * 11,69
Total sqm 1.042,92
Wire mesh ∅5mm/100x100 for Shotcrete - underground works section type 3 - by-pass
47,6 * 11,93
47,6 * 11,61
Total sqm Total 810 - Pre-Support NPR
CARRY FORWARD By-Pass - section type 3 (only excavatio...
CARRY FORWARD By-Pass #1
CARRY FORWARD Road Alignement TU – Tunnel - CH 471,72
0... 471,72
CARRY FORWARD

556,44
556,44

556,44
556,44

567,
87
552,
64

1.120,51
- 206 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
104 - By-Pass #1
153 - By-Pass - section type 3 (only excavation and lining)
820 - Rock Reinforcement

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Self-drilling anchors L=3,00 (yield load > 550 kN) for underground works section type 3 - by-
533 NP.UW.10.01
pass
47,6 * 16
Total no. 761,60
Fiberglass dowels/bolts (ultimate load >350 kN) section type 3 - by-pass
(50%) * 47,6 * (4*4,50/3,50) 761,60 8.033,67
Total m Total 820 - Rock Reinforcement NPR
534 NP.UW.11.01
CARRY FORWARD By-Pass - section type 3 (only excavatio...
CARRY FORWARD By-Pass #1
CARRY FORWARD Road Alignement TU – Tunnel - CH 122,33
0... 122,33 11.800,00
CARRY FORWARD
- 207 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
104 - By-Pass #1
153 - By-Pass - section type 3 (only excavation and lining)
845 - Waterproofing system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Waterproofing system for underground works: composite drainage sheet, PVC
535 NP.UW.13.01
membrane, protection sheet, including granular draining material around the pipe
section type 3 - by-pass 47,6 * 11,90
Total sqm
Drainage pipe f 200 HDPE micro-slotted for drainage underground works section type 3 - by- 566,44
pass
47,6 * 2,00 566,44 4.500,00
Total m Total 845 - Waterproofing system NPR
536 NP.UW.14.01
CARRY FORWARD By-Pass - section type 3 (only excavatio...
CARRY FORWARD By-Pass #1
CARRY FORWARD Road Alignement TU – Tunnel - CH 95,20
0...
CARRY FORWARD 95,20 3.019,03
Total m Total 845 - Waterproofing system NPR
CARRY FORWARD By-Pass - section type 3 (only excavatio...
CARRY FORWARD By-Pass #1
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 208 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
104 - By-Pass #1
153 - By-Pass - section type 3 (only excavation and lining)
850 - Lining bottom side / Inver

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying of Plain Cement Concrete M 10 - for underground works (item
537 NP.UW.20.01
20.01.00.0 + NP.UW.01.00)
section type 3 - by-pass 47,6 * 4,10 * 0,10
Total cum
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground
works (item 20.02.00.G + NP.UW.01.00)
section type 3 - by-pass 47,6 * 0,66
Total cum
Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
+ NP.UW.01.00)
AMOUNT CARRIED FORWARD
Providing and laying of Plain Cement Concrete M 10 - for underground works (item
20.01.00.0 + NP.UW.01.00)
section type 3 - by-pass 47,6 * 4,10 * 0,10
Total cum
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground 19,52
works (item 20.02.00.G + NP.UW.01.00)
section type 3 - by-pass 47,6 * 0,66 19,52 10.981,24
Total cum
538 NP.UW.21.01 Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
+ NP.UW.01.00)
section type 3 - by-pass 47,6 * 0,200
31,42
Total tonne
Plain/Reinforced Cement Concrete in Foundation - PCC Grade M 20 - for underground
works (item 20.02.00.B + NP.UW.01.00) 31,42 15.549,15
539 NP.UW.22.01 section type 3 - by-pass 47,6 * 2,39 * 0,50
Total cum Total 850 - Lining bottom side / Inver NPR
CARRY FORWARD By-Pass - section type 3 (only excavatio...
CARRY FORWARD By-Pass #1
CARRY FORWARD Road Alignement TU – Tunnel - CH
0... 9,5200
CARRY FORWARD 9,5200 122.616,07
540 NP.UW.25.01

56,88

56,88 14.258,95

- 209 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
104 - By-Pass #1
153 - By-Pass - section type 3 (only excavation and lining)
853 - Lining upper side
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Form work for vault (Class F1 Finish) - Using steel section type 3 - by-pass
541 NP.UW.17.01
47,6 * 9,63
Total sqm
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for 458,39
underground works (item 20.08.00.D.1q + NP.UW.01.00)
section type 3 - by-pass 47,6 * 3,11 458,39 2.550,00
Total cum
542 NP.UW.23.01
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00)
section type 3 - by-pass 47,6 * 0,250
Total tonne 148,04
Total 853 - Lining upper side NPR
Total 153 - By-Pass - section type 3 (only excavation and 148,04 19.445,72
lining) NPR
543 NP.UW.24.01
CARRY FORWARD By-Pass #1
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD 11,9000

11,9000 124.626,56
- 210 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
104 - By-Pass #1
154 - By-Pass - Air-Lock section type 3 (only excavation and lining)
800 - Tunnel excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Rock Excavations for underground works - with hammer or drill&blast Air-Lock section type 3 -
544 NP.UW.02.02
by-pass
5,40 * 47,02
Link sections 7,60 * 47,02
Total cum Total 800 - Tunnel excavation NPR 253,91
CARRY FORWARD By-Pass - Air-Lock section type 3 (only...
CARRY FORWARD By-Pass #1 357,35
CARRY FORWARD Road Alignement TU – Tunnel - CH 611,26 6.753,
0... 42
CARRY FORWARD
- 211 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
104 - By-Pass #1
154 - By-Pass - Air-Lock section type 3 (only excavation and lining)
810 - Pre-Support

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Lattice Girders for underground works Air-Lock section type 3 - by-pass lattice girders - weigth
545 NP.UW.03.02
17.40 kg/m 5,40 * (17,54*17,40/1000)
plates & link chains - 45%
5,40 * (17,54*17,40*45%/1000)
Link sections
lattice girders - weigth 17.40 kg/m 7,60 * (17,54*17,40/1000) 1,6481
plates & link chains - 45%
7,60 * (17,54*17,40*45%/1000) 0,7414
Total tonne
50 mm thick shotcreting with steel fibers for underground works Air-Lock section type 3 - by-
pass
lining
2,3195
5,40 * 17,82
excavation face (50%) * 5,40 * 47,02
Link sections lining 1,0435
7,60 * 17,82
excavation face (50%) * 7,60 * 47,02 5,7525 108.379,99
546 NP.UW.04.01 Total sqm
100 mm thick shotcreting with steel fibers for underground works Air-Lock section type 3 - by-
pass
lining
5,40 * 17,82
excavation face (50%) * 5,40 * 47,02 96,23
Link sections lining
7,60 * 17,82 126,95
excavation face (50%) * 7,60 * 47,02
Total sqm
50 mm thick shotcreting for underground works Air-Lock section type 3 - by-pass
5,40 * 17,43
Link sections 7,60 * 17,43
Total sqm
100 mm thick shotcreting for underground works
CARRY FORWARD Pre-Support
CARRY FORWARD By-Pass - Air-Lock section type 3 (only...
CARRY FORWARD By-Pass #1
5,40 * 17,82
excavation face (50%) * 5,40 * 47,02
Link sections lining
7,60 * 17,82
excavation face (50%) * 7,60 * 47,02
Total sqm
50 mm thick shotcreting for underground works Air-Lock section type 3 - by-pass
5,40 * 17,43
Link sections 7,60 * 17,43 135,43
Total sqm
100 mm thick shotcreting for underground works
178,68
CARRY FORWARD Pre-Support
CARRY FORWARD By-Pass - Air-Lock section type 3 (only... 537,29 3.043,88
547 NP.UW.04.02 CARRY FORWARD By-Pass #1
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
96,23

126,95

135,43

178,68
537,29 5.234,30
548 NP.UW.05.01

94,12

132,47
226,59 2.652,95
549 NP.UW.05.02

- 212 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
104 - By-Pass #1
154 - By-Pass - Air-Lock section type 3 (only excavation and lining)
810 - Pre-Support

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Air-Lock section type 3 - by-pass 5,40 * 17,43
Link sections 7,60 * 17,43 94,12
Total sqm
Wire mesh ∅5mm/100x100 for Shotcrete - underground works Air-Lock section type 3 - by-
pass 132,47
5,40 * 17,74
5,40 * 17,34 226,59 4.452,45
550 NP.UW.06.01 Link sections 7,60 * 17,74
7,60 * 17,34
Total sqm Total 810 - Pre-Support NPR
CARRY FORWARD By-Pass - Air-Lock section type 3 (only... 95,80
CARRY FORWARD By-Pass #1
93,64
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
134,82
CARRY FORWARD
131,78
456,04 581,39
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 213 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
104 - By-Pass #1
154 - By-Pass - Air-Lock section type 3 (only excavation and lining)
820 - Rock Reinforcement

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Injected rock bolts L=5,00 (Ftk >350 kN), incl. injections for underground works Air-Lock
551 NP.UW.09.03
section type 3 - by-pass
5,40 * 2
Link sections 7,60 * 2
Total no. 10,80
Self-drilling anchors L=3,00 (yield load > 550 kN) for underground works Air-Lock section type
3 - by-pass 15,20
5,40 * 25
Link sections 7,60 * 25 26,00 11.721,36
Total no.
Fiberglass dowels/bolts (ultimate load >350 kN)
Air-Lock section type 3 - by-pass (50%) * 5,40 * (11*7,00/6,00)
Link sections
(50%) * 7,60 * (11*7,00/6,00)
Total m Total 820 - Rock Reinforcement NPR
CARRY FORWARD By-Pass - Air-Lock section type 3 (only...
5,40 * 2
Link sections 7,60 * 2
Total no.
Self-drilling anchors L=3,00 (yield load > 550 kN) for underground works Air-Lock section type
3 - by-pass
5,40 * 25
Link sections 7,60 * 25
552 NP.UW.10.01 Total no.
Fiberglass dowels/bolts (ultimate load >350 kN)
Air-Lock section type 3 - by-pass (50%) * 5,40 * (11*7,00/6,00)
Link sections
135,00
(50%) * 7,60 * (11*7,00/6,00)
Total m Total 820 - Rock Reinforcement NPR
CARRY FORWARD By-Pass - Air-Lock section type 3 (only... 190,00
CARRY FORWARD By-Pass #1
325,00 8.033,67
CARRY FORWARD Road Alignement TU – Tunnel - CH
553 NP.UW.11.01
0...
CARRY FORWARD

34,64

48,75
83,39 11.800,00

- 214 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
104 - By-Pass #1
154 - By-Pass - Air-Lock section type 3 (only excavation and lining)
845 - Waterproofing system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Waterproofing system for underground works: composite drainage sheet, PVC
membrane, protection sheet, including granular draining material around the pipe
Air-Lock section type 3 - by-pass 5,40 * 17,49
Link sections 7,60 * 17,49
Total sqm
Drainage pipe f 200 HDPE micro-slotted for drainage underground works Air-Lock section type
3 - by-pass
5,40 * 2,00
AMOUNT CARRIED FORWARD
Waterproofing system for underground works: composite drainage sheet, PVC
554 NP.UW.13.01
membrane, protection sheet, including granular draining material around the pipe
Air-Lock section type 3 - by-pass 5,40 * 17,49
Link sections 7,60 * 17,49
Total sqm
94,45
Drainage pipe f 200 HDPE micro-slotted for drainage underground works Air-Lock section type
3 - by-pass
5,40 * 2,00 132,92
Link sections 7,60 * 2
Total m Total 845 - Waterproofing system NPR 227,37 4.500,00
555 NP.UW.14.01 CARRY FORWARD By-Pass - Air-Lock section type 3 (only...
CARRY FORWARD By-Pass #1
CARRY FORWARD Road Alignement TU – Tunnel - CH
0... 10,80
CARRY FORWARD
15,20
26,00 3.019,03

- 215 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
104 - By-Pass #1
154 - By-Pass - Air-Lock section type 3 (only excavation and lining)
850 - Lining bottom side / Inver

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying of Plain Cement Concrete M 10 - for underground works (item
556 NP.UW.20.01
20.01.00.0 + NP.UW.01.00)
Air-Lock section type 3 - by-pass 5,40 * 7,67 * 0,10
Link sections
7,60 * 7,67 * 0,10 4,14
Total cum
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground
works (item 20.02.00.G + NP.UW.01.00) 5,83
Air-Lock section type 3 - by-pass 5,40 * 0,91
Link sections 7,60 * 0,91 9,97 10.981,24
557 NP.UW.21.01 Total cum
Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
+ NP.UW.01.00)
Air-Lock section type 3 - by-pass 5,40 * 0,250 4,91
Link sections 7,60 * 0,250
Total tonne
Plain/Reinforced Cement Concrete in Foundation - PCC Grade M 20 - for underground 6,92
works (item 20.02.00.B + NP.UW.01.00)
Air-Lock section type 3 - by-pass 5,40 * 5,32 * 0,50 11,83 15.549,15
558 NP.UW.22.01 Link sections
7,60 * 5,32 * 0,50
Total cum Total 850 - Lining bottom side / Inver NPR
CARRY FORWARD By-Pass - Air-Lock section type 3 (only...
CARRY FORWARD By-Pass #1
CARRY FORWARD Road Alignement TU – Tunnel - CH 1,3500
0...
CARRY FORWARD 1,9000
3,2500 122.616,07
559 NP.UW.25.01

14,36

20,22
34,58 14.258,95
- 216 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
104 - By-Pass #1
154 - By-Pass - Air-Lock section type 3 (only excavation and lining)
853 - Lining upper side

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Form work for vault (Class F1 Finish) - Using steel Air-Lock section type 3 - by-pass
560 NP.UW.17.01
5,40 * 15,17
Link sections 7,60 * 15,17
Total sqm
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for 81,92
underground works (item 20.08.00.D.1q + NP.UW.01.00)
Air-Lock section type 3 - by-pass 5,40 * 4,90 115,29
Link sections 7,60 * 4,90
Air-Lock Walls 197,21 2.550,00
561 NP.UW.23.01 2 * 27,73 * 0,20
Total cum
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00)
Air-Lock section type 3 - by-pass 5,40 * 1,000 26,46
Link sections 7,60 * 1,000
Air-Lock Walls
Steel ratio 120.00 kg/mc (2*27,73*0,20) * 0,120 37,24
Total tonne
Total 853 - Lining upper side NPR
Total 154 - By-Pass - Air-Lock section type 3 (only excavation 11,09
and lining) NPR 74,79 19.445,72
Total 104 - By-Pass #1 NPR
562 NP.UW.24.01
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
5,4000

7,6000

1,3310

14,3310 124.626,56
- 217 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
105 - By-Pass #2
150 - By-Pass - section type 0 (only excavation and lining)
800 - Tunnel excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

563 NP.UW.02.02 AMOUNT CARRIED FORWARD 6.753,


Rock Excavations for underground works - with hammer or drill&blast section type 0 - by-pass 42
20,5 * 18,63
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD By-Pass - section type 0 (only excavatio...
CARRY FORWARD By-Pass #2 381,92
CARRY FORWARD Road Alignement TU – Tunnel - CH 381,92
0...
CARRY FORWARD
Rock Excavations for underground works - with hammer or drill&blast section type 0 - by-pass 42
20,5 * 18,63
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD By-Pass - section type 0 (only excavatio...
CARRY FORWARD By-Pass #2
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 218 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
105 - By-Pass #2
150 - By-Pass - section type 0 (only excavation and lining)
810 - Pre-Support

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
564 NP.UW.04.01 AMOUNT CARRIED FORWARD 3.043,88
565 NP.UW.05.01 50 mm thick shotcreting with steel fibers for underground works section type 0 - by-pass 2.652,95
566 NP.UW.06.01 20,5 * 11,69 581,39
Total sqm
50 mm thick shotcreting for underground works section type 0 - by-pass
20,5 * 11,53
239,65
Total sqm
Wire mesh ∅5mm/100x100 for Shotcrete - underground works section type 0 - by-pass 239,65
20,5 * 11,61
Total sqm Total 810 - Pre-Support NPR
CARRY FORWARD By-Pass - section type 0 (only excavatio...
CARRY FORWARD By-Pass #2
CARRY FORWARD Road Alignement TU – Tunnel - CH 236,37
0... 236,37
CARRY FORWARD

238,01
238,01

- 219 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
105 - By-Pass #2
150 - By-Pass - section type 0 (only excavation and lining)
820 - Rock Reinforcement
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

567 NP.UW.08.02 AMOUNT CARRIED FORWARD 7.352,


Swellex rock bolts (yield load >200 kN - L=4,00) for underground works section type 0 - by- 36
pass
20,5
Total no. Total 820 - Rock Reinforcement NPR
CARRY FORWARD By-Pass - section type 0 (only excavatio... 20,50
CARRY FORWARD By-Pass #2
20,50
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 220 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
105 - By-Pass #2
150 - By-Pass - section type 0 (only excavation and lining)
845 - Waterproofing system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Waterproofing system for underground works: composite drainage sheet, PVC
568 NP.UW.13.01
membrane, protection sheet, including granular draining material around the pipe
section type 0 - by-pass 20,5 * 11,90
Total sqm
Drainage pipe f 200 HDPE micro-slotted for drainage underground works section type 0 - by- 243,95
pass
20,5 * 2,00 243,95 4.500,00
Total m Total 845 - Waterproofing system NPR
569 NP.UW.14.01
CARRY FORWARD By-Pass - section type 0 (only excavatio...
CARRY FORWARD By-Pass #2
CARRY FORWARD Road Alignement TU – Tunnel - CH 41,00
0...
CARRY FORWARD 41,00 3.019,03
- 221 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
105 - By-Pass #2
150 - By-Pass - section type 0 (only excavation and lining)
850 - Lining bottom side / Inver

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying of Plain Cement Concrete M 10 - for underground works (item
570 NP.UW.20.01
20.01.00.0 + NP.UW.01.00)
section type 0 - by-pass 20,5 * 4,10 * 0,10
Total cum
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground 8,41
works (item 20.02.00.G + NP.UW.01.00)
section type 0 - by-pass 20,5 * 0,66 8,41 10.981,24
Total cum
571 NP.UW.21.01 Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
+ NP.UW.01.00)
section type 0 - by-pass 20,5 * 0,200
13,53
Total tonne
Plain/Reinforced Cement Concrete in Foundation - PCC Grade M 20 - for underground
works (item 20.02.00.B + NP.UW.01.00) 13,53 15.549,15
572 NP.UW.22.01 section type 0 - by-pass 20,5 * 2,39 * 0,50
Total cum Total 850 - Lining bottom side / Inver NPR
CARRY FORWARD By-Pass - section type 0 (only excavatio...
CARRY FORWARD By-Pass #2
CARRY FORWARD Road Alignement TU – Tunnel - CH
0... 4,1000
CARRY FORWARD 4,1000 122.616,07
573 NP.UW.25.01

24,50
24,50 14.258,95

- 222 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
105 - By-Pass #2
150 - By-Pass - section type 0 (only excavation and lining)
853 - Lining upper side

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Form work for vault (Class F1 Finish) - Using steel section type 0 - by-pass
574 NP.UW.17.01
20,5 * 9,63
Total sqm
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for 197,42
underground works (item 20.08.00.D.1q + NP.UW.01.00)
section type 0 - by-pass 20,5 * 3,11 197,42 2.550,00
Total cum
575 NP.UW.23.01
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00)
section type 0 - by-pass 20,5 * 0,250
Total tonne 63,76
Total 853 - Lining upper side NPR
Total 150 - By-Pass - section type 0 (only excavation and 63,76 19.445,72
lining) NPR
576 NP.UW.24.01
CARRY FORWARD By-Pass #2
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD 5,1250
lining) NPR
CARRY FORWARD By-Pass #2
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

5,1250 124.626,56

- 223 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
105 - By-Pass #2
151 - By-Pass - section type 1 (only excavation and lining)
800 - Tunnel excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

577 NP.UW.02.02 AMOUNT CARRIED FORWARD 6.753,


Rock Excavations for underground works - with hammer or drill&blast section type 1 - by-pass 42
51,5 * 19,22
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD By-Pass - section type 1 (only excavatio...
CARRY FORWARD By-Pass #2 989,83
CARRY FORWARD Road Alignement TU – Tunnel - CH 989,83
0...
CARRY FORWARD
Rock Excavations for underground works - with hammer or drill&blast section type 1 - by-pass 42
51,5 * 19,22
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD By-Pass - section type 1 (only excavatio...
CARRY FORWARD By-Pass #2
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 224 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
105 - By-Pass #2
151 - By-Pass - section type 1 (only excavation and lining)
810 - Pre-Support

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
578 NP.UW.04.01 AMOUNT CARRIED FORWARD 3.043,88
579 NP.UW.05.02 50 mm thick shotcreting with steel fibers for underground works section type 1 - by-pass 4.452,45
580 NP.UW.06.01 lining 581,39
51,5 * 11,85 610,
excavation face ((51,5)/2,50) * 19,22 28
Total sqm 395,
100 mm thick shotcreting for underground works section type 1 - by-pass 93
51,5 * 11,61
Total sqm
Wire mesh ∅5mm/100x100 for Shotcrete - underground works section type 1 - by-pass
51,5 * 11,77 1.006,21
Total sqm Total 810 - Pre-Support NPR
CARRY FORWARD By-Pass - section type 1 (only excavatio...
CARRY FORWARD By-Pass #2
CARRY FORWARD Road Alignement TU – Tunnel - CH
0... 597,92
CARRY FORWARD 597,92

606,16
606,16

- 225 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
105 - By-Pass #2
151 - By-Pass - section type 1 (only excavation and lining)
820 - Rock Reinforcement

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

581 NP.UW.08.02 AMOUNT CARRIED FORWARD 7.352,


Swellex rock bolts (yield load >200 kN - L=4,00) for underground works section type 1 - by- 36
pass
51,5 * ((7+6)/2) * (1/(2,00/2))
Total no. Total 820 - Rock Reinforcement NPR
CARRY FORWARD By-Pass - section type 1 (only excavatio... 334,75
CARRY FORWARD By-Pass #2
334,75
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
- 226 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
105 - By-Pass #2
151 - By-Pass - section type 1 (only excavation and lining)
845 - Waterproofing system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Waterproofing system for underground works: composite drainage sheet, PVC
582 NP.UW.13.01
membrane, protection sheet, including granular draining material around the pipe
section type 1 - by-pass 51,5 * 11,90
Total sqm
Drainage pipe f 200 HDPE micro-slotted for drainage underground works section type 1 - by- 612,85
pass
51,5 * 2,00 612,85 4.500,00
Total m Total 845 - Waterproofing system NPR
583 NP.UW.14.01
CARRY FORWARD By-Pass - section type 1 (only excavatio...
CARRY FORWARD By-Pass #2
CARRY FORWARD Road Alignement TU – Tunnel - CH 103,00
0...
CARRY FORWARD 103,00 3.019,03
- 227 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
105 - By-Pass #2
151 - By-Pass - section type 1 (only excavation and lining)
850 - Lining bottom side / Inver

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying of Plain Cement Concrete M 10 - for underground works (item
584 NP.UW.20.01
20.01.00.0 + NP.UW.01.00)
section type 1 - by-pass 51,5 * 4,10 * 0,10
Total cum
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground 21,12
works (item 20.02.00.G + NP.UW.01.00)
section type 1 - by-pass 51,5 * 0,66 21,12 10.981,24
Total cum
585 NP.UW.21.01 Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
+ NP.UW.01.00)
section type 1 - by-pass 51,5 * 0,200
33,99
Total tonne
Plain/Reinforced Cement Concrete in Foundation - PCC Grade M 20 - for underground
works (item 20.02.00.B + NP.UW.01.00) 33,99 15.549,15
586 NP.UW.22.01 section type 1 - by-pass 51,5 * 2,39 * 0,50
Total cum Total 850 - Lining bottom side / Inver NPR
CARRY FORWARD By-Pass - section type 1 (only excavatio...
CARRY FORWARD By-Pass #2
CARRY FORWARD Road Alignement TU – Tunnel - CH
0... 10,3000
CARRY FORWARD 10,3000 122.616,07
587 NP.UW.25.01

61,54
61,54 14.258,95

- 228 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
105 - By-Pass #2
151 - By-Pass - section type 1 (only excavation and lining)
853 - Lining upper side

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Form work for vault (Class F1 Finish) - Using steel section type 1 - by-pass
588 NP.UW.17.01
51,5 * 9,63
Total sqm
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for 495,95
underground works (item 20.08.00.D.1q + NP.UW.01.00)
section type 1 - by-pass 51,5 * 3,11 495,95 2.550,00
Total cum
589 NP.UW.23.01
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00)
section type 1 - by-pass 51,5 * 0,250
Total tonne 160,17
Total 853 - Lining upper side NPR
Total 151 - By-Pass - section type 1 (only excavation and 160,17 19.445,72
lining) NPR
590 NP.UW.24.01
CARRY FORWARD By-Pass #2
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD 12,8750
lining) NPR
CARRY FORWARD By-Pass #2
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

12,8750 124.626,56

- 229 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
105 - By-Pass #2
152 - By-Pass - section type 2 (only excavation and lining)
800 - Tunnel excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

591 NP.UW.02.02 AMOUNT CARRIED FORWARD 6.753,


Rock Excavations for underground works - with hammer or drill&blast section type 2 - by-pass 42
20,5 * 19,82
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD By-Pass - section type 2 (only excavatio...
CARRY FORWARD By-Pass #2 406,31
CARRY FORWARD Road Alignement TU – Tunnel - CH 406,31
0...
CARRY FORWARD
Rock Excavations for underground works - with hammer or drill&blast section type 2 - by-pass 42
20,5 * 19,82
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD By-Pass - section type 2 (only excavatio...
CARRY FORWARD By-Pass #2
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 230 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
105 - By-Pass #2
152 - By-Pass - section type 2 (only excavation and lining)
810 - Pre-Support

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
592 NP.UW.04.01 AMOUNT CARRIED FORWARD 3.043,88
593 NP.UW.04.02 50 mm thick shotcreting with steel fibers for underground works section type 2 - by-pass 5.234,30
594 NP.UW.05.01 lining 2.652,95
595 NP.UW.05.02 20,5 * 12,00 246, 4.452,45
596 NP.UW.06.01 excavation face 00 581,39
(50%) * ((20,5)/1,75) * 19,82 116,
Total sqm 05
100 mm thick shotcreting with steel fibers for underground works section type 2 - by-pass
excavation face
(50%) * 20,5 * 19,82 * (1/1,75)
Total sqm 362,05
50 mm thick shotcreting for underground works section type 2 - by-pass
20,5 * 11,69
Total sqm
100 mm thick shotcreting for underground works section type 2 - by-pass
20,5 * 11,69
Total sqm
Wire mesh ∅5mm/100x100 for Shotcrete - underground works section type 2 - by-pass 115,80
20,5 * 11,93
115,80
20,5 * 11,61
Total sqm Total 810 - Pre-Support NPR
CARRY FORWARD By-Pass - section type 2 (only excavatio...
CARRY FORWARD By-Pass #2
CARRY FORWARD Road Alignement TU – Tunnel - CH 239,65
0... 239,65
CARRY FORWARD

239,65
239,65

244,
57
238,
01

482,58

- 231 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
105 - By-Pass #2
152 - By-Pass - section type 2 (only excavation and lining)
820 - Rock Reinforcement

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Injected rock bolts L=4,50 (Ftk >250 kN), incl. injections for underground works section type 2
597 NP.UW.09.02
- by-pass
20,5 * ((7+6)/2) * (1/1,50)
Total Cadauno 89,28
Fiberglass dowels/bolts (ultimate load >350 kN) section type 2 - by-pass
(50%) * 20,5 * (4*4,50/3,50) 89,28 8.212,36
Total m Total 820 - Rock Reinforcement NPR
598 NP.UW.11.01
CARRY FORWARD By-Pass - section type 2 (only excavatio...
CARRY FORWARD By-Pass #2
CARRY FORWARD Road Alignement TU – Tunnel - CH 52,69
0... 52,69 11.800,00
CARRY FORWARD
- 232 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
105 - By-Pass #2
152 - By-Pass - section type 2 (only excavation and lining)
845 - Waterproofing system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Waterproofing system for underground works: composite drainage sheet, PVC
599 NP.UW.13.01
membrane, protection sheet, including granular draining material around the pipe
section type 2 - by-pass 20,5 * 11,90
Total sqm
Drainage pipe f 200 HDPE micro-slotted for drainage underground works section type 2 - by- 243,95
pass
20,5 * 2,00 243,95 4.500,00
Total m Total 845 - Waterproofing system NPR
600 NP.UW.14.01
CARRY FORWARD By-Pass - section type 2 (only excavatio...
CARRY FORWARD By-Pass #2
CARRY FORWARD Road Alignement TU – Tunnel - CH 41,00
0...
CARRY FORWARD 41,00 3.019,03
Total m Total 845 - Waterproofing system NPR
CARRY FORWARD By-Pass - section type 2 (only excavatio...
CARRY FORWARD By-Pass #2
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 233 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
105 - By-Pass #2
152 - By-Pass - section type 2 (only excavation and lining)
850 - Lining bottom side / Inver

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying of Plain Cement Concrete M 10 - for underground works (item
601 NP.UW.20.01
20.01.00.0 + NP.UW.01.00)
section type 2 - by-pass 20,5 * 4,10 * 0,10
Total cum
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground
works (item 20.02.00.G + NP.UW.01.00)
section type 2 - by-pass 20,5 * 0,66
Total cum
Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
+ NP.UW.01.00)
AMOUNT CARRIED FORWARD
Providing and laying of Plain Cement Concrete M 10 - for underground works (item
20.01.00.0 + NP.UW.01.00)
section type 2 - by-pass 20,5 * 4,10 * 0,10
Total cum
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground 8,41
works (item 20.02.00.G + NP.UW.01.00)
section type 2 - by-pass 20,5 * 0,66 8,41 10.981,24
Total cum
602 NP.UW.21.01 Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
+ NP.UW.01.00)
section type 2 - by-pass 20,5 * 0,200
13,53
Total tonne
Plain/Reinforced Cement Concrete in Foundation - PCC Grade M 20 - for underground
works (item 20.02.00.B + NP.UW.01.00) 13,53 15.549,15
603 NP.UW.22.01 section type 2 - by-pass 20,5 * 2,39 * 0,50
Total cum Total 850 - Lining bottom side / Inver NPR
CARRY FORWARD By-Pass - section type 2 (only excavatio...
CARRY FORWARD By-Pass #2
CARRY FORWARD Road Alignement TU – Tunnel - CH
0... 4,1000
CARRY FORWARD 4,1000 122.616,07
604 NP.UW.25.01

24,50

24,50 14.258,95

- 234 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
105 - By-Pass #2
152 - By-Pass - section type 2 (only excavation and lining)
853 - Lining upper side
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Form work for vault (Class F1 Finish) - Using steel section type 2 - by-pass
605 NP.UW.17.01
20,5 * 9,63
Total sqm
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for 197,42
underground works (item 20.08.00.D.1q + NP.UW.01.00)
section type 2 - by-pass 20,5 * 3,11 197,42 2.550,00
Total cum
606 NP.UW.23.01
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00)
section type 2 - by-pass 20,5 * 0,250
Total tonne 63,76
Total 853 - Lining upper side NPR
Total 152 - By-Pass - section type 2 (only excavation and 63,76 19.445,72
lining) NPR
607 NP.UW.24.01
CARRY FORWARD By-Pass #2
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD 5,1250

5,1250 124.626,56
- 235 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
105 - By-Pass #2
153 - By-Pass - section type 3 (only excavation and lining)
800 - Tunnel excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

608 NP.UW.02.02 AMOUNT CARRIED FORWARD 6.753,


Rock Excavations for underground works - with hammer or drill&blast section type 3 - by-pass 42
41 * 19,82
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD By-Pass - section type 3 (only excavatio...
CARRY FORWARD By-Pass #2 812,62
CARRY FORWARD Road Alignement TU – Tunnel - CH 812,62
0...
CARRY FORWARD
- 236 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
105 - By-Pass #2
153 - By-Pass - section type 3 (only excavation and lining)
810 - Pre-Support

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

609 NP.UW.03.02 AMOUNT CARRIED FORWARD 108.379,99


610 NP.UW.04.01 Lattice Girders for underground works section type 3 - by-pass 3.043,88
611 NP.UW.04.02 lattice girders - weigth 10.30 kg/m 5.234,30
612 NP.UW.05.01 9 * (11,77*10,30/1000) 1,09 2.652,95
613 NP.UW.05.02 plates & link chains - 45% 08 4.452,45
614 NP.UW.06.01 9 * (11,77*10,30*45%/1000) 0,49 581,39
Total tonne 14
50 mm thick shotcreting with steel fibers for underground works section type 3 - by-pass
lining
41 * 12,00
excavation face (50%) * 41 * 19,82 1,5822
Total sqm
100 mm thick shotcreting with steel fibers for underground works section type 3 - by-pass
excavation face
(50%) * 41 * 19,82 492,
Total sqm 00
50 mm thick shotcreting for underground works section type 3 - by-pass 406,
41 * 11,69 31
Total sqm
100 mm thick shotcreting for underground works section type 3 - by-pass
41 * 11,69
Total sqm 898,31
Wire mesh ∅5mm/100x100 for Shotcrete - underground works section type 3 - by-pass
41 * 11,93
41 * 11,61
Total sqm Total 810 - Pre-Support NPR
CARRY FORWARD By-Pass - section type 3 (only excavatio...
CARRY FORWARD By-Pass #2
CARRY FORWARD Road Alignement TU – Tunnel - CH 406,31
0... 406,31
CARRY FORWARD

479,29
479,29

479,29
479,29

489,
13
476,
01

965,14
- 237 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
105 - By-Pass #2
153 - By-Pass - section type 3 (only excavation and lining)
820 - Rock Reinforcement

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Self-drilling anchors L=3,00 (yield load > 550 kN) for underground works section type 3 - by-
615 NP.UW.10.01
pass
41 * 16
Total no. 656,00
Fiberglass dowels/bolts (ultimate load >350 kN) section type 3 - by-pass
(50%) * 41 * (4*4,50/3,50) 656,00 8.033,67
Total m Total 820 - Rock Reinforcement NPR
616 NP.UW.11.01
CARRY FORWARD By-Pass - section type 3 (only excavatio...
CARRY FORWARD By-Pass #2
CARRY FORWARD Road Alignement TU – Tunnel - CH 105,37
0... 105,37 11.800,00
CARRY FORWARD
- 238 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
105 - By-Pass #2
153 - By-Pass - section type 3 (only excavation and lining)
845 - Waterproofing system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Waterproofing system for underground works: composite drainage sheet, PVC
617 NP.UW.13.01
membrane, protection sheet, including granular draining material around the pipe
section type 3 - by-pass 41 * 11,90
Total sqm
Drainage pipe f 200 HDPE micro-slotted for drainage underground works section type 3 - by- 487,90
pass
41 * 2,00 487,90 4.500,00
Total m Total 845 - Waterproofing system NPR
618 NP.UW.14.01
CARRY FORWARD By-Pass - section type 3 (only excavatio...
CARRY FORWARD By-Pass #2
CARRY FORWARD Road Alignement TU – Tunnel - CH 82,00
0...
CARRY FORWARD 82,00 3.019,03
Total m Total 845 - Waterproofing system NPR
CARRY FORWARD By-Pass - section type 3 (only excavatio...
CARRY FORWARD By-Pass #2
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 239 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
105 - By-Pass #2
153 - By-Pass - section type 3 (only excavation and lining)
850 - Lining bottom side / Inver

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying of Plain Cement Concrete M 10 - for underground works (item
619 NP.UW.20.01
20.01.00.0 + NP.UW.01.00)
section type 3 - by-pass 41 * 4,10 * 0,10
Total cum
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground
works (item 20.02.00.G + NP.UW.01.00)
section type 3 - by-pass 41 * 0,66
Total cum
Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
+ NP.UW.01.00)
AMOUNT CARRIED FORWARD
Providing and laying of Plain Cement Concrete M 10 - for underground works (item
20.01.00.0 + NP.UW.01.00)
section type 3 - by-pass 41 * 4,10 * 0,10
Total cum
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground 16,81
works (item 20.02.00.G + NP.UW.01.00)
section type 3 - by-pass 41 * 0,66 16,81 10.981,24
Total cum
620 NP.UW.21.01 Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
+ NP.UW.01.00)
section type 3 - by-pass 41 * 0,200
27,06
Total tonne
Plain/Reinforced Cement Concrete in Foundation - PCC Grade M 20 - for underground
works (item 20.02.00.B + NP.UW.01.00) 27,06 15.549,15
621 NP.UW.22.01 section type 3 - by-pass 41 * 2,39 * 0,50
Total cum Total 850 - Lining bottom side / Inver NPR
CARRY FORWARD By-Pass - section type 3 (only excavatio...
CARRY FORWARD By-Pass #2
CARRY FORWARD Road Alignement TU – Tunnel - CH
0... 8,2000
CARRY FORWARD 8,2000 122.616,07
622 NP.UW.25.01

49,00

49,00 14.258,95

- 240 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
105 - By-Pass #2
153 - By-Pass - section type 3 (only excavation and lining)
853 - Lining upper side
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Form work for vault (Class F1 Finish) - Using steel section type 3 - by-pass
623 NP.UW.17.01
41 * 9,63
Total sqm
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for 394,83
underground works (item 20.08.00.D.1q + NP.UW.01.00)
section type 3 - by-pass 41 * 3,11 394,83 2.550,00
Total cum
624 NP.UW.23.01
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00)
section type 3 - by-pass 41 * 0,250
Total tonne 127,51
Total 853 - Lining upper side NPR
Total 153 - By-Pass - section type 3 (only excavation and 127,51 19.445,72
lining) NPR
625 NP.UW.24.01
CARRY FORWARD By-Pass #2
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD 10,2500

10,2500 124.626,56
- 241 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
105 - By-Pass #2
154 - By-Pass - Air-Lock section type 3 (only excavation and lining)
800 - Tunnel excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Rock Excavations for underground works - with hammer or drill&blast Air-Lock section type 3 -
626 NP.UW.02.02
by-pass
5,40 * 47,02
Link sections 7,60 * 47,02
Total cum Total 800 - Tunnel excavation NPR 253,91
CARRY FORWARD By-Pass - Air-Lock section type 3 (only...
CARRY FORWARD By-Pass #2 357,35
CARRY FORWARD Road Alignement TU – Tunnel - CH 611,26 6.753,
0... 42
CARRY FORWARD
- 242 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
105 - By-Pass #2
154 - By-Pass - Air-Lock section type 3 (only excavation and lining)
810 - Pre-Support

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Lattice Girders for underground works Air-Lock section type 3 - by-pass lattice girders - weigth
627 NP.UW.03.02
17.40 kg/m 5,40 * (17,54*17,40/1000)
plates & link chains - 45%
5,40 * (17,54*17,40*45%/1000)
Link sections
lattice girders - weigth 17.40 kg/m 7,60 * (17,54*17,40/1000) 1,6481
plates & link chains - 45%
7,60 * (17,54*17,40*45%/1000) 0,7414
Total tonne
50 mm thick shotcreting with steel fibers for underground works Air-Lock section type 3 - by-
pass
lining
2,3195
5,40 * 17,82
excavation face (50%) * 5,40 * 47,02
Link sections lining 1,0435
7,60 * 17,82
excavation face (50%) * 7,60 * 47,02 5,7525 108.379,99
628 NP.UW.04.01 Total sqm
100 mm thick shotcreting with steel fibers for underground works Air-Lock section type 3 - by-
pass
lining
5,40 * 17,82
excavation face (50%) * 5,40 * 47,02 96,23
Link sections lining
7,60 * 17,82 126,95
excavation face (50%) * 7,60 * 47,02
Total sqm
50 mm thick shotcreting for underground works Air-Lock section type 3 - by-pass
5,40 * 17,43
Link sections 7,60 * 17,43
Total sqm
100 mm thick shotcreting for underground works
CARRY FORWARD Pre-Support
CARRY FORWARD By-Pass - Air-Lock section type 3 (only...
CARRY FORWARD By-Pass #2
5,40 * 17,82
excavation face (50%) * 5,40 * 47,02
Link sections lining
7,60 * 17,82
excavation face (50%) * 7,60 * 47,02
Total sqm
50 mm thick shotcreting for underground works Air-Lock section type 3 - by-pass
5,40 * 17,43
Link sections 7,60 * 17,43 135,43
Total sqm
100 mm thick shotcreting for underground works
178,68
CARRY FORWARD Pre-Support
CARRY FORWARD By-Pass - Air-Lock section type 3 (only... 537,29 3.043,88
629 NP.UW.04.02 CARRY FORWARD By-Pass #2
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
96,23

126,95

135,43

178,68
537,29 5.234,30
630 NP.UW.05.01

94,12

132,47
226,59 2.652,95
631 NP.UW.05.02

- 243 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
105 - By-Pass #2
154 - By-Pass - Air-Lock section type 3 (only excavation and lining)
810 - Pre-Support

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Air-Lock section type 3 - by-pass 5,40 * 17,43
Link sections 7,60 * 17,43 94,12
Total sqm
Wire mesh ∅5mm/100x100 for Shotcrete - underground works Air-Lock section type 3 - by-
pass 132,47
5,40 * 17,74
5,40 * 17,34 226,59 4.452,45
632 NP.UW.06.01 Link sections 7,60 * 17,74
7,60 * 17,34
Total sqm Total 810 - Pre-Support NPR
CARRY FORWARD By-Pass - Air-Lock section type 3 (only... 95,80
CARRY FORWARD By-Pass #2
93,64
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
134,82
CARRY FORWARD
131,78
456,04 581,39
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 244 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
105 - By-Pass #2
154 - By-Pass - Air-Lock section type 3 (only excavation and lining)
820 - Rock Reinforcement

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Injected rock bolts L=5,00 (Ftk >350 kN), incl. injections for underground works Air-Lock
633 NP.UW.09.03
section type 3 - by-pass
5,40 * 2
Link sections 7,60 * 2
Total no. 10,80
Self-drilling anchors L=3,00 (yield load > 550 kN) for underground works Air-Lock section type
3 - by-pass 15,20
5,40 * 25
Link sections 7,60 * 25 26,00 11.721,36
Total no.
Fiberglass dowels/bolts (ultimate load >350 kN)
Air-Lock section type 3 - by-pass (50%) * 5,40 * (11*7,00/6,00)
Link sections
(50%) * 7,60 * (11*7,00/6,00)
Total m Total 820 - Rock Reinforcement NPR
CARRY FORWARD By-Pass - Air-Lock section type 3 (only...
5,40 * 2
Link sections 7,60 * 2
Total no.
Self-drilling anchors L=3,00 (yield load > 550 kN) for underground works Air-Lock section type
3 - by-pass
5,40 * 25
Link sections 7,60 * 25
634 NP.UW.10.01 Total no.
Fiberglass dowels/bolts (ultimate load >350 kN)
Air-Lock section type 3 - by-pass (50%) * 5,40 * (11*7,00/6,00)
Link sections
135,00
(50%) * 7,60 * (11*7,00/6,00)
Total m Total 820 - Rock Reinforcement NPR
CARRY FORWARD By-Pass - Air-Lock section type 3 (only... 190,00
CARRY FORWARD By-Pass #2
325,00 8.033,67
CARRY FORWARD Road Alignement TU – Tunnel - CH
635 NP.UW.11.01
0...
CARRY FORWARD

34,64

48,75
83,39 11.800,00

- 245 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
105 - By-Pass #2
154 - By-Pass - Air-Lock section type 3 (only excavation and lining)
845 - Waterproofing system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Waterproofing system for underground works: composite drainage sheet, PVC
membrane, protection sheet, including granular draining material around the pipe
Air-Lock section type 3 - by-pass 5,40 * 17,49
Link sections 7,60 * 17,49
Total sqm
Drainage pipe f 200 HDPE micro-slotted for drainage underground works Air-Lock section type
3 - by-pass
5,40 * 2,00
AMOUNT CARRIED FORWARD
Waterproofing system for underground works: composite drainage sheet, PVC
636 NP.UW.13.01
membrane, protection sheet, including granular draining material around the pipe
Air-Lock section type 3 - by-pass 5,40 * 17,49
Link sections 7,60 * 17,49
Total sqm
94,45
Drainage pipe f 200 HDPE micro-slotted for drainage underground works Air-Lock section type
3 - by-pass
5,40 * 2,00 132,92
Link sections 7,60 * 2
Total m Total 845 - Waterproofing system NPR 227,37 4.500,00
637 NP.UW.14.01 CARRY FORWARD By-Pass - Air-Lock section type 3 (only...
CARRY FORWARD By-Pass #2
CARRY FORWARD Road Alignement TU – Tunnel - CH
0... 10,80
CARRY FORWARD
15,20
26,00 3.019,03

- 246 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
105 - By-Pass #2
154 - By-Pass - Air-Lock section type 3 (only excavation and lining)
850 - Lining bottom side / Inver

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying of Plain Cement Concrete M 10 - for underground works (item
638 NP.UW.20.01
20.01.00.0 + NP.UW.01.00)
Air-Lock section type 3 - by-pass 5,40 * 7,67 * 0,10
Link sections
7,60 * 7,67 * 0,10 4,14
Total cum
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground
works (item 20.02.00.G + NP.UW.01.00) 5,83
Air-Lock section type 3 - by-pass 5,40 * 0,91
Link sections 7,60 * 0,91 9,97 10.981,24
639 NP.UW.21.01 Total cum
Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
+ NP.UW.01.00)
Air-Lock section type 3 - by-pass 5,40 * 0,250 4,91
Link sections 7,60 * 0,250
Total tonne
Plain/Reinforced Cement Concrete in Foundation - PCC Grade M 20 - for underground 6,92
works (item 20.02.00.B + NP.UW.01.00)
Air-Lock section type 3 - by-pass 5,40 * 5,32 * 0,50 11,83 15.549,15
640 NP.UW.22.01 Link sections
7,60 * 5,32 * 0,50
Total cum Total 850 - Lining bottom side / Inver NPR
CARRY FORWARD By-Pass - Air-Lock section type 3 (only...
CARRY FORWARD By-Pass #2
CARRY FORWARD Road Alignement TU – Tunnel - CH 1,3500
0...
CARRY FORWARD 1,9000
3,2500 122.616,07
641 NP.UW.25.01

14,36

20,22
34,58 14.258,95
- 247 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
105 - By-Pass #2
154 - By-Pass - Air-Lock section type 3 (only excavation and lining)
853 - Lining upper side

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Form work for vault (Class F1 Finish) - Using steel Air-Lock section type 3 - by-pass
642 NP.UW.17.01
5,40 * 15,17
Link sections 7,60 * 15,17
Total sqm
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for 81,92
underground works (item 20.08.00.D.1q + NP.UW.01.00)
Air-Lock section type 3 - by-pass 5,40 * 4,90 115,29
Link sections 7,60 * 4,90
Air-Lock Walls 197,21 2.550,00
643 NP.UW.23.01 2 * 27,73 * 0,20
Total cum
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00)
Air-Lock section type 3 - by-pass 5,40 * 1,000 26,46
Link sections 7,60 * 1,000
Air-Lock Walls
Steel ratio 120.00 kg/mc (2*27,73*0,20) * 0,120 37,24
Total tonne
Total 853 - Lining upper side NPR
Total 154 - By-Pass - Air-Lock section type 3 (only excavation 11,09
and lining) NPR 74,79 19.445,72
Total 105 - By-Pass #2 NPR
644 NP.UW.24.01
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
5,4000

7,6000

1,3310

14,3310 124.626,56
- 248 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
106 - By-Pass #3
150 - By-Pass - section type 0 (only excavation and lining)
800 - Tunnel excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

645 NP.UW.02.02 AMOUNT CARRIED FORWARD 6.753,


Rock Excavations for underground works - with hammer or drill&blast section type 0 - by-pass 42
9 * 18,63
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD By-Pass - section type 0 (only excavatio...
CARRY FORWARD By-Pass #3 167,67
CARRY FORWARD Road Alignement TU – Tunnel - CH 167,67
0...
CARRY FORWARD
Rock Excavations for underground works - with hammer or drill&blast section type 0 - by-pass 42
9 * 18,63
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD By-Pass - section type 0 (only excavatio...
CARRY FORWARD By-Pass #3
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 249 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
106 - By-Pass #3
150 - By-Pass - section type 0 (only excavation and lining)
810 - Pre-Support

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
646 NP.UW.04.01 AMOUNT CARRIED FORWARD 3.043,88
647 NP.UW.05.01 50 mm thick shotcreting with steel fibers for underground works section type 0 - by-pass 2.652,95
648 NP.UW.06.01 9 * 11,69 581,39
Total sqm
50 mm thick shotcreting for underground works section type 0 - by-pass
9 * 11,53
105,21
Total sqm
Wire mesh ∅5mm/100x100 for Shotcrete - underground works section type 0 - by-pass 105,21
9 * 11,61
Total sqm Total 810 - Pre-Support NPR
CARRY FORWARD By-Pass - section type 0 (only excavatio...
CARRY FORWARD By-Pass #3
CARRY FORWARD Road Alignement TU – Tunnel - CH 103,77
0... 103,77
CARRY FORWARD

104,49
104,49

- 250 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
106 - By-Pass #3
150 - By-Pass - section type 0 (only excavation and lining)
820 - Rock Reinforcement
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

649 NP.UW.08.02 AMOUNT CARRIED FORWARD 7.352,


Swellex rock bolts (yield load >200 kN - L=4,00) for underground works section type 0 - by- 36
pass
9
Total no. Total 820 - Rock Reinforcement NPR
CARRY FORWARD By-Pass - section type 0 (only excavatio... 9,00
CARRY FORWARD By-Pass #3
9,00
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 251 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
106 - By-Pass #3
150 - By-Pass - section type 0 (only excavation and lining)
845 - Waterproofing system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Waterproofing system for underground works: composite drainage sheet, PVC
650 NP.UW.13.01
membrane, protection sheet, including granular draining material around the pipe
section type 0 - by-pass 9 * 11,90
Total sqm
Drainage pipe f 200 HDPE micro-slotted for drainage underground works section type 0 - by- 107,10
pass
9 * 2,00 107,10 4.500,00
Total m Total 845 - Waterproofing system NPR
651 NP.UW.14.01
CARRY FORWARD By-Pass - section type 0 (only excavatio...
CARRY FORWARD By-Pass #3
CARRY FORWARD Road Alignement TU – Tunnel - CH 18,00
0...
CARRY FORWARD 18,00 3.019,03
- 252 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
106 - By-Pass #3
150 - By-Pass - section type 0 (only excavation and lining)
850 - Lining bottom side / Inver

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying of Plain Cement Concrete M 10 - for underground works (item
652 NP.UW.20.01
20.01.00.0 + NP.UW.01.00)
section type 0 - by-pass 9 * 4,10 * 0,10
Total cum
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground 3,69
works (item 20.02.00.G + NP.UW.01.00)
section type 0 - by-pass 9 * 0,66 3,69 10.981,24
Total cum
653 NP.UW.21.01 Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
+ NP.UW.01.00)
section type 0 - by-pass 9 * 0,200
5,94
Total tonne
Plain/Reinforced Cement Concrete in Foundation - PCC Grade M 20 - for underground
works (item 20.02.00.B + NP.UW.01.00) 5,94 15.549,15
654 NP.UW.22.01 section type 0 - by-pass 9 * 2,39 * 0,50
Total cum Total 850 - Lining bottom side / Inver NPR
CARRY FORWARD By-Pass - section type 0 (only excavatio...
CARRY FORWARD By-Pass #3
CARRY FORWARD Road Alignement TU – Tunnel - CH
0... 1,8000
CARRY FORWARD 1,8000 122.616,07
655 NP.UW.25.01

10,76
10,76 14.258,95

- 253 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
106 - By-Pass #3
150 - By-Pass - section type 0 (only excavation and lining)
853 - Lining upper side

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Form work for vault (Class F1 Finish) - Using steel section type 0 - by-pass
656 NP.UW.17.01
9 * 9,63
Total sqm
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for 86,67
underground works (item 20.08.00.D.1q + NP.UW.01.00)
section type 0 - by-pass 9 * 3,11 86,67 2.550,00
Total cum
657 NP.UW.23.01
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00)
section type 0 - by-pass 9 * 0,250
Total tonne 27,99
Total 853 - Lining upper side NPR
Total 150 - By-Pass - section type 0 (only excavation and 27,99 19.445,72
lining) NPR
658 NP.UW.24.01
CARRY FORWARD By-Pass #3
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD 2,2500
lining) NPR
CARRY FORWARD By-Pass #3
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

2,2500 124.626,56

- 254 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
106 - By-Pass #3
151 - By-Pass - section type 1 (only excavation and lining)
800 - Tunnel excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

659 NP.UW.02.02 AMOUNT CARRIED FORWARD 6.753,


Rock Excavations for underground works - with hammer or drill&blast section type 1 - by-pass 42
26,5 * 19,22
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD By-Pass - section type 1 (only excavatio...
CARRY FORWARD By-Pass #3 509,33
CARRY FORWARD Road Alignement TU – Tunnel - CH 509,33
0...
CARRY FORWARD
Rock Excavations for underground works - with hammer or drill&blast section type 1 - by-pass 42
26,5 * 19,22
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD By-Pass - section type 1 (only excavatio...
CARRY FORWARD By-Pass #3
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 255 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
106 - By-Pass #3
151 - By-Pass - section type 1 (only excavation and lining)
810 - Pre-Support

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
660 NP.UW.04.01 AMOUNT CARRIED FORWARD 3.043,88
661 NP.UW.05.02 50 mm thick shotcreting with steel fibers for underground works section type 1 - by-pass 4.452,45
662 NP.UW.06.01 lining 581,39
26,5 * 11,85 314,
excavation face ((26,5)/2,50) * 19,22 03
Total sqm 203,
100 mm thick shotcreting for underground works section type 1 - by-pass 73
26,5 * 11,61
Total sqm
Wire mesh ∅5mm/100x100 for Shotcrete - underground works section type 1 - by-pass
26,5 * 11,77 517,76
Total sqm Total 810 - Pre-Support NPR
CARRY FORWARD By-Pass - section type 1 (only excavatio...
CARRY FORWARD By-Pass #3
CARRY FORWARD Road Alignement TU – Tunnel - CH
0... 307,67
CARRY FORWARD 307,67

311,91
311,91

- 256 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
106 - By-Pass #3
151 - By-Pass - section type 1 (only excavation and lining)
820 - Rock Reinforcement

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

663 NP.UW.08.02 AMOUNT CARRIED FORWARD 7.352,


Swellex rock bolts (yield load >200 kN - L=4,00) for underground works section type 1 - by- 36
pass
26,5 * ((7+6)/2) * (1/(2,00/2))
Total no. Total 820 - Rock Reinforcement NPR
CARRY FORWARD By-Pass - section type 1 (only excavatio... 172,25
CARRY FORWARD By-Pass #3
172,25
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
- 257 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
106 - By-Pass #3
151 - By-Pass - section type 1 (only excavation and lining)
845 - Waterproofing system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Waterproofing system for underground works: composite drainage sheet, PVC
664 NP.UW.13.01
membrane, protection sheet, including granular draining material around the pipe
section type 1 - by-pass 26,5 * 11,90
Total sqm
Drainage pipe f 200 HDPE micro-slotted for drainage underground works section type 1 - by- 315,35
pass
26,5 * 2,00 315,35 4.500,00
Total m Total 845 - Waterproofing system NPR
665 NP.UW.14.01
CARRY FORWARD By-Pass - section type 1 (only excavatio...
CARRY FORWARD By-Pass #3
CARRY FORWARD Road Alignement TU – Tunnel - CH 53,00
0...
CARRY FORWARD 53,00 3.019,03
- 258 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
106 - By-Pass #3
151 - By-Pass - section type 1 (only excavation and lining)
850 - Lining bottom side / Inver

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying of Plain Cement Concrete M 10 - for underground works (item
666 NP.UW.20.01
20.01.00.0 + NP.UW.01.00)
section type 1 - by-pass 26,5 * 4,10 * 0,10
Total cum
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground 10,87
works (item 20.02.00.G + NP.UW.01.00)
section type 1 - by-pass 26,5 * 0,66 10,87 10.981,24
Total cum
667 NP.UW.21.01 Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
+ NP.UW.01.00)
section type 1 - by-pass 26,5 * 0,200
17,49
Total tonne
Plain/Reinforced Cement Concrete in Foundation - PCC Grade M 20 - for underground
works (item 20.02.00.B + NP.UW.01.00) 17,49 15.549,15
668 NP.UW.22.01 section type 1 - by-pass 26,5 * 2,39 * 0,50
Total cum Total 850 - Lining bottom side / Inver NPR
CARRY FORWARD By-Pass - section type 1 (only excavatio...
CARRY FORWARD By-Pass #3
CARRY FORWARD Road Alignement TU – Tunnel - CH
0... 5,3000
CARRY FORWARD 5,3000 122.616,07
669 NP.UW.25.01

31,67
31,67 14.258,95

- 259 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
106 - By-Pass #3
151 - By-Pass - section type 1 (only excavation and lining)
853 - Lining upper side

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Form work for vault (Class F1 Finish) - Using steel section type 1 - by-pass
670 NP.UW.17.01
26,5 * 9,63
Total sqm
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for 255,20
underground works (item 20.08.00.D.1q + NP.UW.01.00)
section type 1 - by-pass 26,5 * 3,11 255,20 2.550,00
Total cum
671 NP.UW.23.01
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00)
section type 1 - by-pass 26,5 * 0,250
Total tonne 82,42
Total 853 - Lining upper side NPR
Total 151 - By-Pass - section type 1 (only excavation and 82,42 19.445,72
lining) NPR
672 NP.UW.24.01
CARRY FORWARD By-Pass #3
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD 6,6250
lining) NPR
CARRY FORWARD By-Pass #3
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

6,6250 124.626,56

- 260 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
106 - By-Pass #3
152 - By-Pass - section type 2 (only excavation and lining)
800 - Tunnel excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

673 NP.UW.02.02 AMOUNT CARRIED FORWARD 6.753,


Rock Excavations for underground works - with hammer or drill&blast section type 2 - by-pass 42
35,5 * 19,82
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD By-Pass - section type 2 (only excavatio...
CARRY FORWARD By-Pass #3 703,61
CARRY FORWARD Road Alignement TU – Tunnel - CH 703,61
0...
CARRY FORWARD
Rock Excavations for underground works - with hammer or drill&blast section type 2 - by-pass 42
35,5 * 19,82
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD By-Pass - section type 2 (only excavatio...
CARRY FORWARD By-Pass #3
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 261 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
106 - By-Pass #3
152 - By-Pass - section type 2 (only excavation and lining)
810 - Pre-Support

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
674 NP.UW.04.01 AMOUNT CARRIED FORWARD 3.043,88
675 NP.UW.04.02 50 mm thick shotcreting with steel fibers for underground works section type 2 - by-pass 5.234,30
676 NP.UW.05.01 lining 2.652,95
677 NP.UW.05.02 35,5 * 12,00 426, 4.452,45
678 NP.UW.06.01 excavation face 00 581,39
(50%) * ((35,5)/1,75) * 19,82 201,
Total sqm 07
100 mm thick shotcreting with steel fibers for underground works section type 2 - by-pass
excavation face
(50%) * 35,5 * 19,82 * (1/1,75)
Total sqm 627,07
50 mm thick shotcreting for underground works section type 2 - by-pass
35,5 * 11,69
Total sqm
100 mm thick shotcreting for underground works section type 2 - by-pass
35,5 * 11,69
Total sqm
Wire mesh ∅5mm/100x100 for Shotcrete - underground works section type 2 - by-pass 200,53
35,5 * 11,93
200,53
35,5 * 11,61
Total sqm Total 810 - Pre-Support NPR
CARRY FORWARD By-Pass - section type 2 (only excavatio...
CARRY FORWARD By-Pass #3
CARRY FORWARD Road Alignement TU – Tunnel - CH 415,00
0... 415,00
CARRY FORWARD

415,00
415,00

423,
52
412,
16

835,68

- 262 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
106 - By-Pass #3
152 - By-Pass - section type 2 (only excavation and lining)
820 - Rock Reinforcement

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Injected rock bolts L=4,50 (Ftk >250 kN), incl. injections for underground works section type 2
679 NP.UW.09.02
- by-pass
35,5 * ((7+6)/2) * (1/1,50)
Total Cadauno 154,60
Fiberglass dowels/bolts (ultimate load >350 kN) section type 2 - by-pass
(50%) * 35,5 * (4*4,50/3,50) 154,60 8.212,36
Total m Total 820 - Rock Reinforcement NPR
680 NP.UW.11.01
CARRY FORWARD By-Pass - section type 2 (only excavatio...
CARRY FORWARD By-Pass #3
CARRY FORWARD Road Alignement TU – Tunnel - CH 91,24
0... 91,24 11.800,00
CARRY FORWARD
- 263 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
106 - By-Pass #3
152 - By-Pass - section type 2 (only excavation and lining)
845 - Waterproofing system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Waterproofing system for underground works: composite drainage sheet, PVC
681 NP.UW.13.01
membrane, protection sheet, including granular draining material around the pipe
section type 2 - by-pass 35,5 * 11,90
Total sqm
Drainage pipe f 200 HDPE micro-slotted for drainage underground works section type 2 - by- 422,45
pass
35,5 * 2,00 422,45 4.500,00
Total m Total 845 - Waterproofing system NPR
682 NP.UW.14.01
CARRY FORWARD By-Pass - section type 2 (only excavatio...
CARRY FORWARD By-Pass #3
CARRY FORWARD Road Alignement TU – Tunnel - CH 71,00
0...
CARRY FORWARD 71,00 3.019,03
Total m Total 845 - Waterproofing system NPR
CARRY FORWARD By-Pass - section type 2 (only excavatio...
CARRY FORWARD By-Pass #3
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 264 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
106 - By-Pass #3
152 - By-Pass - section type 2 (only excavation and lining)
850 - Lining bottom side / Inver

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying of Plain Cement Concrete M 10 - for underground works (item
683 NP.UW.20.01
20.01.00.0 + NP.UW.01.00)
section type 2 - by-pass 35,5 * 4,10 * 0,10
Total cum
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground
works (item 20.02.00.G + NP.UW.01.00)
section type 2 - by-pass 35,5 * 0,66
Total cum
Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
+ NP.UW.01.00)
AMOUNT CARRIED FORWARD
Providing and laying of Plain Cement Concrete M 10 - for underground works (item
20.01.00.0 + NP.UW.01.00)
section type 2 - by-pass 35,5 * 4,10 * 0,10
Total cum
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground 14,56
works (item 20.02.00.G + NP.UW.01.00)
section type 2 - by-pass 35,5 * 0,66 14,56 10.981,24
Total cum
684 NP.UW.21.01 Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
+ NP.UW.01.00)
section type 2 - by-pass 35,5 * 0,200
23,43
Total tonne
Plain/Reinforced Cement Concrete in Foundation - PCC Grade M 20 - for underground
works (item 20.02.00.B + NP.UW.01.00) 23,43 15.549,15
685 NP.UW.22.01 section type 2 - by-pass 35,5 * 2,39 * 0,50
Total cum Total 850 - Lining bottom side / Inver NPR
CARRY FORWARD By-Pass - section type 2 (only excavatio...
CARRY FORWARD By-Pass #3
CARRY FORWARD Road Alignement TU – Tunnel - CH
0... 7,1000
CARRY FORWARD 7,1000 122.616,07
686 NP.UW.25.01

42,42

42,42 14.258,95

- 265 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
106 - By-Pass #3
152 - By-Pass - section type 2 (only excavation and lining)
853 - Lining upper side
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Form work for vault (Class F1 Finish) - Using steel section type 2 - by-pass
687 NP.UW.17.01
35,5 * 9,63
Total sqm
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for 341,87
underground works (item 20.08.00.D.1q + NP.UW.01.00)
section type 2 - by-pass 35,5 * 3,11 341,87 2.550,00
Total cum
688 NP.UW.23.01
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00)
section type 2 - by-pass 35,5 * 0,250
Total tonne 110,41
Total 853 - Lining upper side NPR
Total 152 - By-Pass - section type 2 (only excavation and 110,41 19.445,72
lining) NPR
689 NP.UW.24.01
CARRY FORWARD By-Pass #3
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD 8,8750

8,8750 124.626,56
- 266 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
106 - By-Pass #3
153 - By-Pass - section type 3 (only excavation and lining)
800 - Tunnel excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

690 NP.UW.02.02 AMOUNT CARRIED FORWARD 6.753,


Rock Excavations for underground works - with hammer or drill&blast section type 3 - by-pass 42
48,35 * 19,82
Total cum Total 800 - Tunnel excavation NPR
CARRY FORWARD By-Pass - section type 3 (only excavatio...
CARRY FORWARD By-Pass #3 958,30
CARRY FORWARD Road Alignement TU – Tunnel - CH 958,30
0...
CARRY FORWARD
- 267 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
106 - By-Pass #3
153 - By-Pass - section type 3 (only excavation and lining)
810 - Pre-Support

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

691 NP.UW.03.02 AMOUNT CARRIED FORWARD 108.379,99


692 NP.UW.04.01 Lattice Girders for underground works section type 3 - by-pass 3.043,88
693 NP.UW.04.02 lattice girders - weigth 10.30 kg/m 5.234,30
694 NP.UW.05.01 9 * (11,77*10,30/1000) 1,09 2.652,95
695 NP.UW.05.02 plates & link chains - 45% 08 4.452,45
696 NP.UW.06.01 9 * (11,77*10,30*45%/1000) 0,49 581,39
Total tonne 14
50 mm thick shotcreting with steel fibers for underground works section type 3 - by-pass
lining
48,35 * 12,00
excavation face 1,5822
(50%) * 48,35 * 19,82
Total sqm
100 mm thick shotcreting with steel fibers for underground works section type 3 - by-pass
excavation face 580,
(50%) * 48,35 * 19,82 20
Total sqm 479,
50 mm thick shotcreting for underground works section type 3 - by-pass 15
48,35 * 11,69
Total sqm
100 mm thick shotcreting for underground works section type 3 - by-pass
48,35 * 11,69 1.059,35
Total sqm
Wire mesh ∅5mm/100x100 for Shotcrete - underground works section type 3 - by-pass
48,35 * 11,93
48,35 * 11,61
Total sqm Total 810 - Pre-Support NPR
CARRY FORWARD By-Pass - section type 3 (only excavatio...
CARRY FORWARD By-Pass #3 479,15
CARRY FORWARD Road Alignement TU – Tunnel - CH 479,15
0...
CARRY FORWARD

565,21
565,21

565,21
565,21

576,
82
561,
34

1.138,16
- 268 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
106 - By-Pass #3
153 - By-Pass - section type 3 (only excavation and lining)
820 - Rock Reinforcement

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Self-drilling anchors L=3,00 (yield load > 550 kN) for underground works section type 3 - by-
697 NP.UW.10.01
pass
48,35 * 16
Total no. 773,60
Fiberglass dowels/bolts (ultimate load >350 kN) section type 3 - by-pass
(50%) * 48,35 * (4*4,50/3,50) 773,60 8.033,67
Total m Total 820 - Rock Reinforcement NPR
698 NP.UW.11.01
CARRY FORWARD By-Pass - section type 3 (only excavatio...
CARRY FORWARD By-Pass #3
CARRY FORWARD Road Alignement TU – Tunnel - CH 124,26
0... 124,26 11.800,00
CARRY FORWARD
- 269 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
106 - By-Pass #3
153 - By-Pass - section type 3 (only excavation and lining)
845 - Waterproofing system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Waterproofing system for underground works: composite drainage sheet, PVC
699 NP.UW.13.01
membrane, protection sheet, including granular draining material around the pipe
section type 3 - by-pass 48,35 * 11,90
Total sqm
Drainage pipe f 200 HDPE micro-slotted for drainage underground works section type 3 - by- 575,37
pass
48,35 * 2,00 575,37 4.500,00
Total m Total 845 - Waterproofing system NPR
700 NP.UW.14.01
CARRY FORWARD By-Pass - section type 3 (only excavatio...
CARRY FORWARD By-Pass #3
CARRY FORWARD Road Alignement TU – Tunnel - CH 96,70
0...
CARRY FORWARD 96,70 3.019,03
Total m Total 845 - Waterproofing system NPR
CARRY FORWARD By-Pass - section type 3 (only excavatio...
CARRY FORWARD By-Pass #3
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 270 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
106 - By-Pass #3
153 - By-Pass - section type 3 (only excavation and lining)
850 - Lining bottom side / Inver

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying of Plain Cement Concrete M 10 - for underground works (item
701 NP.UW.20.01
20.01.00.0 + NP.UW.01.00)
section type 3 - by-pass 48,35 * 4,10 * 0,10
Total cum
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground
works (item 20.02.00.G + NP.UW.01.00)
section type 3 - by-pass 48,35 * 0,66
Total cum
Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
+ NP.UW.01.00)
AMOUNT CARRIED FORWARD
Providing and laying of Plain Cement Concrete M 10 - for underground works (item
20.01.00.0 + NP.UW.01.00)
section type 3 - by-pass 48,35 * 4,10 * 0,10
Total cum
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground 19,82
works (item 20.02.00.G + NP.UW.01.00)
section type 3 - by-pass 48,35 * 0,66 19,82 10.981,24
Total cum
702 NP.UW.21.01 Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
+ NP.UW.01.00)
section type 3 - by-pass 48,35 * 0,200
31,91
Total tonne
Plain/Reinforced Cement Concrete in Foundation - PCC Grade M 20 - for underground
works (item 20.02.00.B + NP.UW.01.00) 31,91 15.549,15
703 NP.UW.22.01 section type 3 - by-pass 48,35 * 2,39 * 0,50
Total cum Total 850 - Lining bottom side / Inver NPR
CARRY FORWARD By-Pass - section type 3 (only excavatio...
CARRY FORWARD By-Pass #3
CARRY FORWARD Road Alignement TU – Tunnel - CH
0... 9,6700
CARRY FORWARD 9,6700 122.616,07
704 NP.UW.25.01

57,78

57,78 14.258,95

- 271 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
106 - By-Pass #3
153 - By-Pass - section type 3 (only excavation and lining)
853 - Lining upper side
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Form work for vault (Class F1 Finish) - Using steel section type 3 - by-pass
705 NP.UW.17.01
48,35 * 9,63
Total sqm
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for 465,61
underground works (item 20.08.00.D.1q + NP.UW.01.00)
section type 3 - by-pass 48,35 * 3,11 465,61 2.550,00
Total cum
706 NP.UW.23.01
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00)
section type 3 - by-pass 48,35 * 0,250
Total tonne 150,37
Total 853 - Lining upper side NPR
Total 153 - By-Pass - section type 3 (only excavation and 150,37 19.445,72
lining) NPR
707 NP.UW.24.01
CARRY FORWARD By-Pass #3
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD 12,0875

12,0875 124.626,56
- 272 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
106 - By-Pass #3
154 - By-Pass - Air-Lock section type 3 (only excavation and lining)
800 - Tunnel excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Rock Excavations for underground works - with hammer or drill&blast Air-Lock section type 3 -
708 NP.UW.02.02
by-pass
5,40 * 47,02
Link sections 7,60 * 47,02
Total cum Total 800 - Tunnel excavation NPR 253,91
CARRY FORWARD By-Pass - Air-Lock section type 3 (only...
CARRY FORWARD By-Pass #3 357,35
CARRY FORWARD Road Alignement TU – Tunnel - CH 611,26 6.753,
0... 42
CARRY FORWARD
- 273 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
106 - By-Pass #3
154 - By-Pass - Air-Lock section type 3 (only excavation and lining)
810 - Pre-Support

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Lattice Girders for underground works Air-Lock section type 3 - by-pass lattice girders - weigth
709 NP.UW.03.02
17.40 kg/m 5,40 * (17,54*17,40/1000)
plates & link chains - 45%
5,40 * (17,54*17,40*45%/1000)
Link sections
lattice girders - weigth 17.40 kg/m 7,60 * (17,54*17,40/1000) 1,6481
plates & link chains - 45%
7,60 * (17,54*17,40*45%/1000) 0,7414
Total tonne
50 mm thick shotcreting with steel fibers for underground works Air-Lock section type 3 - by-
pass
lining
2,3195
5,40 * 17,82
excavation face (50%) * 5,40 * 47,02
Link sections lining 1,0435
7,60 * 17,82
excavation face (50%) * 7,60 * 47,02 5,7525 108.379,99
710 NP.UW.04.01 Total sqm
100 mm thick shotcreting with steel fibers for underground works Air-Lock section type 3 - by-
pass
lining
5,40 * 17,82
excavation face (50%) * 5,40 * 47,02 96,23
Link sections lining
7,60 * 17,82 126,95
excavation face (50%) * 7,60 * 47,02
Total sqm
50 mm thick shotcreting for underground works Air-Lock section type 3 - by-pass
5,40 * 17,43
Link sections 7,60 * 17,43
Total sqm
100 mm thick shotcreting for underground works
CARRY FORWARD Pre-Support
CARRY FORWARD By-Pass - Air-Lock section type 3 (only...
CARRY FORWARD By-Pass #3
5,40 * 17,82
excavation face (50%) * 5,40 * 47,02
Link sections lining
7,60 * 17,82
excavation face (50%) * 7,60 * 47,02
Total sqm
50 mm thick shotcreting for underground works Air-Lock section type 3 - by-pass
5,40 * 17,43
Link sections 7,60 * 17,43 135,43
Total sqm
100 mm thick shotcreting for underground works
178,68
CARRY FORWARD Pre-Support
CARRY FORWARD By-Pass - Air-Lock section type 3 (only... 537,29 3.043,88
711 NP.UW.04.02 CARRY FORWARD By-Pass #3
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
96,23

126,95

135,43

178,68
537,29 5.234,30
712 NP.UW.05.01

94,12

132,47
226,59 2.652,95
713 NP.UW.05.02

- 274 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
106 - By-Pass #3
154 - By-Pass - Air-Lock section type 3 (only excavation and lining)
810 - Pre-Support

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Air-Lock section type 3 - by-pass 5,40 * 17,43
Link sections 7,60 * 17,43 94,12
Total sqm
Wire mesh ∅5mm/100x100 for Shotcrete - underground works Air-Lock section type 3 - by-
pass 132,47
5,40 * 17,74
5,40 * 17,34 226,59 4.452,45
714 NP.UW.06.01 Link sections 7,60 * 17,74
7,60 * 17,34
Total sqm Total 810 - Pre-Support NPR
CARRY FORWARD By-Pass - Air-Lock section type 3 (only... 95,80
CARRY FORWARD By-Pass #3
93,64
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
134,82
CARRY FORWARD
131,78
456,04 581,39
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 275 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
106 - By-Pass #3
154 - By-Pass - Air-Lock section type 3 (only excavation and lining)
820 - Rock Reinforcement

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Injected rock bolts L=5,00 (Ftk >350 kN), incl. injections for underground works Air-Lock
715 NP.UW.09.03
section type 3 - by-pass
5,40 * 2
Link sections 7,60 * 2
Total no. 10,80
Self-drilling anchors L=3,00 (yield load > 550 kN) for underground works Air-Lock section type
3 - by-pass 15,20
5,40 * 25
Link sections 7,60 * 25 26,00 11.721,36
Total no.
Fiberglass dowels/bolts (ultimate load >350 kN)
Air-Lock section type 3 - by-pass (50%) * 5,40 * (11*7,00/6,00)
Link sections
(50%) * 7,60 * (11*7,00/6,00)
Total m Total 820 - Rock Reinforcement NPR
CARRY FORWARD By-Pass - Air-Lock section type 3 (only...
5,40 * 2
Link sections 7,60 * 2
Total no.
Self-drilling anchors L=3,00 (yield load > 550 kN) for underground works Air-Lock section type
3 - by-pass
5,40 * 25
Link sections 7,60 * 25
716 NP.UW.10.01 Total no.
Fiberglass dowels/bolts (ultimate load >350 kN)
Air-Lock section type 3 - by-pass (50%) * 5,40 * (11*7,00/6,00)
Link sections
135,00
(50%) * 7,60 * (11*7,00/6,00)
Total m Total 820 - Rock Reinforcement NPR
CARRY FORWARD By-Pass - Air-Lock section type 3 (only... 190,00
CARRY FORWARD By-Pass #3
325,00 8.033,67
CARRY FORWARD Road Alignement TU – Tunnel - CH
717 NP.UW.11.01
0...
CARRY FORWARD

34,64

48,75
83,39 11.800,00

- 276 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
106 - By-Pass #3
154 - By-Pass - Air-Lock section type 3 (only excavation and lining)
845 - Waterproofing system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Waterproofing system for underground works: composite drainage sheet, PVC
membrane, protection sheet, including granular draining material around the pipe
Air-Lock section type 3 - by-pass 5,40 * 17,49
Link sections 7,60 * 17,49
Total sqm
Drainage pipe f 200 HDPE micro-slotted for drainage underground works Air-Lock section type
3 - by-pass
5,40 * 2,00
AMOUNT CARRIED FORWARD
Waterproofing system for underground works: composite drainage sheet, PVC
718 NP.UW.13.01
membrane, protection sheet, including granular draining material around the pipe
Air-Lock section type 3 - by-pass 5,40 * 17,49
Link sections 7,60 * 17,49
Total sqm
94,45
Drainage pipe f 200 HDPE micro-slotted for drainage underground works Air-Lock section type
3 - by-pass
5,40 * 2,00 132,92
Link sections 7,60 * 2
Total m Total 845 - Waterproofing system NPR 227,37 4.500,00
719 NP.UW.14.01 CARRY FORWARD By-Pass - Air-Lock section type 3 (only...
CARRY FORWARD By-Pass #3
CARRY FORWARD Road Alignement TU – Tunnel - CH
0... 10,80
CARRY FORWARD
15,20
26,00 3.019,03

- 277 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
106 - By-Pass #3
154 - By-Pass - Air-Lock section type 3 (only excavation and lining)
850 - Lining bottom side / Inver

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying of Plain Cement Concrete M 10 - for underground works (item
720 NP.UW.20.01
20.01.00.0 + NP.UW.01.00)
Air-Lock section type 3 - by-pass 5,40 * 7,67 * 0,10
Link sections
7,60 * 7,67 * 0,10 4,14
Total cum
lain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 - for underground
works (item 20.02.00.G + NP.UW.01.00) 5,83
Air-Lock section type 3 - by-pass 5,40 * 0,91
Link sections 7,60 * 0,91 9,97 10.981,24
721 NP.UW.21.01 Total cum
Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation - for underground works (item 20.03.00.0
+ NP.UW.01.00)
Air-Lock section type 3 - by-pass 5,40 * 0,250 4,91
Link sections 7,60 * 0,250
Total tonne
Plain/Reinforced Cement Concrete in Foundation - PCC Grade M 20 - for underground 6,92
works (item 20.02.00.B + NP.UW.01.00)
Air-Lock section type 3 - by-pass 5,40 * 5,32 * 0,50 11,83 15.549,15
722 NP.UW.22.01 Link sections
7,60 * 5,32 * 0,50
Total cum Total 850 - Lining bottom side / Inver NPR
CARRY FORWARD By-Pass - Air-Lock section type 3 (only...
CARRY FORWARD By-Pass #3
CARRY FORWARD Road Alignement TU – Tunnel - CH 1,3500
0...
CARRY FORWARD 1,9000
3,2500 122.616,07
723 NP.UW.25.01

14,36

20,22
34,58 14.258,95
- 278 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
106 - By-Pass #3
154 - By-Pass - Air-Lock section type 3 (only excavation and lining)
853 - Lining upper side

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Form work for vault (Class F1 Finish) - Using steel Air-Lock section type 3 - by-pass
724 NP.UW.17.01
5,40 * 15,17
Link sections 7,60 * 15,17
Total sqm
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for 81,92
underground works (item 20.08.00.D.1q + NP.UW.01.00)
Air-Lock section type 3 - by-pass 5,40 * 4,90 115,29
Link sections 7,60 * 4,90
Air-Lock Walls 197,21 2.550,00
725 NP.UW.23.01 2 * 27,73 * 0,20
Total cum
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure -
for underground works (item 20.09.00.0 + NP.UW.01.00)
Air-Lock section type 3 - by-pass 5,40 * 1,000 26,46
Link sections 7,60 * 1,000
Air-Lock Walls
Steel ratio 120.00 kg/mc (2*27,73*0,20) * 0,120 37,24
Total tonne
Total 853 - Lining upper side NPR
Total 154 - By-Pass - Air-Lock section type 3 (only excavation 11,09
and lining) NPR 74,79 19.445,72
Total 106 - By-Pass #3 NPR
726 NP.UW.24.01
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
5,4000

7,6000

1,3310

14,3310 124.626,56
- 279 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
115 - SOS niches
131 - Flushing niches
800 - Tunnel excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

727 NP.UW.02.02 AMOUNT CARRIED FORWARD 6.753,


Rock Excavations for underground works - with hammer or drill&blast 32 * 42
(2,14+(1,10/2)+(1,10/2)) * 5,36
Total cum
Total 800 - Tunnel excavation NPR 555,72
CARRY FORWARD Flushing niches 555,72
CARRY FORWARD SOS niches
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
727 NP.UW.02.02 AMOUNT CARRIED FORWARD 6.753,
Rock Excavations for underground works - with hammer or drill&blast 32 * 42
(2,14+(1,10/2)+(1,10/2)) * 5,36
Total cum
Total 800 - Tunnel excavation NPR
CARRY FORWARD Flushing niches
CARRY FORWARD SOS niches
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 280 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
115 - SOS niches
131 - Flushing niches
810 - Pre-Support

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
728 NP.UW.03.02 AMOUNT CARRIED FORWARD 108.379,99
729 NP.UW.04.01 Lattice Girders for underground works lattice girders - weigth 17.40 kg/m 3.043,88
730 NP.UW.05.01 32 * 3 * (1,42*17,40/1000) 2.652,95
731 NP.UW.05.02 Total tonne 4.452,45
732 NP.UW.06.01 50 mm thick shotcreting with steel fibers for underground works 32 * (1,56+1,56) * 4,69 581,39
32 * (2,14+(1,10/2)+(1,10/2)) * 1,46
2,3712
Total sqm
50 mm thick shotcreting for underground works 32 * (1,56+1,56) * 4,69 2,3712
32 * (2,14+(1,10/2)+(1,10/2)) * 1,46
468,
Total sqm
25
100 mm thick shotcreting for underground works 32 * (1,56+1,56) * 4,69
151,
32 * (2,14+(1,10/2)+(1,10/2)) * 1,46
37
Total sqm
Wire mesh ∅5mm/100x100 for Shotcrete - underground works 32 * 2 * (1,56+1,56) * 4,69 619,62
32 * 2 * (2,14+(1,10/2)+(1,10/2)) * 1,46
Total sqm Total 810 - Pre-Support NPR 468,
25
CARRY FORWARD Flushing niches
151,
CARRY FORWARD SOS niches
37
CARRY FORWARD Road Alignement TU – Tunnel - CH
619,62
0...
CARRY FORWARD 468,
25
151,
37
619,62

936,
50
302,
75
1.239,25

- 281 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
115 - SOS niches
131 - Flushing niches
845 - Waterproofing system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

733 NP.UW.13.01 AMOUNT CARRIED FORWARD 4.500,


Waterproofing system for underground works: composite drainage sheet, PVC 00
membrane, protection sheet, including granular draining material around the pipe
32 * (1,56+1,56) * 6,50
Total sqm Total 845 - Waterproofing system NPR
CARRY FORWARD Flushing niches 648,96
CARRY FORWARD SOS niches 648,96
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
- 282 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
115 - SOS niches
131 - Flushing niches
850 - Lining bottom side / Inver

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

734 NP.UW.20.01 AMOUNT CARRIED FORWARD 10.981


Providing and laying of Plain Cement Concrete M 10 - for underground works (item ,24
20.01.00.0 + NP.UW.01.00)
32 * (2,14+(1,10/2)+(1,10/2)) * (0,55+1,55+0,10) * 0,10
Total cum Total 850 - Lining bottom side / Inver NPR
CARRY FORWARD Flushing niches 22,81
CARRY FORWARD SOS niches 22,81
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
Providing and laying of Plain Cement Concrete M 10 - for underground works (item ,24
20.01.00.0 + NP.UW.01.00)
32 * (2,14+(1,10/2)+(1,10/2)) * (0,55+1,55+0,10) * 0,10
Total cum Total 850 - Lining bottom side / Inver NPR
CARRY FORWARD Flushing niches
CARRY FORWARD SOS niches
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 283 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
115 - SOS niches
131 - Flushing niches
853 - Lining upper side

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
735 NP.UW.17.01 AMOUNT CARRIED FORWARD 2.550,00
736 NP.UW.23.01 Form work for vault (Class F1 Finish) - Using steel 32 * (1,56+1,56) * 4,25 424, 19.445,72
737 NP.UW.24.01 32 * (2,14+(1,10/2)+(1,10/2)) * 1,36 32 124.626,56
Total sqm 141,
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for 00
underground works (item 20.08.00.D.1q + NP.UW.01.00)
32 * (1,56+1,56) * 1,74 565,32
32 * (2,14+(1,10/2)+(1,10/2)) * 0,56
Total cum 173,
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure - 72
for underground works (item 20.09.00.0 + NP.UW.01.00) 58,0
Steel ratio 94.60 kg/mc 32 * 7,24 * (94,60/1000) 6
Total tonne
Total 853 - Lining upper side NPR 231,78
Total 131 - Flushing niches NPR
CARRY FORWARD SOS niches
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
21,9169
21,9169

- 284 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
115 - SOS niches
132 - Hydrant niches
800 - Tunnel excavation
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

738 NP.UW.02.02 AMOUNT CARRIED FORWARD 6.753,


Rock Excavations for underground works - with hammer or drill&blast 6 * 42
(1,82+(0,25/2)+(0,25/2)) * 2,39
Total cum
Total 800 - Tunnel excavation NPR 29,68
CARRY FORWARD Hydrant niches 29,68
CARRY FORWARD SOS niches
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 285 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
115 - SOS niches
132 - Hydrant niches
810 - Pre-Support

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

739 NP.UW.03.02 AMOUNT CARRIED FORWARD 108.379,99


740 NP.UW.04.01 Lattice Girders for underground works lattice girders - weigth 17.40 kg/m 3.043,88
741 NP.UW.05.01 6 * 3 * (0,61*17,40/1000) 2.652,95
742 NP.UW.05.02 Total tonne 4.452,45
743 NP.UW.06.01 50 mm thick shotcreting with steel fibers for underground works 6 * (0,74+0,74) * 3,78 581,39
6 * (1,82+(0,25/2)+(0,25/2)) * 0,63
0,1908
Total sqm
50 mm thick shotcreting for underground works 6 * (0,74+0,74) * 3,78 0,1908
6 * (1,82+(0,25/2)+(0,25/2)) * 0,63
Total sqm
33,57
100 mm thick shotcreting for underground works 6 * (0,74+0,74) * 3,78
7,82
6 * (1,82+(0,25/2)+(0,25/2)) * 0,63
Total sqm
Wire mesh ∅5mm/100x100 for Shotcrete - underground works 6 * 2 * (0,74+0,74) * 3,78 41,39
6 * 2 * (1,82+(0,25/2)+(0,25/2)) * 0,63
Total sqm Total 810 - Pre-Support NPR
33,57
CARRY FORWARD Hydrant niches
7,82
CARRY FORWARD SOS niches
CARRY FORWARD Road Alignement TU – Tunnel - CH
41,39
0...
CARRY FORWARD
33,57
7,82

41,39

67,1
3
15,6
5
82,78
- 286 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
115 - SOS niches
132 - Hydrant niches
845 - Waterproofing system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

744 NP.UW.13.01 AMOUNT CARRIED FORWARD 4.500,


Waterproofing system for underground works: composite drainage sheet, PVC 00
membrane, protection sheet, including granular draining material around the pipe
6 * (0,74+0,74) * 4,95
Total sqm Total 845 - Waterproofing system NPR
CARRY FORWARD Hydrant niches 43,96
CARRY FORWARD SOS niches 43,96
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
Waterproofing system for underground works: composite drainage sheet, PVC 00
membrane, protection sheet, including granular draining material around the pipe
6 * (0,74+0,74) * 4,95
Total sqm Total 845 - Waterproofing system NPR
CARRY FORWARD Hydrant niches
CARRY FORWARD SOS niches
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 287 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
115 - SOS niches
132 - Hydrant niches
850 - Lining bottom side / Inver

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
745 NP.UW.20.01 AMOUNT CARRIED FORWARD 10.981
Providing and laying of Plain Cement Concrete M 10 - for underground works (item ,24
20.01.00.0 + NP.UW.01.00)
6 * (1,82+(0,25/2)+(0,25/2)) * 0,84 * 0,10
Total cum Total 850 - Lining bottom side / Inver NPR
CARRY FORWARD Hydrant niches 1,04
CARRY FORWARD SOS niches 1,04
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 288 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
115 - SOS niches
132 - Hydrant niches
853 - Lining upper side
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

746 NP.UW.17.01 AMOUNT CARRIED FORWARD 2.550,00


747 NP.UW.23.01 Form work for vault (Class F1 Finish) - Using steel 6 * (0,74+0,74) * 3,24 19.445,72
748 NP.UW.24.01 6 * (0,90+(0,25/2)+(0,25/2)) * 0,58 28,77 124.626,56
Total sqm 4,00
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for
underground works (item 20.08.00.D.1q + NP.UW.01.00)
6 * (0,74+0,74) * 1,35 32,77
6 * (1,46+(0,25/2)+(0,25/2)) * 0,24
Total cum
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure - 11,99
for underground works (item 20.09.00.0 + NP.UW.01.00) 2,46
Steel ratio 94.60 kg/mc 6 * 2,41 * (94,60/1000)
Total tonne
Total 853 - Lining upper side NPR 14,45
Total 132 - Hydrant niches NPR
CARRY FORWARD SOS niches
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
1,3679
1,3679

- 289 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
115 - SOS niches
133 - SOS / Hydrant niches
800 - Tunnel excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

749 NP.UW.02.02 AMOUNT CARRIED FORWARD 6.753,


Rock Excavations for underground works - with hammer or drill&blast Schotcreting 42
9 * 3,10 * 0,88
24,5
Rock
5
9 * 3,10 * 12,05
336,
Total cum Total 800 - Tunnel excavation NPR
20
CARRY FORWARD SOS / Hydrant niches
CARRY FORWARD SOS niches
CARRY FORWARD Road Alignement TU – Tunnel - CH
360,
0... 75
CARRY FORWARD
- 290 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
115 - SOS niches
133 - SOS / Hydrant niches
810 - Pre-Support

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

750 NP.UW.03.02 AMOUNT CARRIED FORWARD 108.379,99


751 NP.UW.04.01 Lattice Girders for underground works lattice girders - weigth 17.40 kg/m 3.043,88
752 NP.UW.05.01 9 * 3 * (7,03*17,40/1000) 2.652,95
753 NP.UW.05.02 Total tonne 4.452,45
754 NP.UW.06.01 50 mm thick shotcreting with steel fibers for underground works 9 * 3,10 * 7,40 581,39
9 * (11,42+11,42)
3,3021
Total sqm
50 mm thick shotcreting for underground works 9 * 3,10 * 7,28 3,3021
9 * (11,42+11,42)
206,
Total sqm
46
100 mm thick shotcreting for underground works 9 * 3,10 * 7,16
205,
9 * (11,42+11,42)
56
Total sqm
Wire mesh ∅5mm/100x100 for Shotcrete - underground works 9 * 2 * 3,10 * 7,26 412,02
9 * 2 * (11,42+11,42)
Total sqm Total 810 - Pre-Support NPR 203,
11
CARRY FORWARD SOS / Hydrant niches
205,
CARRY FORWARD SOS niches
56
CARRY FORWARD Road Alignement TU – Tunnel - CH
408,67
0...
CARRY FORWARD 199,
76
205,
56
405,32

405,
11
411,
12
816,23
- 291 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
115 - SOS niches
133 - SOS / Hydrant niches
845 - Waterproofing system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

755 NP.UW.13.01 AMOUNT CARRIED FORWARD 4.500,


Waterproofing system for underground works: composite drainage sheet, PVC 00
membrane, protection sheet, including granular draining material around the pipe
9 * (11,42+11,42)
Total sqm Total 845 - Waterproofing system NPR
CARRY FORWARD SOS / Hydrant niches 205,56
CARRY FORWARD SOS niches 205,56
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD
Waterproofing system for underground works: composite drainage sheet, PVC 00
membrane, protection sheet, including granular draining material around the pipe
9 * (11,42+11,42)
Total sqm Total 845 - Waterproofing system NPR
CARRY FORWARD SOS / Hydrant niches
CARRY FORWARD SOS niches
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 292 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
115 - SOS niches
133 - SOS / Hydrant niches
850 - Lining bottom side / Inver

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
756 NP.UW.20.01 AMOUNT CARRIED FORWARD 10.981
Providing and laying of Plain Cement Concrete M 10 - for underground works (item ,24
20.01.00.0 + NP.UW.01.00)
9 * 2,60 * 2,95 * 0,10
Total cum Total 850 - Lining bottom side / Inver NPR
CARRY FORWARD SOS / Hydrant niches 6,90
CARRY FORWARD SOS niches 6,90
CARRY FORWARD Road Alignement TU – Tunnel - CH
0...
CARRY FORWARD

- 293 -
Priced Bill of Quantities
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034
115 - SOS niches
133 - SOS / Hydrant niches
853 - Lining upper side
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

757 NP.UW.17.01 AMOUNT CARRIED FORWARD 2.550,00


758 NP.UW.23.01 Form work for vault (Class F1 Finish) - Using steel 9 * 1,80 * 6,36 103, 19.445,72
759 NP.UW.24.01 9 * (9,86+9,86) 03 124.626,56
Total sqm 177,
Reinforced/ Pre-stressed cement concrete in super-structure. RCC Grade M 40 - for 48
underground works (item 20.08.00.D.1q + NP.UW.01.00)
9 * 2,60 * 2,73 280,51
9 * 0,40 * (9,86+9,86)
Total cum 63,8
Providing and laying , fitting and placing HYSD bar reinforcement in super- structure - 8
for underground works (item 20.09.00.0 + NP.UW.01.00) 70,9
Steel ratio 94.60 kg/mc 9
9 * 14,99 * (94,60/1000)
Total tonne 134,87
Total 853 - Lining upper side NPR
Total 133 - SOS / Hydrant niches NPR
Total 115 - SOS niches NPR
Total 02 - Road Alignement TU – Tunnel - CH 0+904 to
2+034 NPR
CARRY FORWARD 12,7625
12,7625

- 294 -
Priced Bill of Quantities
03 - Pedestrian Road Alignement PE
006 - Hydraulic Works
026 - Culvert A3
1005 - culverts

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying , fitting and placing un-coated Mild steel / HYSD
760 20.03.00.0
reinforcement complete in foundation
stell ratio 14,70 * 0,100
Total tonne
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item 1,4700
20.04.00.H.0p + 7%)
culvert 14,70 1,4700 110.464,93
Total cum
761 NP.CW.16.01 Total 1005 - culverts NPR
Total 026 - Culvert A3 NPR
CARRY FORWARD Hydraulic Works
CARRY FORWARD Pedestrian Road Alignement PE 14,70
CARRY FORWARD
14,70 16.220,39
- 295 -
Priced Bill of Quantities
03 - Pedestrian Road Alignement PE
006 - Hydraulic Works
027 - Culvert 6
1005 - culverts

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying , fitting and placing un-coated Mild steel / HYSD
762 20.03.00.0
reinforcement complete in foundation
stell ratio 20,94 * 0,100
Total tonne
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item 2,0940
20.04.00.H.0p + 7%)
culvert 20,94 2,0940 110.464,93
Total cum
763 NP.CW.16.01 Total 1005 - culverts NPR
Total 027 - Culvert 6 NPR
CARRY FORWARD Hydraulic Works
CARRY FORWARD Pedestrian Road Alignement PE 20,94
CARRY FORWARD
20,94 16.220,39
CARRY FORWARD Hydraulic Works
CARRY FORWARD Pedestrian Road Alignement PE
CARRY FORWARD

- 296 -
Priced Bill of Quantities
03 - Pedestrian Road Alignement PE
006 - Hydraulic Works
028 - Culvert 7
1005 - culverts

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying , fitting and placing un-coated Mild steel / HYSD
764 20.03.00.0
reinforcement complete in foundation
stell ratio 18,66 * 0,100
Total tonne
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item 1,8660
20.04.00.H.0p + 7%)
culvert 18,66
Total cum
Total 1005 - culverts NPR
Total 028 - Culvert 7 NPR
CARRY FORWARD Hydraulic Works
CARRY FORWARD Pedestrian Road Alignement PE
CARRY FORWARD
AMOUNT CARRIED FORWARD
Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation
stell ratio 18,66 * 0,100
Total tonne
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item
20.04.00.H.0p + 7%)
culvert 18,66 1,8660 110.464,93
Total cum
765 NP.CW.16.01 Total 1005 - culverts NPR
Total 028 - Culvert 7 NPR
CARRY FORWARD Hydraulic Works
CARRY FORWARD Pedestrian Road Alignement PE 18,66
CARRY FORWARD
18,66 16.220,39

- 297 -
Priced Bill of Quantities
03 - Pedestrian Road Alignement PE
006 - Hydraulic Works
029 - Culvert 8
1005 - culverts

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE


DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying , fitting and placing un-coated Mild steel / HYSD
766 20.03.00.0
reinforcement complete in foundation
stell ratio 43,38 * 0,100
Total tonne
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item 4,3380
20.04.00.H.0p + 7%)
culvert 43,38 4,3380 110.464,93
Total cum
767 NP.CW.16.01 Total 1005 - culverts NPR
Total 029 - Culvert 8 NPR
CARRY FORWARD Hydraulic Works
CARRY FORWARD Pedestrian Road Alignement PE 43,38
CARRY FORWARD
43,38 16.220,39

- 298 -
Priced Bill of Quantities
03 - Pedestrian Road Alignement PE
006 - Hydraulic Works
030 - Culvert 9
1005 - culverts

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying , fitting and placing un-coated Mild steel / HYSD
768 20.03.00.0
reinforcement complete in foundation
stell ratio 26,08 * 0,100
Total tonne
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item 2,6080
20.04.00.H.0p + 7%)
culvert 26,08 2,6080 110.464,93
Total cum
769 NP.CW.16.01 Total 1005 - culverts NPR
Total 030 - Culvert 9 NPR
CARRY FORWARD Hydraulic Works
CARRY FORWARD Pedestrian Road Alignement PE 26,08
CARRY FORWARD
26,08 16.220,39
- 299 -
Priced Bill of Quantities
03 - Pedestrian Road Alignement PE
006 - Hydraulic Works
031 - Culvert 10
1005 - culverts

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying , fitting and placing un-coated Mild steel / HYSD
770 20.03.00.0
reinforcement complete in foundation
stell ratio 35,03 * 0,100
Total tonne
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item 3,5030
20.04.00.H.0p + 7%)
culvert 35,03 3,5030 110.464,93
Total cum
771 NP.CW.16.01 Total 1005 - culverts NPR
Total 031 - Culvert 10 NPR
CARRY FORWARD Hydraulic Works
CARRY FORWARD Pedestrian Road Alignement PE 35,03
CARRY FORWARD
35,03 16.220,39
CARRY FORWARD Hydraulic Works
CARRY FORWARD Pedestrian Road Alignement PE
CARRY FORWARD

- 300 -
Priced Bill of Quantities
03 - Pedestrian Road Alignement PE
006 - Hydraulic Works
032 - Culvert A4
1005 - culverts

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying , fitting and placing un-coated Mild steel / HYSD
772 20.03.00.0
reinforcement complete in foundation
stell ratio 22,17 * 0,100
Total tonne
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item 2,2170
20.04.00.H.0p + 7%)
culvert 22,17
Total cum
Total 1005 - culverts NPR
Total 032 - Culvert A4 NPR
CARRY FORWARD Hydraulic Works
CARRY FORWARD Pedestrian Road Alignement PE
CARRY FORWARD
AMOUNT CARRIED FORWARD
Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation
stell ratio 22,17 * 0,100
Total tonne
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item
20.04.00.H.0p + 7%)
culvert 22,17 2,2170 110.464,93
Total cum
773 NP.CW.16.01 Total 1005 - culverts NPR
Total 032 - Culvert A4 NPR
CARRY FORWARD Hydraulic Works
CARRY FORWARD Pedestrian Road Alignement PE 22,17
CARRY FORWARD
22,17 16.220,39

- 301 -
Priced Bill of Quantities
03 - Pedestrian Road Alignement PE
006 - Hydraulic Works
033 - Culvert 11
1005 - culverts

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE


DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying , fitting and placing un-coated Mild steel / HYSD
774 20.03.00.0
reinforcement complete in foundation
stell ratio 24,76 * 0,100
Total tonne
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item 2,4760
20.04.00.H.0p + 7%)
culvert 24,76 2,4760 110.464,93
Total cum
775 NP.CW.16.01 Total 1005 - culverts NPR
Total 033 - Culvert 11 NPR
CARRY FORWARD Hydraulic Works
CARRY FORWARD Pedestrian Road Alignement PE 24,76
CARRY FORWARD
24,76 16.220,39

- 302 -
Priced Bill of Quantities
03 - Pedestrian Road Alignement PE
006 - Hydraulic Works
034 - Culvert A5
1005 - culverts

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying , fitting and placing un-coated Mild steel / HYSD
776 20.03.00.0
reinforcement complete in foundation
stell ratio 20,27 * 0,100
Total tonne
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item 2,0270
20.04.00.H.0p + 7%)
culvert 20,27 2,0270 110.464,93
Total cum
777 NP.CW.16.01 Total 1005 - culverts NPR Total 034 - Culvert A5 NPR Total 006 - Hydraulic Works
NPR
CARRY FORWARD Pedestrian Road Alignement PE
CARRY FORWARD 20,27

20,27 16.220,39
- 303 -
Priced Bill of Quantities
03 - Pedestrian Road Alignement PE
007 - Civil Works
067 - Wall CH 0+080 / CH 0+095
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

778 09.04.02.B.01 AMOUNT CARRIED FORWARD 31


Excavation for Structures Foundation - Ordinary Rock (not requiring blasting) - 9,
Mechanical Means 82
13,00 * ((1,60+1,20)/2) * 1,30
Total cum Total 90 - Excavation NPR
CARRY FORWARD Wall CH 0+080 / CH 0+095 23,66
CARRY FORWARD Civil Works 23,66
CARRY FORWARD Pedestrian Road Alignement PE
CARRY FORWARD
Excavation for Structures Foundation - Ordinary Rock (not requiring blasting) - 9,
Mechanical Means 82
13,00 * ((1,60+1,20)/2) * 1,30
Total cum Total 90 - Excavation NPR
CARRY FORWARD Wall CH 0+080 / CH 0+095
CARRY FORWARD Civil Works
CARRY FORWARD Pedestrian Road Alignement PE
CARRY FORWARD

- 304 -
Priced Bill of Quantities
03 - Pedestrian Road Alignement PE
007 - Civil Works
067 - Wall CH 0+080 / CH 0+095
560 - Structures

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
779 20.01.00.0 AMOUNT CARRIED FORWARD 9.893,01
780 20.03.00.0 Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal mix) in Foundation 110.464,93
781 20.05.00.0 13,00 * 0,70 * 0,10 110.464,93
782 NP.CW.04.01 Total cum 7.780,00
783 NP.CW.04.03 Providing and laying , fitting and placing un-coated Mild steel / HYSD 11.720,00
784 NP.CW.16.01 reinforcement complete in foundation 0,91 16.220,39
785 NP.CW.18.01 steel rate 1,95 * 0,080 0,91 15.188,18
786 NP.CW.19.01 Total tonne 2.900,00
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure steel ratio
4,25 * 0,080
Total tonne
Providing and driving of 25 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
sub-horizontal bolts 6 * 8,00 0,1560
Total m 0,1560
Providing and driving of 32 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
vertical bolts 5 * 7,50
Total m
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item
0,3400
20.04.00.H.0p + 7%)
wall 0,3400
13,00 * 1,00 * 0,30
protection cap
6 * ((0,70*0,70+0,30*0,30)/2) * 0,20
Total cum
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 40 (item
20.02.00.h + 7%) 13,00 * 0,50 * 0,30
48,00
Total cum
Drainage holes (weep holes f 100 mm) shall be provided in the walls every 3 m (longitudinal 48,00
step) and in multiple rows as indicated below, as well as a longitudinal drainage pipe f
100 mm shall be installed at the wall foot, wrapped into a geotextile
4 * 5,00
Total m
Total 560 - Structures NPR
Total 067 - Wall CH 0+080 / CH 0+095 NPR 37,50
CARRY FORWARD Civil Works
37,50
CARRY FORWARD Pedestrian Road Alignement PE
CARRY FORWARD

3,90
0,35

4,25

1,95

1,95

20,00
20,00

- 305 -
Priced Bill of Quantities
03 - Pedestrian Road Alignement PE
007 - Civil Works
068 - Wall CH 0+900 / CH 0+920
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

787 09.04.02.B.01 AMOUNT CARRIED FORWARD 31


Excavation for Structures Foundation - Ordinary Rock (not requiring blasting) - 9,
Mechanical Means 82
10,35 * ((1,60+1,20)/2) * 1,30 18,8
10,35 * ((1,60+1,20)/2) * 2,30 4
Total cum Total 90 - Excavation NPR 33,3
CARRY FORWARD Wall CH 0+900 / CH 0+920 3
CARRY FORWARD Civil Works 52,1
CARRY FORWARD Pedestrian Road Alignement PE 7
CARRY FORWARD
- 306 -
Priced Bill of Quantities
03 - Pedestrian Road Alignement PE
007 - Civil Works
068 - Wall CH 0+900 / CH 0+920
560 - Structures

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

788 20.01.00.0 AMOUNT CARRIED FORWARD 9.893,01


789 20.03.00.0 Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal mix) in Foundation 110.464,93
790 20.05.00.0 20,70 * 0,70 * 0,10 110.464,93
791 NP.CW.04.01 Total cum 7.780,00
792 NP.CW.04.03 Providing and laying , fitting and placing un-coated Mild steel / HYSD 11.720,00
793 NP.CW.16.01 reinforcement complete in foundation 1,45 16.220,39
794 NP.CW.18.01 steel rate 3,11 * 0,080 1,45 15.188,18
795 NP.CW.19.01 Total tonne 2.900,00
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure steel ratio
13,01 * 0,080
Total tonne
Providing and driving of 25 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
sub-horizontal bolts 10 * 8,00 0,2488
Total m 0,2488
Providing and driving of 32 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
vertical bolts 11 * 7,50
Total m
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item
1,0408
20.04.00.H.0p + 7%)
wall 1,0408
10,35 * 1,00 * 0,30
10,35 * 3,00 * 0,30
protection cap
10 * ((0,70*0,70+0,30*0,30)/2) * 0,20
Total cum
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 40 (item
80,00
20.02.00.h + 7%) 20,70 * 0,50 * 0,30
Total cum 80,00
Drainage holes (weep holes f 100 mm) shall be provided in the walls every 3 m (longitudinal
step) and in multiple rows as indicated below, as well as a longitudinal drainage pipe f
100 mm shall be installed at the wall foot, wrapped into a geotextile
8 * 5,00
Total m
Total 560 - Structures NPR 82,50
Total 068 - Wall CH 0+900 / CH 0+920 NPR 82,503
CARRY FORWARD Civil Works
,
CARRY FORWARD Pedestrian Road Alignement PE 1
CARRY FORWARD
1
9
,
3
2
0
,
5
13,018
3,11

3,11

40,00
40,00

- 307 -
Priced Bill of Quantities
03 - Pedestrian Road Alignement PE
007 - Civil Works
069 - Wall CH 0+920 / CH 0+950
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

796 09.04.02.B.01 AMOUNT CARRIED FORWARD 31


Excavation for Structures Foundation - Ordinary Rock (not requiring blasting) - 9,
Mechanical Means 82
41,20 * (3,50*2,50/2)
Total cum Total 90 - Excavation NPR
CARRY FORWARD Wall CH 0+920 / CH 0+950 180,46
CARRY FORWARD Civil Works 180,46
CARRY FORWARD Pedestrian Road Alignement PE
CARRY FORWARD
Excavation for Structures Foundation - Ordinary Rock (not requiring blasting) - 9,
Mechanical Means 82
41,20 * (3,50*2,50/2)
Total cum Total 90 - Excavation NPR
CARRY FORWARD Wall CH 0+920 / CH 0+950
CARRY FORWARD Civil Works
CARRY FORWARD Pedestrian Road Alignement PE
CARRY FORWARD

- 308 -
Priced Bill of Quantities
03 - Pedestrian Road Alignement PE
007 - Civil Works
069 - Wall CH 0+920 / CH 0+950
560 - Structures

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
797 20.01.00.0 AMOUNT CARRIED FORWARD 9.893,01
798 20.03.00.0 Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal mix) in Foundation 110.464,93
799 20.05.00.0 41,20 * 2,40 * 0,10 110.464,93
800 NP.CW.04.01 Total cum 7.780,00
801 NP.CW.04.05 Providing and laying , fitting and placing un-coated Mild steel / HYSD 20.140,00
802 NP.CW.16.01 reinforcement complete in foundation 9,89 16.220,39
803 NP.CW.18.01 steel rate 54,38 * 0,080 9,89 15.188,18
804 NP.CW.19.01 Total tonne 2.900,00
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure steel ratio
234,32 * 0,080
Total tonne
Providing and driving of 25 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
sub-horizontal bolts 20 * 10,00 4,3504
16 * 10,00 4,3504
2 * 13 * 10,00
Total m
Providing and driving of 43 mm dia rock bolt steel nails by drilling holes of 120 mm dia using
cement grouting for fixing
vertical bolts 41 * 2 * 4,00
18,7456
Total m
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item 18,7456
20.04.00.H.0p + 7%)
wall 200,
41,20 * 8,00 * ((0,30+1,10)/2)
00
protection cap 160,
62 * ((0,70*0,70+0,30*0,30)/2) * 0,20
00
Total cum
260,
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 40 (item
00
20.02.00.h + 7%) 41,20 * 2,20 * 0,60
Total cum
Drainage holes (weep holes f 100 mm) shall be provided in the walls every 3 m (longitudinal 620,00
step) and in multiple rows as indicated below, as well as a longitudinal drainage pipe f
100 mm shall be installed at the wall foot, wrapped into a geotextile
36,00 * 5,00
Total m Total 560 - Structures NPR
CARRY FORWARD Civil Works
CARRY FORWARD Pedestrian Road Alignement PE 328,00
CARRY FORWARD
328,00

230,72
3,60

234,32

54,38

54,38

180,00
180,00

- 309 -
Priced Bill of Quantities
03 - Pedestrian Road Alignement PE
007 - Civil Works
069 - Wall CH 0+920 / CH 0+950
560 - Structures

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Total 069 - Wall CH 0+920 / CH 0+950 NPR
CARRY FORWARD Civil Works
CARRY FORWARD Pedestrian Road Alignement PE
CARRY FORWARD
- 310 -
Priced Bill of Quantities
03 - Pedestrian Road Alignement PE
007 - Civil Works
070 - Walls CH 0+110 / CH 0+890
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

805 09.04.02.B.01 AMOUNT CARRIED FORWARD 31


Excavation for Structures Foundation - Ordinary Rock (not requiring blasting) - 9,
Mechanical Means 756, 82
(35,00+80,00+5,00+20,00+15,00+25,00+30,00+5,00+20,00) * ((1,60+1,20)/2) 70
* 2,30 191,
20,00 * (4,25*4,50/2) 20
Total cum Total 90 - Excavation NPR
CARRY FORWARD Walls CH 0+110 / CH 0+890
CARRY FORWARD Civil Works
CARRY FORWARD Pedestrian Road Alignement PE 947,
90
CARRY FORWARD
* 2,30
20,00 * (4,25*4,50/2)
Total cum Total 90 - Excavation NPR
CARRY FORWARD Walls CH 0+110 / CH 0+890
CARRY FORWARD Civil Works
CARRY FORWARD Pedestrian Road Alignement PE
CARRY FORWARD

- 311 -
Priced Bill of Quantities
03 - Pedestrian Road Alignement PE
007 - Civil Works
070 - Walls CH 0+110 / CH 0+890
560 - Structures

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
806 20.01.00.0 AMOUNT CARRIED FORWARD 9.893,01
807 20.03.00.0 Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal mix) in Foundation 110.464,93
808 20.05.00.0 (35,00+80,00+5,00+20,00+15,00+25,00+30,00+5,00+20,00) * 0,70 * 0,10 110.464,93
809 NP.CW.04.01 20,00 * 2,20 * 0,10 7.780,00
810 NP.CW.04.03 Total cum 11.720,00
811 NP.CW.16.01 Providing and laying , fitting and placing un-coated Mild steel / HYSD 16,45 16.220,39
812 NP.CW.18.01 reinforcement complete in foundation 4,40 15.188,18
813 NP.CW.19.01 steel rate 59,25 * 0,080 20,85
Total tonne
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure steel ratio
310,62 * 0,080
Total tonne
Providing and driving of 25 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
sub-horizontal bolts (17+40+2+10+7+12+15+2+10) * 8,00 4,7400
10 * 10,00 4,7400
8 * 10,00
7 * 10,00
Total m
Providing and driving of 32 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
vertical bolts (23+53+3+13+10+16+20+3+13) * 7,50 24,8496
2 * 20 * 8,00 24,8496
Total m
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item 920,
20.04.00.H.0p + 7%) 00
wall 100,
(35,00+80,00+5,00+20,00+15,00+25,00+30,00+5,00+20,00) * 3,00 * 0,30 00
20,00 * 7,00 * ((0,30+1,00)/2) 80,0
protection cap 0
140 * ((0,70*0,70+0,30*0,30)/2) * 0,20 70,0
Total cum 0
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 40 (item
20.02.00.h + 7%) (35,00+80,00+5,00+20,00+15,00+25,00+30,00+5,00+20,00) * 0,50 * 0,30 1.170,00
20,00 * 2,00 * 0,60
Total cum
Drainage holes (weep holes f 100 mm) shall be provided in the walls every 3 m (longitudinal
step) and in multiple rows as indicated below, as well as a longitudinal drainage pipe f
100 mm shall be installed at the wall foot, wrapped
CARRY FORWARD Structures
CARRY FORWARD Walls CH 0+110 / CH 0+890 1.155,00
CARRY FORWARD Civil Works 320,00
CARRY FORWARD Pedestrian Road Alignement PE 1.475,00
CARRY FORWARD

211,50
91,00
8,12

310,62

35,2
5
24,0
0

59,25

- 312 -
Priced Bill of Quantities
03 - Pedestrian Road Alignement PE
007 - Civil Works
070 - Walls CH 0+110 / CH 0+890
560 - Structures

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD 2.900,


into a geotextile (12+27+3+6+5+8+10+2+6) * 5,00 395, 00
(3*6) * 5,00 00
Total m Total 560 - Structures NPR 90,0
Total 070 - Walls CH 0+110 / CH 0+890 NPR 0
Total 007 - Civil Works NPR
485,
CARRY FORWARD Pedestrian Road Alignement PE 00
CARRY FORWARD
- 313 -
Priced Bill of Quantities
03 - Pedestrian Road Alignement PE
202 - Pedestrain rockshed
001 - Exavation, Filling and Paving
1420 - Paving

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

814 12.01.00.a AMOUNT CARRIED FORWARD 1.996,11


815 13.03.00.0 Providing and laying Granular Sub-Base Material - By Mechanical means 1056,71 12.172,63
816 13.04.00.A Total cum 9.577,26
817 13.09.00.B.01 Bituminous Macadam 355,85 73,42
Total cum 1.056,71
Bituminous Penetration Macadam - 50 mm thick 89,06 1.056,71
Total sqm
20 mm thick Open-Graded Premix Carpet using Bituminous (Paving bitumen / Modified
bitumen) Binder - By Mechanical Means - Mechanical method using Hot Mix Plant
50 mm 355,85
(50/20) * 4277,28 355,85
Total sqm
Total 1420 - Paving NPR
Total 001 - Exavation, Filling and Paving NPR
CARRY FORWARD Pedestrain rockshed 89,06
CARRY FORWARD Pedestrian Road Alignement PE 89,06
CARRY FORWARD

10.693,20
10.693,20
- 314 -
Priced Bill of Quantities
03 - Pedestrian Road Alignement PE
202 - Pedestrain rockshed
201 - Exavation and Filling
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Roadway Excavation in Ordinary Rock - Roadway Excavation in hard rock by
818 09.01.03.B
Mechanical Means .
pedestrian rockshed 7510,27
square 3087,42
Total cum Total 90 - Excavation NPR
7.510,27
CARRY FORWARD Exavation and Filling
CARRY FORWARD Pedestrain rockshed
CARRY FORWARD Pedestrian Road Alignement PE 3.087,42
CARRY FORWARD 10.597,69 38
3,
49
square 3087,42
Total cum Total 90 - Excavation NPR
CARRY FORWARD Exavation and Filling
CARRY FORWARD Pedestrain rockshed
CARRY FORWARD Pedestrian Road Alignement PE
CARRY FORWARD

- 315 -
Priced Bill of Quantities
03 - Pedestrian Road Alignement PE
202 - Pedestrain rockshed
201 - Exavation and Filling
175 - Embankment/Filling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
AMOUNT CARRIED FORWARD
Construction of Embankment with Material Deposited from Roadway Cutting -
819 09.09.00.b
With machine pedestrian rockshed 761,05
square
842,90
Total cum
761,05
Providing suitable material and Back filling behind abutment, wing wall and return wall -
Granular Material
backfilling pedestrian rockshed 11290,70 842,90
Total cum
Total 175 - Embankment/Filling NPR 1.603,95 364,83
820 09.11.00.A Total 201 - Exavation and Filling NPR
CARRY FORWARD Pedestrain rockshed
CARRY FORWARD Pedestrian Road Alignement PE
CARRY FORWARD
11.290,70

11.290,70 1.500,45

- 316 -
Priced Bill of Quantities
03 - Pedestrian Road Alignement PE
202 - Pedestrain rockshed
204 - Consolidamento parete lungo il manufatto
160 - Protezione scavi

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


150 mm thick shotcreting for excavated rock stabilisation for external areas Rockshed
821 NP.CW.01.02
connection By-pass 1
121,61
Rockshed connection By-pass 2 121,61
Rockshed connection By-pass 3 121,61 121,61
Total sqm
Wire mesh D. 5/100/100 for Shotcrete - external areas Rockshed connection By-pass 1 121,61
121,61
Rockshed connection By-pass 2 121,61
Rockshed connection By-pass 3 121,61 121,61
Total sqm
364,83 8.500,00
Providing and driving of 25 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
822 NP.CW.02.01 cement grouting for fixing
Rockshed connection By-pass 1 32 * 4,50
Rockshed connection By-pass 2 32 * 4,50
Rockshed connection By-pass 3 32 * 4,50 121,61
Total m
Total 160 - Protezione scavi NPR
Total 204 - Consolidamento parete lungo il manufatto NPR 121,61
CARRY FORWARD Pedestrain rockshed
CARRY FORWARD Pedestrian Road Alignement PE 121,61
CARRY FORWARD
364,83 521,01
823 NP.CW.04.01

144,00

144,00

144,00
432,00 7.780,00
- 317 -
Priced Bill of Quantities
03 - Pedestrian Road Alignement PE
202 - Pedestrain rockshed
205 - Rockshed Section
280 - Foundation Slabs

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal mix) in Foundation
824 20.01.00.0
Rockshed
780,15 * 5,90 * 0,10
Rockshed connection By-pass 1 2,24 * 6,44 * 0,10
Rockshed connection By-pass 2 1,54 * 6,44 * 0,10
460,29
Rockshed connection By-pass 3 0,60 * 6,44 * 0,10
Total cum
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 Rockshed
1,44
779,95 * 5,70 * 0,60
779,95 * ((1,10+0,50)/2) * 0,60
Rockshed connection By-pass 1 2,24 * 6,24 * 0,60 0,99
Rockshed connection By-pass 2 1,54 * 6,24 * 0,60
Rockshed connection By-pass 3 0,60 * 6,24 * 0,60
Total cum 0,39
Providing and laying , fitting and placing un-coated Mild steel / HYSD 463,11 9.893,01
reinforcement complete in foundation
825 20.02.00.G Rockshed
steel ratio 165 kg/cum 3041,81 * 0,165
Rockshed connection By-pass 1-2-3 steel ratio 165 kg/cum
16,41 * 0,165 2.667,43
Total tonne Total 280 - Foundation Slabs NPR 374,38
CARRY FORWARD Rockshed Section
CARRY FORWARD Pedestrain rockshed
CARRY FORWARD Pedestrian Road Alignement PE 8,39
CARRY FORWARD
5,77

2,25
3.058,22 13.966,07
826 20.03.00.0

501,8987

2,7077

504,6064 110.464,93
- 318 -
Priced Bill of Quantities
03 - Pedestrian Road Alignement PE
202 - Pedestrain rockshed
205 - Rockshed Section
300 - Vertical Elements

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure Rockshed
827 20.05.00.0
steel ratio 190 kg/cum
3716,56 * 0,190
Rockshed connection By-pass 1-2-3 steel ratio 145 kg/cum
30,07 * 0,145
Total tonne 706,1464
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item
20.04.00.H.0p + 7%)
ROCKSHED
4,3602
upstream side wall 779,95 * 3,90 * 0,60
-3 * 4,04 * 3,90 * 0,60
downstream side wall 779,95 * 3,90 * 0,60 710,5066 110.464,93
828 NP.CW.16.01 -389 * 1,00 * 2,00 * 0,60
wall on slab
779,95 * 1,80 * ((0,30+0,50)/2) ROCKSHED CONNECTION BY-PASS 1
side walls
2 * 2,74 * 0,60 * 3,90
closing wal 2,83 * 0,30
ROCKSHED CONNECTION BY-PASS 2 1.825,08
side walls
-28,36
2 * 2,04 * 0,60 * 3,90
closing wal 2,83 * 0,30
ROCKSHED CONNECTION BY-PASS 3 1.825,08
side walls
-466,80
2 * 1,10 * 0,60 * 3,90
closing wal 2,83 * 0,30
Total cum Total 300 - Vertical Elements NPR 561,56
CARRY FORWARD Rockshed Section
CARRY FORWARD Pedestrain rockshed
CARRY FORWARD Pedestrian Road Alignement PE
CARRY FORWARD 12,82

0,85
CARRY FORWARD Pedestrian Road Alignement PE
CARRY FORWARD

9,55

0,85

5,15

0,85
3.746,63 16.220,39

- 319 -
Priced Bill of Quantities
03 - Pedestrian Road Alignement PE
202 - Pedestrain rockshed
205 - Rockshed Section
574 - Impermeabilizzazioni

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying Cement concrete wearing coat M-30 grade including reinforcement
829 20.12.00.0
Rockshed
(779,95-5,04-5,04-5,04) * 2,20
Total cum
Wire mesh D. 6/100/100 for Shotcrete - external areas Rockshed 1.682,63
(779,95-5,04-5,04-5,04) * 8,80
Rockshed connection By-pass 1 14,45 * 3,40 1.682,63 24.081,94
Rockshed connection By-pass 2 14,45 * 2,70
830 NP.CW.02.02 Rockshed connection By-pass 3 14,45 * 1,75
Total sqm
Supply and installation of PVC waterstop joint 30 * 17,30
Total m 6.730,50
Waterproofing system for civil works: composite drainage sheet, PVC membrane, protection
sheet
Rockshed 49,13
(779,95-5,04-5,04-5,04) * 11,00
Rockshed connection By-pass 1 14,45 * 3,40
39,02
Rockshed connection By-pass 2 14,45 * 2,70
Rockshed connection By-pass 3 14,45 * 1,75
Total sqm 25,29
Waterproofing system for civil works: composite drainage sheet, PVC membrane, protection
sheet 6.843,94 666,05
831 NP.CW.09.01 Rockshed
(779,95-5,04-5,04-5,04) * 8,80 * 0,10
Rockshed connection By-pass 1 14,45 * 3,40 * 0,10 519,00
Rockshed connection By-pass 2 14,45 * 2,70 * 0,10 519,00 1.464,50
Rockshed connection By-pass 3 14,45 * 1,75 * 0,10
Total sqm Total 574 - Impermeabilizzazioni NPR
CARRY FORWARD Rockshed Section
CARRY FORWARD Pedestrain rockshed
CARRY FORWARD Pedestrian Road Alignement PE
CARRY FORWARD
Waterproofing system for civil works: composite drainage sheet, PVC membrane, protection
sheet
Rockshed
(779,95-5,04-5,04-5,04) * 8,80 * 0,10
Rockshed connection By-pass 1 14,45 * 3,40 * 0,10
Rockshed connection By-pass 2 14,45 * 2,70 * 0,10
Rockshed connection By-pass 3 14,45 * 1,75 * 0,10
832 NP.CW.10.01 Total sqm Total 574 - Impermeabilizzazioni NPR
CARRY FORWARD Rockshed Section
CARRY FORWARD Pedestrain rockshed
CARRY FORWARD Pedestrian Road Alignement PE
8.413,13
CARRY FORWARD

49,13

39,02

25,29
8.526,57 2.800,00
833 NP.CW.10.01

673,05

4,91

3,90

2,53
684,39 2.800,00

- 320 -
Priced Bill of Quantities
03 - Pedestrian Road Alignement PE
202 - Pedestrain rockshed
205 - Rockshed Section
680 - Slabs

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and laying , fitting and placing HYSD bar reinforcement in super- structure
834 20.09.00.0
Rockshed
steel ratio 205 kg/cum 2566,04 * 0,205
Rockshed connection By-pass 1-2-3 steel ratio 195 kg/cum
21,56 * 0,195
Total tonne
Reinforced/ Pre-stressed cement concrete in super-structure. RCC/PSC Grade M 40 - For solid 526,0382
slab super-structure. (item 20.04.00.H.0p + 2,75%)
Rockshed Slab
779,95 * 4,70 * 0,70
Rockshed connection By-pass 1 Slab 4,2042
2,74 * 5,24 * 0,70
Rockshed connection By-pass 2 Slab 530,2424 112.276,18
835 NP.CW.17.01 2,04 * 5,24 * 0,70
Rockshed connection By-pass 3 Slab
1,10 * 5,24 * 0,70
Total cum
Total 680 - Slabs NPR
Total 205 - Rockshed Section NPR
2.566,04
CARRY FORWARD Pedestrain rockshed
CARRY FORWARD Pedestrian Road Alignement PE
CARRY FORWARD
1,10 * 5,24 * 0,70
Total cum
Total 680 - Slabs NPR
Total 205 - Rockshed Section NPR
CARRY FORWARD Pedestrain rockshed
CARRY FORWARD Pedestrian Road Alignement PE
CARRY FORWARD
10,05

7,48

4,03

2.587,60 17.501,69

- 321 -
Priced Bill of Quantities
03 - Pedestrian Road Alignement PE
202 - Pedestrain rockshed
206 - Road works and secondary civil works
1420 - Paving

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing and Laying Reinforced Cement Concrete Pipe for culverts including fixing collar
836 07.03.00.A
- 300 mm internal dia.
external drainage pipes 3 * 780,00
Total m
Providing and laying Granular Sub-Base Material - By Mechanical means 779,95 * 3,20 * 2.340,00
((0,25+0,21)/2)
Total cum 2.340,00 5.116,63
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 779,95 * 3,20 * 0,05
837 12.01.00.a Total cum
Concrete Drainage Channel whit cast iron grill - inner section: 200 x 200 mm internal drainage
574,04
channel
780,00 574,04 1.996,11
Total m
Total 1420 - Paving NPR
Total 206 - Road works and secondary civil works NPR
CARRY FORWARD Pedestrain rockshed
CARRY FORWARD Pedestrian Road Alignement PE
CARRY FORWARD
Total cum
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 779,95 * 3,20 * 0,05
Total cum
Concrete Drainage Channel whit cast iron grill - inner section: 200 x 200 mm internal drainage
channel
780,00
Total m
838 20.02.00.G
Total 1420 - Paving NPR
Total 206 - Road works and secondary civil works NPR 124,79
CARRY FORWARD Pedestrain rockshed
124,79 13.966,07
CARRY FORWARD Pedestrian Road Alignement PE
839 NP.UW.18.02 CARRY FORWARD

780,00

780,00 33.500,00

- 322 -
Priced Bill of Quantities
03 - Pedestrian Road Alignement PE
202 - Pedestrain rockshed
207 - Cushion layer (Leca)
175 - Embankment/Filling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Providing suitable material and Back filling behind abutment, wing wall and return wall -
840 09.11.00.A
Granular Material
7690,90 * 0,20
Total cum
Providing and laying of a geotextile filter between pitching and embankment slopes
18211,01
Total sqm
Backfilling whit Leca Fill backfilling pedestrian rockshed 13920,20
Total cum
Total 175 - Embankment/Filling NPR
AMOUNT CARRIED FORWARD
Providing suitable material and Back filling behind abutment, wing wall and return wall -
Granular Material
7690,90 * 0,20
Total cum 1.538,18
Providing and laying of a geotextile filter between pitching and embankment slopes
18211,01 1.538,18 1.500,45
841 24.05.00.0 Total sqm
Backfilling whit Leca Fill backfilling pedestrian rockshed 13920,20
Total cum
18.211,01
Total 175 - Embankment/Filling NPR
Total 207 - Cushion layer (Leca) NPR 18.211,01 114,66
Total 202 - Pedestrain rockshed NPR
842 NP.CW.03.01
CARRY FORWARD Pedestrian Road Alignement PE
CARRY FORWARD
13.920,20

13.920,20 16.000,00

- 323 -
Priced Bill of Quantities
03 - Pedestrian Road Alignement PE
203 - ROADSIDE ROCK STABILIZATION
208 - Shotcrete + bolts
160 - Protezione scavi

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


150 mm thick shotcreting for excavated rock stabilisation for external areas 190,00 * 10,20
843 NP.CW.01.02
Total sqm
Wire mesh D. 6/100/100 for Shotcrete - external areas 190,00 * 10,20 1.938,00
Total sqm
Providing and driving of 32 mm dia rock bolt steel nails by drilling holes of 110 mm dia using 1.938,00 8.500,00
844 NP.CW.02.02 cement grouting for fixing
484 * 12,00
Total m 1.938,00
Drainage pipes D.100 mm, wrapped into a geotextile non-woven layer, 4 m long, having a 1.938,00 666,05
gradient of 5 ° above horizontal plane, shall be installed on the shotcrete wall, having a pattern
845 NP.CW.04.03 of 3m x 3m
215 * 6,00
Total m 5.808,00
Total 160 - Protezione scavi NPR
Total 208 - Shotcrete + bolts NPR 5.808,00 11.720,00
Total 203 - ROADSIDE ROCK STABILIZATION NPR
846 NP.CW.19.02
CARRY FORWARD Pedestrian Road Alignement PE
CARRY FORWARD

1.290,00

1.290,00 3.000,00
- 324 -
Priced Bill of Quantities
03 - Pedestrian Road Alignement PE
204 - ROADSIDE ROCK EXCAVATION
208 - Shotcrete + bolts
160 - Protezione scavi

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


847 NP.CW.01.02 150 mm thick shotcreting for excavated rock stabilisation for external areas

CH 0+040 - CH 0+070
30,00 * ((3,90+3,40)/2) 109,50
CH 0+110 - CH 0+140
30,00 * ((6,00+4,80)/2) 162,00
CH 0+170 - CH 0+200
30,00 * 9,00 270,00
CH 0+220 - CH 0+230
10,00 * 9,00 90,00
CH 0+260 - CH 0+280
20,00 * 4,50 90,00
CH 0+310 - CH 0+340
30,00 * ((5,50+4,20)/2) 145,50
CH 0+310 - CH 0+340
15,00 * 7,40 111,00
CH 0+540 - CH 0+560
40,00 * ((5,80+7,70)/2) 270,00
CH 0+580
7,00 * 6,60 46,20
CH 0+640 - CH 0+660
35,00 * 4,20 147,00
CH 0+720
5,00 * 5,40 27,00
CH 0+740
15,00 * 5,40 81,00
CH 0+780 - CH 0+830
50,00 * 4,00 200,00
CH 0+880
5,00 * 4,00 20,00
Total sqm 1.769,20 8.500,
00
848 NP.CW.02.02 Wire mesh D. 6/100/100 for Shotcrete - external areas

CH 0+040 - CH 0+070
30,00 * ((3,90+3,40)/2) 109,50
CH 0+110 - CH 0+140
30,00 * ((6,00+4,80)/2) 162,00
CH 0+170 - CH 0+200
30,00 * 9,00 270,00
CH 0+220 - CH 0+230
10,00 * 9,00 90,00
CH 0+260 - CH 0+280
20,00 * 4,50 90,00
CH 0+310 - CH 0+340
30,00 * ((5,50+4,20)/2) 145,50
CH 0+310 - CH 0+340

CARRY FORWARD Protezione scavi

CARRY FORWARD Shotcrete + bolts


CARRY FORWARD ROADSIDE ROCK EXCAVATION
CARRY FORWARD Pedestrian Road Alignement PE
CARRY FORWARD
- 325 -
Priced Bill of Quantities
03 - Pedestrian Road Alignement PE
204 - ROADSIDE ROCK EXCAVATION
208 - Shotcrete + bolts
160 - Protezione scavi

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


15,00 * 7,40 111,00
CH 0+540 - CH 0+560
40,00 * ((5,80+7,70)/2) 270,00
CH 0+580
7,00 * 6,60 46,20
CH 0+640 - CH 0+660
35,00 * 4,20 147,00
CH 0+720
5,00 * 5,40 27,00
CH 0+740
15,00 * 5,40 81,00
CH 0+780 - CH 0+830
50,00 * 4,00 200,00
CH 0+880
5,00 * 4,00 20,00
Total sqm 1.769,20 66
6,
849 NP.CW.04.03 Providing and driving of 32 mm dia rock bolt steel nails by drilling holes of 110
05
mm dia using cement grouting for fixing
CH 0+040 - CH 0+070
15 * 5,00 75,00
15 * 6,00 90,00
CH 0+110 - CH 0+140
15 * 5,00 75,00
15 * 6,00 90,00
7 * 8,00 56,00
CH 0+170 - CH 0+200
15 * 5,00 75,00
15 * 6,00 90,00
15 * 8,00 120,00
15 * 8,00 120,00
CH 0+220 - CH 0+230
5 * 5,00 25,00
5 * 6,00 30,00
5 * 8,00 40,00
5 * 8,00 40,00
CH 0+260 - CH 0+270
10 * 5,00 50,00
10 * 6,00 60,00
CH 0+310 - CH 0+340
15 * 5,00 75,00
15 * 6,00 90,00
CH 0+310 - CH 0+340
7 * 5,00 35,00
7 * 6,00 42,00
7 * 8,00 56,00

CARRY FORWARD Protezione scavi

CARRY FORWARD Shotcrete + bolts


CARRY FORWARD ROADSIDE ROCK EXCAVATION
CARRY FORWARD Pedestrian Road Alignement PE
CARRY FORWARD
- 326 -
Priced Bill of Quantities
03 - Pedestrian Road Alignement PE
204 - ROADSIDE ROCK EXCAVATION
208 - Shotcrete + bolts
160 - Protezione scavi

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


CH 0+540 - CH 0+560
20 * 5,00 100,00
20 * 6,00
20 * 8,00 120,00
CH 0+580 160,00
3 * 5,00
3 * 6,00
3 * 8,00 15,00
CH 0+640 - CH 0+660
18,00
17 * 5,00
17 * 6,00 24,00
13 * 8,00
8 * 8,00 85,00
CH 0+720
2 * 5,00 102,00
2 * 6,00 104,00
CH 0+740
7 * 5,00 64,00
7 * 6,00
CH 0+780 - CH 0+830 10,00
25 * 5,00
25 * 6,00 12,00
CH 0+880
2 * 5,00 35,00
2 * 6,00
Total m 42,00
Drainage pipes D.100 mm, wrapped into a geotextile non-woven layer, 4 m long, having a
gradient of 5 ° above horizontal plane, shall be installed on the shotcrete wall, having a pattern 125,00
of 3m x 3m
196 * 6,00
Total m
Total 160 - Protezione scavi NPR
Total 208 - Shotcrete + bolts NPR
Total 204 - ROADSIDE ROCK EXCAVATION NPR
Total 03 - Pedestrian Road Alignement PE NPR
CH 0+880
2 * 5,00
2 * 6,00
Total m
Drainage pipes D.100 mm, wrapped into a geotextile non-woven layer, 4 m long, having a
gradient of 5 ° above horizontal plane, shall be installed on the shotcrete wall, having a pattern
of 3m x 3m
196 * 6,00 150,00
Total m
Total 160 - Protezione scavi NPR 10,00
Total 208 - Shotcrete + bolts NPR
Total 204 - ROADSIDE ROCK EXCAVATION NPR 12,00
Total 03 - Pedestrian Road Alignement PE NPR 2.522,00 11.720,00
CARRY FORWARD
850 NP.CW.19.02

1.176,00

1.176,00 3.000,00

- 327 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
001 - Road Works
001 - Exavation, Filling and Paving
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

851 09.01.03.B AMOUNT CARRIED FORWARD 38


Roadway Excavation in Ordinary Rock - Roadway Excavation in hard rock by 3,
Mechanical Means . 49
4228,19
Total cum Total 90 - Excavation NPR
CARRY FORWARD Exavation, Filling and Paving 4.228,19
CARRY FORWARD Road Works 4.228,19
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD
Roadway Excavation in Ordinary Rock - Roadway Excavation in hard rock by 3,
Mechanical Means . 49
4228,19
Total cum Total 90 - Excavation NPR
CARRY FORWARD Exavation, Filling and Paving
CARRY FORWARD Road Works
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD

- 328 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
001 - Road Works
001 - Exavation, Filling and Paving
175 - Embankment/Filling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
852 09.09.00.b AMOUNT CARRIED FORWARD 36
Construction of Embankment with Material Deposited from Roadway Cutting - With 4,
machine 83
800,76
Total cum Total 175 - Embankment/Filling NPR
CARRY FORWARD Exavation, Filling and Paving 800,76
CARRY FORWARD Road Works 800,76
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD

- 329 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
001 - Road Works
001 - Exavation, Filling and Paving
980 - Precast rectangular channeling
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

853 NP.CW.20.01 AMOUNT CARRIED FORWARD 4.900,


Providing and laying concrete channeling - Laying (Joining) of Precast concrete panel 00
550,00
Total m Total 980 - Precast rectangular channeling NPR
CARRY FORWARD Exavation, Filling and Paving
CARRY FORWARD Road Works 550,00
CARRY FORWARD Road Alignement MR2 - Mai... 550,00
CARRY FORWARD

- 330 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
001 - Road Works
001 - Exavation, Filling and Paving
1420 - Paving

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

854 12.01.00.a AMOUNT CARRIED FORWARD 1.996,11


855 13.03.00.0 Providing and laying Granular Sub-Base Material - By Mechanical means 4061,36 12.172,63
856 13.04.00.A Total cum 9.577,26
857 13.09.00.B.01 Bituminous Macadam 959,78 73,42
Total cum 4.061,36
Bituminous Penetration Macadam - 50 mm thick 242,95 4.061,36
Total sqm
20 mm thick Open-Graded Premix Carpet using Bituminous (Paving bitumen / Modified
bitumen) Binder - By Mechanical Means - Mechanical method using Hot Mix Plant
50 mm 959,78
2,5 * 4859,00 959,78
Total sqm
Total 1420 - Paving NPR
Total 001 - Exavation, Filling and Paving NPR
CARRY FORWARD Road Works 242,95
242,95
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD

12.147,50
12.147,50
- 331 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
001 - Road Works
004 - Signaling
1610 - Signaling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Road Marking with Hot Applied Thermoplastic Compound with Reflectorizing Glass Beads on
858 15.09.00.
Bituminous Surface
0.01
On smooth surface (similar to Asphalt concrete and rigid pavement) Road Marking
2 * 548,90 * 0,25
2 * 548,90 * 0,20
Painting Lines, Dashes, Arrows etc. 50,00
Total sqm 274,45
Total 1610 - Signaling NPR Total 004 - Signaling NPR Total 001 - Road Works NPR 219,56
CARRY FORWARD Road Alignement MR2 - Mai... 50,00
CARRY FORWARD
544,01 1.745,
53
Total 1610 - Signaling NPR Total 004 - Signaling NPR Total 001 - Road Works NPR
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD

- 332 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
002 - Rockside rock excavation
006 - Tecco Mesh and Shotcrete CH 30+250 / CH 30+450
160 - Protezione scavi

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


859 NP.CW.01.02 150 mm thick shotcreting for excavated rock stabilisation for external areas

CH 2+130 / CH 2+310
20,00 * 1,00 20,00
20,00 * 6,00 120,00
20,00 * 4,00 80,00
20,00 * 6,50 130,00
20,00 * 5,00 100,00
20,00 * 2,00 40,00
20,00 * 7,50 150,00
20,00 * 3,50 70,00
20,00 * 3,00 60,00
20,00 * 2,00 40,00
CH 2+350 / CH 2+590
20,00 * 1,00 20,00
20,00 * 4,00 80,00
20,00 * 2,50 50,00
20,00 * 1,00 20,00
20,00 * 5,00 100,00
20,00 * 1,00 20,00
20,00 * 5,50 110,00
20,00 * 3,50 70,00
20,00 * 2,00 40,00
20,00 * 2,00 40,00
20,00 * 1,00 20,00
20,00 * 1,50 30,00
20,00 * 1,00 20,00
Total sqm 1.430,00 8.500,
00
860 NP.CW.02.02 Wire mesh D. 6/100/100 for Shotcrete - external areas

CH 2+130 / CH 2+310
20,00 * 1,00 20,00
20,00 * 6,00 120,00
20,00 * 4,00 80,00
20,00 * 6,50 130,00
20,00 * 5,00 100,00
20,00 * 2,00 40,00
20,00 * 7,50 150,00
20,00 * 3,50 70,00
20,00 * 3,00 60,00
20,00 * 2,00 40,00
CH 2+350 / CH 2+590
20,00 * 1,00 20,00
20,00 * 4,00 80,00
20,00 * 2,50 50,00
20,00 * 1,00 20,00

CARRY FORWARD Protezione scavi

CARRY FORWARD Tecco Mesh and Shotcrete CH 30+25...


CARRY FORWARD Rockside rock excavation
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD
- 333 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
002 - Rockside rock excavation
006 - Tecco Mesh and Shotcrete CH 30+250 / CH 30+450
160 - Protezione scavi

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
AMOUNT CARRIED FORWARD
20,00 * 5,00 100,00
20,00 * 1,00 20,00
20,00 * 5,50 110,00
20,00 * 3,50 70,00
20,00 * 2,00 40,00
20,00 * 2,00 40,00
20,00 * 1,00 20,00
20,00 * 1,50 30,00
20,00 * 1,00 20,00
Total sqm 1.430,00 66
6,
861 NP.CW.04.01 Providing and driving of 25 mm dia rock bolt steel nails by drilling holes of 110
05
mm dia using cement grouting for fixing
CH 2+130 / CH 2+310
10 * 5,00 50,00
10 * 6,00 60,00
10 * 8,00 80,00
(10*2) * 10,00 200,00
10 * 5,00 50,00
10 * 6,00 60,00
10 * 6,00 60,00
10 * 8,00 80,00
(10*2) * 10,00 200,00
10 * 5,00 50,00
10 * 6,00 60,00
10 * 8,00 80,00
10 * 5,00 50,00

10 * 6,00 60,00
10 * 8,00 80,00
(10*2) * 10,00 200,00
10 * 5,00 50,00
10 * 6,00 60,00
10 * 5,00 50,00
10 * 6,00 60,00
10 * 5,00 50,00
CH 2+350 / CH 2+590
10 * 5,00 50,00
10 * 5,00 50,00
10 * 6,00 60,00
10 * 5,00 50,00
10 * 6,00 60,00
10 * 5,00 50,00

10 * 5,00 50,00

CARRY FORWARD Protezione scavi

CARRY FORWARD Tecco Mesh and Shotcrete CH 30+25...


CARRY FORWARD Rockside rock excavation
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD
- 334 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
002 - Rockside rock excavation
006 - Tecco Mesh and Shotcrete CH 30+250 / CH 30+450
160 - Protezione scavi
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


10 * 6,00 60,00
10 * 8,00
80,00
10 * 5,00
10 * 5,00 50,00
10 * 6,00
10 * 8,00 50,00
10 * 5,00 60,00
10 * 6,00
10 * 5,00 80,00
10 * 5,00 50,00
10 * 5,00
10 * 5,00 60,00
10 * 5,00 50,00
Total m
Drainage pipes D.100 mm, wrapped into a geotextile non-woven layer, 4 m long, having a 50,00
gradient of 5 ° above horizontal plane, shall be installed on the shotcrete wall, having a pattern
of 3m x 3m 50,00
158 * 6,00
50,00
Total m
Total 160 - Protezione scavi NPR 50,00
Total 006 - Tecco Mesh and Shotcrete CH 30+250 / CH 30+450
2.800,00 7.780,00
NPR
862 NP.CW.19.02 Total 002 - Rockside rock excavation NPR
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD
948,00

948,00 3.000,00
- 335 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
003 - Rockfall Protection Measures
006 - Tecco Mesh and Shotcrete CH 30+250 / CH 30+450
160 - Protezione scavi

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


150 mm thick shotcreting for excavated rock stabilisation for external areas A06
863 NP.CW.01.02
2765,00 * (40%)
A07
4995,00 * (40%) A08
3935,00 * (40%) 1.106,00
Total sqm
Wire mesh D. 6/100/100 for Shotcrete - external areas A06
1.998,00
2765,00 * (40%)
A07
4995,00 * (40%) A08 1.574,00
3935,00 * (40%)
4.678,00 8.500,00
Total sqm
864 NP.CW.02.02 Providing and driving of 28 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
A06
(1/(2,00*2,00)) * 2765,00 * (40%) * 6,00 1.106,00
A07
(1/(2,00*2,00)) * 4995,00 * (40%) * 6,00
A08 1.998,00
(1/(2,00*2,00)) * 3935,00 * (40%) * 6,00
Total m
1.574,00
Providing and driving of 32 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing 4.678,00 666,05
A06
865 NP.CW.04.02
(1/(2,50*2,50)) * 2765,00 * 6,00
A07
(1/(2,50*2,50)) * 4995,00 * 6,00
A08
(1/(2,50*2,50)) * 3935,00 * 6,00 1.659,00
Total m
Installation of Wiremesh system as per design and specification including the
construction at site, and use of helicopter or the crane, whichever is feasible & equivalent to 2.997,00
Geobrugg TECCO G65/3 high tensile steel wire mesh
A06 2765,00 A07 4995,00 A08 3935,00 2.361,00
Total sqm
CARRY FORWARD Protezione scavi CARRY FORWARD Tecco Mesh and Shotcrete 7.017,00 9.350,00
866 NP.CW.04.03 CH 30+25... CARRY FORWARD Rockfall Protection Measures
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD

2.654,40

4.795,20

3.777,60
11.227,20 11.720,00
867 NP.CW.06.01

2.765,00

4.995,00

3.935,00
11.695,00 6.000,00
- 336 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
003 - Rockfall Protection Measures
006 - Tecco Mesh and Shotcrete CH 30+250 / CH 30+450
160 - Protezione scavi

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

868 NP.CW.19.02 AMOUNT CARRIED FORWARD 3.000,


Drainage pipes D.100 mm, wrapped into a geotextile non-woven layer, 4 m long, having a 00
gradient of 5 ° above horizontal plane, shall be installed on the shotcrete wall, having a pattern
of 3m x 3m
515 * 6,00
Total m 3.090,00
Total 160 - Protezione scavi NPR
3.090,00
Total 006 - Tecco Mesh and Shotcrete CH 30+250 / CH 30+450
NPR
CARRY FORWARD Rockfall Protection Measures
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD
- 337 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
003 - Rockfall Protection Measures
009 - ROCKFALL BARRIER
160 - Protezione scavi

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Installation of Rocknet Works to withstand 3000kJ R03
869 NP.CW.07.02
141,50 * 4,00
R04
23,50 * 4,00
Total sqm 566,00
Installation of Rocknet Works to withstand 5000kJ R05
121,00 * 5,00 94,00
R06
112,00 * 5,00 660,00 40.400,00
870 NP.CW.07.03 Total sqm
Total 160 - Protezione scavi NPR
Total 009 - ROCKFALL BARRIER NPR
Total 003 - Rockfall Protection Measures NPR 605,00
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD
560,00
1.165,00 53.000,00
- 338 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
006 - Hydraulic Works
035 - Culvert 12
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

871 09.04.01.B.01 AMOUNT CARRIED FORWARD 11


Excavation for Structures Foundation - Ordinary soil - Mechanical Means - Depth upto 3 m 9,
79,74 93
Total cum Total 90 - Excavation NPR
CARRY FORWARD Culvert 12
CARRY FORWARD Hydraulic Works 79,74
CARRY FORWARD Road Alignement MR2 - Mai... 79,74
CARRY FORWARD
Excavation for Structures Foundation - Ordinary soil - Mechanical Means - Depth upto 3 m 9,
79,74 93
Total cum Total 90 - Excavation NPR
CARRY FORWARD Culvert 12
CARRY FORWARD Hydraulic Works
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD

- 339 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
006 - Hydraulic Works
035 - Culvert 12
180 - Filling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
872 09.09.00.b AMOUNT CARRIED FORWARD 36
Construction of Embankment with Material Deposited from Roadway Cutting - With 4,
machine 83
13,79
Total cum Total 180 - Filling NPR
CARRY FORWARD Culvert 12 13,79
CARRY FORWARD Hydraulic Works 13,79
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD

- 340 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
006 - Hydraulic Works
035 - Culvert 12
1005 - culverts
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

873 20.02.00.A AMOUNT CARRIED FORWARD 11.539,20


874 20.02.00.G Plain/Reinforced Cement Concrete in Foundation - PCC Grade M 15 culvert 13.966,07
875 20.03.00.0 12,50 * 2,60 * 0,10 110.464,93
876 20.04.00.G.0p shaft 14.843,16
3,25
877 20.05.00.0 2,60 * 2,60 * 0,20 110.464,93
1,35
878 22.01.00.A Total cum 437.000,00
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 culvert
24,75
shaft 2,03
Total cum 4,60
Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation
stell ratio 26,78 * 0,100
Total tonne 24,75
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 30 - Height upto 5 m 2,03
culvert 24,75
shaft 15,36
Total cum
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure stell ratio 26,78
40,11 * 0,100
Total tonne
Providing, Fabricating, assembling and erecting structural steel
components/elements
steel grating cover 0,250
Total tonne
Total 1005 - culverts NPR 2,6780
Total 035 - Culvert 12 NPR 2,6780
CARRY FORWARD Hydraulic Works
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD
24,7
5
15,3
6

40,11

4,0110
4,0110

0,2500
0,2500
- 341 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
006 - Hydraulic Works
036 - Culvert A6
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

879 09.04.01.B.01 AMOUNT CARRIED FORWARD 11


Excavation for Structures Foundation - Ordinary soil - Mechanical Means - Depth upto 3 m 9,
2,50 * 2,50 * 3,00 93
12,00 * 1,30 * 3,00 18,7
Total cum Total 90 - Excavation NPR 5
CARRY FORWARD Culvert A6 46,8
CARRY FORWARD Hydraulic Works 0
CARRY FORWARD Road Alignement MR2 - Mai... 65,5
CARRY FORWARD 5
2,50 * 2,50 * 3,00 93
12,00 * 1,30 * 3,00
Total cum Total 90 - Excavation NPR
CARRY FORWARD Culvert A6
CARRY FORWARD Hydraulic Works
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD

- 342 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
006 - Hydraulic Works
036 - Culvert A6
180 - Filling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
880 09.09.00.b AMOUNT CARRIED FORWARD 36
Construction of Embankment with Material Deposited from Roadway Cutting - With 4,
machine 83
32,06
Total cum Total 180 - Filling NPR
CARRY FORWARD Culvert A6 32,06
CARRY FORWARD Hydraulic Works 32,06
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD

- 343 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
006 - Hydraulic Works
036 - Culvert A6
1005 - culverts
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

881 07.02.00.D AMOUNT CARRIED FORWARD 16.857,39


882 20.02.00.A Providing and Laying Reinforced Cement Concrete Flush jointed Pipe for culverts - 900 mm 11.539,20
883 20.02.00.G internal dia. 13.966,07
884 20.03.00.0 12,54 110.464,93
885 20.04.00.G.0p Total m 14.843,16
886 20.05.00.0 Plain/Reinforced Cement Concrete in Foundation - PCC Grade M 15 2,50 * 2,50 * 0,20 12,54 110.464,93
887 22.01.00.A 12,25 * 1,30 * 0,20 12,54 437.000,00
Total cum
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 2,10 * 2,10 * 0,30
Total cum 1,25
Providing and laying , fitting and placing un-coated Mild steel / HYSD 3,19
reinforcement complete in foundation
stell ratio 1,32 * 0,060
4,44
Total tonne
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 30 - Height upto 5 m
2 * 1,50 * 2,50 * 0,30
2,10 * 2,50 * 0,30 1,32
2,10 * 4,00 * 0,30 1,32
Total cum
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure stell ratio
6,35 * 0,100
Total tonne
Providing, Fabricating, assembling and erecting structural steel
components/elements
steel grating cover 0,150 0,0792
Total tonne 0,0792
Total 1005 - culverts NPR
Total 036 - Culvert A6 NPR
CARRY FORWARD Hydraulic Works
2,25
CARRY FORWARD Road Alignement MR2 - Mai... 1,58
CARRY FORWARD 2,52

6,35

0,6350
0,6350

0,1500
0,1500
- 344 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
006 - Hydraulic Works
037 - Culvert 13
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

888 09.04.01.B.01 AMOUNT CARRIED FORWARD 11


Excavation for Structures Foundation - Ordinary soil - Mechanical Means - Depth upto 3 m 9,
312,62 93
Total cum Total 90 - Excavation NPR
CARRY FORWARD Culvert 13
CARRY FORWARD Hydraulic Works 312,62
CARRY FORWARD Road Alignement MR2 - Mai... 312,62
CARRY FORWARD
Excavation for Structures Foundation - Ordinary soil - Mechanical Means - Depth upto 3 m 9,
312,62 93
Total cum Total 90 - Excavation NPR
CARRY FORWARD Culvert 13
CARRY FORWARD Hydraulic Works
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD

- 345 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
006 - Hydraulic Works
037 - Culvert 13
180 - Filling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
889 09.09.00.b AMOUNT CARRIED FORWARD 36
Construction of Embankment with Material Deposited from Roadway Cutting - With 4,
machine 83
32,32
Total cum Total 180 - Filling NPR
CARRY FORWARD Culvert 13 32,32
CARRY FORWARD Hydraulic Works 32,32
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD

- 346 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
006 - Hydraulic Works
037 - Culvert 13
1005 - culverts
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

890 20.02.00.A AMOUNT CARRIED FORWARD 11.539,20


891 20.02.00.G Plain/Reinforced Cement Concrete in Foundation - PCC Grade M 15 culvert 13.966,07
892 20.03.00.0 15,90 * 4,90 * 0,10 110.464,93
893 20.04.00.G.0p shaft 14.843,16
7,79
894 20.05.00.0 2,60 * 2,60 * 0,20 110.464,93
1,35
895 22.01.00.A Total cum 437.000,00
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 culvert
23,37
shaft 2,03
Total cum 9,14
Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation
stell ratio 25,40 * 0,100
Total tonne 23,37
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 30 - Height upto 5 m 2,03
culvert 51,99
shaft 15,59
Total cum
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure stell ratio 25,40
67,58 * 0,100
Total tonne
Providing, Fabricating, assembling and erecting structural steel
components/elements
steel grating cover 0,250
Total tonne
Total 1005 - culverts NPR 2,5400
Total 037 - Culvert 13 NPR 2,5400
CARRY FORWARD Hydraulic Works
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD
51,9
9
15,5
9

67,58

6,7580
6,7580

0,2500
0,2500
- 347 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
006 - Hydraulic Works
038 - Culvert A7
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

896 09.04.01.B.01 AMOUNT CARRIED FORWARD 11


Excavation for Structures Foundation - Ordinary soil - Mechanical Means - Depth upto 3 m 9,
2,50 * 2,50 * 3,00 93
12,90 * 1,40 * 3,00 18,7
Total cum Total 90 - Excavation NPR 5
CARRY FORWARD Culvert A7 54,1
CARRY FORWARD Hydraulic Works 8
CARRY FORWARD Road Alignement MR2 - Mai... 72,9
CARRY FORWARD 3
2,50 * 2,50 * 3,00 93
12,90 * 1,40 * 3,00
Total cum Total 90 - Excavation NPR
CARRY FORWARD Culvert A7
CARRY FORWARD Hydraulic Works
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD

- 348 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
006 - Hydraulic Works
038 - Culvert A7
180 - Filling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
897 09.09.00.b AMOUNT CARRIED FORWARD 36
Construction of Embankment with Material Deposited from Roadway Cutting - With 4,
machine 83
34,56
Total cum Total 180 - Filling NPR
CARRY FORWARD Culvert A7 34,56
CARRY FORWARD Hydraulic Works 34,56
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD

- 349 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
006 - Hydraulic Works
038 - Culvert A7
1005 - culverts
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

898 07.02.00.E AMOUNT CARRIED FORWARD 18.507,00


899 20.02.00.A Providing and Laying Reinforced Cement Concrete Flush jointed Pipe for culverts - 1000 mm 11.539,20
900 20.02.00.G internal dia. 13.966,07
901 20.03.00.0 13,20 110.464,93
902 20.04.00.G.0p Total m 14.843,16
903 20.05.00.0 Plain/Reinforced Cement Concrete in Foundation - PCC Grade M 15 2,50 * 2,50 * 0,20 13,20 110.464,93
904 22.01.00.A 12,90 * 1,40 * 0,20 13,20 437.000,00
Total cum
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 2,10 * 2,10 * 0,30
Total cum 1,25
Providing and laying , fitting and placing un-coated Mild steel / HYSD 3,61
reinforcement complete in foundation
stell ratio 1,32 * 0,100
4,86
Total tonne
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 30 - Height upto 5 m
2 * 1,50 * 2,50 * 0,30
2,10 * 2,50 * 0,30 1,32
2,10 * 4,00 * 0,30 1,32
Total cum
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure stell ratio
6,35 * 0,100
Total tonne
Providing, Fabricating, assembling and erecting structural steel
components/elements
steel grating cover 0,150 0,1320
Total tonne 0,1320
Total 1005 - culverts NPR
Total 038 - Culvert A7 NPR
CARRY FORWARD Hydraulic Works
2,25
CARRY FORWARD Road Alignement MR2 - Mai... 1,58
CARRY FORWARD 2,52

6,35

0,6350
0,6350

0,1500
0,1500
- 350 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
006 - Hydraulic Works
039 - Culvert 14
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

905 09.04.01.B.01 AMOUNT CARRIED FORWARD 11


Excavation for Structures Foundation - Ordinary soil - Mechanical Means - Depth upto 3 m 9,
2,50 * 2,50 * 3,00 93
13,50 * 1,30 * 3,00 18,7
Total cum Total 90 - Excavation NPR 5
CARRY FORWARD Culvert 14 52,6
CARRY FORWARD Hydraulic Works 5
CARRY FORWARD Road Alignement MR2 - Mai... 71,4
CARRY FORWARD 0
2,50 * 2,50 * 3,00 93
13,50 * 1,30 * 3,00
Total cum Total 90 - Excavation NPR
CARRY FORWARD Culvert 14
CARRY FORWARD Hydraulic Works
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD

- 351 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
006 - Hydraulic Works
039 - Culvert 14
180 - Filling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
906 09.09.00.b AMOUNT CARRIED FORWARD 36
Construction of Embankment with Material Deposited from Roadway Cutting - With 4,
machine 83
35,55
Total cum Total 180 - Filling NPR
CARRY FORWARD Culvert 14 35,55
CARRY FORWARD Hydraulic Works 35,55
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD

- 352 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
006 - Hydraulic Works
039 - Culvert 14
1005 - culverts
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

907 07.02.00.D AMOUNT CARRIED FORWARD 16.857,39


908 20.02.00.A Providing and Laying Reinforced Cement Concrete Flush jointed Pipe for culverts - 900 mm 11.539,20
909 20.02.00.G internal dia. 13.966,07
910 20.03.00.0 13,95 110.464,93
911 20.04.00.G.0p Total m 14.843,16
912 20.05.00.0 Plain/Reinforced Cement Concrete in Foundation - PCC Grade M 15 2,50 * 2,50 * 0,20 13,95 110.464,93
913 22.01.00.A 13,65 * 1,30 * 0,20 13,95 437.000,00
Total cum
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 2,10 * 2,10 * 0,30
Total cum 1,25
Providing and laying , fitting and placing un-coated Mild steel / HYSD 3,55
reinforcement complete in foundation
stell ratio 1,32 * 0,100
4,80
Total tonne
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 30 - Height upto 5 m
2 * 1,50 * 2,50 * 0,30
2,10 * 2,50 * 0,30 1,32
2,10 * 4,00 * 0,30 1,32
Total cum
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure stell ratio
6,35 * 0,100
Total tonne
Providing, Fabricating, assembling and erecting structural steel
components/elements
steel grating cover 0,150 0,1320
Total tonne 0,1320
Total 1005 - culverts NPR
Total 039 - Culvert 14 NPR
CARRY FORWARD Hydraulic Works
2,25
CARRY FORWARD Road Alignement MR2 - Mai... 1,58
CARRY FORWARD 2,52

6,35

0,6350
0,6350

0,1500
0,1500
- 353 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
006 - Hydraulic Works
040 - Culvert 15
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

914 09.04.01.B.01 AMOUNT CARRIED FORWARD 11


Excavation for Structures Foundation - Ordinary soil - Mechanical Means - Depth upto 3 m 9,
176,42 93
Total cum Total 90 - Excavation NPR
CARRY FORWARD Culvert 15
CARRY FORWARD Hydraulic Works 176,42
CARRY FORWARD Road Alignement MR2 - Mai... 176,42
CARRY FORWARD
Excavation for Structures Foundation - Ordinary soil - Mechanical Means - Depth upto 3 m 9,
176,42 93
Total cum Total 90 - Excavation NPR
CARRY FORWARD Culvert 15
CARRY FORWARD Hydraulic Works
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD

- 354 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
006 - Hydraulic Works
040 - Culvert 15
180 - Filling

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
915 09.09.00.b AMOUNT CARRIED FORWARD 36
Construction of Embankment with Material Deposited from Roadway Cutting - With 4,
machine 83
59,94
Total cum Total 180 - Filling NPR
CARRY FORWARD Culvert 15 59,94
CARRY FORWARD Hydraulic Works 59,94
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD

- 355 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
006 - Hydraulic Works
040 - Culvert 15
1005 - culverts
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

916 20.02.00.A AMOUNT CARRIED FORWARD 11.539,20


917 20.02.00.G Plain/Reinforced Cement Concrete in Foundation - PCC Grade M 15 culvert 13.966,07
918 20.03.00.0 17,75 * 2,10 * 0,10 110.464,93
919 20.04.00.G.0p shaft 14.843,16
3,73
920 20.05.00.0 2,60 * 2,60 * 0,20 110.464,93
1,35
921 22.01.00.A Total cum 437.000,00
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 30 culvert
11,18
shaft 2,03
Total cum 5,08
Providing and laying , fitting and placing un-coated Mild steel / HYSD
reinforcement complete in foundation
stell ratio 13,21 * 0,100
Total tonne 11,18
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 30 - Height upto 5 m 2,03
culvert 32,48
shaft 13,20
Total cum
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure stell ratio 13,21
45,68 * 0,100
Total tonne
Providing, Fabricating, assembling and erecting structural steel
components/elements
steel grating cover 0,250
Total tonne
Total 1005 - culverts NPR Total 040 - Culvert 15 NPR Total 006 - Hydraulic Works 1,3210
NPR 1,3210
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD
32,4
8
13,2
0

45,68

4,5680
4,5680

0,2500
0,2500
- 356 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
007 - Civil Works
059 - Wall CH 2+070 / CH 2+090
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

922 09.04.02.B.01 AMOUNT CARRIED FORWARD 31


Excavation for Structures Foundation - Ordinary Rock (not requiring blasting) - 9,
Mechanical Means 82
40,00 * (6,50*5,40/2)
Total cum Total 90 - Excavation NPR
CARRY FORWARD Wall CH 2+070 / CH 2+090 702,00
CARRY FORWARD Civil Works 702,00
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD
- 357 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
007 - Civil Works
059 - Wall CH 2+070 / CH 2+090
560 - Structures

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

923 20.01.00.0 AMOUNT CARRIED FORWARD 9.893,01


924 20.03.00.0 Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal mix) in Foundation 110.464,93
925 20.05.00.0 40,00 * ((2,40+2,10)/2) * 0,10 110.464,93
926 NP.CW.04.01 Total cum 7.780,00
927 NP.CW.04.03 Providing and laying , fitting and placing un-coated Mild steel / HYSD 11.720,00
928 NP.CW.16.01 reinforcement complete in foundation 9,00 16.220,39
929 NP.CW.18.01 steel rate 49,20 * 0,080 9,00 15.188,18
930 NP.CW.19.01 Total tonne 2.900,00
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure steel ratio
130,73 * 0,080
Total tonne
Providing and driving of 25 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
sub-horizontal bolts 14 * 10,00 3,9360
20 * 10,00 3,9360
20 * 10,00
Total m
Providing and driving of 32 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
vertical bolts 80 * 8,00
10,4584
Total m
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item 10,4584
20.04.00.H.0p + 7%)
wall 140,
40,00 * ((7,00+4,00)/2) * ((0,30+0,85)/2)
00
protection cap
200,
54 * ((0,70*0,70+0,30*0,30)/2) * 0,20
00
Total cum
200,
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 40 (item
00
20.02.00.h + 7%)
40,00 * ((2,20+1,90)/2) * 0,60
Total cum 540,00
Drainage holes (weep holes f 100 mm) shall be provided in the walls every 3 m (longitudinal
step) and in multiple rows as indicated below, as well as a longitudinal drainage pipe f
100 mm shall be installed at the wall foot, wrapped into a geotextile
25 * 5,00
Total m Total 560 - Structures NPR
CARRY FORWARD Civil Works
640,00
CARRY FORWARD Road Alignement MR2 - Mai... 640,00
CARRY FORWARD

127,60
3,13

130,73
49,20

49,20

125,00
125,00

- 358 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
007 - Civil Works
059 - Wall CH 2+070 / CH 2+090
560 - Structures

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
AMOUNT CARRIED FORWARD
Total 059 - Wall CH 2+070 / CH 2+090 NPR
CARRY FORWARD Civil Works
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD

- 359 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
007 - Civil Works
060 - Wall CH 2+110 / CH 2+130
90 - Excavation
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

931 09.04.02.B.01 AMOUNT CARRIED FORWARD 31


Excavation for Structures Foundation - Ordinary Rock (not requiring blasting) - 9,
Mechanical Means 82
20,00 * ((1,60+1,20)/2) * 1,30 36,4
20,00 * ((1,60+1,20)/2) * 1,30 0
Total cum Total 90 - Excavation NPR 36,4
CARRY FORWARD Wall CH 2+110 / CH 2+130 0
CARRY FORWARD Civil Works 72,8
CARRY FORWARD Road Alignement MR2 - Mai... 0
CARRY FORWARD

- 360 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
007 - Civil Works
060 - Wall CH 2+110 / CH 2+130
560 - Structures

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

932 20.01.00.0 AMOUNT CARRIED FORWARD 9.893,01


933 20.03.00.0 Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal mix) in Foundation 110.464,93
934 20.05.00.0 40,00 * 0,70 * 0,10 110.464,93
935 NP.CW.04.01 Total cum 7.780,00
936 NP.CW.04.03 Providing and laying , fitting and placing un-coated Mild steel / HYSD 11.720,00
937 NP.CW.16.01 reinforcement complete in foundation 2,80 16.220,39
938 NP.CW.18.01 steel rate 6,00 * 0,080 2,80 15.188,18
939 NP.CW.19.01 Total tonne 2.900,00
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure steel ratio
18,81 * 0,080
Total tonne
Providing and driving of 25 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
sub-horizontal bolts 14 * 8,00 0,4800
Total m 0,4800
Providing and driving of 32 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
vertical bolts 27 * 7,50
Total m
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item
1,5048
20.04.00.H.0p + 7%)
wall 1,5048
20 * 1,00 * 0,30
20,00 * 2,00 * 0,30
protection cap
14 * ((0,70*0,70+0,30*0,30)/2) * 0,20
Total cum
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 40 (item
112,00
20.02.00.h + 7%) 40,00 * 0,50 * 0,30
Total cum 112,00
Drainage holes (weep holes f 100 mm) shall be provided in the walls every 3 m (longitudinal
step) and in multiple rows as indicated below, as well as a longitudinal drainage pipe f
100 mm shall be installed at the wall foot, wrapped into a geotextile
13 * 5,00
Total m
Total 560 - Structures NPR 202,50
Total 060 - Wall CH 2+110 / CH 2+130 NPR 202,50
CARRY FORWARD Civil Works
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD
6,00
12,0
0
0,81

18,81

6,00

6,00

65,00
65,00
- 361 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
007 - Civil Works
061 - Wall CH 2+210
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

940 09.04.02.B.01 AMOUNT CARRIED FORWARD 31


Excavation for Structures Foundation - Ordinary Rock (not requiring blasting) - 9,
Mechanical Means 82
20,00 * ((1,60+1,20)/2) * 1,30
Total cum Total 90 - Excavation NPR
CARRY FORWARD Wall CH 2+210 36,40
CARRY FORWARD Civil Works 36,40
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD
Excavation for Structures Foundation - Ordinary Rock (not requiring blasting) - 9,
Mechanical Means 82
20,00 * ((1,60+1,20)/2) * 1,30
Total cum Total 90 - Excavation NPR
CARRY FORWARD Wall CH 2+210
CARRY FORWARD Civil Works
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD

- 362 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
007 - Civil Works
061 - Wall CH 2+210
560 - Structures

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
941 20.01.00.0 AMOUNT CARRIED FORWARD 9.893,01
942 20.03.00.0 Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal mix) in Foundation 110.464,93
943 20.05.00.0 20,00 * 0,70 * 0,10 110.464,93
944 NP.CW.04.01 Total cum 7.780,00
945 NP.CW.04.03 Providing and laying , fitting and placing un-coated Mild steel / HYSD 11.720,00
946 NP.CW.16.01 reinforcement complete in foundation 1,40 16.220,39
947 NP.CW.18.01 steel rate 3,00 * 0,080 1,40 15.188,18
948 NP.CW.19.01 Total tonne 2.900,00
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure steel ratio
6,41 * 0,080
Total tonne
Providing and driving of 25 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
sub-horizontal bolts 7 * 8,00 0,2400
Total m 0,2400
Providing and driving of 32 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
vertical bolts 13 * 7,50
Total m
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item
0,5128
20.04.00.H.0p + 7%)
wall 0,5128
20,00 * 1,00 * 0,30
protection cap
7 * ((0,70*0,70+0,30*0,30)/2) * 0,20
Total cum
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 40 (item
20.02.00.h + 7%) 20,00 * 0,50 * 0,30
56,00
Total cum
Drainage holes (weep holes f 100 mm) shall be provided in the walls every 3 m (longitudinal 56,00
step) and in multiple rows as indicated below, as well as a longitudinal drainage pipe f
100 mm shall be installed at the wall foot, wrapped into a geotextile
6 * 5,00
Total m
Total 560 - Structures NPR
Total 061 - Wall CH 2+210 NPR 97,50
CARRY FORWARD Civil Works
97,50
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD

6,00
0,41

6,41

3,00

3,00

30,00
30,00

- 363 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
007 - Civil Works
062 - Wall CH 2+270
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

949 09.04.02.B.01 AMOUNT CARRIED FORWARD 31


Excavation for Structures Foundation - Ordinary Rock (not requiring blasting) - 9,
Mechanical Means 82
20,00 * ((1,60+1,20)/2) * 1,30
Total cum Total 90 - Excavation NPR
CARRY FORWARD Wall CH 2+270 36,40
CARRY FORWARD Civil Works 36,40
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD
- 364 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
007 - Civil Works
062 - Wall CH 2+270
560 - Structures

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

950 20.01.00.0 AMOUNT CARRIED FORWARD 9.893,01


951 20.03.00.0 Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal mix) in Foundation 110.464,93
952 20.05.00.0 20,00 * 0,70 * 0,10 110.464,93
953 NP.CW.04.01 Total cum 7.780,00
954 NP.CW.04.03 Providing and laying , fitting and placing un-coated Mild steel / HYSD 11.720,00
955 NP.CW.16.01 reinforcement complete in foundation 1,40 16.220,39
956 NP.CW.18.01 steel rate 3,00 * 0,080 1,40 15.188,18
957 NP.CW.19.01 Total tonne 2.900,00
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure steel ratio
6,41 * 0,080
Total tonne
Providing and driving of 25 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
sub-horizontal bolts 7 * 8,00 0,2400
Total m 0,2400
Providing and driving of 32 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
vertical bolts 13 * 7,50
Total m
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item
0,5128
20.04.00.H.0p + 7%)
wall 0,5128
20,00 * 1,00 * 0,30
protection cap
7 * ((0,70*0,70+0,30*0,30)/2) * 0,20
Total cum
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 40 (item
20.02.00.h + 7%) 20,00 * 0,50 * 0,30
56,00
Total cum
Drainage holes (weep holes f 100 mm) shall be provided in the walls every 3 m (longitudinal 56,00
step) and in multiple rows as indicated below, as well as a longitudinal drainage pipe f
100 mm shall be installed at the wall foot, wrapped into a geotextile
6 * 5,00
Total m
Total 560 - Structures NPR
Total 062 - Wall CH 2+270 NPR 97,50
CARRY FORWARD Civil Works
97,50
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD

6,00
0,41

6,41
3,00

3,00

30,00
30,00

- 365 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
007 - Civil Works
063 - Wall CH 2+310
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

958 09.04.02.B.01 AMOUNT CARRIED FORWARD 31


Excavation for Structures Foundation - Ordinary Rock (not requiring blasting) - 9,
Mechanical Means 82
20,00 * ((1,60+1,20)/2) * 1,30
Total cum Total 90 - Excavation NPR
CARRY FORWARD Wall CH 2+310 36,40
CARRY FORWARD Civil Works 36,40
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD
Excavation for Structures Foundation - Ordinary Rock (not requiring blasting) - 9,
Mechanical Means 82
20,00 * ((1,60+1,20)/2) * 1,30
Total cum Total 90 - Excavation NPR
CARRY FORWARD Wall CH 2+310
CARRY FORWARD Civil Works
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD

- 366 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
007 - Civil Works
063 - Wall CH 2+310
560 - Structures

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
959 20.01.00.0 AMOUNT CARRIED FORWARD 9.893,01
960 20.03.00.0 Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal mix) in Foundation 110.464,93
961 20.05.00.0 20,00 * 0,70 * 0,10 110.464,93
962 NP.CW.04.01 Total cum 7.780,00
963 NP.CW.04.03 Providing and laying , fitting and placing un-coated Mild steel / HYSD 11.720,00
964 NP.CW.16.01 reinforcement complete in foundation 1,40 16.220,39
965 NP.CW.18.01 steel rate 3,00 * 0,080 1,40 15.188,18
966 NP.CW.19.01 Total tonne 2.900,00
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure steel ratio
6,58 * 0,080
Total tonne
Providing and driving of 25 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
sub-horizontal bolts 10 * 3,50 0,2400
Total m 0,2400
Providing and driving of 32 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
vertical bolts 8 * 4,50
Total m
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item
0,5264
20.04.00.H.0p + 7%)
wall 0,5264
20,00 * 1,00 * 0,30
protection cap
10 * ((0,70*0,70+0,30*0,30)/2) * 0,20
Total cum
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 40 (item
20.02.00.h + 7%) 20,00 * 0,50 * 0,30
35,00
Total cum
Drainage holes (weep holes f 100 mm) shall be provided in the walls every 3 m (longitudinal 35,00
step) and in multiple rows as indicated below, as well as a longitudinal drainage pipe f
100 mm shall be installed at the wall foot, wrapped into a geotextile
6 * 5,00
Total m
Total 560 - Structures NPR
Total 063 - Wall CH 2+310 NPR 36,00
CARRY FORWARD Civil Works
36,00
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD

6,00
0,58

6,58

3,00

3,00

30,00
30,00

- 367 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
007 - Civil Works
064 - Wall CH 2+410 / CH 2+430
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

967 09.04.02.B.01 AMOUNT CARRIED FORWARD 31


Excavation for Structures Foundation - Ordinary Rock (not requiring blasting) - 9,
Mechanical Means 82
40,00 * ((1,60+1,20)/2) * 1,30
Total cum Total 90 - Excavation NPR
CARRY FORWARD Wall CH 2+410 / CH 2+430 72,80
CARRY FORWARD Civil Works 72,80
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD
- 368 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
007 - Civil Works
064 - Wall CH 2+410 / CH 2+430
560 - Structures

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

968 20.01.00.0 AMOUNT CARRIED FORWARD 9.893,01


969 20.03.00.0 Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal mix) in Foundation 110.464,93
970 20.05.00.0 40,00 * 0,70 * 0,10 110.464,93
971 NP.CW.04.01 Total cum 7.780,00
972 NP.CW.04.03 Providing and laying , fitting and placing un-coated Mild steel / HYSD 11.720,00
973 NP.CW.16.01 reinforcement complete in foundation 2,80 16.220,39
974 NP.CW.18.01 steel rate 6,00 * 0,080 2,80 15.188,18
975 NP.CW.19.01 Total tonne 2.900,00
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure steel ratio
13,16 * 0,080
Total tonne
Providing and driving of 25 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
sub-horizontal bolts 20 * 3,50 0,4800
Total m 0,4800
Providing and driving of 32 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
vertical bolts 16 * 4,50
Total m
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item
1,0528
20.04.00.H.0p + 7%)
wall 1,0528
40,00 * 1,00 * 0,30
protection cap
20 * ((0,70*0,70+0,30*0,30)/2) * 0,20
Total cum
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 40 (item
20.02.00.h + 7%) 40,00 * 0,50 * 0,30
70,00
Total cum
Drainage holes (weep holes f 100 mm) shall be provided in the walls every 3 m (longitudinal 70,00
step) and in multiple rows as indicated below, as well as a longitudinal drainage pipe f
100 mm shall be installed at the wall foot, wrapped into a geotextile
13 * 5,00
Total m
Total 560 - Structures NPR
Total 064 - Wall CH 2+410 / CH 2+430 NPR 72,00
CARRY FORWARD Civil Works
72,00
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD

12,00
1,16

13,16
6,00

6,00

65,00
65,00

- 369 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
007 - Civil Works
065 - Wall CH 2+510 / CH 2+530
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

976 09.04.02.B.01 AMOUNT CARRIED FORWARD 31


Excavation for Structures Foundation - Ordinary Rock (not requiring blasting) - 9,
Mechanical Means 82
40,00 * ((1,60+1,20)/2) * 1,30
Total cum Total 90 - Excavation NPR
CARRY FORWARD Wall CH 2+510 / CH 2+530 72,80
CARRY FORWARD Civil Works 72,80
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD
Excavation for Structures Foundation - Ordinary Rock (not requiring blasting) - 9,
Mechanical Means 82
40,00 * ((1,60+1,20)/2) * 1,30
Total cum Total 90 - Excavation NPR
CARRY FORWARD Wall CH 2+510 / CH 2+530
CARRY FORWARD Civil Works
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD

- 370 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
007 - Civil Works
065 - Wall CH 2+510 / CH 2+530
560 - Structures

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
977 20.01.00.0 AMOUNT CARRIED FORWARD 9.893,01
978 20.03.00.0 Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal mix) in Foundation 110.464,93
979 20.05.00.0 40,00 * 0,70 * 0,10 110.464,93
980 NP.CW.04.01 Total cum 7.780,00
981 NP.CW.04.03 Providing and laying , fitting and placing un-coated Mild steel / HYSD 11.720,00
982 NP.CW.16.01 reinforcement complete in foundation 2,80 16.220,39
983 NP.CW.18.01 steel rate 6,00 * 0,080 2,80 15.188,18
984 NP.CW.19.01 Total tonne 2.900,00
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure steel ratio
13,16 * 0,080
Total tonne
Providing and driving of 25 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
sub-horizontal bolts 20 * 3,50 0,4800
Total m 0,4800
Providing and driving of 32 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
vertical bolts 16 * 4,50
Total m
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item
1,0528
20.04.00.H.0p + 7%)
wall 1,0528
40,00 * 1,00 * 0,30
protection cap
20 * ((0,70*0,70+0,30*0,30)/2) * 0,20
Total cum
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 40 (item
20.02.00.h + 7%) 40,00 * 0,50 * 0,30
70,00
Total cum
Drainage holes (weep holes f 100 mm) shall be provided in the walls every 3 m (longitudinal 70,00
step) and in multiple rows as indicated below, as well as a longitudinal drainage pipe f
100 mm shall be installed at the wall foot, wrapped into a geotextile
13 * 5,00
Total m
Total 560 - Structures NPR
Total 065 - Wall CH 2+510 / CH 2+530 NPR 72,00
CARRY FORWARD Civil Works
72,00
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD

12,00
1,16

13,16

6,00

6,00

65,00
65,00

- 371 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
007 - Civil Works
066 - Wall CH 2+570 / CH 2+590
90 - Excavation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

985 09.04.02.B.01 AMOUNT CARRIED FORWARD 31


Excavation for Structures Foundation - Ordinary Rock (not requiring blasting) - 9,
Mechanical Means 82
40,00 * ((1,60+1,20)/2) * 1,30
Total cum Total 90 - Excavation NPR
CARRY FORWARD Wall CH 2+570 / CH 2+590 72,80
CARRY FORWARD Civil Works 72,80
CARRY FORWARD Road Alignement MR2 - Mai...
CARRY FORWARD
- 372 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
007 - Civil Works
066 - Wall CH 2+570 / CH 2+590
560 - Structures

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

986 20.01.00.0 AMOUNT CARRIED FORWARD 9.893,01


987 20.03.00.0 Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal mix) in Foundation 110.464,93
988 20.05.00.0 40,00 * 0,70 * 0,10 110.464,93
989 NP.CW.04.01 Total cum 7.780,00
990 NP.CW.04.03 Providing and laying , fitting and placing un-coated Mild steel / HYSD 11.720,00
991 NP.CW.16.01 reinforcement complete in foundation 2,80 16.220,39
992 NP.CW.18.01 steel rate 6,00 * 0,080 2,80 15.188,18
993 NP.CW.19.01 Total tonne 2.900,00
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure steel ratio
12,75 * 0,080
Total tonne
Providing and driving of 25 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
sub-horizontal bolts 13 * 8,00 0,4800
Total m 0,4800
Providing and driving of 32 mm dia rock bolt steel nails by drilling holes of 110 mm dia using
cement grouting for fixing
vertical bolts 27 * 7,50
Total m
Plain/Reinforced cement concrete in sub-structure - RCC Grade M 40 (item
1,0200
20.04.00.H.0p + 7%)
wall 1,0200
40,00 * 1,00 * 0,30
protection cap
13 * ((0,70*0,70+0,30*0,30)/2) * 0,20
Total cum
Plain/Reinforced Cement Concrete in Foundation - RCC Grade M 40 (item
20.02.00.h + 7%) 40,00 * 0,50 * 0,30
104,00
Total cum
Drainage holes (weep holes f 100 mm) shall be provided in the walls every 3 m (longitudinal 104,00
step) and in multiple rows as indicated below, as well as a longitudinal drainage pipe f
100 mm shall be installed at the wall foot, wrapped into a geotextile
13 * 5,00
Total m
Total 560 - Structures NPR
Total 066 - Wall CH 2+570 / CH 2+590 NPR 202,50
Total 007 - Civil Works NPR
202,50
CARRY FORWARD

12,00
0,75

12,75
6,00

6,00

65,00
65,00

- 373 -
Priced Bill of Quantities
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587
007 - Civil Works
066 - Wall CH 2+570 / CH 2+590
560 - Structures

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
AMOUNT CARRIED FORWARD
Total 04 - Road Alignement MR2 - Main Road - North
Stretch - CH 2+034 to 2+587 NPR
CARRY FORWARD

- 374 -
Priced Bill of Quantities
05 - waste disposal

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE


DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

994 09.02.00.0 AMOUNT CARRIED FORWARD 69


Removal of unserviceable soil including excavation, loading and disposal upto 1000 ,5
meters lead 8
total excavated material 189025,68
total material reused
-21508,3800
Total cum
Total 05 - waste disposal NPR
CARRY FORWARD 189.025,68
-21.508,38
167.517,30

- 375 -
Priced Bill of Quantities
07 - Main Tunnel - Electromechanical Equipment
301 - Electrical Systems
301 - Energy supply

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

995 NP.ES.01 AMOUNT CARRIED FORWARD 29.700.000,00


996 NP.ES.02 Low voltage supply as per Drawing and Technical Specifications. 1 11.880.000,00
997 NP.ES.03 Total amount 132.000,00
998 NP.ES.04 Uninterruptible power supply as per Drawing and Technical Specifications. 1 1.320.000,00
999 NP.ES.05 Total amount 1,00 2.508.000,00
1000 NP.ES.06 Quality assurance as per Drawing and Technical Specifications. 1 1,00 10.560.000,00
1001 NP.ES.07 Total amount 264.000,00
1002 NP.ES.08 Engineering and configuration as per Drawing and Technical Specifications. 1 132.000,00
1003 NP.ES.09 Total amount 660.000,00
1004 NP.ES.10 Tests (FAT, SAT) as per Drawing and Technical Specifications. 1 1,00 132.000,00
Total amount 1,00
Installation as per Drawing and Technical Specifications. 1
Total amount
Documentation as per Drawing and Technical Specifications. 1
Total amount 1,00
Training for operators as per Drawing and Technical Specifications. 1 1,00
Total amount
Transport, packaging as per Drawing and Technical Specifications. 1
Total amount
Maintenance and warranty (36 months) as per Drawing and Technical 1,00
Specifications. 1,00
1
Total amount
Total 301 - Energy supply NPR
1,00
CARRY FORWARD Electrical Systems
1,00
CARRY FORWARD Main Tunnel - Electromechani...
CARRY FORWARD

1,00
1,00

1,00
1,00

1,00
1,00

1,00
1,00

1,00

1,00
- 376 -
Priced Bill of Quantities
07 - Main Tunnel - Electromechanical Equipment
301 - Electrical Systems
302 - Lighting

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

1005 NP.LG.02 AMOUNT CARRIED FORWARD 15.972.000,00


1006 NP.LG.03 Crossing lighting as per Drawing and Technical Specifications. 1 13.200.000,00
1007 NP.LG.04 Total amount 2.376.000,00
1008 NP.LG.05 Reinforcement lighting as per Drawing and Technical Specifications. 1 10.560.000,00
1009 NP.LG.06 Total amount 1,00 3.036.000,00
1010 NP.LG.07 Fire emergency lighting as per Drawing and Technical Specifications. 1 1,00 5.148.000,00
1011 NP.LG.08 Total amount 1.584.000,00
1012 NP.LG.09 LED optical guide as per Drawing and Technical Specifications. 1 132.000,00
1013 NP.LG.10 Total amount 1.980.000,00
1014 NP.LG.11 Illumination of escape routes as per Drawing and Technical Specifications. 1 1,00 264.000,00
1015 NP.LG.12 Total amount 1,00 16.500.000,00
1016 NP.LG.13 Iillumination of rock sheed as per Drawing and Technical Specifications. 1 132.000,00
1017 NP.LG.14 Total amount 528.000,00
1018 NP.LG.15 Iillumination of vehicle control area as per Drawing and Technical Specifications. 1
Total amount 1,00
Quality assurance as per Drawing and Technical Specifications. 1 1,00
Total amount
Engineering and configuration as per Drawing and Technical Specifications. 1
Total amount
Tests (FAT, SAT) as per Drawing and Technical Specifications. 1 1,00
Total amount 1,00
Installation as per Drawing and Technical Specifications. 1
Total amount
Documentation as per Drawing and Technical Specifications. 1
Total amount 1,00
Training for operators as per Drawing and Technical Specifications. 1 1,00
Total amount
Transport, packaging as per Drawing and Technical Specifications.
CARRY FORWARD Lighting 1,00
CARRY FORWARD Electrical Systems
1,00
CARRY FORWARD Main Tunnel - Electromechani...
CARRY FORWARD

1,00
1,00

1,00
1,00
1,00
1,00

1,00
1,00

1,00
1,00

1,00
1,00

1,00
1,00

- 377 -
Priced Bill of Quantities
07 - Main Tunnel - Electromechanical Equipment
301 - Electrical Systems
302 - Lighting

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

1019 NP.LG.16 AMOUNT CARRIED FORWARD 2.640.000,00


1 1,00 660.000,00
Total amount
Maintenance and warranty (36 months) as per Drawing and Technical 1,00
Specifications.
1
Total amount 1,00
Total 302 - Lighting NPR
Total 301 - Electrical Systems NPR
1,00
CARRY FORWARD Main Tunnel - Electromechani...
CARRY FORWARD
Maintenance and warranty (36 months) as per Drawing and Technical
Specifications.
1
Total amount
Total 302 - Lighting NPR
Total 301 - Electrical Systems NPR
CARRY FORWARD Main Tunnel - Electromechani...
CARRY FORWARD

- 378 -
Priced Bill of Quantities
07 - Main Tunnel - Electromechanical Equipment
302 - Mechanical Systems
303 - Ventilation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

1020 NP.VT.01 AMOUNT CARRIED FORWARD 4.488.000,00


1021 NP.VT.02 Jet fans (including silencers and fixings) as per Drawing and Technical 1.848.000,00
1022 NP.VT.03 Specifications. 2.244.000,00
1023 NP.VT.04 15 396.000,00
1024 NP.VT.05 Total no. 3.960.000,00
1025 NP.VT.06 Air quality meters: turbidity and CO comb. as per Drawing and Technical Specifications. 15,00 3.300.000,00
1026 NP.VT.07 2 4.620.000,00
1027 NP.VT.08 Total no. 396.000,00
1028 NP.VT.09 Anemometer as per Drawing and Technical Specifications. 6 924.000,00
1029 NP.VT.10 Total no. 3.960.000,00
1030 NP.VT.11 Quality assurance as per Drawing and Technical Specifications. 1 1.320.000,00
Total amount
Engineering and configuration as per Drawing and Technical Specifications. 1
1020 NP.VT.01 AMOUNT CARRIED FORWARD 4.488.000,00
1021 NP.VT.02 Jet fans (including silencers and fixings) as per Drawing and Technical 1.848.000,00
1022 NP.VT.03 Specifications. 2.244.000,00
1023 NP.VT.04 15 396.000,00
1024 NP.VT.05 Total no. 3.960.000,00
1025 NP.VT.06 Air quality meters: turbidity and CO comb. as per Drawing and Technical Specifications. 3.300.000,00
1026 NP.VT.07 2 15,00 4.620.000,00
1027 NP.VT.08 Total no. 396.000,00
1028 NP.VT.09 Anemometer as per Drawing and Technical Specifications. 6 924.000,00
1029 NP.VT.10 Total no. 2,00 3.960.000,00
1030 NP.VT.11 Quality assurance as per Drawing and Technical Specifications. 1 1.320.000,00
Total amount
Engineering and configuration as per Drawing and Technical Specifications. 1 2,00
Total amount
Tests (FAT, SAT) as per Drawing and Technical Specifications. 1
Total amount
Installation as per Drawing and Technical Specifications. 1 6,00
Total amount 6,00
Documentation as per Drawing and Technical Specifications. 1
Total amount
Training for operators as per Drawing and Technical Specifications. 1
Total amount 1,00
Transport, packaging as per Drawing and Technical Specifications. 1 1,00
Total amount
Maintenance and warranty (36 months) as per Drawing and Technical
Specifications.
1 1,00
Total amount 1,00
Total 303 - Ventilation NPR
CARRY FORWARD Mechanical Systems
CARRY FORWARD Main Tunnel - Electromechani... 1,00
CARRY FORWARD 1,00

1,00
1,00

1,00
1,00

1,00
1,00

1,00
1,00

1,00

1,00

- 379 -
Priced Bill of Quantities
07 - Main Tunnel - Electromechanical Equipment
302 - Mechanical Systems
313 - Engress tunnel ventilation

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE


DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

1031 NP.ETV.01 AMOUNT CARRIED FORWARD 15.840.000,00


1032 NP.ETV.02 Fans, dampers und monitoring devices (1 fan spare) 4 264.000,00
1033 NP.ETV.03 Total no. 3.300.000,00
1034 NP.ETV.04 Quality assurance 1 2.772.000,00
1035 NP.ETV.05 Total amount 4,00 3.696.000,00
1036 NP.ETV.06 Engineering and configuration 1 4,00 396.000,00
1037 NP.ETV.07 Total amount 792.000,00
1038 NP.ETV.08 Tests (FAT, SAT) 1 3.300.000,00
1039 NP.ETV.09 Total amount 1.056.000,00
Installation 1 1,00
Total amount 1,00
Documentation 1
Total amount
Training for operators 1
Total amount 1,00
Transport, packaging 1 1,00
Total amount
Maintenance and warranty (36 months) 1
Total amount
1,00
Total 313 - Engress tunnel ventilation NPR
Total 302 - Mechanical Systems NPR 1,00
CARRY FORWARD Main Tunnel - Electromechani...
CARRY FORWARD
1,00
1,00

1,00
1,00

1,00
1,00

1,00
1,00

1,00
1,00
- 380 -
Priced Bill of Quantities
07 - Main Tunnel - Electromechanical Equipment
304 - Signage, Detection, Communication and Control Systems
304 - Signage

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

1040 NP.SG.01 AMOUNT CARRIED FORWARD 1.056.000,00


1041 NP.SG.02 Lights as per Drawing and Technical Specifications. 1 330.000,00
1042 NP.SG.03 Total no. 1.056.000,00
1043 NP.SG.04 Variable signs SDV as per Drawing and Technical Specifications. 4 528.000,00
1044 NP.SG.05 Total no. 1,00 132.000,00
1045 NP.SG.06 Traffic guides as per Drawing and Technical Specifications. 7 1,00 2.640.000,00
1046 NP.SG.07 Total no. 3.960.000,00
1047 NP.SG.08 Fixed signs as per Drawing and Technical Specifications. 4 132.000,00
1048 NP.SG.09 Total no. 660.000,00
1049 NP.SG.10 Emergency exits and safety signs as per Drawing and Technical Specifications. 36 4,00 1.980.000,00
1050 NP.SG.11 Total amount 4,00 1.584.000,00
1051 NP.SG.12 Traffic detection and counting as per Drawing and Technical Specifications. 1 132.000,00
1052 NP.SG.13 Total amount 528.000,00
Software Traffic detection and counting as per Drawing and Technical
Specifications. 7,00
1 7,00
Total no.
Quality assurance as per Drawing and Technical Specifications. 1
Total amount
Engineering and configuration as per Drawing and Technical Specifications. 1 4,00
Total amount 4,00
Tests (FAT, SAT) as per Drawing and Technical Specifications. 1
Total amount
Installation as per Drawing and Technical Specifications. 1
Total amount 36,00
Documentation as per Drawing and Technical Specifications. 1 36,00
Total amount
Training for operators as per Drawing and Technical Specifications. 1
Total amount
1,00
CARRY FORWARD Signage
CARRY FORWARD Signage, Detection, Communication and Co... 1,00
CARRY FORWARD Main Tunnel - Electromechani...
CARRY FORWARD 1,00
CARRY FORWARD Signage
CARRY FORWARD Signage, Detection, Communication and Co...
CARRY FORWARD Main Tunnel - Electromechani...
CARRY FORWARD

1,00

1,00
1,00

1,00
1,00

1,00
1,00

1,00
1,00

1,00
1,00

1,00
1,00

- 381 -
Priced Bill of Quantities
07 - Main Tunnel - Electromechanical Equipment
304 - Signage, Detection, Communication and Control Systems
304 - Signage

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

1053 NP.SG.14 AMOUNT CARRIED FORWARD 1.320.000,00


1054 NP.SG.15 Transport, packaging as per Drawing and Technical Specifications. 1 792.000,00
1,00
Total amount
Maintenance and warranty (36 months) as per Drawing and Technical
Specifications. 1,00
1
Total amount
Total 304 - Signage NPR 1,00
CARRY FORWARD Signage, Detection, Communication and Co...
CARRY FORWARD Main Tunnel - Electromechani...
CARRY FORWARD 1,00
1
Total amount
Total 304 - Signage NPR
CARRY FORWARD Signage, Detection, Communication and Co...
CARRY FORWARD Main Tunnel - Electromechani...
CARRY FORWARD

- 382 -
Priced Bill of Quantities
07 - Main Tunnel - Electromechanical Equipment
304 - Signage, Detection, Communication and Control Systems
305 - Tunnel fire detection system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

1055 NP.SS.01 AMOUNT CARRIED FORWARD 4.620.000,00


1056 NP.SS.02 Fire control unit as per Drawing and Technical Specifications. 2 1.320.000,00
1057 NP.SS.03 Total no. 1.980,00
1058 NP.SS.04 Smoke control unit as per Drawing and Technical Specifications. 2 594.000,00
1059 NP.SS.05 Total no. 2,00 1.320.000,00
1060 NP.SS.06 Fibre optic sensor cable (per meter) as per Drawing and Technical Specifications. 1400 2,00 660.000,00
1061 NP.SS.07 Total no. 132.000,00
1062 NP.SS.08 Smoke detector as per Drawing and Technical Specifications. 12 924.000,00
1063 NP.SS.09 Total no. 1.980.000,00
1064 NP.SS.10 Software fire control unit as per Drawing and Technical Specifications. 1 3.960.000,00
1065 NP.SS.11 Total amount 132.000,00
1066 NP.SS.12 Software smoke control as per Drawing and Technical Specifications. 1 264.000,00
1067 NP.SS.13 Total amount 1.056.000,00
1068 NP.SS.14 Quality assurance as per Drawing and Technical Specifications. 1
1055 NP.SS.01 AMOUNT CARRIED FORWARD 4.620.000,00
1056 NP.SS.02 Fire control unit as per Drawing and Technical Specifications. 2 1.320.000,00
1057 NP.SS.03 Total no. 1.980,00
1058 NP.SS.04 Smoke control unit as per Drawing and Technical Specifications. 2 594.000,00
1059 NP.SS.05 Total no. 1.320.000,00
1060 NP.SS.06 Fibre optic sensor cable (per meter) as per Drawing and Technical Specifications. 1400 660.000,00
1061 NP.SS.07 Total no. 132.000,00
1062 NP.SS.08 Smoke detector as per Drawing and Technical Specifications. 12 924.000,00
1063 NP.SS.09 Total no. 1.980.000,00
1064 NP.SS.10 Software fire control unit as per Drawing and Technical Specifications. 1 2,00 3.960.000,00
1065 NP.SS.11 Total amount 2,00 132.000,00
1066 NP.SS.12 Software smoke control as per Drawing and Technical Specifications. 1 264.000,00
1067 NP.SS.13 Total amount 1.056.000,00
1068 NP.SS.14 Quality assurance as per Drawing and Technical Specifications. 1
Total amount 1.400,00
Engineering and configuration as per Drawing and Technical Specifications. 1 1.400,00
Total amount
Tests (FAT, SAT) as per Drawing and Technical Specifications. 1
Total amount
Installation as per Drawing and Technical Specifications. 1 12,00
Total amount 12,00
Documentation as per Drawing and Technical Specifications. 1
Total amount
Training for operators as per Drawing and Technical Specifications. 1
Total amount 1,00
Transport, packaging as per Drawing and Technical Specifications. 1 1,00
Total amount
Maintenance and warranty (36 months) as per Drawing and Technical
CARRY FORWARD Tunnel fire detection system 1,00
CARRY FORWARD Signage, Detection, Communication and Co...
1,00
CARRY FORWARD Main Tunnel - Electromechani...
CARRY FORWARD

1,00
1,00

1,00
1,00

1,00
1,00

1,00
1,00

1,00
1,00

1,00
1,00

1,00
1,00

- 383 -
Priced Bill of Quantities
07 - Main Tunnel - Electromechanical Equipment
304 - Signage, Detection, Communication and Control Systems
305 - Tunnel fire detection system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
AMOUNT CARRIED FORWARD 396.000,00
Specifications. 1,00
1
Total amount
Total 305 - Tunnel fire detection system NPR 1,00
CARRY FORWARD Signage, Detection, Communication and Co...
CARRY FORWARD Main Tunnel - Electromechani...
CARRY FORWARD

- 384 -
Priced Bill of Quantities
07 - Main Tunnel - Electromechanical Equipment
304 - Signage, Detection, Communication and Control Systems
306 - Videosurveillance system
ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

1069 NP.SS.15 AMOUNT CARRIED FORWARD 1.320.000,00


1070 NP.SS.16 Server control system videosurveillance as per Drawing and Technical 924.000,00
1071 NP.SS.17 Specifications. 237.600,00
1072 NP.SS.18 1 264.000,00
1073 NP.SS.19 Total no. 396.000,00
1074 NP.SS.20 Recording system, hardware as per Drawing and Technical Specifications. 1 1,00 1.320.000,00
1075 NP.SS.21 Total no. 1,00 1.584.000,00
1076 NP.SS.22 Tunnel cameras with case and mounting as per Drawing and Technical 264.000,00
1077 NP.SS.23 Specifications. 132.000,00
1078 NP.SS.24 13 924.000,00
1079 NP.SS.25 Total no. 1,00 1.320.000,00
1080 NP.SS.26 Outdoor cameras with case and mounting as per Drawing and Technical Specifications. 1,00 3.300.000,00
1081 NP.SS.27 3
Total no.
Racks outdoor, complete as per Drawing and Technical Specifications. 2 13,00
Total no.
Cablings as per Drawing and Technical Specifications. 1
Total amount 13,00
Software control system videosurveillance as per Drawing and Technical
Specifications.
1 3,00
Total amount
Software recording system as per Drawing and Technical Specifications. 1
Total amount 3,00
Quality assurance as per Drawing and Technical Specifications. 1
Total amount
Engineering and configuration as per Drawing and Technical Specifications. 1
2,00
Total amount
Tests (FAT, SAT) as per Drawing and Technical Specifications. 1 2,00
Total amount
Installation as per Drawing and Technical Specifications. 1
Total amount
1,00
Documentation as per Drawing and Technical Specifications.
1,00
CARRY FORWARD Videosurveillance system
CARRY FORWARD Signage, Detection, Communication and Co...
CARRY FORWARD Main Tunnel - Electromechani... 1,00
CARRY FORWARD

1,00

1,00
1,00

1,00
1,00

1,00
1,00

1,00
1,00

1,00
1,00

- 385 -
Priced Bill of Quantities
07 - Main Tunnel - Electromechanical Equipment
304 - Signage, Detection, Communication and Control Systems
306 - Videosurveillance system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

1082 NP.SS.28 AMOUNT CARRIED FORWARD 132.000,00


1083 NP.SS.29 1 1,00 198.000,00
1084 NP.SS.30 Total amount 792.000,00
Training for operators as per Drawing and Technical Specifications. 1 1,00 396.000,00
Total amount
Transport, packaging as per Drawing and Technical Specifications. 1
Total amount 1,00
Maintenance and warranty (36 months) as per Drawing and Technical
1,00
Specifications.
1
Total amount
Total 306 - Videosurveillance system NPR 1,00
CARRY FORWARD Signage, Detection, Communication and Co... 1,00
CARRY FORWARD Main Tunnel - Electromechani...
CARRY FORWARD
1,00

1,00
- 386 -
Priced Bill of Quantities
07 - Main Tunnel - Electromechanical Equipment
304 - Signage, Detection, Communication and Control Systems
307 - Communication network

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

1085 NP.CC.01 AMOUNT CARRIED FORWARD 2.244.000,00


1086 NP.CC.02 Main switches as per Drawing and Technical Specifications. 3 3.300.000,00
1087 NP.CC.03 Total no. 660.000,00
1088 NP.CC.04 Secondary switches as per Drawing and Technical Specifications. 1 528.000,00
1089 NP.CC.05 Total amount 3,00 132.000,00
1090 NP.CC.06 Network management system (NMS) as per Drawing and Technical Specifications. 1 3,00 660.000,00
1091 NP.CC.07 Total no. 1.056.000,00
1092 NP.CC.08 NMS software, software of the switches as per Drawing and Technical 1.320.000,00
1093 NP.CC.09 Specifications. 132.000,00
1094 NP.CC.10 1 1,00 264.000,00
1095 NP.CC.11 Total amount 1,00 132.000,00
1096 NP.CC.12 Quality assurance as per Drawing and Technical Specifications. 1 264.000,00
Total amount
Engineering and configuration as per Drawing and Technical Specifications. 1
Total amount 1,00
Tests (FAT, SAT) as per Drawing and Technical Specifications. 1 1,00
Total amount
Installation as per Drawing and Technical Specifications. 1
Total amount 1,00
Documentation as per Drawing and Technical Specifications. 1
Total amount
Training for operators as per Drawing and Technical Specifications. 1 1,00
Total amount
Transport, packaging as per Drawing and Technical Specifications. 1
Total amount
1,00
Maintenance and warranty (36 months) as per Drawing and Technical
Specifications. 1,00
1
Total amount
Total 307 - Communication network NPR 1,00
CARRY FORWARD Signage, Detection, Communication and Co...
1,00
CARRY FORWARD Main Tunnel - Electromechani...
CARRY FORWARD

1,00
1,00

1,00
1,00

1,00
1,00

1,00
1,00

1,00
1,00

1,00

1,00
- 387 -
Priced Bill of Quantities
07 - Main Tunnel - Electromechanical Equipment
304 - Signage, Detection, Communication and Control Systems
308 - Tunnel control system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

1097 NP.CC.13 AMOUNT CARRIED FORWARD 396.000,00


1098 NP.CC.14 SCADA client as per Drawing and Technical Specifications. 2 660.000,00
1099 NP.CC.15 Total no. 1.320.000,00
1100 NP.CC.16 SCADA server as per Drawing and Technical Specifications. 2 198.000,00
1101 NP.CC.17 Total no. 2,00 1.584.000,00
1102 NP.CC.17b PLC as per Drawing and Technical Specifications. 10 2,00 1.056.000,00
1103 NP.CC.18 Total no. 66.000,00
1104 NP.CC.19 Operator panels as per Drawing and Technical Specifications. 12 264.000,00
1105 NP.CC.20 Total no. 1.320.000,00
1106 NP.CC.21 RTU as per Drawing and Technical Specifications. 1 2,00 9.900.000,00
1107 NP.CC.22 Total amount 2,00 528.000,00
1108 NP.CC.23 Control unit for remote VDS, with data transmission and power supply (1 spare) 5 198.000,00
1109 NP.CC.24 Total no. 1.056.000,00
Control room display w/ optical and acustic signalling as per Drawing and Technical
Specifications. 10,00
6 10,00
Total no.
Cablings, KVM included as per Drawing and Technical Specifications. 1
Total amount
SCADA client, license included as per Drawing and Technical Specifications. 1 12,00
Total amount 12,00
SCADA server, license included as per Drawing and Technical Specifications. 1
Total amount
PLC as per Drawing and Technical Specifications. 10
Total no. 1,00
Operator panels as per Drawing and Technical Specifications. 10 1,00
Total no.
RTU as per Drawing and Technical Specifications. 1
Total amount 5,00
CARRY FORWARD Tunnel control system
CARRY FORWARD Signage, Detection, Communication and Co... 5,00
CARRY FORWARD Main Tunnel - Electromechani...
CARRY FORWARD
6,00

6,00

1,00
1,00

1,00
1,00

1,00
1,00

10,00
10,00

10,00
10,00

1,00
1,00

- 388 -
Priced Bill of Quantities
07 - Main Tunnel - Electromechanical Equipment
304 - Signage, Detection, Communication and Control Systems
308 - Tunnel control system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

1110 NP.CC.25 AMOUNT CARRIED FORWARD 396.000,00


1111 NP.CC.26 Quality assurance as per Drawing and Technical Specifications. 1 5.280.000,00
1112 NP.CC.27 Total amount 3.960.000,00
1113 NP.CC.28 Engineering and configuration as per Drawing and Technical Specifications. 1 3.300.000,00
1114 NP.CC.29 Total amount 1,00 660.000,00
1115 NP.CC.30 Tests (FAT, SAT) as per Drawing and Technical Specifications. 1 1,00 1.980.000,00
1116 NP.CC.31 Total amount 2.640.000,00
1117 NP.CC.32 Installation as per Drawing and Technical Specifications. 1 660.000,00
Total amount
Documentation as per Drawing and Technical Specifications. 1 1,00
Total amount 1,00
Training for operators as per Drawing and Technical Specifications. 1
Total amount
Transport, packaging as per Drawing and Technical Specifications. 1
Total amount 1,00
Maintenance and warranty (36 months) as per Drawing and Technical 1,00
Specifications.
1
Total amount
1,00
Total 308 - Tunnel control system NPR
CARRY FORWARD Signage, Detection, Communication and Co... 1,00
CARRY FORWARD Main Tunnel - Electromechani...
CARRY FORWARD
1,00
1,00

1,00
1,00

1,00
1,00

1,00

1,00
- 389 -
Priced Bill of Quantities
07 - Main Tunnel - Electromechanical Equipment
304 - Signage, Detection, Communication and Control Systems
309 - Radio diffusion in tunnel

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

1118 NP.CC.33 AMOUNT CARRIED FORWARD 10.824.000,00


1119 NP.CC.34 Main Station FM, UHF and VHF as per Drawing and Technical Specifications. 1 4.884.000,00
1120 NP.CC.35 Total no. 1.782.000,00
1121 NP.CC.36 Tunnel Station FM, UHF and VHF as per Drawing and Technical Specifications. 2 1.320,00
1122 NP.CC.37 Total no. 1,00 528,00
1123 NP.CC.38 Pole and Antennas as per Drawing and Technical Specifications. 1 1,00 132.000,00
1124 NP.CC.39 Total no. 660,00
1125 NP.CC.40 Radiating cable as per Drawing and Technical Specifications. 1000 264.000,00
1126 NP.CC.41 Total no. 2.970.000,00
1127 NP.CC.42 Plastic Clips as per Drawing and Technical Specifications. 1000 2,00 132.000,00
1128 NP.CC.43 Total no. 2,00 792.000,00
1129 NP.CC.44 Stainless-steel clips as per Drawing and Technical Specifications. 1 594.000,00
1130 NP.CC.45 Total amount 2.970.000,00
1131 NP.CC.46 Coaxial cables as per Drawing and Technical Specifications. 300
Total no. 1,00
Other (connectors, resistors, etc.) as per Drawing and Technical Specifications. 1 1,00
Total no.
Police announcements (Option) as per Drawing and Technical Specifications. 1
Total amount
Quality assurance as per Drawing and Technical Specifications. 1 1.000,00
Total amount 1.000,00
Engineering and configuration as per Drawing and Technical Specifications. 1
Total amount
Tests (FAT, SAT) as per Drawing and Technical Specifications. 1
Total amount 1.000,00
Installation as per Drawing and Technical Specifications. 1 1.000,00
Total amount
Documentation as per Drawing and Technical Specifications.
CARRY FORWARD Radio diffusion in tunnel 1,00
CARRY FORWARD Signage, Detection, Communication and Co...
1,00
CARRY FORWARD Main Tunnel - Electromechani...
CARRY FORWARD
Total amount
Installation as per Drawing and Technical Specifications. 1
Total amount
Documentation as per Drawing and Technical Specifications.
CARRY FORWARD Radio diffusion in tunnel
CARRY FORWARD Signage, Detection, Communication and Co...
CARRY FORWARD Main Tunnel - Electromechani...
CARRY FORWARD

300,00
300,00

1,00
1,00

1,00
1,00

1,00
1,00

1,00
1,00

1,00
1,00

1,00
1,00

- 390 -
Priced Bill of Quantities
07 - Main Tunnel - Electromechanical Equipment
304 - Signage, Detection, Communication and Control Systems
309 - Radio diffusion in tunnel

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

1132 NP.CC.47 AMOUNT CARRIED FORWARD 330.000,00


1133 NP.CC.48 1 1,00 264.000,00
1134 NP.CC.49 Total amount 528.000,00
Training for operators as per Drawing and Technical Specifications. 1 1,00 396.000,00
Total amount
Transport, packaging as per Drawing and Technical Specifications. 1
Total amount
Maintenance and warranty (36 months) as per Drawing and Technical 1,00
Specifications. 1,00
1
Total amount
Total 309 - Radio diffusion in tunnel NPR
1,00
CARRY FORWARD Signage, Detection, Communication and Co...
1,00
CARRY FORWARD Main Tunnel - Electromechani...
CARRY FORWARD
1,00

1,00
CARRY FORWARD Main Tunnel - Electromechani...
CARRY FORWARD

- 391 -
Priced Bill of Quantities
07 - Main Tunnel - Electromechanical Equipment
304 - Signage, Detection, Communication and Control Systems
310 - Emergency telephone system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

1135 NP.CC.50 AMOUNT CARRIED FORWARD 1.716.000,00


1136 NP.CC.51 SOS cabinet, full as per Drawing and Technical Specifications. 11 2.640.000,00
1137 NP.CC.52 Total no. 660.000,00
1138 NP.CC.53 Equipment for treating the SOS calls as per Drawing and Technical Specifications. 2.640.000,00
1139 NP.CC.54 1 11,00 396.000,00
1140 NP.CC.55 Total no. 11,00 132.000,00
1141 NP.CC.56 Receiving station in control room as per Drawing and Technical Specifications. 1 660.000,00
1142 NP.CC.57 Total no. 1.980.000,00
1143 NP.CC.58 Software for treating the SOS calls as per Drawing and Technical Specifications. 1 1,00 2.640.000,00
1144 NP.CC.59 Total amount 132.000,00
1145 NP.CC.60 Software for receiving station as per Drawing and Technical Specifications. 1 396.000,00
1146 NP.CC.61 Total amount 1,00 1.980.000,00
1147 NP.CC.62 Quality assurance as per Drawing and Technical Specifications. 1
Total amount
Engineering and configuration as per Drawing and Technical Specifications. 1
Total amount 1,00
Tests (FAT, SAT) as per Drawing and Technical Specifications. 1
Total amount
Installation as per Drawing and Technical Specifications. 1
Total amount
Documentation as per Drawing and Technical Specifications. 1
Total amount
1144 NP.CC.59 Total amount 132.000,00
1145 NP.CC.60 Software for receiving station as per Drawing and Technical Specifications. 1 396.000,00
1146 NP.CC.61 Total amount 1.980.000,00
1147 NP.CC.62 Quality assurance as per Drawing and Technical Specifications. 1
Total amount
Engineering and configuration as per Drawing and Technical Specifications. 1
Total amount
Tests (FAT, SAT) as per Drawing and Technical Specifications. 1 1,00
Total amount
Installation as per Drawing and Technical Specifications. 1
Total amount
1,00
Documentation as per Drawing and Technical Specifications. 1
Total amount 1,00
Training for operators as per Drawing and Technical Specifications. 1
Total amount
Transport, packaging as per Drawing and Technical Specifications. 1
1,00
Total amount
Maintenance and warranty (36 months) as per Drawing and Technical 1,00
Specifications.
1
CARRY FORWARD Signage, Detection, Communication and Co...
1,00
CARRY FORWARD Main Tunnel - Electromechani... 1,00
CARRY FORWARD

1,00
1,00

1,00
1,00

1,00
1,00

1,00
1,00

1,00
1,00

1,00
1,00

1,00

- 392 -
Priced Bill of Quantities
07 - Main Tunnel - Electromechanical Equipment
304 - Signage, Detection, Communication and Control Systems
310 - Emergency telephone system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD 264.000,00


Total amount 1,00
Total 310 - Emergency telephone system NPR
CARRY FORWARD Signage, Detection, Communication and Co...
CARRY FORWARD Main Tunnel - Electromechani...
CARRY FORWARD
AMOUNT CARRIED FORWARD 264.000,00
Total amount
Total 310 - Emergency telephone system NPR
CARRY FORWARD Signage, Detection, Communication and Co...
CARRY FORWARD Main Tunnel - Electromechani...
CARRY FORWARD

- 393 -
Priced Bill of Quantities
07 - Main Tunnel - Electromechanical Equipment
304 - Signage, Detection, Communication and Control Systems
311 - Cabling system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE


DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

1148 NP.CS.01 AMOUNT CARRIED FORWARD 5.940.000,00


1149 NP.CS.02 Earthing and lightning protection system as per Drawing and Technical 3.960.000,00
1150 NP.CS.03 Specifications. 1.584.000,00
1151 NP.CS.04 1 44.220.000,00
1152 NP.CS.05 Total amount 132.000,00
1153 NP.CS.06 Fibre-optic infrastructure as per Drawing and Technical Specifications. 1 1,00 2.640.000,00
1154 NP.CS.07 Total amount 1,00 1.320.000,00
1155 NP.CS.08 Universal structured wiring as per Drawing and Technical Specifications. 1 15.840.000,00
1156 NP.CS.09 Total amount 132.000,00
1157 NP.CS.10 Cable shelves and pipe infrastructure as per Drawing and Technical Specifications. 264.000,00
1158 NP.CS.11 1 1,00 1.980.000,00
1159 NP.CS.12 Total amount 1,00 132.000,00
Quality assurance as per Drawing and Technical Specifications. 1
Total amount
Engineering and configuration as per Drawing and Technical Specifications. 1
Total amount 1,00
Tests (FAT, SAT) as per Drawing and Technical Specifications. 1 1,00
Total amount
Installation as per Drawing and Technical Specifications. 1
Total amount 1,00
Documentation as per Drawing and Technical Specifications. 1
Total amount
Training for operators as per Drawing and Technical Specifications. 1 1,00
Total amount
Transport, packaging as per Drawing and Technical Specifications. 1
Total amount
Maintenance and warranty (36 months) as per Drawing and Technical 1,00
Specifications. 1,00
1
Total amount
Total 311 - Cabling system NPR 1,00
CARRY FORWARD Main Tunnel - Electromechani... 1,00
CARRY FORWARD

1,00
1,00

1,00
1,00

1,00
1,00

1,00
1,00

1,00
1,00

1,00

1,00

- 394 -
Priced Bill of Quantities
07 - Main Tunnel - Electromechanical Equipment
304 - Signage, Detection, Communication and Control Systems
311 - Cabling system

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

AMOUNT CARRIED FORWARD


Total 304 - Signage, Detection, Communication and Control Systems
NPR
CARRY FORWARD Main Tunnel - Electromechani...
CARRY FORWARD
- 395 -
Priced Bill of Quantities
07 - Main Tunnel - Electromechanical Equipment
305 - Secondary systems
312 - Secondary installations

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE

1160 NP.SI.01 AMOUNT CARRIED FORWARD 3.300.000,00


1161 NP.SI.02 Electrical and lighting system in buildings as per Drawing and Technical 990.000,00
1162 NP.SI.03 Specifications. 528.000,00
1163 NP.SI.04 1 264.000,00
1164 NP.SI.05 Total amount 132.000,00
1165 NP.SI.06 Chain hoist as per Drawing and Technical Specifications. 2 1,00 1.320.000,00
1166 NP.SI.07 Total no. 1,00 528.000,00
1167 NP.SI.08 Fire barriers as per Drawing and Technical Specifications. 1 1.980.000,00
1168 NP.SI.09 Total amount 132.000,00
1169 NP.SI.10 Telephony in rooms and buildings as per Drawing and Technical Specifications. 1 528.000,00
1170 NP.SI.11 Total amount 2,00 660.000,00
1171 NP.SI.12 Quality assurance as per Drawing and Technical Specifications. 1 2,00 396.000,00
Total amount
Engineering and configuration as per Drawing and Technical Specifications. 1
Total amount
Tests (FAT, SAT) as per Drawing and Technical Specifications. 1 1,00
Total amount 1,00
Installation as per Drawing and Technical Specifications. 1
Total amount
Documentation as per Drawing and Technical Specifications. 1
Total amount 1,00
Training for operators as per Drawing and Technical Specifications. 1 1,00
Total amount
Transport, packaging as per Drawing and Technical Specifications. 1
Total amount
Maintenance and warranty (36 months) as per Drawing and Technical 1,00
Specifications. 1,00
1
Total amount
Total 312 - Secondary installations NPR
Total 305 - Secondary systems NPR 1,00
CARRY FORWARD 1,00

1,00
1,00

1,00
1,00
1,00
1,00

1,00
1,00

1,00
1,00

1,00

1,00

- 396 -
Priced Bill of Quantities
07 - Main Tunnel - Electromechanical Equipment
305 - Secondary systems
312 - Secondary installations

ITEM DESCRIPTION OF WORKS AND SUPPLIES QUANTITY PRICE

N. CODE
AMOUNT CARRIED FORWARD
Total 07 - Main Tunnel - Electromechanical Equipment
NPR
Jobs amount NPR

- 397 -
TOTAL AMOUNT OF WORK

DESCRIPTION OF WORKS AND SUPPLIES PARTIAL AMOUNTS

A) WORKS
01 - Road Alignement MR1 - Main Road - South Stretch - CH 0+000 to 0+904 462.984.316,2
1
001 - Road Works 36.116.491,12
001 - Exavation, Filling and Paving 34.617.691,79
90 - Excavation 2.703.232,51
175 - Embankment/Filling 228.503,97
980 - Precast rectangular channeling 4.410.000,00
1420 - Paving 27.275.955,31
004 - Signaling 1.498.799,33
1610 - Signaling 1.498.799,33
002 - Rockside rock excavation 69.747.367,00
005 - Tecco Mesh and Shotcrete CH 28+200 / CH 28+350 69.747.367,00
160 - Protezione scavi 69.747.367,00
003 - Rockfall Protection Measures 304.477.591,60
006 - Tecco Mesh and Shotcrete CH 30+250 / CH 30+450 191.114.391,60
160 - Protezione scavi 191.114.391,60
009 - ROCKFALL BARRIER 84.819.500,00
160 - Protezione scavi 84.819.500,00
010 - Scaling of unstable blocks 28.543.700,00
160 - Protezione scavi 28.543.700,00
006 - Hydraulic Works 8.171.761,30
019 - Culvert 1 525.546,12
90 - Excavation 7.393,68
180 - Filling 10.528,99
1005 - culverts 507.623,45
020 - Culvert 2 1.393.006,17
90 - Excavation 20.901,40
180 - Filling 18.620,92
1005 - culverts 1.353.483,85
021 - Culvert A1 673.324,07
90 - Excavation 10.934,02
180 - Filling 13.049,97
1005 - culverts 649.340,08
022 - Culvert 3 739.628,57
90 - Excavation 12.340,80
180 - Filling 18.788,75
1005 - culverts 708.499,02
023 - Culvert A2 1.374.898,66
90 - Excavation 22.781,90
180 - Filling 11.944,53
1005 - culverts 1.340.172,23
024 - Culvert 4 2.382.544,31
90 - Excavation 15.121,97
180 - Filling 21.371,74
1005 - culverts 2.346.050,60
025 - Culvert 5 1.082.813,40
90 - Excavation 9.249,00
1005 - culverts 1.073.564,40
007 - Civil Works 44.471.105,19
050 - Wall CH 0+050 / CH 0+110 3.932.383,57
90 - Excavation 46.565,79
560 - Structures 3.885.817,78
051 - Wall CH 0+150 / CH 0+250 8.588.437,99
90 - Excavation 84.384,51
560 - Structures 8.504.053,48
052 - Wall CH 0+350 1.920.652,20
90 - Excavation 11.641,45
560 - Structures 1.909.010,75
053 - Wall CH 0+390 2.161.812,40
90 - Excavation 11.641,45
560 - Structures 2.150.170,95

- 398 -
TOTAL AMOUNT OF WORK

DESCRIPTION OF WORKS AND SUPPLIES PARTIAL AMOUNTS

A) WORKS
054 - Wall CH 0+450 1.488.326,69
90 - Excavation 11.641,45
560 - Structures 1.476.685,24
055 - Wall CH 0+530 / CH 0+550 4.249.974,25
90 - Excavation 23.282,90
560 - Structures 4.226.691,35
056 - Wall CH 0+630 / CH 0+650 4.249.974,25
90 - Excavation 23.282,90
560 - Structures 4.226.691,35
057 - Wall CH 0+790 1.043.666,69
90 - Excavation 11.641,45
560 - Structures 1.032.025,24
058 - Wall CH 0+870 / CH 0+890 16.835.877,15
90 - Excavation 224.513,64
560 - Structures 16.611.363,51
02 - Road Alignement TU – Tunnel - CH 0+904 to 2+034 4.042.251.071,
06
001 - Road Works 24.934.578,82
001 - Exavation, Filling and Paving 23.013.083,42
1420 - Paving 23.013.083,42
004 - Signaling 1.921.495,40
1610 - Signaling 1.921.495,40
101 - Main Tunnel - South portal -Technological Building 151.558.736,59
005 - Tecco Mesh and Shotcrete CH 28+200 / CH 28+350 125.537.408,65
90 - Excavation 3.450.896,12
175 - Embankment/Filling 5.411.903,89
600 - Protezione imbocchi in ingresso gallerie in presenza di marciapiedi 116.674.608,64
102 - Technological Building South 26.021.327,94
280 - Foundation Slabs 3.537.735,67
300 - Vertical Elements 6.840.429,02
680 - Slabs 5.918.163,25
685 - Completion work 9.725.000,00
102 - Main Tunnel - North portal -Technological Building 124.030.036,00
006 - Tecco Mesh and Shotcrete CH 30+250 / CH 30+450 107.971.857,09
90 - Excavation 2.885.639,53
175 - Embankment/Filling 5.974.001,55
600 - Protezione imbocchi in ingresso gallerie in presenza di marciapiedi 99.112.216,01
103 - Technological Building North 16.058.178,91
280 - Foundation Slabs 4.385.473,04
300 - Vertical Elements 6.039.736,07
680 - Slabs 3.482.969,80
685 - Completion work 2.150.000,00
103 - Main Tunnel 3.399.993.377,39
110 - Main Tunnel - section type 0 straight line (only excavation and lining) 73.658.776,41
180 - Filling 1.616.589,61
800 - Tunnel excavation 39.382.568,73
810 - Pre-Support 9.265.520,58
820 - Rock Reinforcement 400.703,62
845 - Waterproofing system 6.975.349,27
850 - Lining bottom side / Inver 1.739.417,53
853 - Lining upper side 14.278.627,07
111 - Main Tunnel - section type 1 straight line (only excavation and lining) 216.141.826,13
180 - Filling 1.616.589,61
800 - Tunnel excavation 100.256.680,99
810 - Pre-Support 48.143.937,10
820 - Rock Reinforcement 8.325.150,75
845 - Waterproofing system 17.534.364,22
850 - Lining bottom side / Inver 4.372.285,33
853 - Lining upper side 35.892.818,13
112 - Main Tunnel - section type 2 straight line (only excavation and lining) 159.874.101,31
180 - Filling 1.616.589,61
800 - Tunnel excavation 55.954.583,47
- 399 -
TOTAL AMOUNT OF WORK

DESCRIPTION OF WORKS AND SUPPLIES PARTIAL AMOUNTS

A) WORKS
810 - Pre-Support 42.833.410,81
820 - Rock Reinforcement 15.892.667,52
845 - Waterproofing system 9.663.098,53
850 - Lining bottom side / Inver 4.724.000,18
853 - Lining upper side 29.189.751,19
113 - Main Tunnel - section type 3 straight line (only excavation and lining) 267.656.895,58
180 - Filling 1.616.589,61
800 - Tunnel excavation 77.490.091,76
810 - Pre-Support 92.055.359,97
820 - Rock Reinforcement 37.045.880,51
845 - Waterproofing system 13.182.770,18
850 - Lining bottom side / Inver 6.444.556,43
853 - Lining upper side 39.821.647,12
114 - Main Tunnel - section type 4 straight line (only excavation and lining) 389.742.328,62
180 - Filling 1.616.589,61
800 - Tunnel excavation 76.500.580,67
810 - Pre-Support 143.932.549,95
820 - Rock Reinforcement 103.183.941,77
845 - Waterproofing system 11.839.378,46
850 - Lining bottom side / Inver 8.473.661,34
853 - Lining upper side 44.195.626,82
115 - Main Tunnel - section type 5 straight line (only excavation and lining) 891.513.136,76
180 - Filling 2.390.082,23
800 - Tunnel excavation 150.727.960,16
810 - Pre-Support 340.722.508,16
820 - Rock Reinforcement 232.224.000,00
845 - Waterproofing system 21.978.961,84
850 - Lining bottom side / Inver 49.456.583,83
853 - Lining upper side 94.013.040,54
117 - Main Tunnel - section type 0 widened section (only excavation and lining) 81.655.350,99
180 - Filling 1.751.486,72
800 - Tunnel excavation 39.683.095,92
810 - Pre-Support 9.036.359,87
820 - Rock Reinforcement 382.322,72
845 - Waterproofing system 6.798.119,12
850 - Lining bottom side / Inver 3.253.562,47
853 - Lining upper side 20.750.404,17
118 - Main Tunnel - section type 1 widened section (only excavation and lining) 254.342.234,61
180 - Filling 1.751.486,72
800 - Tunnel excavation 108.935.365,97
810 - Pre-Support 51.270.704,08
820 - Rock Reinforcement 8.863.637,60
845 - Waterproofing system 18.433.361,46
850 - Lining bottom side / Inver 8.822.159,78
853 - Lining upper side 56.265.519,00
119 - Main Tunnel - section type 2 widened section (only excavation and lining) 263.204.564,17
180 - Filling 1.751.486,72
800 - Tunnel excavation 93.853.628,42
810 - Pre-Support 70.614.577,23
820 - Rock Reinforcement 25.903.135,44
845 - Waterproofing system 15.687.967,20
850 - Lining bottom side / Inver 7.508.221,08
853 - Lining upper side 47.885.548,08
120 - Main Tunnel - section type 3 widened section (only excavation and lining) 177.211.446,06
180 - Filling 1.751.486,72
800 - Tunnel excavation 52.377.229,36
810 - Pre-Support 61.310.120,19
820 - Rock Reinforcement 22.677.654,78
845 - Waterproofing system 8.628.381,96
850 - Lining bottom side / Inver 4.129.521,60
853 - Lining upper side 26.337.051,45
122 - Main Tunnel - section type 0 lay-by (only excavation and lining) 49.915.641,98
180 - Filling 2.221.450,86
- 400 -
TOTAL AMOUNT OF WORK

DESCRIPTION OF WORKS AND SUPPLIES PARTIAL AMOUNTS

A) WORKS
800 - Tunnel excavation 16.642.587,97
810 - Pre-Support 3.272.865,50
820 - Rock Reinforcement 124.990,12
845 - Waterproofing system 2.451.962,02
850 - Lining bottom side / Inver 1.633.261,99
853 - Lining upper side 23.568.523,52
123 - Main Tunnel - section type 1 lay-by (only excavation and lining) 127.048.103,95
180 - Filling 2.221.450,86
800 - Tunnel excavation 42.543.169,29
810 - Pre-Support 29.489.855,74
820 - Rock Reinforcement 3.812.786,85
845 - Waterproofing system 6.202.021,58
850 - Lining bottom side / Inver 4.131.192,07
853 - Lining upper side 38.647.627,56
124 - Main Tunnel - section type 2 lay-by (only excavation and lining) 62.962.577,59
180 - Filling 2.221.450,86
800 - Tunnel excavation 16.998.493,21
810 - Pre-Support 11.872.453,77
820 - Rock Reinforcement 4.216.432,22
845 - Waterproofing system 2.451.962,02
850 - Lining bottom side / Inver 1.633.261,99
853 - Lining upper side 23.568.523,52
125 - Main Tunnel - section type 3 lay-by (only excavation and lining) 45.878.039,88
180 - Filling 2.221.450,86
800 - Tunnel excavation 9.211.935,02
810 - Pre-Support 10.688.516,25
820 - Rock Reinforcement 2.664.572,90
845 - Waterproofing system 1.298.097,54
850 - Lining bottom side / Inver 864.668,10
853 - Lining upper side 18.928.799,21
126 - Main Tunnel - Cut&Cover Stretch South 18.369.618,41
870 - Portal 18.369.618,41
127 - Main Tunnel - Cut&Cover Stretch North 21.783.716,45
870 - Portal 21.783.716,45
130 - Main Tunnel - Completation work 299.035.018,49
250 - Drenaggi 57.622.922,94
700 - Marciapiedi e cordoli 59.793.195,64
1980 - Antincendio 56.526.950,00
1982 - Doors for by-pass and niches 21.600.000,00
1983 - Metallic horizontal support for traffic lights 11.000.000,00
1985 - Painting and internal surfaces finishing 54.450.000,00
2100 - Vie cavi 38.041.949,91
104 - By-Pass #1 107.239.423,50
150 - By-Pass - section type 0 (only excavation and lining) 5.039.434,35
800 - Tunnel excavation 1.446.920,24
810 - Pre-Support 838.627,59
820 - Rock Reinforcement 84.552,14
845 - Waterproofing system 685.262,69
850 - Lining bottom side / Inver 647.784,43
853 - Lining upper side 1.336.287,26
151 - By-Pass - section type 1 (only excavation and lining) 17.941.899,34
800 - Tunnel excavation 4.413.224,90
810 - Pre-Support 4.012.239,81
820 - Rock Reinforcement 1.624.871,56
845 - Waterproofing system 2.025.994,04
850 - Lining bottom side / Inver 1.915.131,84
853 - Lining upper side 3.950.437,19
152 - By-Pass - section type 2 (only excavation and lining) 27.852.012,13
800 - Tunnel excavation 6.090.301,69
810 - Pre-Support 8.193.641,86
820 - Rock Reinforcement 3.007.171,13
845 - Waterproofing system 2.711.256,73
850 - Lining bottom side / Inver 2.562.916,26
- 401 -
TOTAL AMOUNT OF WORK

DESCRIPTION OF WORKS AND SUPPLIES PARTIAL AMOUNTS

A) WORKS
853 - Lining upper side 5.286.724,46
153 - By-Pass - section type 3 (only excavation and lining) 35.401.973,11
800 - Tunnel excavation 6.371.379,03
810 - Pre-Support 10.420.308,24
820 - Rock Reinforcement 7.561.937,07
845 - Waterproofing system 2.836.391,66
850 - Lining bottom side / Inver 2.681.262,16
853 - Lining upper side 5.530.694,95
154 - By-Pass - Air-Lock section type 3 (only excavation and lining) 21.004.104,57
800 - Tunnel excavation 4.128.095,51
810 - Pre-Support 6.946.388,92
820 - Rock Reinforcement 3.899.700,11
845 - Waterproofing system 1.101.659,78
850 - Lining bottom side / Inver 1.185.006,12
853 - Lining upper side 3.743.254,13
105 - By-Pass #2 100.230.084,47
150 - By-Pass - section type 0 (only excavation and lining) 8.983.258,67
800 - Tunnel excavation 2.579.266,17
810 - Pre-Support 1.494.920,26
820 - Rock Reinforcement 150.723,38
845 - Waterproofing system 1.221.555,23
850 - Lining bottom side / Inver 1.154.802,40
853 - Lining upper side 2.381.991,23
151 - By-Pass - section type 1 (only excavation and lining) 27.176.873,20
800 - Tunnel excavation 6.684.737,72
810 - Pre-Support 6.077.406,75
820 - Rock Reinforcement 2.461.202,51
845 - Waterproofing system 3.068.785,09
850 - Lining bottom side / Inver 2.900.880,70
853 - Lining upper side 5.983.860,43
152 - By-Pass - section type 2 (only excavation and lining) 12.548.817,43
800 - Tunnel excavation 2.743.982,08
810 - Pre-Support 3.691.544,99
820 - Rock Reinforcement 1.354.941,50
845 - Waterproofing system 1.221.555,23
850 - Lining bottom side / Inver 1.154.802,40
853 - Lining upper side 2.381.991,23
153 - By-Pass - section type 3 (only excavation and lining) 30.517.030,60
800 - Tunnel excavation 5.487.964,16
810 - Pre-Support 8.999.245,00
820 - Rock Reinforcement 6.513.453,52
845 - Waterproofing system 2.443.110,46
850 - Lining bottom side / Inver 2.309.494,96
853 - Lining upper side 4.763.762,50
154 - By-Pass - Air-Lock section type 3 (only excavation and lining) 21.004.104,57
800 - Tunnel excavation 4.128.095,51
810 - Pre-Support 6.946.388,92
820 - Rock Reinforcement 3.899.700,11
845 - Waterproofing system 1.101.659,78
850 - Lining bottom side / Inver 1.185.006,12
853 - Lining upper side 3.743.254,13
106 - By-Pass #3 96.620.130,74
150 - By-Pass - section type 0 (only excavation and lining) 3.943.824,30
800 - Tunnel excavation 1.132.345,93
810 - Pre-Support 656.292,67
820 - Rock Reinforcement 66.171,24
845 - Waterproofing system 536.292,54
850 - Lining bottom side / Inver 507.017,96
853 - Lining upper side 1.045.703,96
151 - By-Pass - section type 1 (only excavation and lining) 13.984.366,99
800 - Tunnel excavation 3.439.719,41
810 - Pre-Support 3.127.225,95
820 - Rock Reinforcement 1.266.444,01
- 402 -
TOTAL AMOUNT OF WORK

DESCRIPTION OF WORKS AND SUPPLIES PARTIAL AMOUNTS

A) WORKS
845 - Waterproofing system 1.579.083,59
850 - Lining bottom side / Inver 1.492.766,83
853 - Lining upper side 3.079.127,20
152 - By-Pass - section type 2 (only excavation and lining) 21.730.843,21
800 - Tunnel excavation 4.751.773,85
810 - Pre-Support 6.392.957,01
820 - Rock Reinforcement 2.346.262,86
845 - Waterproofing system 2.115.376,13
850 - Lining bottom side / Inver 1.999.642,19
853 - Lining upper side 4.124.831,17
153 - By-Pass - section type 3 (only excavation and lining) 35.956.991,67
800 - Tunnel excavation 6.471.802,39
810 - Pre-Support 10.581.785,92
820 - Rock Reinforcement 7.681.115,11
845 - Waterproofing system 2.881.105,20
850 - Lining bottom side / Inver 2.723.401,09
853 - Lining upper side 5.617.781,96
154 - By-Pass - Air-Lock section type 3 (only excavation and lining) 21.004.104,57
800 - Tunnel excavation 4.128.095,51
810 - Pre-Support 6.946.388,92
820 - Rock Reinforcement 3.899.700,11
845 - Waterproofing system 1.101.659,78
850 - Lining bottom side / Inver 1.185.006,12
853 - Lining upper side 3.743.254,13
115 - SOS niches 37.644.703,55
131 - Flushing niches 22.870.110,54
800 - Tunnel excavation 3.753.010,56
810 - Pre-Support 7.266.175,07
845 - Waterproofing system 2.920.320,00
850 - Lining bottom side / Inver 250.482,08
853 - Lining upper side 8.680.122,83
132 - Hydrant niches 1.433.597,88
800 - Tunnel excavation 200.441,51
810 - Pre-Support 488.885,06
845 - Waterproofing system 197.820,00
850 - Lining bottom side / Inver 11.420,49
853 - Lining upper side 535.030,82
133 - SOS / Hydrant niches 13.340.995,13
800 - Tunnel excavation 2.436.296,27
810 - Pre-Support 4.975.417,07
845 - Waterproofing system 925.020,00
850 - Lining bottom side / Inver 75.770,56
853 - Lining upper side 4.928.491,23
03 - Pedestrian Road Alignement PE 928.318.891,2
2
006 - Hydraulic Works 6.162.042,91
026 - Culvert A3 400.823,18
1005 - culverts 400.823,18
027 - Culvert 6 570.968,53
1005 - culverts 570.968,53
028 - Culvert 7 508.800,04
1005 - culverts 508.800,04
029 - Culvert 8 1.182.837,39
1005 - culverts 1.182.837,39
030 - Culvert 9 711.120,31
1005 - culverts 711.120,31
031 - Culvert 10 955.158,91
1005 - culverts 955.158,91
032 - Culvert A4 604.506,80
1005 - culverts 604.506,80
033 - Culvert 11 675.128,03
1005 - culverts 675.128,03
- 403 -
TOTAL AMOUNT OF WORK

DESCRIPTION OF WORKS AND SUPPLIES PARTIAL AMOUNTS

A) WORKS
034 - Culvert A5 552.699,72
1005 - culverts 552.699,72
007 - Civil Works 59.975.388,31
067 - Wall CH 0+080 / CH 0+095 1.040.853,80
90 - Excavation 7.566,94
560 - Structures 1.033.286,86
068 - Wall CH 0+900 / CH 0+920 2.137.047,95
90 - Excavation 16.685,01
560 - Structures 2.120.362,94
069 - Wall CH 0+920 / CH 0+950 19.285.069,62
90 - Excavation 57.714,72
560 - Structures 19.227.354,90
070 - Walls CH 0+110 / CH 0+890 37.512.416,94
90 - Excavation 303.157,38
560 - Structures 37.209.259,56
202 - Pedestrain rockshed 723.175.479,44
001 - Exavation, Filling and Paving 8.078.985,31
1420 - Paving 8.078.985,31
201 - Exavation and Filling 21.590.408,04
90 - Excavation 4.064.108,14
175 - Embankment/Filling 17.526.299,90
204 - Consolidamento parete lungo il manufatto 6.652.095,08
160 - Protezione scavi 6.652.095,08
205 - Rockshed Section 418.743.167,36
280 - Foundation Slabs 103.034.177,11
300 - Vertical Elements 139.257.861,62
574 - Impermeabilizzazioni 71.630.164,44
680 - Slabs 104.820.964,19
206 - Road works and secondary civil works 40.991.587,06
1420 - Paving 40.991.587,06
207 - Cushion layer (Leca) 227.119.236,59
175 - Embankment/Filling 227.119.236,59
203 - ROADSIDE ROCK STABILIZATION 89.703.564,90
208 - Shotcrete + bolts 89.703.564,90
160 - Protezione scavi 89.703.564,90
204 - ROADSIDE ROCK EXCAVATION 49.302.415,66
208 - Shotcrete + bolts 49.302.415,66
160 - Protezione scavi 49.302.415,66
04 - Road Alignement MR2 - Main Road - North Stretch - CH 2+034 to 2+587 516.094.456,2
6
001 - Road Works 28.566.828,53
001 - Exavation, Filling and Paving 27.617.242,75
90 - Excavation 1.621.468,58
175 - Embankment/Filling 292.141,27
980 - Precast rectangular channeling 2.695.000,00
1420 - Paving 23.008.632,90
004 - Signaling 949.585,78
1610 - Signaling 949.585,78
002 - Rockside rock excavation 37.735.451,50
006 - Tecco Mesh and Shotcrete CH 30+250 / CH 30+450 37.735.451,50
160 - Protezione scavi 37.735.451,50
003 - Rockfall Protection Measures 407.919.515,90
006 - Tecco Mesh and Shotcrete CH 30+250 / CH 30+450 319.510.515,90
160 - Protezione scavi 319.510.515,90
009 - ROCKFALL BARRIER 88.409.000,00
160 - Protezione scavi 88.409.000,00
006 - Hydraulic Works 7.957.147,38
035 - Culvert 12 1.885.194,96
90 - Excavation 9.563,22
180 - Filling 5.031,01
1005 - culverts 1.870.600,73
- 404 -
TOTAL AMOUNT OF WORK

DESCRIPTION OF WORKS AND SUPPLIES PARTIAL AMOUNTS

A) WORKS
036 - Culvert A6 539.316,91
90 - Excavation 7.861,41
180 - Filling 11.696,45
1005 - culverts 519.759,05
037 - Culvert 13 2.648.943,97
90 - Excavation 37.492,52
180 - Filling 11.791,31
1005 - culverts 2.599.660,14
038 - Culvert A7 584.693,80
90 - Excavation 8.746,49
180 - Filling 12.608,52
1005 - culverts 563.338,79
039 - Culvert 14 575.047,34
90 - Excavation 8.563,00
180 - Filling 12.969,71
1005 - culverts 553.514,63
040 - Culvert 15 1.723.950,40
90 - Excavation 21.158,05
180 - Filling 21.867,91
1005 - culverts 1.680.924,44
007 - Civil Works 33.915.512,95
059 - Wall CH 2+070 / CH 2+090 16.835.877,15
90 - Excavation 224.513,64
560 - Structures 16.611.363,51
060 - Wall CH 2+110 / CH 2+130 4.099.628,75
90 - Excavation 23.282,90
560 - Structures 4.076.345,85
061 - Wall CH 2+210 1.923.566,90
90 - Excavation 11.641,45
560 - Structures 1.911.925,45
062 - Wall CH 2+270 1.923.566,90
90 - Excavation 11.641,45
560 - Structures 1.911.925,45
063 - Wall CH 2+310 1.043.666,69
90 - Excavation 11.641,45
560 - Structures 1.032.025,24
064 - Wall CH 2+410 / CH 2+430 2.101.833,39
90 - Excavation 23.282,90
560 - Structures 2.078.550,49
065 - Wall CH 2+510 / CH 2+530 2.101.833,39
90 - Excavation 23.282,90
560 - Structures 2.078.550,49
066 - Wall CH 2+570 / CH 2+590 3.885.539,78
90 - Excavation 23.282,90
560 - Structures 3.862.256,88
05 - waste disposal 11.655.853,73
07 - Main Tunnel - Electromechanical Equipment 630.418.800,0
0
301 - Electrical Systems 132.000.000,00
301 - Energy supply 57.288.000,00
302 - Lighting 74.712.000,00
302 - Mechanical Systems 182.292.000,00
303 - Ventilation 103.356.000,00
313 - Engress tunnel ventilation 78.936.000,00
304 - Signage, Detection, Communication and Control Systems 304.378.800,00
304 - Signage 30.360.000,00
305 - Tunnel fire detection system 32.604.000,00
306 - Videosurveillance system 17.278.800,00
307 - Communication network 15.180.000,00
- 405 -
TOTAL AMOUNT OF WORK

DESCRIPTION OF WORKS AND SUPPLIES PARTIAL AMOUNTS

A) WORKS
308 - Tunnel control system 63.624.000,00
309 - Radio diffusion in tunnel 33.792.000,00
310 - Emergency telephone system 33.396.000,00
311 - Cabling system 78.144.000,00
305 - Secondary systems 11.748.000,00
312 - Secondary installations 11.748.000,00

JOBS AMOUNT NPR

B) AVAILABLE AMOUNTS

TOTAL AVAILABLE AMOUNTS

TOTAL AMOUNT OF WORK NPR


- 406 -
g through the

ON OF

0.DOC
Approved
MUB
oQ

................ 4
................ 5

Page 2
oQ

9
9

soft
copy.
.pdf

Page 3
oQ

tunnel of the Siddhababa stretch along

. In cases where DoR norms are not


ds have been defined here.

roved District rates of Rupandehi for


h new rates have been developed,

ndertake construction following


works (except for tunnel portals).

oQ

the cost of the project, detailed quantity


vities. The quantities of road works
ated by design software.
PRICE AMOUNT

38
3,
49

2.703.232,51
2.703.232,51
2.703.232,51
2.703.232,51
2.703.232,5
2.703.232,51
PRICE AMOUNT

36 2.703.232,51
4, 228.503,97
83
4,
83

228.503,97
2.931.736,48
2.931.736,48
2.931.736,4
2.931.736,48

PRICE AMOUNT
4.900, 2.931.736,48
00 4.410.000,00

4.410.000,00
7.341.736,48
7.341.736,48
7.341.736,4
7.341.736,48
PRICE AMOUNT

1.996,11 7.341.736,48
12.172,63 3.979.165,44
9.577,26 18.313.721,84
73,42 3.602.294,80
1.380.773,23

27.275.955,31
34.617.691,7
9
34.617.691,79
34.617.691,
34.617.691,79
PRICE AMOUNT

34.617.691,79

1.745, 1.498.799,33
53
1.498.799,33
1.498.799,33
36.116.491,12
36.116.491,
36.116.491,12

PRICE AMOUNT

36.116.491,12
8.500, 21.590.000,00
00

21.590.000,00

21.590.000,0
21.590.000,00
57.706.491,

57.706.491,12

PRICE AMOUNT

57.706.491,12
66 1.691.767,00
6,
05

23.281.767,00
23.281.767,0
23.281.767,00
59.398.258,

59.398.258,12

PRICE AMOUNT

59.398.258,12
23.281.767,00

23.281.767,0
23.281.767,00
59.398.258,

59.398.258,12

PRICE AMOUNT

59.398.258,12
7.780,00 41.389.600,00

3.000,00 5.076.000,00
69.747.367,00
69.747.367,0
0
69.747.367,00

105.863.858
105.863.858,12

PRICE AMOUNT

105.863.858,12
8.500,00 27.132.000,00

666,05 2.126.031,60

9.350,00 44.767.800,00

74.025.831,60

74.025.831,6
74.025.831,60
179.889.689
179.889.689,72

PRICE AMOUNT

179.889.689,72
8.200,00 62.818.560,00

6.000,00 47.880.000,00

3.000,00 6.390.000,00
191.114.391,60
191.114.391,
60

191.114.391,60
296.978.249
296.978.249,72

PRICE AMOUNT
PRICE AMOUNT

296.978.249,72

34.500,00 17.112.000,00

53.000,00 67.707.500,00
84.819.500,00
84.819.500,0
0

275.933.891,60
381.797.749
381.797.749,72
PRICE AMOUNT

1.900, 381.797.749,72
00 28.543.700,00

28.543.700,00
28.543.700,0
0
304.477.591,60
410.341.449
410.341.449,72
PRICE AMOUNT

11 410.341.449,72
9, 7.393,68
93

7.393,68
7.393,68
7.393,68
410.348.843
410.348.843,40
PRICE AMOUNT

36 410.348.843,40
4, 10.528,99
83
4,
83

10.528,99
17.922,67
17.922,67
410.359.372
410.359.372,39

PRICE AMOUNT
16.857,39 410.359.372,39
11.539,20 197.231,46
13.966,07 47.426,11
110.464,93 18.435,21
14.843,16 14.581,37
110.464,93 94.254,07
437.000,00 70.145,23
65.550,00

507.623,45
525.546,12
525.546,12
410.866.995
410.866.995,84
PRICE AMOUNT

11 410.866.995,84
9, 20.901,40
93

20.901,40
20.901,40
546.447,52
410.887.897
410.887.897,24
PRICE AMOUNT

36 410.887.897,24
4, 18.620,92
83
4,
83

18.620,92
39.522,32
565.068,44
410.906.518
410.906.518,16

PRICE AMOUNT
11.539,20 410.906.518,16
13.966,07 47.656,90
110.464,93 144.967,81
14.843,16 114.662,60
110.464,93 537.173,96
437.000,00 399.772,58
109.250,00

1.353.483,85
1.393.006,17
1.918.552,29
412.260.002
412.260.002,01
PRICE AMOUNT

11 412.260.002,01
9, 10.934,02
93

10.934,02
10.934,02
1.929.486,31
412.270.936
412.270.936,03
PRICE AMOUNT

36 412.270.936,03
4, 13.049,97
83
4,
83

13.049,97
23.983,99
1.942.536,28
412.283.986
412.283.986,00

PRICE AMOUNT
21.807,99 412.283.986,00
11.539,20 316.215,86
13.966,07 70.158,34
110.464,93 18.435,21
14.843,16 14.581,37
110.464,93 94.254,07
437.000,00 70.145,23
65.550,00

649.340,08
673.324,07
2.591.876,36
412.933.326
412.933.326,08
PRICE AMOUNT

11 412.933.326,08
9, 12.340,80
93

12.340,80
12.340,80
2.604.217,16
412.945.666
412.945.666,88
PRICE AMOUNT

36 412.945.666,88
4, 18.788,75
83
4,
83

18.788,75
31.129,55
2.623.005,91
412.964.455
412.964.455,63

PRICE AMOUNT
21.807,99 412.964.455,63
11.539,20 366.374,23
13.966,07 79.158,91
110.464,93 18.435,21
14.843,16 14.581,37
110.464,93 94.254,07
437.000,00 70.145,23
65.550,00

708.499,02
739.628,57
3.331.504,93
413.672.954
413.672.954,65
PRICE AMOUNT

11 413.672.954,65
9, 22.781,90
93

22.781,90
22.781,90
3.354.286,83
413.695.736
413.695.736,55
PRICE AMOUNT

36 413.695.736,55
4, 11.944,53
83
4,
83

11.944,53
34.726,43
3.366.231,36
413.707.681
413.707.681,08

PRICE AMOUNT
11.539,20 413.707.681,08
13.966,07 53.195,71
110.464,93 164.799,63
14.843,16 130.348,62
110.464,93 506.003,32
437.000,00 376.574,95
109.250,00

1.340.172,23
1.374.898,66
4.706.403,59
415.047.853
415.047.853,31
PRICE AMOUNT

11 415.047.853,31
9, 15.121,97
93

15.121,97
15.121,97
4.721.525,56
415.062.975
415.062.975,28
PRICE AMOUNT

36 415.062.975,28
4, 21.371,74
83
4,
83

21.371,74
36.493,71
4.742.897,30
415.084.347
415.084.347,02

PRICE AMOUNT
11.539,20 415.084.347,02
13.966,07 88.505,66
110.464,93 293.147,81
14.843,16 231.865,89
110.464,93 930.666,13
437.000,00 692.615,11
109.250,00

2.346.050,60
2.382.544,31
7.088.947,90
417.430.397
417.430.397,62
PRICE AMOUNT

11 417.430.397,62
9, 9.249,00
93

9.249,00
9.249,00
7.098.196,90
417.439.646
417.439.646,62
PRICE AMOUNT

11.539,20 417.439.646,62
13.966,07 41.541,12
110.464,93 122.622,09
14.843,16 96.988,21
110.464,93 403.140,23
437.000,00 300.022,75
109.250,00
1.073.564,40
1.082.813,40
8.171.761,30
418.513.211
418.513.211,02

PRICE AMOUNT

31 418.513.211,02
9, 46.565,79
82
9,
82

46.565,79
46.565,79
46.565,79
418.559.776
418.559.776,81

PRICE AMOUNT
9.893,01 418.559.776,81
110.464,93 55.400,86
110.464,93 106.046,33
7.780,00 225.967,06
11.720,00 735.210,00
16.220,39 1.687.680,00
15.188,18 414.755,37
2.900,00 182.258,16
478.500,00

3.885.817,78
3.932.383,57
3.932.383,57
422.445.594
422.445.594,59
PRICE AMOUNT

422.445.594,59

31 84.384,51
9,
82 84.384,51
84.384,51
4.016.768,08
422.529.979
422.529.979,10

PRICE AMOUNT

422.529.979,10

9.893,01 83.101,28

110.464,93 159.069,50

110.464,93 560.985,10

7.780,00 1.633.800,00
11.720,00 4.184.040,00

16.220,39 1.029.670,36

15.188,18 273.387,24

2.900,00 580.000,00

12.520.821,56
431.034.032
431.034.032,58

PRICE AMOUNT
431.034.032,58
8.504.053,48
8.588.437,99
12.520.821,56
431.034.032
431.034.032,58
PRICE AMOUNT

31 431.034.032,58
9, 11.641,45
82

11.641,45
11.641,45
12.532.463,01
431.045.674
431.045.674,03
PRICE AMOUNT

9.893,01 431.045.674,03
110.464,93 13.850,21
110.464,93 26.511,58
7.780,00 111.171,91
11.720,00 272.300,00
16.220,39 1.148.560,00
15.188,18 204.052,51
2.900,00 45.564,54
87.000,00
1.909.010,75
1.920.652,20
14.441.473,76
432.954.684
432.954.684,78

PRICE AMOUNT

31 432.954.684,78
9, 11.641,45
82
9,
82

11.641,45
11.641,45
14.453.115,21
432.966.326
432.966.326,23

PRICE AMOUNT
9.893,01 432.966.326,23
110.464,93 13.850,21
110.464,93 26.511,58
7.780,00 109.669,58
11.720,00 435.680,00
16.220,39 1.230.600,00
15.188,18 201.295,04
2.900,00 45.564,54
87.000,00

2.150.170,95
2.161.812,40
16.603.286,16
435.116.497
435.116.497,18
PRICE AMOUNT

31 435.116.497,18
9, 11.641,45
82

11.641,45
11.641,45
16.614.927,61
435.128.138
435.128.138,63
PRICE AMOUNT

9.893,01 435.128.138,63
110.464,93 13.850,21
110.464,93 26.511,58
7.780,00 58.148,74
11.720,00 435.680,00
16.220,39 703.200,00
15.188,18 106.730,17
2.900,00 45.564,54
87.000,00
1.476.685,24
1.488.326,69
18.091.612,85
436.604.823
436.604.823,87

PRICE AMOUNT

31 436.604.823,87
9, 23.282,90
82
9,
82

23.282,90
23.282,90
18.114.895,75
436.628.106
436.628.106,77

PRICE AMOUNT
9.893,01 436.628.106,77
110.464,93 27.700,43
110.464,93 53.023,17
7.780,00 219.250,79
11.720,00 871.360,00
16.220,39 2.373.300,00
15.188,18 402.427,88
2.900,00 91.129,08
188.500,00

4.226.691,35
4.249.974,25
22.341.587,10
440.854.798
440.854.798,12
PRICE AMOUNT

31 440.854.798,12
9, 23.282,90
82

23.282,90
23.282,90
22.364.870,00
440.878.081
440.878.081,02
PRICE AMOUNT

9.893,01 440.878.081,02
110.464,93 27.700,43
110.464,93 53.023,17
7.780,00 219.250,79
11.720,00 871.360,00
16.220,39 2.373.300,00
15.188,18 402.427,88
2.900,00 91.129,08
188.500,00
4.226.691,35
4.249.974,25
26.591.561,35
445.104.772
445.104.772,37

PRICE AMOUNT

31 445.104.772,37
9, 11.641,45
82
9,
82

11.641,45
11.641,45
26.603.202,80
445.116.413
445.116.413,82

PRICE AMOUNT
9.893,01 445.116.413,82
110.464,93 13.850,21
110.464,93 26.511,58
7.780,00 58.148,74
11.720,00 272.300,00
16.220,39 421.920,00
15.188,18 106.730,17
2.900,00 45.564,54
87.000,00

1.032.025,24
1.043.666,69
27.635.228,04
446.148.439
446.148.439,06
PRICE AMOUNT

31 446.148.439,06
9, 224.513,64
82

224.513,64
224.513,64
27.859.741,68
446.372.952
446.372.952,70
PRICE AMOUNT

9.893,01 446.372.952,70
110.464,93 89.037,09
110.464,93 434.789,96
7.780,00 1.155.286,42
11.720,00 4.201.200,00
16.220,39 7.500.800,00
15.188,18 2.120.491,58
2.900,00 747.258,46
362.500,00
16.611.363,51
462.984.316,21

PRICE AMOUNT
462.984.316,21
16.835.877,1
5
44.471.105,19
462.984.316
,21
462.984.316,21
PRICE AMOUNT

12.172,63 462.984.316,21
9.577,26 16.900.601,22
73,42 4.418.756,22
1.693.725,98

23.013.083,42
23.013.083,4
2
23.013.083,42
23.013.083,
485.997.399,63
PRICE AMOUNT

485.997.399,63

1.745,53 1.786.375,40

600,00 135.120,00
1.921.495,40
1.921.495,40
24.934.578,82
24.934.578,
487.918.895,03

PRICE AMOUNT

38 487.918.895,03
3, 3.450.896,12
49
3,
49

3.450.896,12
3.450.896,12
3.450.896,12
28.385.474,
491.369.791,15

PRICE AMOUNT

491.369.791,15
1.500,45 4.076.347,54

9.893,01 1.335.556,35
5.411.903,89

8.862.800,01
8.862.800,01
33.797.378,
496.781.695,04
PRICE AMOUNT

496.781.695,04

110.464,93 293.682,06

1.272,98 1.438.467,40

11.300,00 20.426.445,00

22.158.594,46

31.021.394,4
31.021.394,47
55.955.973,
518.940.289,50

PRICE AMOUNT

518.940.289,50

1.494,15 5.401.800,50

11.990,00 54.242.760,00
81.803.154,96
90.665.954,9
90.665.954,97
115.600.533
578.584.850,00

PRICE AMOUNT

578.584.850,00

20.140,00 21.694.606,60

15.000,00 12.600.000,00

15.188,18 576.847,08
116.674.608,64

125.537.408,
65
125.537.408,65
150.471.987
613.456.303,68

PRICE AMOUNT

613.456.303,68

9.893,01 462.003,57

110.464,93 1.037.630,23

15.188,18 2.038.101,87
3.537.735,67

3.537.735,67
129.075.144,32
154.009.723

616.994.039,35

PRICE AMOUNT

616.994.039,35

110.464,93 2.735.697,13
2.735.697,13
6.273.432,80
131.810.841,45
156.745.420

619.729.736,48

PRICE AMOUNT

619.729.736,48

16.220 4.104.731,89
,39
6.840.429,02

10.378.164,6
135.915.573,34
160.850.152

623.834.468,37

PRICE AMOUNT

623.834.468,37
112.276,18 2.415.375,01

17.501,69 3.502.788,24
5.918.163,25

16.296.327,9
141.833.736,59
166.768.315
629.752.631,62
PRICE AMOUNT

629.752.631,62

5.000.000,00 5.000.000,00

4.400.000,00 4.400.000,00

50.000,00 200.000,00

25.000,00 125.000,00
9.725.000,00
26.021.327,9
4
151.558.736,59

176.493.315
639.477.631,62
PRICE AMOUNT

38 639.477.631,62
3, 2.885.639,53
49

2.885.639,53
2.885.639,53
2.885.639,53
179.378.954
642.363.271,15
PRICE AMOUNT

642.363.271,15

1.500,45 3.698.609,25

9.893,01 2.275.392,30
5.974.001,55
8.859.641,08
8.859.641,08
185.352.956
648.337.272,70

PRICE AMOUNT

648.337.272,70

13.966,07 133.515,63

110.464,93 73.923,13

1.272,98 1.069.303,20
11.300,00 15.262.797,00

19.425.713,81

28.285.354,8
28.285.354,89
204.778.670
667.762.986,51

PRICE AMOUNT

667.762.986,51
1.494,15 2.886.174,85

1.958,27 1.507.300,00
11.990,00 34.120.902,20

20.140,00 37.158.300,00

92.212.216,01

101.071.857,
101.071.857,09
277.565.172
740.549.488,71

PRICE AMOUNT

15.000 740.549.488,71
,00 6.900.000,00
15.000
,00

99.112.216,01
107.971.857,
09
107.971.857,09
284.465.172
747.449.488,71

PRICE AMOUNT
9.893,01 747.449.488,71
110.464,93 224.670,26
15.188,18 1.700.165,74
2.460.637,04

4.385.473,04
4.385.473,04
112.357.330,13
288.850.645
751.834.961,75
PRICE AMOUNT

751.834.961,75

110.464,93 2.317.156,56

2.317.156,56
6.702.629,60
114.674.486,69
291.167.802

754.152.118,31

PRICE AMOUNT

754.152.118,31

16.220 3.722.579,51
,39
6.039.736,07
10.425.209,1
118.397.066,20
294.890.381

757.874.697,82

PRICE AMOUNT

757.874.697,82

112.276,18 1.318.885,83

17.501,69 2.164.083,97
3.482.969,80

13.908.178,9
121.880.036,00
298.373.351
761.357.667,62

PRICE AMOUNT

761.357.667,62

2.000.000,00 2.000.000,00

50.000,00 150.000,00
2.150.000,00
16.058.178,9
1
124.030.036,00

300.523.351
763.507.667,62

PRICE AMOUNT
1.996, 763.507.667,62
11 1.616.589,61

1.616.589,61
1.616.589,61
1.616.589,61
302.139.941
765.124.257,23
PRICE AMOUNT

6.753, 765.124.257,23
42 39.382.568,73

39.382.568,73
40.999.158,3
40.999.158,34
341.522.509
804.506.825,96
PRICE AMOUNT

3.043,88 804.506.825,96
2.652,95 4.503.968,36
581,39 3.903.815,93
857.736,29
9.265.520,58
50.264.678,9
50.264.678,92
350.788.030
813.772.346,54

PRICE AMOUNT

7.352, 813.772.346,54
36 400.703,62
36

400.703,62
50.665.382,5
50.665.382,54
351.188.733
814.173.050,16

PRICE AMOUNT

814.173.050,16
4.500,00 6.646.275,00

3.019,03 329.074,27
6.975.349,27

57.640.731,8
57.640.731,81
358.164.083
821.148.399,43
PRICE AMOUNT

821.148.399,43

10.981,24 239.391,03

15.549,15 1.500.026,50

122.616,07 0,00
1.739.417,53
59.380.149,3
59.380.149,34
359.903.500
822.887.816,96

PRICE AMOUNT

822.887.816,96

2.550,00 3.352.077,00

19.445,72 10.926.550,07

124.626,56 0,00
14.278.627,07
73.658.776,4
1

73.658.776,41
374.182.127
837.166.444,03

PRICE AMOUNT

1.996, 837.166.444,03
11 1.616.589,61
11

1.616.589,61
1.616.589,61
75.275.366,02
375.798.717
838.783.033,64

PRICE AMOUNT
6.753, 838.783.033,64
42 100.256.680,99

100.256.680,99
101.873.270,
175.532.047,01
476.055.398
939.039.714,63
PRICE AMOUNT

3.043,88 939.039.714,63
4.452,45 29.463.540,85
581,39 16.512.311,55
2.168.084,70

48.143.937,10
150.017.207,
223.675.984,11
524.199.335
987.183.651,73
PRICE AMOUNT

7.352, 987.183.651,73
36 8.325.150,75

8.325.150,75
158.342.358,
232.001.134,86
532.524.486
995.508.802,48
PRICE AMOUNT

995.508.802,48

4.500,00 16.707.150,00

3.019,03 827.214,22
17.534.364,22
175.876.722,
249.535.499,08
550.058.850
1.013.043.166,70

PRICE AMOUNT

1.013.043.166,70

10.981,24 601.771,95

15.549,15 3.770.513,38

122.616,07 0,00
4.372.285,33

180.249.008,
253.907.784,41
554.431.135
1.017.415.452,03

PRICE AMOUNT

1.017.415.452,03

2.550,00 8.426.322,00

19.445,72 27.466.496,13
124.626,56 0,00
35.892.818,13
216.141.826,
13

289.800.602,54
590.323.953
1.053.308.270,16

PRICE AMOUNT

1.996, 1.053.308.270,16
11 1.616.589,61
1.996, 1.053.308.270,16
11 1.616.589,61

1.616.589,61
1.616.589,61
291.417.192,15
591.940.543
1.054.924.859,77

PRICE AMOUNT
6.753, 1.054.924.859,77
42 55.954.583,47

55.954.583,47
57.571.173,0
347.371.775,62
647.895.127
1.110.879.443,24
PRICE AMOUNT

3.043,88 1.110.879.443,24
5.234,30 13.518.114,59
2.652,95 12.359.909,62
4.452,45 5.438.096,50
581,39 9.126.765,58
2.390.524,52
42.833.410,81
100.404.583,
390.205.186,43
690.728.537
1.153.712.854,05

PRICE AMOUNT

1.153.712.854,05

16.001,24 11.736.589,52

11.800,00 4.156.078,00
15.892.667,52

116.297.251,
406.097.853,95
706.621.205
1.169.605.521,57

PRICE AMOUNT

1.169.605.521,57
4.500,00 9.207.225,00

3.019,03 455.873,53
9.663.098,53

125.960.349,
415.760.952,48
716.284.303
1.179.268.620,10
PRICE AMOUNT

1.179.268.620,10

10.981,24 331.633,45

15.549,15 2.077.988,41

122.616,07 2.314.378,32
4.724.000,18
130.684.350,
420.484.952,66
721.008.304
1.183.992.620,28

PRICE AMOUNT

1.183.992.620,28

2.550,00 4.643.703,00

19.445,72 15.136.742,91

124.626,56 9.409.305,28
29.189.751,19
159.874.101,
31

449.674.703,85
750.198.055
1.213.182.371,47

PRICE AMOUNT

1.996, 1.213.182.371,47
11 1.616.589,61
11

1.616.589,61
1.616.589,61
451.291.293,46
751.814.644
1.214.798.961,08

PRICE AMOUNT
6.753, 1.214.798.961,08
42 77.490.091,76

77.490.091,76
79.106.681,3
528.781.385,22
829.304.736
1.292.289.052,84
PRICE AMOUNT

108.379,99 1.292.289.052,84
3.043,88 7.700.333,26
5.234,30 26.075.428,46
8.904,90 30.029.702,53
581,39 24.975.483,98
3.274.411,74
92.055.359,97
171.162.041,
620.836.745,19
921.360.096
1.384.344.412,81

PRICE AMOUNT

11.721 1.384.344.412,81
,36 2.414.600,16
8.033, 28.961.380,35
67 5.669.900,00
11.800
,00
37.045.880,51
208.207.921,
657.882.625,70
958.405.977
1.421.390.293,32

PRICE AMOUNT

1.421.390.293,32

4.500,00 12.560.850,00

3.019,03 621.920,18
13.182.770,18

221.390.692,
671.065.395,88
971.588.747
1.434.573.063,50

PRICE AMOUNT

1.434.573.063,50
10.981,24 452.427,09

15.549,15 2.834.765,54

122.616,07 3.157.363,80
6.444.556,43

227.835.248,
677.509.952,31
978.033.303
1.441.017.619,93
PRICE AMOUNT

1.441.017.619,93

2.550,00 6.335.118,00

19.445,72 20.649.993,44

124.626,56 12.836.535,68
39.821.647,12
267.656.895,
58

717.331.599,43
1.017.854.9
1.480.839.267,05
PRICE AMOUNT

1.996, 1.480.839.267,05
11 1.616.589,61

1.616.589,61
1.616.589,61
718.948.189,04
1.019.471.5
1.482.455.856,66
PRICE AMOUNT

6.753, 1.482.455.856,66
42 76.500.580,67
42

76.500.580,67
78.117.170,2
795.448.769,71
1.095.972.1
1.558.956.437,33

PRICE AMOUNT
277.778,00 1.558.956.437,33
3.043,88 53.755.765,23
5.234,30 26.483.308,38
11.131,12 31.722.998,58
581,39 28.939.464,95
3.031.012,81

143.932.549,95
222.049.720,
939.381.319,66
1.239.904.6
1.702.888.987,28
PRICE AMOUNT

3.229,18 1.702.888.987,28
16.466,26 15.427.407,45
11.800,00 2.996.859,32
250.000,00 38.656.800,00
46.102.875,00
103.183.941,77
325.233.662,
1.042.565.261,
1.343.088.6
1.806.072.929,05

PRICE AMOUNT

1.806.072.929,05

4.500,00 11.289.915,00

3.019,03 549.463,46
11.839.378,46

337.073.040,
1.054.404.639,
1.354.927.9
1.817.912.307,51

PRICE AMOUNT

1.817.912.307,51
15.549,15 622.587,97

15.549,15 2.829.945,30

122.616,07 5.021.128,07
8.473.661,34

345.546.701,
1.062.878.301,
1.363.401.6
1.826.385.968,85
PRICE AMOUNT

1.826.385.968,85

2.550,00 5.597.046,00

19.445,72 22.721.157,08

124.626,56 15.877.423,74
44.195.626,82
389.742.328,
62

1.107.073.928,
1.407.597.2
1.870.581.595,67
PRICE AMOUNT

1.996, 1.870.581.595,67
11 2.390.082,23

2.390.082,23
2.390.082,23
1.109.464.010,
1.409.987.3
1.872.971.677,90
PRICE AMOUNT

6.753, 1.872.971.677,90
42 150.727.960,16
42

150.727.960,16
153.118.042,
1.260.191.970,
1.560.715.3
2.023.699.638,06

PRICE AMOUNT
277.778,00 2.023.699.638,06
3.043,88 140.830.557,11
5.234,30 50.446.284,12
13.357,34 51.209.355,31
581,39 90.296.686,99
7.939.624,63

340.722.508,16
493.840.550,
1.600.914.478,
1.901.437.8
2.364.422.146,22
PRICE AMOUNT

11.800 2.364.422.146,22
,00 232.224.000,00

232.224.000,00
726.064.550,
1.833.138.478,
2.133.661.8
2.596.646.146,22
PRICE AMOUNT

2.596.646.146,22

4.500,00 20.988.720,00

3.019,03 990.241,84
21.978.961,84
748.043.512,
1.855.117.440,
2.155.640.7
2.618.625.108,06

PRICE AMOUNT

2.618.625.108,06

15.549,15 20.298.482,38

122.616,07 29.158.101,45
49.456.583,83

797.500.096,
1.904.574.024,
2.205.097.3
2.668.081.691,89

PRICE AMOUNT

2.668.081.691,89

2.550,00 10.086.984,00
19.445,72 46.114.358,24

124.626,56 37.811.698,30
94.013.040,54
891.513.136,
76

1.998.587.064,
2.299.110.4
2.762.094.732,43

PRICE AMOUNT
1.996, 2.762.094.732,43
11 1.751.486,72

1.751.486,72
1.751.486,72
2.000.338.551,
2.300.861.9
2.763.846.219,15
PRICE AMOUNT

6.753, 2.763.846.219,15
42 39.683.095,92

39.683.095,92
41.434.582,6
2.040.021.647,
2.340.544.9
2.803.529.315,07
PRICE AMOUNT

3.043,88 2.803.529.315,07
2.652,95 4.392.318,84
581,39 3.807.513,84
836.527,19
9.036.359,87
50.470.942,5
2.049.058.007,
2.349.581.3
2.812.565.674,94

PRICE AMOUNT

7.352, 2.812.565.674,94
36 382.322,72
36

382.322,72
50.853.265,2
2.049.440.330,
2.349.963.6
2.812.947.997,66

PRICE AMOUNT

2.812.947.997,66
4.500,00 6.484.140,00

3.019,03 313.979,12
6.798.119,12

57.651.384,3
2.056.238.449,
2.356.761.8
2.819.746.116,78
PRICE AMOUNT

2.819.746.116,78

10.981,24 228.409,79

15.549,15 1.431.143,77

122.616,07 1.594.008,91
3.253.562,47
60.904.946,8
2.059.492.011,
2.360.015.3
2.822.999.679,25

PRICE AMOUNT

2.822.999.679,25

2.550,00 3.277.872,00

19.445,72 10.667.921,99

124.626,56 6.804.610,18
20.750.404,17
81.655.350,9
9

2.080.242.415,
2.380.765.7
2.843.750.083,42

PRICE AMOUNT

1.996, 2.843.750.083,42
11 1.751.486,72
11

1.751.486,72
1.751.486,72
2.081.993.902,
2.382.517.2
2.845.501.570,14

PRICE AMOUNT
6.753, 2.845.501.570,14
42 108.935.365,97

108.935.365,97
110.686.852,
2.190.929.268,
2.491.452.6
2.954.436.936,11
PRICE AMOUNT

3.043,88 2.954.436.936,11
4.452,45 31.618.212,18
581,39 17.371.100,10
2.281.391,80

51.270.704,08
161.957.556,
2.242.199.972,
2.542.723.3
3.005.707.640,19
PRICE AMOUNT

7.352, 3.005.707.640,19
36 8.863.637,60

8.863.637,60
170.821.194,
2.251.063.610,
2.551.586.9
3.014.571.277,79
PRICE AMOUNT

3.014.571.277,79

4.500,00 17.581.995,00

3.019,03 851.366,46
18.433.361,46
189.254.555,
2.269.496.971,
2.570.020.3
3.033.004.639,25

PRICE AMOUNT

3.033.004.639,25

10.981,24 619.341,94

15.549,15 3.880.601,37

122.616,07 4.322.216,47
8.822.159,78

198.076.715,
2.278.319.131,
2.578.842.4
3.041.826.799,03

PRICE AMOUNT

3.041.826.799,03

2.550,00 8.888.076,00

19.445,72 28.926.480,79
124.626,56 18.450.962,21
56.265.519,00
254.342.234,
61

2.334.584.650,
2.635.108.0
3.098.092.318,03

PRICE AMOUNT

1.996, 3.098.092.318,03
11 1.751.486,72
1.996, 3.098.092.318,03
11 1.751.486,72

1.751.486,72
1.751.486,72
2.336.336.137,
2.636.859.4
3.099.843.804,75

PRICE AMOUNT
6.753, 3.099.843.804,75
42 93.853.628,42

93.853.628,42
95.605.115,1
2.430.189.765,
2.730.713.1
3.193.697.433,17
PRICE AMOUNT

3.043,88 3.193.697.433,17
5.234,30 22.338.883,13
2.652,95 20.731.492,01
4.452,45 8.834.323,50
581,39 14.826.658,50
3.883.220,09
70.614.577,23
166.219.692,
2.500.804.342,
2.801.327.6
3.264.312.010,40

PRICE AMOUNT

3.264.312.010,40

16.001,24 19.297.495,44

11.800,00 6.605.640,00
25.903.135,44

192.122.827,
2.526.707.478,
2.827.230.8
3.290.215.145,84

PRICE AMOUNT

3.290.215.145,84
4.500,00 14.963.400,00

3.019,03 724.567,20
15.687.967,20

207.810.795,
2.542.395.445,
2.842.918.7
3.305.903.113,04
PRICE AMOUNT

3.305.903.113,04

10.981,24 527.099,52

15.549,15 3.302.639,46

122.616,07 3.678.482,10
7.508.221,08
215.319.016,
2.549.903.666,
2.850.427.0
3.313.411.334,12

PRICE AMOUNT

3.313.411.334,12

2.550,00 7.564.320,00

19.445,72 24.618.281,52

124.626,56 15.702.946,56
47.885.548,08
263.204.564,
17

2.597.789.214,
2.898.312.5
3.361.296.882,20

PRICE AMOUNT

1.996, 3.361.296.882,20
11 1.751.486,72
11

1.751.486,72
1.751.486,72
2.599.540.701,
2.900.064.0
3.363.048.368,92

PRICE AMOUNT
6.753, 3.363.048.368,92
42 52.377.229,36

52.377.229,36
54.128.716,0
2.651.917.930,
2.952.441.2
3.415.425.598,28
PRICE AMOUNT

108.379,99 3.415.425.598,28
3.043,88 5.042.920,93
5.234,30 17.468.918,64
8.904,90 20.297.725,57
581,39 16.356.342,22
2.144.212,83
61.310.120,19
115.438.836,
2.713.228.050,
3.013.751.4
3.476.735.718,47

PRICE AMOUNT

11.721 3.476.735.718,47
,36 1.547.219,52
8.033, 17.497.333,26
67 3.633.102,00
11.800
,00
22.677.654,78
138.116.491,
2.735.905.705,
3.036.429.0
3.499.413.373,25

PRICE AMOUNT

3.499.413.373,25

4.500,00 8.229.870,00

3.019,03 398.511,96
8.628.381,96

146.744.873,
2.744.534.087,
3.045.057.4
3.508.041.755,21

PRICE AMOUNT

3.508.041.755,21
10.981,24 289.904,74

15.549,15 1.816.451,70

122.616,07 2.023.165,16
4.129.521,60

150.874.394,
2.748.663.609,
3.049.186.9
3.512.171.276,81
PRICE AMOUNT

3.512.171.276,81

2.550,00 4.160.376,00

19.445,72 13.540.054,84

124.626,56 8.636.620,61
26.337.051,45
177.211.446,
06

2.775.000.660,
3.075.524.0
3.538.508.328,26
PRICE AMOUNT

1.996, 3.538.508.328,26
11 2.221.450,86

2.221.450,86
2.221.450,86
2.777.222.111,
3.077.745.4
3.540.729.779,12
PRICE AMOUNT

6.753, 3.540.729.779,12
42 16.642.587,97
42

16.642.587,97
18.864.038,8
2.793.864.699,
3.094.388.0
3.557.372.367,09

PRICE AMOUNT
3.043,88 3.557.372.367,09
2.652,95 1.590.670,81
581,39 1.379.162,59
303.032,10

3.272.865,50
22.136.904,3
2.797.137.564,
3.097.660.9
3.560.645.232,59
PRICE AMOUNT

7.352, 3.560.645.232,59
36 124.990,12

124.990,12
22.261.894,4
2.797.262.555,
3.097.785.9
3.560.770.222,71
PRICE AMOUNT

3.560.770.222,71

4.500,00 2.349.315,00

3.019,03 102.647,02
2.451.962,02
24.713.856,4
2.799.714.517,
3.100.237.8
3.563.222.184,73

PRICE AMOUNT

3.563.222.184,73

10.981,24 95.207,35

15.549,15 600.041,70

122.616,07 938.012,94
1.633.261,99

26.347.118,4
2.801.347.779,
3.101.871.1
3.564.855.446,72

PRICE AMOUNT

3.564.855.446,72

2.550,00 1.189.957,50
19.445,72 13.262.369,95

124.626,56 9.116.196,07
23.568.523,52
49.915.641,9
8

2.824.916.302,
3.125.439.6
3.588.423.970,24

PRICE AMOUNT

1.996, 3.588.423.970,24
11 2.221.450,86
1.996, 3.588.423.970,24
11 2.221.450,86

2.221.450,86
2.221.450,86
2.827.137.753,
3.127.661.1
3.590.645.421,10

PRICE AMOUNT
6.753, 3.590.645.421,10
42 42.543.169,29

42.543.169,29
44.764.620,1
2.869.680.922,
3.170.204.2
3.633.188.590,39
PRICE AMOUNT

3.043,88 3.633.188.590,39
4.452,45 22.849.341,80
581,39 5.870.021,03
770.492,91

29.489.855,74
74.254.475,8
2.899.170.778,
3.199.694.1
3.662.678.446,13
PRICE AMOUNT

7.352, 3.662.678.446,13
36 3.812.786,85

3.812.786,85
78.067.262,7
2.902.983.565,
3.203.506.9
3.666.491.232,98
PRICE AMOUNT

3.666.491.232,98

4.500,00 5.942.385,00

3.019,03 259.636,58
6.202.021,58
84.269.284,3
2.909.185.586,
3.209.708.9
3.672.693.254,56

PRICE AMOUNT

3.672.693.254,56

10.981,24 240.818,59

15.549,15 1.517.752,53

122.616,07 2.372.620,95
4.131.192,07

88.400.476,3
2.913.316.779,
3.213.840.1
3.676.824.446,63

PRICE AMOUNT

3.676.824.446,63

2.550,00 3.009.892,50
19.445,72 21.013.045,03

124.626,56 14.624.690,03
38.647.627,56
127.048.103,
95

2.951.964.406,
3.252.487.7
3.715.472.074,19

PRICE AMOUNT

1.996, 3.715.472.074,19
11 2.221.450,86
1.996, 3.715.472.074,19
11 2.221.450,86

2.221.450,86
2.221.450,86
2.954.185.857,
3.254.709.2
3.717.693.525,05

PRICE AMOUNT
6.753, 3.717.693.525,05
42 16.998.493,21

16.998.493,21
19.219.944,0
2.971.184.350,
3.271.707.7
3.734.692.018,26
PRICE AMOUNT

3.043,88 3.734.692.018,26
5.234,30 3.795.261,78
2.652,95 3.754.825,11
4.452,45 1.386.378,61
581,39 2.326.761,32
609.226,95
11.872.453,77
31.092.397,8
2.983.056.804,
3.283.580.1
3.746.564.472,03

PRICE AMOUNT

3.746.564.472,03

16.001,24 3.280.574,22

11.800,00 935.858,00
4.216.432,22

35.308.830,0
2.987.273.236,
3.287.796.5
3.750.780.904,25

PRICE AMOUNT

3.750.780.904,25
4.500,00 2.349.315,00

3.019,03 102.647,02
2.451.962,02

37.760.792,0
2.989.725.198,
3.290.248.5
3.753.232.866,27
PRICE AMOUNT

3.753.232.866,27

10.981,24 95.207,35

15.549,15 600.041,70

122.616,07 938.012,94
1.633.261,99
39.394.054,0
2.991.358.460,
3.291.881.8
3.754.866.128,26

PRICE AMOUNT

3.754.866.128,26

2.550,00 1.189.957,50

19.445,72 13.262.369,95

124.626,56 9.116.196,07
23.568.523,52
62.962.577,5
9

3.014.926.984,
3.315.450.3
3.778.434.651,78

PRICE AMOUNT

1.996, 3.778.434.651,78
11 2.221.450,86
11

2.221.450,86
2.221.450,86
3.017.148.435,
3.317.671.7
3.780.656.102,64

PRICE AMOUNT
6.753, 3.780.656.102,64
42 9.211.935,02

9.211.935,02
11.433.385,8
3.026.360.370,
3.326.883.7
3.789.868.037,66
PRICE AMOUNT

108.379,99 3.789.868.037,66
3.043,88 763.168,54
5.234,30 2.935.365,68
11.131,12 3.569.897,29
581,39 3.095.564,47
324.520,27
10.688.516,25
22.121.902,1
3.037.048.886,
3.337.572.2
3.800.556.553,91

PRICE AMOUNT

3.800.556.553,91

8.033,67 2.169.090,90

11.800,00 495.482,00
2.664.572,90

24.786.475,0
3.039.713.459,
3.340.236.8
3.803.221.126,81

PRICE AMOUNT

3.803.221.126,81
4.500,00 1.243.755,00

3.019,03 54.342,54
1.298.097,54

26.084.572,5
3.041.011.556,
3.341.534.9
3.804.519.224,35
PRICE AMOUNT

3.804.519.224,35

10.981,24 50.403,89

15.549,15 317.669,13

122.616,07 496.595,08
864.668,10
26.949.240,6
3.041.876.224,
3.342.399.5
3.805.383.892,45

PRICE AMOUNT

3.805.383.892,45

2.550,00 629.977,50

19.445,72 10.877.546,85

124.626,56 7.421.274,86
18.928.799,21
45.878.039,8
8

3.060.805.024,
3.361.328.3
3.824.312.691,66

PRICE AMOUNT

3.824.312.691,66

16.967,86 805.973,35

112.276,18 1.039.958,12

2.550,00 1.000.084,50
10.981,24 82.139,68

10.981,24 3.623,81

15.549,15 1.049.878,61

122.616,07 1.986.968,89

19.445,72 6.536.289,86

124.626,56 5.864.701,59

3.079.174.642,
3.379.697.9
3.842.682.310,07

PRICE AMOUNT
3.842.682.310,07
18.369.618,41
18.369.618,4
1
3.079.174.642,
3.379.697.9
3.842.682.310,07
PRICE AMOUNT

16.967,86 3.842.682.310,07
112.276,18 431.832,04
2.550,00 657.208,62
10.981,24 1.230.120,00
15.549,15 98.831,16
122.616,07 1.264.145,90
19.445,72 2.392.484,76
124.626,56 7.755.925,42
7.953.168,55
21.783.716,45
21.783.716,4
5
3.100.958.358,
3.401.481.7
3.864.466.026,52

PRICE AMOUNT

114.300,00 3.864.466.026,52
139.000,00 1.828.800,00
80.600,00 2.224.000,00
46.000,00 2.337.400,00
200.000,00 828.000,00
150.000,00 200.000,00
1.618,68 150.000,00
183.396,44
7.751.596,44
7.751.596,44
3.108.709.955,
3.409.233.3
3.872.217.622,96
PRICE AMOUNT

3.872.217.622,96
5.800.973,20
15.855.940,74
15.837.198,30
57.311.372,94
57.311.372,9
3.158.269.731,
3.458.793.0
3.921.777.399,46

2.549,
15
5.725,
82
2.549,
15
5.725,
82
8.872,
38

PRICE AMOUNT

3.921.777.399,46
10.715,51 12.065.664,26

33.500,00 311.550,00
57.622.922,94

57.622.922,9
3.158.581.281,
3.459.104.6
3.922.088.949,46

PRICE AMOUNT

3.922.088.949,46
12.463,60 55.399.455,64

1.950,00 4.393.740,00
59.793.195,64

117.416.118,
3.218.374.477,
3.518.897.8
3.981.882.145,10
PRICE AMOUNT

3.981.882.145,10

40.300,00 282.100,00

47.650,00 428.850,00

20.000,00 27.516.000,00

10.000,00 700.000,00

280.000,00 5.600.000,00

12.000.000,00 12.000.000,00

10.000.000,00 10.000.000,00
56.526.950,00

173.943.068,
3.274.901.427,
3.575.424.7
4.038.409.095,10

PRICE AMOUNT

4.038.409.095,10

1.900.000,00 17.100.000,00

500.000,00 4.500.000,00
21.600.000,00
195.543.068,
3.296.501.427,
3.597.024.7
4.060.009.095,10

PRICE AMOUNT

5.500.000,00 4.060.009.095,10
11.000.000,00
11.000.000,00
206.543.068,
3.307.501.427,
3.608.024.7
4.071.009.095,10

PRICE AMOUNT
5.500,00 4.071.009.095,10
110.000,00 52.800.000,00
220.000,00 990.000,00
660.000,00

54.450.000,00
260.993.068,
3.361.951.427,
3.662.474.7
4.125.459.095,10
PRICE AMOUNT

21.900,00 4.125.459.095,10
1.000.000,00 43.800,00
1.601,34 2.000.000,00
1.890,91 23.779.963,05
10.486.986,86
36.310.749,91
297.303.818,
3.398.262.177,
3.698.785.5
4.161.769.845,01
PRICE AMOUNT

4.161.769.845,01

48.000,00 1.584.000,00

73.600,00 147.200,00
38.041.949,91
299.035.018,
49
3.399.993.377,
39
3.700.516.7
4.163.501.045,01

PRICE AMOUNT

6.753, 4.163.501.045,01
42 1.446.920,24
42

1.446.920,24
1.446.920,24
1.446.920,24
3.701.963.6
4.164.947.965,25

PRICE AMOUNT
3.043,88 4.164.947.965,25
2.652,95 409.219,23
581,39 351.781,17
77.627,19

838.627,59
2.285.547,83
2.285.547,83
3.702.802.2
4.165.786.592,84
PRICE AMOUNT

7.352, 4.165.786.592,84
36 84.552,14

84.552,14
2.370.099,97
2.370.099,97
3.702.886.8
4.165.871.144,98
PRICE AMOUNT

4.165.871.144,98

4.500,00 615.825,00

3.019,03 69.437,69
685.262,69
3.055.362,66
3.055.362,66
3.703.572.0
4.166.556.407,67

PRICE AMOUNT

4.166.556.407,67

10.981,24 51.831,45

15.549,15 118.018,05

122.616,07 282.016,96
14.258,95 195.917,97
647.784,43

3.703.147,09
3.703.147,09
3.704.219.8
4.167.204.192,10

PRICE AMOUNT

4.167.204.192,10

2.550,00 282.412,50

19.445,72 695.573,40
124.626,56 358.301,36
1.336.287,26
5.039.434,35

5.039.434,35
3.705.556.1
4.168.540.479,36

PRICE AMOUNT

6.753, 4.168.540.479,36
42 4.413.224,90
42

4.413.224,90
4.413.224,90
9.452.659,25
3.709.969.3
4.172.953.704,26

PRICE AMOUNT
3.043,88 4.172.953.704,26
4.452,45 2.022.019,05
581,39 1.757.560,11
232.660,65

4.012.239,81
8.425.464,71
13.464.899,06
3.713.981.6
4.176.965.944,07
PRICE AMOUNT

7.352, 4.176.965.944,07
36 1.624.871,56

1.624.871,56
10.050.336,2
15.089.770,62
3.715.606.4
4.178.590.815,63
PRICE AMOUNT

4.178.590.815,63

4.500,00 1.820.700,00

3.019,03 205.294,04
2.025.994,04
12.076.330,3
17.115.764,66
3.717.632.4
4.180.616.809,67

PRICE AMOUNT

4.180.616.809,67

10.981,24 153.078,49

15.549,15 348.922,93

122.616,07 833.789,28
14.258,95 579.341,14
1.915.131,84

13.991.462,1
19.030.896,50
3.719.547.6
4.182.531.941,51

PRICE AMOUNT

4.182.531.941,51

2.550,00 834.921,00

19.445,72 2.056.190,43
124.626,56 1.059.325,76
3.950.437,19
17.941.899,3
4

22.981.333,69
3.723.498.0
4.186.482.378,70

PRICE AMOUNT

6.753, 4.186.482.378,70
42 6.090.301,69
42

6.090.301,69
6.090.301,69
29.071.635,38
3.729.588.3
4.192.572.680,39

PRICE AMOUNT
3.043,88 4.192.572.680,39
5.234,30 2.446.244,60
2.652,95 1.345.319,79
4.452,45 1.411.104,11
581,39 2.368.258,16
622.715,20

8.193.641,86
14.283.943,5
37.265.277,24
3.737.782.0
4.200.766.322,25
PRICE AMOUNT

4.200.766.322,25

8.212,36 1.627.279,13

11.800,00 1.379.892,00
3.007.171,13
17.291.114,6
40.272.448,37
3.740.789.1
4.203.773.493,38

PRICE AMOUNT

4.203.773.493,38

4.500,00 2.436.525,00

3.019,03 274.731,73
2.711.256,73

20.002.371,4
42.983.705,10
3.743.500.4
4.206.484.750,11

PRICE AMOUNT

4.206.484.750,11
10.981,24 204.909,94

15.549,15 466.940,97

122.616,07 1.115.806,24

14.258,95 775.259,11
2.562.916,26

22.565.287,6
45.546.621,36
3.746.063.3
4.209.047.666,37
PRICE AMOUNT

4.209.047.666,37

2.550,00 1.117.333,50

19.445,72 2.751.763,84

124.626,56 1.417.627,12
5.286.724,46
27.852.012,1
3

50.833.345,82
3.751.350.0
4.214.334.390,83
PRICE AMOUNT

6.753, 4.214.334.390,83
42 6.371.379,03

6.371.379,03
6.371.379,03
57.204.724,85
3.757.721.4
4.220.705.769,86
PRICE AMOUNT

108.379,99 4.220.705.769,86
3.043,88 171.478,82
5.234,30 3.174.523,33
2.652,95 2.469.124,00
4.452,45 1.476.207,50
581,39 2.477.521,28
651.453,31
10.420.308,24
16.791.687,2
67.625.033,09
3.768.141.7
4.231.126.078,10

PRICE AMOUNT

4.231.126.078,10

8.033,67 6.118.443,07

11.800,00 1.443.494,00
7.561.937,07
24.353.624,3
75.186.970,16
3.775.703.6
4.238.688.015,17

PRICE AMOUNT

4.238.688.015,17

4.500,00 2.548.980,00

3.019,03 287.411,66
2.836.391,66

27.190.016,0
78.023.361,82
3.778.540.0
4.241.524.406,83

PRICE AMOUNT

4.241.524.406,83
10.981,24 214.353,80

15.549,15 488.554,29

122.616,07 1.167.304,99

14.258,95 811.049,08
2.681.262,16

29.871.278,1
80.704.623,98
3.781.221.3
4.244.205.668,99
PRICE AMOUNT

4.244.205.668,99

2.550,00 1.168.894,50

19.445,72 2.878.744,39

124.626,56 1.483.056,06
5.530.694,95
35.401.973,1
1

86.235.318,93
3.786.752.0
4.249.736.363,94
PRICE AMOUNT

4.249.736.363,94

6.753, 4.128.095,51
42
4.128.095,51
4.128.095,51
90.363.414,44
3.790.880.1
4.253.864.459,45

PRICE AMOUNT

4.253.864.459,45

108.379,99 623.455,89
3.043,88 1.635.446,29

5.234,30 2.812.337,05

2.652,95 601.131,94

5.672.371,17
9.800.466,68
96.035.785,61
3.796.552.5
4.259.536.830,62

PRICE AMOUNT

4.259.536.830,62

4.452,45 1.008.880,65

581,39 265.137,10
6.946.388,92

11.074.484,4
97.309.803,36
3.797.826.5
4.260.810.848,37

PRICE AMOUNT

4.260.810.848,37

11.721,36 304.755,36
8.033,67 2.610.942,75

11.800,00 984.002,00
3.899.700,11

14.974.184,5
101.209.503,47
3.801.726.2
4.264.710.548,48

PRICE AMOUNT

4.264.710.548,48
4.500,00 1.023.165,00

3.019,03 78.494,78
1.101.659,78

16.075.844,3
102.311.163,25
3.802.827.8
4.265.812.208,26
PRICE AMOUNT

4.265.812.208,26

10.981,24 109.482,96

15.549,15 183.946,44

122.616,07 398.502,23

14.258,95 493.074,49
1.185.006,12

17.260.850,4
103.496.169,37
3.804.012.8
4.266.997.214,38

PRICE AMOUNT

4.266.997.214,38

2.550,00 502.885,50

19.445,72 1.454.345,40

124.626,56 1.786.023,23
3.743.254,13
21.004.104,5
7
107.239.423,50
3.807.756.1
4.270.740.468,51

PRICE AMOUNT

6.753, 4.270.740.468,51
42 2.579.266,17
42

2.579.266,17
2.579.266,17
2.579.266,17
3.810.335.4
4.273.319.734,68

PRICE AMOUNT
3.043,88 4.273.319.734,68
2.652,95 729.465,84
581,39 627.077,79
138.376,63

1.494.920,26
4.074.186,43
4.074.186,43
3.811.830.3
4.274.814.654,94
PRICE AMOUNT

7.352, 4.274.814.654,94
36 150.723,38

150.723,38
4.224.909,81
4.224.909,81
3.811.981.0
4.274.965.378,32
PRICE AMOUNT

4.274.965.378,32

4.500,00 1.097.775,00

3.019,03 123.780,23
1.221.555,23
5.446.465,04
5.446.465,04
3.813.202.6
4.276.186.933,55

PRICE AMOUNT

4.276.186.933,55

10.981,24 92.352,23

15.549,15 210.380,00

122.616,07 502.725,89
14.258,95 349.344,28
1.154.802,40

6.601.267,44
6.601.267,44
3.814.357.4
4.277.341.735,95

PRICE AMOUNT

4.277.341.735,95

2.550,00 503.421,00

19.445,72 1.239.859,11
124.626,56 638.711,12
2.381.991,23
8.983.258,67

8.983.258,67
3.816.739.4
4.279.723.727,18

PRICE AMOUNT

6.753, 4.279.723.727,18
42 6.684.737,72
42

6.684.737,72
6.684.737,72
15.667.996,39
3.823.424.1
4.286.408.464,90

PRICE AMOUNT
3.043,88 4.286.408.464,90
4.452,45 3.062.782,49
581,39 2.662.208,90
352.415,36

6.077.406,75
12.762.144,4
21.745.403,14
3.829.501.5
4.292.485.871,65
PRICE AMOUNT

7.352, 4.292.485.871,65
36 2.461.202,51

2.461.202,51
15.223.346,9
24.206.605,65
3.831.962.7
4.294.947.074,16
PRICE AMOUNT

4.294.947.074,16

4.500,00 2.757.825,00

3.019,03 310.960,09
3.068.785,09
18.292.132,0
27.275.390,74
3.835.031.5
4.298.015.859,25

PRICE AMOUNT

4.298.015.859,25

10.981,24 231.923,79

15.549,15 528.515,61

122.616,07 1.262.945,52
14.258,95 877.495,78
2.900.880,70

21.193.012,7
30.176.271,44
3.837.932.4
4.300.916.739,95

PRICE AMOUNT

4.300.916.739,95

2.550,00 1.264.672,50

19.445,72 3.114.620,97
124.626,56 1.604.566,96
5.983.860,43
27.176.873,2
0

36.160.131,87
3.843.916.2
4.306.900.600,38

PRICE AMOUNT

6.753, 4.306.900.600,38
42 2.743.982,08
42

2.743.982,08
2.743.982,08
38.904.113,95
3.846.660.2
4.309.644.582,46

PRICE AMOUNT
3.043,88 4.309.644.582,46
5.234,30 1.102.036,75
2.652,95 606.131,94
4.452,45 635.779,47
581,39 1.067.029,64
280.567,19

3.691.544,99
6.435.527,07
42.595.658,94
3.850.351.8
4.313.336.127,45
PRICE AMOUNT

4.313.336.127,45

8.212,36 733.199,50

11.800,00 621.742,00
1.354.941,50
7.790.468,57
43.950.600,44
3.851.706.7
4.314.691.068,95

PRICE AMOUNT

4.314.691.068,95

4.500,00 1.097.775,00

3.019,03 123.780,23
1.221.555,23

9.012.023,80
45.172.155,67
3.852.928.3
4.315.912.624,18

PRICE AMOUNT

4.315.912.624,18
10.981,24 92.352,23

15.549,15 210.380,00

122.616,07 502.725,89

14.258,95 349.344,28
1.154.802,40

10.166.826,2
46.326.958,07
3.854.083.1
4.317.067.426,58
PRICE AMOUNT

4.317.067.426,58

2.550,00 503.421,00

19.445,72 1.239.859,11

124.626,56 638.711,12
2.381.991,23
12.548.817,4
3

48.708.949,30
3.856.465.1
4.319.449.417,81
PRICE AMOUNT

6.753, 4.319.449.417,81
42 5.487.964,16

5.487.964,16
5.487.964,16
54.196.913,46
3.861.953.0
4.324.937.381,97
PRICE AMOUNT

108.379,99 4.324.937.381,97
3.043,88 171.478,82
5.234,30 2.734.347,84
2.652,95 2.126.748,43
4.452,45 1.271.532,41
581,39 2.134.014,76
561.122,74
8.999.245,00
14.487.209,1
63.196.158,46
3.870.952.3
4.333.936.626,97

PRICE AMOUNT

4.333.936.626,97

8.033,67 5.270.087,52

11.800,00 1.243.366,00
6.513.453,52
21.000.662,6
69.709.611,98
3.877.465.7
4.340.450.080,49

PRICE AMOUNT

4.340.450.080,49

4.500,00 2.195.550,00

3.019,03 247.560,46
2.443.110,46

23.443.773,1
72.152.722,44
3.879.908.8
4.342.893.190,95

PRICE AMOUNT

4.342.893.190,95
10.981,24 184.594,64

15.549,15 420.760,00

122.616,07 1.005.451,77

14.258,95 698.688,55
2.309.494,96

25.753.268,1
74.462.217,40
3.882.218.3
4.345.202.685,91
PRICE AMOUNT

4.345.202.685,91

2.550,00 1.006.816,50

19.445,72 2.479.523,76

124.626,56 1.277.422,24
4.763.762,50
30.517.030,6
0

79.225.979,90
3.886.982.1
4.349.966.448,41
PRICE AMOUNT

4.349.966.448,41

6.753, 4.128.095,51
42
4.128.095,51
4.128.095,51
83.354.075,41
3.891.110.2
4.354.094.543,92

PRICE AMOUNT

4.354.094.543,92

108.379,99 623.455,89
3.043,88 1.635.446,29

5.234,30 2.812.337,05

2.652,95 601.131,94

5.672.371,17
9.800.466,68
89.026.446,58
3.896.782.5
4.359.766.915,09

PRICE AMOUNT

4.359.766.915,09

4.452,45 1.008.880,65

581,39 265.137,10
6.946.388,92

11.074.484,4
90.300.464,33
3.898.056.6
4.361.040.932,84

PRICE AMOUNT

4.361.040.932,84

11.721,36 304.755,36
8.033,67 2.610.942,75

11.800,00 984.002,00
3.899.700,11

14.974.184,5
94.200.164,44
3.901.956.3
4.364.940.632,95

PRICE AMOUNT

4.364.940.632,95
4.500,00 1.023.165,00

3.019,03 78.494,78
1.101.659,78

16.075.844,3
95.301.824,22
3.903.057.9
4.366.042.292,73
PRICE AMOUNT

4.366.042.292,73

10.981,24 109.482,96

15.549,15 183.946,44

122.616,07 398.502,23

14.258,95 493.074,49
1.185.006,12

17.260.850,4
96.486.830,34
3.904.242.9
4.367.227.298,85

PRICE AMOUNT

4.367.227.298,85

2.550,00 502.885,50

19.445,72 1.454.345,40

124.626,56 1.786.023,23
3.743.254,13
21.004.104,5
7
100.230.084,47
3.907.986.2
4.370.970.552,98

PRICE AMOUNT

6.753, 4.370.970.552,98
42 1.132.345,93
42

1.132.345,93
1.132.345,93
1.132.345,93
3.909.118.5
4.372.102.898,91

PRICE AMOUNT
3.043,88 4.372.102.898,91
2.652,95 320.246,61
581,39 275.296,62
60.749,44

656.292,67
1.788.638,60
1.788.638,60
3.909.774.8
4.372.759.191,58
PRICE AMOUNT

7.352, 4.372.759.191,58
36 66.171,24

66.171,24
1.854.809,84
1.854.809,84
3.909.841.0
4.372.825.362,82
PRICE AMOUNT

4.372.825.362,82

4.500,00 481.950,00

3.019,03 54.342,54
536.292,54
2.391.102,38
2.391.102,38
3.910.377.3
4.373.361.655,36

PRICE AMOUNT

4.373.361.655,36

10.981,24 40.520,78

15.549,15 92.361,95

122.616,07 220.708,93
14.258,95 153.426,30
507.017,96

2.898.120,34
2.898.120,34
3.910.884.3
4.373.868.673,32

PRICE AMOUNT

4.373.868.673,32

2.550,00 221.008,50

19.445,72 544.285,70
124.626,56 280.409,76
1.045.703,96
3.943.824,30

3.943.824,30
3.911.930.0
4.374.914.377,28

PRICE AMOUNT

6.753, 4.374.914.377,28
42 3.439.719,41
42

3.439.719,41
3.439.719,41
7.383.543,71
3.915.369.7
4.378.354.096,69

PRICE AMOUNT
3.043,88 4.378.354.096,69
4.452,45 1.575.999,31
581,39 1.369.885,29
181.341,35

3.127.225,95
6.566.945,36
10.510.769,66
3.918.497.0
4.381.481.322,64
PRICE AMOUNT

7.352, 4.381.481.322,64
36 1.266.444,01

1.266.444,01
7.833.389,37
11.777.213,67
3.919.763.4
4.382.747.766,65
PRICE AMOUNT

4.382.747.766,65

4.500,00 1.419.075,00

3.019,03 160.008,59
1.579.083,59
9.412.472,96
13.356.297,26
3.921.342.5
4.384.326.850,24

PRICE AMOUNT

4.384.326.850,24

10.981,24 119.366,08

15.549,15 271.954,63

122.616,07 649.865,17
14.258,95 451.580,95
1.492.766,83

10.905.239,7
14.849.064,09
3.922.835.3
4.385.819.617,07

PRICE AMOUNT

4.385.819.617,07

2.550,00 650.760,00

19.445,72 1.602.716,24
124.626,56 825.650,96
3.079.127,20
13.984.366,9
9

17.928.191,29
3.925.914.4
4.388.898.744,27

PRICE AMOUNT

6.753, 4.388.898.744,27
42 4.751.773,85
42

4.751.773,85
4.751.773,85
22.679.965,14
3.930.666.2
4.393.650.518,12

PRICE AMOUNT
3.043,88 4.393.650.518,12
5.234,30 1.908.725,83
2.652,95 1.049.634,18
4.452,45 1.100.974,25
581,39 1.847.766,75
485.856,00

6.392.957,01
11.144.730,8
29.072.922,15
3.937.059.1
4.400.043.475,13
PRICE AMOUNT

4.400.043.475,13

8.212,36 1.269.630,86

11.800,00 1.076.632,00
2.346.262,86
13.490.993,7
31.419.185,01
3.939.405.4
4.402.389.737,99

PRICE AMOUNT

4.402.389.737,99

4.500,00 1.901.025,00

3.019,03 214.351,13
2.115.376,13

15.606.369,8
33.534.561,14
3.941.520.7
4.404.505.114,12

PRICE AMOUNT

4.404.505.114,12
10.981,24 159.886,85

15.549,15 364.316,58

122.616,07 870.574,10

14.258,95 604.864,66
1.999.642,19

17.606.012,0
35.534.203,33
3.943.520.4
4.406.504.756,31
PRICE AMOUNT

4.406.504.756,31

2.550,00 871.768,50

19.445,72 2.147.001,95

124.626,56 1.106.060,72
4.124.831,17
21.730.843,2
1

39.659.034,50
3.947.645.2
4.410.629.587,48
PRICE AMOUNT

6.753, 4.410.629.587,48
42 6.471.802,39

6.471.802,39
6.471.802,39
46.130.836,89
3.954.117.0
4.417.101.389,87
PRICE AMOUNT

108.379,99 4.417.101.389,87
3.043,88 171.478,82
5.234,30 3.224.534,28
2.652,95 2.508.014,85
4.452,45 1.499.473,87
581,39 2.516.569,26
661.714,84
10.581.785,92
17.053.588,3
56.712.622,81
3.964.698.8
4.427.683.175,79

PRICE AMOUNT

4.427.683.175,79

8.033,67 6.214.847,11

11.800,00 1.466.268,00
7.681.115,11
24.734.703,4
64.393.737,92
3.972.379.9
4.435.364.290,90

PRICE AMOUNT

4.435.364.290,90

4.500,00 2.589.165,00

3.019,03 291.940,20
2.881.105,20

27.615.808,6
67.274.843,12
3.975.261.0
4.438.245.396,10

PRICE AMOUNT

4.438.245.396,10
10.981,24 217.648,18

15.549,15 496.173,38

122.616,07 1.185.697,40

14.258,95 823.882,13
2.723.401,09

30.339.209,7
69.998.244,21
3.977.984.4
4.440.968.797,19
PRICE AMOUNT

4.440.968.797,19

2.550,00 1.187.305,50

19.445,72 2.924.052,92

124.626,56 1.506.423,54
5.617.781,96
35.956.991,6
7

75.616.026,17
3.983.602.2
4.446.586.579,15
PRICE AMOUNT

4.446.586.579,15

6.753, 4.128.095,51
42
4.128.095,51
4.128.095,51
79.744.121,68
3.987.730.3
4.450.714.674,66

PRICE AMOUNT

4.450.714.674,66

108.379,99 623.455,89
3.043,88 1.635.446,29

5.234,30 2.812.337,05

2.652,95 601.131,94

5.672.371,17
9.800.466,68
85.416.492,85
3.993.402.7
4.456.387.045,83

PRICE AMOUNT

4.456.387.045,83

4.452,45 1.008.880,65

581,39 265.137,10
6.946.388,92

11.074.484,4
86.690.510,60
3.994.676.7
4.457.661.063,58

PRICE AMOUNT

4.457.661.063,58

11.721,36 304.755,36
8.033,67 2.610.942,75

11.800,00 984.002,00
3.899.700,11

14.974.184,5
90.590.210,71
3.998.576.4
4.461.560.763,69

PRICE AMOUNT

4.461.560.763,69
4.500,00 1.023.165,00

3.019,03 78.494,78
1.101.659,78

16.075.844,3
91.691.870,49
3.999.678.1
4.462.662.423,47
PRICE AMOUNT

4.462.662.423,47

10.981,24 109.482,96

15.549,15 183.946,44

122.616,07 398.502,23

14.258,95 493.074,49
1.185.006,12

17.260.850,4
92.876.876,61
4.000.863.1
4.463.847.429,59

PRICE AMOUNT

4.463.847.429,59

2.550,00 502.885,50

19.445,72 1.454.345,40

124.626,56 1.786.023,23
3.743.254,13
21.004.104,5
7
96.620.130,74
4.004.606.3
4.467.590.683,72

PRICE AMOUNT

6.753, 4.467.590.683,72
42 3.753.010,56
6.753,
42

3.753.010,56
3.753.010,56
3.753.010,56
4.008.359.3
4.471.343.694,28

PRICE AMOUNT
108.379,99 4.471.343.694,28
3.043,88 256.990,63
2.652,95 1.886.048,93
4.452,45 1.643.820,88
581,39 2.758.827,07
720.487,56

7.266.175,07
11.019.185,6
11.019.185,63
4.015.625.5
4.478.609.869,35
PRICE AMOUNT

4.500, 4.478.609.869,35
00 2.920.320,00

2.920.320,00
13.939.505,6
13.939.505,63
4.018.545.8
4.481.530.189,35
PRICE AMOUNT

10.981 4.481.530.189,35
,24 250.482,08
,24

250.482,08
14.189.987,7
14.189.987,71
4.018.796.3
4.481.780.671,43

PRICE AMOUNT
2.550,00 4.481.780.671,43
19.445,72 1.441.566,00
124.626,56 4.507.128,98
2.731.427,85

8.680.122,83
22.870.110,5
4
22.870.110,54
4.027.476.4
4.490.460.794,26
PRICE AMOUNT

6.753, 4.490.460.794,26
42 200.441,51

200.441,51
200.441,51
23.070.552,05
4.027.676.9
4.490.661.235,77
PRICE AMOUNT

108.379,99 4.490.661.235,77
3.043,88 20.678,90
2.652,95 125.986,19
4.452,45 109.805,60
581,39 184.286,91
48.127,46
488.885,06
689.326,57
23.559.437,11
4.028.165.8
4.491.150.120,83

PRICE AMOUNT

4.500, 4.491.150.120,83
00 197.820,00
00

197.820,00
887.146,57
23.757.257,11
4.028.363.6
4.491.347.940,83

PRICE AMOUNT
10.981 4.491.347.940,83
,24 11.420,49

11.420,49
898.567,06
23.768.677,60
4.028.375.0
4.491.359.361,32
PRICE AMOUNT

2.550,00 4.491.359.361,32
19.445,72 83.563,50
124.626,56 280.990,65
170.476,67

535.030,82
1.433.597,88
24.303.708,42
4.028.910.0
4.491.894.392,14
PRICE AMOUNT

6.753, 4.491.894.392,14
42 2.436.296,27

2.436.296,27
2.436.296,27
26.740.004,69
4.031.346.3
4.494.330.688,41
PRICE AMOUNT

108.379,99 4.494.330.688,41
3.043,88 357.881,56
2.652,95 1.254.139,44
4.452,45 1.084.181,08
581,39 1.804.667,03
474.547,96
4.975.417,07
7.411.713,34
31.715.421,76
4.036.321.7
4.499.306.105,48

PRICE AMOUNT

4.500, 4.499.306.105,48
00 925.020,00
00

925.020,00
8.336.733,34
32.640.441,76
4.037.246.8
4.500.231.125,48

PRICE AMOUNT
10.981 4.500.231.125,48
,24 75.770,56

75.770,56
8.412.503,90
32.716.212,32
4.037.322.5
4.500.306.896,04
PRICE AMOUNT

2.550,00 4.500.306.896,04
19.445,72 715.300,50
124.626,56 2.622.644,26
1.590.546,47

4.928.491,23
13.340.995,1
3
37.644.703,55
4.042.251.0
71,06
4.505.235.387,27
PRICE AMOUNT

4.505.235.387,27

110.464,93 162.383,45

16.220,39 238.439,73
400.823,18
400.823,18
400.823,18
400.823,18
4.505.636.210,45

PRICE AMOUNT

4.505.636.210,45

110.464,93 231.313,56

16.220,39 339.654,97
570.968,53
570.968,53

971.791,71
971.791,71
4.506.207.178,98

PRICE AMOUNT

4.506.207.178,98
110.464,93 206.127,56

16.220,39 302.672,48
508.800,04
508.800,04

1.480.591,75
1.480.591,7
4.506.715.979,02

PRICE AMOUNT
PRICE AMOUNT

4.506.715.979,02

110.464,93 479.196,87

16.220,39 703.640,52
1.182.837,39
1.182.837,39

2.663.429,14
2.663.429,1
4.507.898.816,41
PRICE AMOUNT

4.507.898.816,41

110.464,93 288.092,54

16.220,39 423.027,77
711.120,31
711.120,31
3.374.549,45
3.374.549,4
4.508.609.936,72

PRICE AMOUNT

4.508.609.936,72

110.464,93 386.958,65

16.220,39 568.200,26
955.158,91
955.158,91

4.329.708,36
4.329.708,3
4.509.565.095,63

PRICE AMOUNT

4.509.565.095,63
110.464,93 244.900,75

16.220,39 359.606,05
604.506,80
604.506,80

4.934.215,16
4.934.215,1
4.510.169.602,43

PRICE AMOUNT
PRICE AMOUNT

4.510.169.602,43

110.464,93 273.511,17

16.220,39 401.616,86
675.128,03
675.128,03

5.609.343,19
5.609.343,1
4.510.844.730,46
PRICE AMOUNT

4.510.844.730,46

110.464,93 223.912,41

16.220,39 328.787,31
552.699,72
552.699,72
6.162.042,91
6.162.042,9
4.511.397.430,18

PRICE AMOUNT

31 4.511.397.430,18
9, 7.566,94
82
9,
82

7.566,94
7.566,94
7.566,94
6.169.609,8
4.511.404.997,12

PRICE AMOUNT
9.893,01 4.511.404.997,12
110.464,93 9.002,64
110.464,93 17.232,53
7.780,00 37.558,08
11.720,00 373.440,00
16.220,39 439.500,00
15.188,18 68.936,66
2.900,00 29.616,95
58.000,00

1.033.286,86
1.040.853,80
1.040.853,80
7.202.896,7
4.512.438.283,98
PRICE AMOUNT

31 4.512.438.283,98
9, 16.685,01
82

16.685,01
16.685,01
1.057.538,81
7.219.581,7
4.512.454.968,99
PRICE AMOUNT

9.893,01 4.512.454.968,99
110.464,93 14.344,86
110.464,93 27.483,67
7.780,00 114.971,90
11.720,00 622.400,00
16.220,39 966.900,00
15.188,18 211.027,27
2.900,00 47.235,24
116.000,00
2.120.362,94
2.137.047,95
3.177.901,75
9.339.944,6
4.514.575.331,93

PRICE AMOUNT

31 4.514.575.331,93
9, 57.714,72
82
9,
82

57.714,72
57.714,72
3.235.616,47
9.397.659,3
4.514.633.046,65

PRICE AMOUNT
9.893,01 4.514.633.046,65
110.464,93 97.841,87
110.464,93 480.566,63
7.780,00 2.070.731,39
20.140,00 4.823.600,00
16.220,39 6.605.920,00
15.188,18 3.800.761,78
2.900,00 825.933,23
522.000,00

19.227.354,90
22.462.971,37
28.625.014,
4.533.860.401,55
PRICE AMOUNT

4.533.860.401,55
19.285.069,6
2
22.462.971,37
28.625.014,
4.533.860.401,55
PRICE AMOUNT

31 4.533.860.401,55
9, 303.157,38
82
303.157,38
303.157,38
22.766.128,75
28.928.171,
4.534.163.558,93

PRICE AMOUNT
9.893,01 4.534.163.558,93
110.464,93 206.269,26
110.464,93 523.603,77
7.780,00 2.745.009,32
11.720,00 9.102.600,00
16.220,39 17.287.000,00
15.188,18 5.038.377,54
899.899,67
35.802.759,56
36.105.916,9
58.568.888,31
64.730.931,
4.569.966.318,49
PRICE AMOUNT

2.900, 4.569.966.318,49
00 1.406.500,00

37.209.259,56
37.512.416,9
4
59.975.388,31
66.137.431,
4.571.372.818,49
PRICE AMOUNT

1.996,11 4.571.372.818,49
12.172,63 2.109.309,40
9.577,26 4.331.630,39
73,42 852.950,78
785.094,74
8.078.985,31
8.078.985,31
8.078.985,31
74.216.416,
4.579.451.803,80

PRICE AMOUNT

4.579.451.803,80

38 4.064.108,14
3,
49
4.064.108,14

4.064.108,14
12.143.093,45
78.280.524,
4.583.515.911,94

PRICE AMOUNT
4.583.515.911,94

364,83 585.169,08

1.500,45 16.941.130,82
17.526.299,90
21.590.408,0
4

29.669.393,35
95.806.824,
4.601.042.211,84
PRICE AMOUNT

4.601.042.211,84

8.500,00 3.101.055,00

521,01 190.080,08

7.780,00 3.360.960,00
6.652.095,08
6.652.095,08
36.321.488,43
102.458.919
4.607.694.306,92

PRICE AMOUNT

4.607.694.306,92

9.893,01 4.581.551,86

13.966,07 42.711.314,60

110.464,93 55.741.310,65
103.034.177,11

103.034.177,
139.355.665,54
205.493.096
4.710.728.484,03

PRICE AMOUNT

4.710.728.484,03

110.464,93 78.486.061,83
16.220,39 60.771.799,79
139.257.861,62

242.292.038,
278.613.527,16
344.750.958
4.849.986.345,65

PRICE AMOUNT

4.849.986.345,65

24.081,94 40.520.994,70

666,05 4.558.406,24

1.464,50 760.075,50
2.800,00 23.874.396,00

2.800,00 1.916.292,00
71.630.164,44

313.922.203,
350.243.691,60
416.381.122
4.921.616.510,09

PRICE AMOUNT

4.921.616.510,09

112.276,18 59.533.591,15
17.501,69 45.287.373,04
104.820.964,19
418.743.167,
36

455.064.655,79
521.202.087
5.026.437.474,28

PRICE AMOUNT

5.026.437.474,28

5.116,63 11.972.914,20

1.996,11 1.145.846,98
13.966,07 1.742.825,88

33.500,00 26.130.000,00
40.991.587,06
40.991.587,0
6

496.056.242,85
562.193.674
5.067.429.061,34

PRICE AMOUNT

5.067.429.061,34
1.500,45 2.307.962,18

114,66 2.088.074,41

16.000,00 222.723.200,00
227.119.236,59
227.119.236,
59
723.175.479,44

789.312.910
5.294.548.297,93
PRICE AMOUNT

5.294.548.297,93

8.500,00 16.473.000,00

666,05 1.290.804,90

11.720,00 68.069.760,00

3.000,00 3.870.000,00
89.703.564,90
89.703.564,9
0
89.703.564,90
879.016.475
5.384.251.862,83

PRICE AMOUNT

5.384.251.862,83
8.500, 15.038.200,00
00

15.038.200,00

15.038.200,0
15.038.200,00
894.054.675
5.399.290.062,83

PRICE AMOUNT

5.399.290.062,83

66 1.178.375,66
6,
05
16.216.575,66

16.216.575,6
16.216.575,66
895.233.051
5.400.468.438,49

PRICE AMOUNT

5.400.468.438,49
11.720,00 29.557.840,00

3.000,00 3.528.000,00
49.302.415,66
49.302.415,6
6
49.302.415,66
928.318.891
,22

5.433.554.278,49

PRICE AMOUNT

38 5.433.554.278,49
3, 1.621.468,58
49
3,
49

1.621.468,58
1.621.468,58
1.621.468,58
1.621.468,5
5.435.175.747,07

PRICE AMOUNT
36 5.435.175.747,07
4, 292.141,27
83

292.141,27
1.913.609,85
1.913.609,85
1.913.609,8
5.435.467.888,34
PRICE AMOUNT

4.900, 5.435.467.888,34
00 2.695.000,00

2.695.000,00
4.608.609,85
4.608.609,85
4.608.609,8
5.438.162.888,34
PRICE AMOUNT

1.996,11 5.438.162.888,34
12.172,63 8.106.921,31
9.577,26 11.683.046,82
73,42 2.326.795,32
891.869,45
23.008.632,90
27.617.242,7
5
27.617.242,75
27.617.242,
5.461.171.521,24

PRICE AMOUNT

5.461.171.521,24

1.745, 949.585,78
53
949.585,78
949.585,78
28.566.828,53

28.566.828,
5.462.121.107,02

PRICE AMOUNT

5.462.121.107,02
8.500, 12.155.000,00
00

12.155.000,00

12.155.000,0
12.155.000,00
40.721.828,
5.474.276.107,02

PRICE AMOUNT
5.474.276.107,02

66 952.451,50
6,
05

13.107.451,50

13.107.451,5
13.107.451,50
41.674.280,
5.475.228.558,52
PRICE AMOUNT

5.475.228.558,52

7.780,00 21.784.000,00

3.000,00 2.844.000,00
37.735.451,50
37.735.451,5
0
37.735.451,50

66.302.280,
5.499.856.558,52

PRICE AMOUNT

5.499.856.558,52

8.500,00 39.763.000,00

666,05 3.115.781,90

9.350,00 65.608.950,00

11.720,00 131.582.784,00

6.000,00 70.170.000,00

310.240.515,90
310.240.515,
310.240.515,90
376.542.795
5.810.097.074,42

PRICE AMOUNT

3.000, 5.810.097.074,42
00 9.270.000,00

319.510.515,90
319.510.515,
90
319.510.515,90
385.812.795
5.819.367.074,42
PRICE AMOUNT

5.819.367.074,42

40.400,00 26.664.000,00

53.000,00 61.745.000,00
88.409.000,00
88.409.000,0
0
407.919.515,90
474.221.795
5.907.776.074,42

PRICE AMOUNT

11 5.907.776.074,42
9, 9.563,22
93
9,
93

9.563,22
9.563,22
9.563,22
474.231.359
5.907.785.637,64

PRICE AMOUNT
36 5.907.785.637,64
4, 5.031,01
83

5.031,01
14.594,23
14.594,23
474.236.390
5.907.790.668,65
PRICE AMOUNT

11.539,20 5.907.790.668,65
13.966,07 53.080,32
110.464,93 374.011,35
14.843,16 295.825,08
110.464,93 595.359,15
437.000,00 443.074,83
109.250,00
1.870.600,73
1.885.194,96
1.885.194,96
476.106.990
5.909.661.269,38

PRICE AMOUNT

11 5.909.661.269,38
9, 7.861,41
93
93

7.861,41
7.861,41
1.893.056,37
476.114.852
5.909.669.130,79

PRICE AMOUNT
36 5.909.669.130,79
4, 11.696,45
83

11.696,45
19.557,86
1.904.752,82
476.126.548
5.909.680.827,24
PRICE AMOUNT

16.857,39 5.909.680.827,24
11.539,20 211.391,67
13.966,07 51.234,05
110.464,93 18.435,21
14.843,16 8.748,82
110.464,93 94.254,07
437.000,00 70.145,23
65.550,00
519.759,05
539.316,91
2.424.511,87
476.646.307
5.910.200.586,29

PRICE AMOUNT

11 5.910.200.586,29
9, 37.492,52
93
9,
93

37.492,52
37.492,52
2.462.004,39
476.683.800
5.910.238.078,81

PRICE AMOUNT
36 5.910.238.078,81
4, 11.791,31
83

11.791,31
49.283,83
2.473.795,70
476.695.591
5.910.249.870,12
PRICE AMOUNT

11.539,20 5.910.249.870,12
13.966,07 105.468,29
110.464,93 354.738,18
14.843,16 280.580,92
110.464,93 1.003.100,75
437.000,00 746.522,00
109.250,00
2.599.660,14
2.648.943,97
5.073.455,84
479.295.251
5.912.849.530,26

PRICE AMOUNT

11 5.912.849.530,26
9, 8.746,49
93
93

8.746,49
8.746,49
5.082.202,33
479.303.998
5.912.858.276,75

PRICE AMOUNT
36 5.912.858.276,75
4, 12.608,52
83

12.608,52
21.355,01
5.094.810,85
479.316.606
5.912.870.885,27
PRICE AMOUNT

18.507,00 5.912.870.885,27
11.539,20 244.292,40
13.966,07 56.080,51
110.464,93 18.435,21
14.843,16 14.581,37
110.464,93 94.254,07
437.000,00 70.145,23
65.550,00
563.338,79
584.693,80
5.658.149,64
479.879.945
5.913.434.224,06

PRICE AMOUNT

11 5.913.434.224,06
9, 8.563,00
93
93

8.563,00
8.563,00
5.666.712,64
479.888.508
5.913.442.787,06

PRICE AMOUNT
36 5.913.442.787,06
4, 12.969,71
83

12.969,71
21.532,71
5.679.682,35
479.901.478
5.913.455.756,77
PRICE AMOUNT

16.857,39 5.913.455.756,77
11.539,20 235.160,59
13.966,07 55.388,16
110.464,93 18.435,21
14.843,16 14.581,37
110.464,93 94.254,07
437.000,00 70.145,23
65.550,00
553.514,63
575.047,34
6.233.196,98
480.454.992
5.914.009.271,40

PRICE AMOUNT

11 5.914.009.271,40
9, 21.158,05
93
9,
93

21.158,05
21.158,05
6.254.355,03
480.476.150
5.914.030.429,45

PRICE AMOUNT
36 5.914.030.429,45
4, 21.867,91
83

21.867,91
43.025,96
6.276.222,94
480.498.018
5.914.052.297,36
PRICE AMOUNT

11.539,20 5.914.052.297,36
13.966,07 58.619,14
110.464,93 184.491,78
14.843,16 145.924,17
110.464,93 678.035,55
437.000,00 504.603,80
109.250,00

1.680.924,44
1.723.950,40
7.957.147,38
482.178.943
5.915.733.221,80
PRICE AMOUNT

31 5.915.733.221,80
9, 224.513,64
82

224.513,64
224.513,64
224.513,64
482.403.456
5.915.957.735,44
PRICE AMOUNT

9.893,01 5.915.957.735,44
110.464,93 89.037,09
110.464,93 434.789,96
7.780,00 1.155.286,42
11.720,00 4.201.200,00
16.220,39 7.500.800,00
15.188,18 2.120.491,58
2.900,00 747.258,46
362.500,00
16.611.363,51
16.835.877,15
499.014.820
5.932.569.098,95

PRICE AMOUNT
5.932.569.098,95
16.835.877,1
5
16.835.877,15
499.014.820
5.932.569.098,95
PRICE AMOUNT

31 5.932.569.098,95
9, 23.282,90
82

23.282,90
23.282,90
16.859.160,05
499.038.103
5.932.592.381,85
PRICE AMOUNT

9.893,01 5.932.592.381,85
110.464,93 27.700,43
110.464,93 53.023,17
7.780,00 166.227,63
11.720,00 871.360,00
16.220,39 2.373.300,00
15.188,18 305.105,54
2.900,00 91.129,08
188.500,00
4.076.345,85
4.099.628,75
20.935.505,90
503.114.449
5.936.668.727,70

PRICE AMOUNT

31 5.936.668.727,70
9, 11.641,45
82
9,
82

11.641,45
11.641,45
20.947.147,35
503.126.090
5.936.680.369,15

PRICE AMOUNT
9.893,01 5.936.680.369,15
110.464,93 13.850,21
110.464,93 26.511,58
7.780,00 56.646,42
11.720,00 435.680,00
16.220,39 1.142.700,00
15.188,18 103.972,70
2.900,00 45.564,54
87.000,00

1.911.925,45
1.923.566,90
22.859.072,80
505.038.016
5.938.592.294,60
PRICE AMOUNT

31 5.938.592.294,60
9, 11.641,45
82

11.641,45
11.641,45
22.870.714,25
505.049.657
5.938.603.936,05
PRICE AMOUNT

9.893,01 5.938.603.936,05
110.464,93 13.850,21
110.464,93 26.511,58
7.780,00 56.646,42
11.720,00 435.680,00
16.220,39 1.142.700,00
15.188,18 103.972,70
2.900,00 45.564,54
87.000,00
1.911.925,45
1.923.566,90
24.782.639,70
506.961.583
5.940.515.861,50

PRICE AMOUNT

31 5.940.515.861,50
9, 11.641,45
82
9,
82

11.641,45
11.641,45
24.794.281,15
506.973.224
5.940.527.502,95

PRICE AMOUNT
9.893,01 5.940.527.502,95
110.464,93 13.850,21
110.464,93 26.511,58
7.780,00 58.148,74
11.720,00 272.300,00
16.220,39 421.920,00
15.188,18 106.730,17
2.900,00 45.564,54
87.000,00

1.032.025,24
1.043.666,69
25.826.306,39
508.005.249
5.941.559.528,19
PRICE AMOUNT

31 5.941.559.528,19
9, 23.282,90
82

23.282,90
23.282,90
25.849.589,29
508.028.532
5.941.582.811,09
PRICE AMOUNT

9.893,01 5.941.582.811,09
110.464,93 27.700,43
110.464,93 53.023,17
7.780,00 116.297,48
11.720,00 544.600,00
16.220,39 843.840,00
15.188,18 213.460,33
2.900,00 91.129,08
188.500,00
2.078.550,49
2.101.833,39
27.928.139,78
510.107.083
5.943.661.361,58

PRICE AMOUNT

31 5.943.661.361,58
9, 23.282,90
82
9,
82

23.282,90
23.282,90
27.951.422,68
510.130.365
5.943.684.644,48

PRICE AMOUNT
9.893,01 5.943.684.644,48
110.464,93 27.700,43
110.464,93 53.023,17
7.780,00 116.297,48
11.720,00 544.600,00
16.220,39 843.840,00
15.188,18 213.460,33
2.900,00 91.129,08
188.500,00

2.078.550,49
2.101.833,39
30.029.973,17
512.208.916
5.945.763.194,97
PRICE AMOUNT

31 5.945.763.194,97
9, 23.282,90
82

23.282,90
23.282,90
30.053.256,07
512.232.199
5.945.786.477,87
PRICE AMOUNT

9.893,01 5.945.786.477,87
110.464,93 27.700,43
110.464,93 53.023,17
7.780,00 112.674,23
11.720,00 809.120,00
16.220,39 2.373.300,00
15.188,18 206.809,97
2.900,00 91.129,08
188.500,00
3.862.256,88
3.885.539,78
33.915.512,95
5.949.648.734,75

PRICE AMOUNT
5.949.648.734,75
516.094.456
,26
5.949.648.734,75

PRICE AMOUNT
PRICE AMOUNT

69 5.949.648.734,75
,5 11.655.853,73
8

11.655.853,
73
5.961.304.588,48
PRICE AMOUNT

29.700.000,00 5.961.304.588,48
11.880.000,00 29.700.000,00
132.000,00 11.880.000,00
1.320.000,00 132.000,00
2.508.000,00 1.320.000,00
10.560.000,00 2.508.000,00
264.000,00 10.560.000,00
132.000,00 264.000,00
660.000,00 132.000,00
132.000,00 660.000,00
132.000,00
57.288.000,0
0
57.288.000,00
57.288.000,
6.018.592.588,48

PRICE AMOUNT

15.972.000,00 6.018.592.588,48
13.200.000,00 15.972.000,00
2.376.000,00 13.200.000,00
10.560.000,00 2.376.000,00
3.036.000,00 10.560.000,00
5.148.000,00 3.036.000,00
1.584.000,00 5.148.000,00
132.000,00 1.584.000,00
1.980.000,00 132.000,00
264.000,00 1.980.000,00
16.500.000,00 264.000,00
132.000,00 16.500.000,00
528.000,00 132.000,00
528.000,00
71.412.000,00
71.412.000,0
128.700.000,00
128.700.000
6.090.004.588,48
PRICE AMOUNT

2.640.000,00 6.090.004.588,48
660.000,00 2.640.000,00
660.000,00
74.712.000,0
0
132.000.000,00
132.000.000
6.093.304.588,48

PRICE AMOUNT

4.488.000,00 6.093.304.588,48
1.848.000,00 67.320.000,00
2.244.000,00 3.696.000,00
396.000,00 13.464.000,00
3.960.000,00 396.000,00
3.300.000,00 3.960.000,00
4.620.000,00 3.300.000,00
396.000,00 4.620.000,00
924.000,00 396.000,00
3.960.000,00 924.000,00
1.320.000,00 3.960.000,00
1.320.000,00
4.488.000,00 6.093.304.588,48
1.848.000,00 67.320.000,00
2.244.000,00 3.696.000,00
396.000,00 13.464.000,00
3.960.000,00 396.000,00
3.300.000,00 3.960.000,00
4.620.000,00 3.300.000,00
396.000,00 4.620.000,00
924.000,00 396.000,00
3.960.000,00 924.000,00
1.320.000,00 3.960.000,00
1.320.000,00

103.356.000,
00
103.356.000,00
235.356.000
6.196.660.588,48

PRICE AMOUNT
PRICE AMOUNT

15.840.000,00 6.196.660.588,48
264.000,00 63.360.000,00
3.300.000,00 264.000,00
2.772.000,00 3.300.000,00
3.696.000,00 2.772.000,00
396.000,00 3.696.000,00
792.000,00 396.000,00
3.300.000,00 792.000,00
1.056.000,00 3.300.000,00
1.056.000,00
78.936.000,0
0
182.292.000,00
314.292.000
6.275.596.588,48

PRICE AMOUNT

1.056.000,00 6.275.596.588,48
330.000,00 1.056.000,00
1.056.000,00 1.320.000,00
528.000,00 7.392.000,00
132.000,00 2.112.000,00
2.640.000,00 4.752.000,00
3.960.000,00 2.640.000,00
132.000,00 3.960.000,00
660.000,00 132.000,00
1.980.000,00 660.000,00
1.584.000,00 1.980.000,00
132.000,00 1.584.000,00
528.000,00 132.000,00
528.000,00
28.248.000,00
28.248.000,0
28.248.000,00
342.540.000
6.303.844.588,48
PRICE AMOUNT

1.320.000,00 6.303.844.588,48
792.000,00 1.320.000,00
792.000,00
30.360.000,0
0
30.360.000,00
344.652.000
6.305.956.588,48

PRICE AMOUNT

4.620.000,00 6.305.956.588,48
1.320.000,00 9.240.000,00
1.980,00 2.640.000,00
594.000,00 2.772.000,00
1.320.000,00 7.128.000,00
660.000,00 1.320.000,00
132.000,00 660.000,00
924.000,00 132.000,00
1.980.000,00 924.000,00
3.960.000,00 1.980.000,00
132.000,00 3.960.000,00
264.000,00 132.000,00
1.056.000,00 264.000,00
1.056.000,00
4.620.000,00 6.305.956.588,48
1.320.000,00 9.240.000,00
1.980,00 2.640.000,00
594.000,00 2.772.000,00
1.320.000,00 7.128.000,00
660.000,00 1.320.000,00
132.000,00 660.000,00
924.000,00 132.000,00
1.980.000,00 924.000,00
3.960.000,00 1.980.000,00
132.000,00 3.960.000,00
264.000,00 132.000,00
1.056.000,00 264.000,00
1.056.000,00
32.208.000,00
32.208.000,0
62.568.000,00
376.860.000
6.338.164.588,48

PRICE AMOUNT
396.000,00 6.338.164.588,48
396.000,00

32.604.000,0
0
62.964.000,00
377.256.000
6.338.560.588,48
PRICE AMOUNT

1.320.000,00 6.338.560.588,48
924.000,00 1.320.000,00
237.600,00 924.000,00
264.000,00 3.088.800,00
396.000,00 792.000,00
1.320.000,00 792.000,00
1.584.000,00 1.320.000,00
264.000,00 1.584.000,00
132.000,00 264.000,00
924.000,00 132.000,00
1.320.000,00 924.000,00
3.300.000,00 1.320.000,00
3.300.000,00
15.760.800,00
15.760.800,0
78.724.800,00
393.016.800
6.354.321.388,48
PRICE AMOUNT

132.000,00 6.354.321.388,48
198.000,00 132.000,00
792.000,00 198.000,00
396.000,00 792.000,00
396.000,00

17.278.800,0
0
80.242.800,00
394.534.800
6.355.839.388,48
PRICE AMOUNT

2.244.000,00 6.355.839.388,48
3.300.000,00 6.732.000,00
660.000,00 3.300.000,00
528.000,00 660.000,00
132.000,00 528.000,00
660.000,00 132.000,00
1.056.000,00 660.000,00
1.320.000,00 1.056.000,00
132.000,00 1.320.000,00
264.000,00 132.000,00
132.000,00 264.000,00
264.000,00 132.000,00
264.000,00
15.180.000,0
0
95.422.800,00
409.714.800
6.371.019.388,48

PRICE AMOUNT

396.000,00 6.371.019.388,48
660.000,00 792.000,00
1.320.000,00 1.320.000,00
198.000,00 13.200.000,00
1.584.000,00 2.376.000,00
1.056.000,00 1.584.000,00
66.000,00 5.280.000,00
264.000,00 396.000,00
1.320.000,00 264.000,00
9.900.000,00 1.320.000,00
528.000,00 9.900.000,00
198.000,00 5.280.000,00
1.056.000,00 1.980.000,00
1.056.000,00
44.748.000,00
44.748.000,0
140.170.800,00
454.462.800
6.415.767.388,48
PRICE AMOUNT

396.000,00 6.415.767.388,48
5.280.000,00 396.000,00
3.960.000,00 5.280.000,00
3.300.000,00 3.960.000,00
660.000,00 3.300.000,00
1.980.000,00 660.000,00
2.640.000,00 1.980.000,00
660.000,00 2.640.000,00
660.000,00
63.624.000,0
0
159.046.800,00
473.338.800
6.434.643.388,48

PRICE AMOUNT

10.824.000,00 6.434.643.388,48
4.884.000,00 10.824.000,00
1.782.000,00 9.768.000,00
1.320,00 1.782.000,00
528,00 1.320.000,00
132.000,00 528.000,00
660,00 132.000,00
264.000,00 198.000,00
2.970.000,00 264.000,00
132.000,00 2.970.000,00
792.000,00 132.000,00
594.000,00 792.000,00
2.970.000,00 594.000,00
2.970.000,00
32.274.000,00
32.274.000,0
191.320.800,00
505.612.800
6.466.917.388,48
PRICE AMOUNT

330.000,00 6.466.917.388,48
264.000,00 330.000,00
528.000,00 264.000,00
396.000,00 528.000,00
396.000,00
33.792.000,0
0
192.838.800,00
507.130.800
6.468.435.388,48

PRICE AMOUNT

1.716.000,00 6.468.435.388,48
2.640.000,00 18.876.000,00
660.000,00 2.640.000,00
2.640.000,00 660.000,00
396.000,00 2.640.000,00
132.000,00 396.000,00
660.000,00 132.000,00
1.980.000,00 660.000,00
2.640.000,00 1.980.000,00
132.000,00 2.640.000,00
396.000,00 132.000,00
1.980.000,00 396.000,00
1.980.000,00
226.234.800,00
540.526.800
6.501.831.388,48
132.000,00 2.640.000,00
396.000,00 132.000,00
1.980.000,00 396.000,00
1.980.000,00
226.234.800,00
540.526.800
6.501.831.388,48

PRICE AMOUNT

264.000,00 6.501.831.388,48
264.000,00
264.000,00

33.396.000,0
0
226.234.800,00
540.526.800
6.501.831.388,48

PRICE AMOUNT
PRICE AMOUNT

5.940.000,00 6.501.831.388,48
3.960.000,00 5.940.000,00
1.584.000,00 3.960.000,00
44.220.000,00 1.584.000,00
132.000,00 44.220.000,00
2.640.000,00 132.000,00
1.320.000,00 2.640.000,00
15.840.000,00 1.320.000,00
132.000,00 15.840.000,00
264.000,00 132.000,00
1.980.000,00 264.000,00
132.000,00 1.980.000,00
132.000,00

78.144.000,0
0
618.670.800
6.579.975.388,48
PRICE AMOUNT

6.579.975.388,48
304.378.800,00
618.670.800
6.579.975.388,48
PRICE AMOUNT

3.300.000,00 6.579.975.388,48
990.000,00 3.300.000,00
528.000,00 1.980.000,00
264.000,00 528.000,00
132.000,00 264.000,00
1.320.000,00 132.000,00
528.000,00 1.320.000,00
1.980.000,00 528.000,00
132.000,00 1.980.000,00
528.000,00 132.000,00
660.000,00 528.000,00
396.000,00 660.000,00
396.000,00
11.748.000,0
0
11.748.000,00
6.591.723.388,48

PRICE AMOUNT
6.591.723.388,48
630.418.800
,00
6.591.723.388,
48

RTIAL AMOUNTS TOTAL AMOUNTS


462.984.316,2
1
36.116.491,12
34.617.691,79
2.703.232,51
228.503,97
4.410.000,00
27.275.955,31
1.498.799,33
1.498.799,33
69.747.367,00
69.747.367,00
69.747.367,00
304.477.591,60
191.114.391,60
191.114.391,60
84.819.500,00
84.819.500,00
28.543.700,00
28.543.700,00
8.171.761,30
525.546,12
7.393,68
10.528,99
507.623,45
1.393.006,17
20.901,40
18.620,92
1.353.483,85
673.324,07
10.934,02
13.049,97
649.340,08
739.628,57
12.340,80
18.788,75
708.499,02
1.374.898,66
22.781,90
11.944,53
1.340.172,23
2.382.544,31
15.121,97
21.371,74
2.346.050,60
1.082.813,40
9.249,00
1.073.564,40
44.471.105,19
3.932.383,57
46.565,79
3.885.817,78
8.588.437,99
84.384,51
8.504.053,48
1.920.652,20
11.641,45
1.909.010,75
2.161.812,40
11.641,45
2.150.170,95
RTIAL AMOUNTS TOTAL AMOUNTS

1.488.326,69
11.641,45
1.476.685,24
4.249.974,25
23.282,90
4.226.691,35
4.249.974,25
23.282,90
4.226.691,35
1.043.666,69
11.641,45
1.032.025,24
16.835.877,15
224.513,64
16.611.363,51
4.042.251.071,
06
24.934.578,82
23.013.083,42
23.013.083,42
1.921.495,40
1.921.495,40
151.558.736,59
125.537.408,65
3.450.896,12
5.411.903,89
116.674.608,64
26.021.327,94
3.537.735,67
6.840.429,02
5.918.163,25
9.725.000,00
124.030.036,00
107.971.857,09
2.885.639,53
5.974.001,55
99.112.216,01
16.058.178,91
4.385.473,04
6.039.736,07
3.482.969,80
2.150.000,00
3.399.993.377,39
73.658.776,41
1.616.589,61
39.382.568,73
9.265.520,58
400.703,62
6.975.349,27
1.739.417,53
14.278.627,07
216.141.826,13
1.616.589,61
100.256.680,99
48.143.937,10
8.325.150,75
17.534.364,22
4.372.285,33
35.892.818,13
159.874.101,31
1.616.589,61
55.954.583,47

RTIAL AMOUNTS TOTAL AMOUNTS

42.833.410,81
15.892.667,52
9.663.098,53
4.724.000,18
29.189.751,19
267.656.895,58
1.616.589,61
77.490.091,76
92.055.359,97
37.045.880,51
13.182.770,18
6.444.556,43
39.821.647,12
389.742.328,62
1.616.589,61
76.500.580,67
143.932.549,95
103.183.941,77
11.839.378,46
8.473.661,34
44.195.626,82
891.513.136,76
2.390.082,23
150.727.960,16
340.722.508,16
232.224.000,00
21.978.961,84
49.456.583,83
94.013.040,54
81.655.350,99
1.751.486,72
39.683.095,92
9.036.359,87
382.322,72
6.798.119,12
3.253.562,47
20.750.404,17
254.342.234,61
1.751.486,72
108.935.365,97
51.270.704,08
8.863.637,60
18.433.361,46
8.822.159,78
56.265.519,00
263.204.564,17
1.751.486,72
93.853.628,42
70.614.577,23
25.903.135,44
15.687.967,20
7.508.221,08
47.885.548,08
177.211.446,06
1.751.486,72
52.377.229,36
61.310.120,19
22.677.654,78
8.628.381,96
4.129.521,60
26.337.051,45
49.915.641,98
2.221.450,86

RTIAL AMOUNTS TOTAL AMOUNTS

16.642.587,97
3.272.865,50
124.990,12
2.451.962,02
1.633.261,99
23.568.523,52
127.048.103,95
2.221.450,86
42.543.169,29
29.489.855,74
3.812.786,85
6.202.021,58
4.131.192,07
38.647.627,56
62.962.577,59
2.221.450,86
16.998.493,21
11.872.453,77
4.216.432,22
2.451.962,02
1.633.261,99
23.568.523,52
45.878.039,88
2.221.450,86
9.211.935,02
10.688.516,25
2.664.572,90
1.298.097,54
864.668,10
18.928.799,21
18.369.618,41
18.369.618,41
21.783.716,45
21.783.716,45
299.035.018,49
57.622.922,94
59.793.195,64
56.526.950,00
21.600.000,00
11.000.000,00
54.450.000,00
38.041.949,91
107.239.423,50
5.039.434,35
1.446.920,24
838.627,59
84.552,14
685.262,69
647.784,43
1.336.287,26
17.941.899,34
4.413.224,90
4.012.239,81
1.624.871,56
2.025.994,04
1.915.131,84
3.950.437,19
27.852.012,13
6.090.301,69
8.193.641,86
3.007.171,13
2.711.256,73
2.562.916,26

RTIAL AMOUNTS TOTAL AMOUNTS

5.286.724,46
35.401.973,11
6.371.379,03
10.420.308,24
7.561.937,07
2.836.391,66
2.681.262,16
5.530.694,95
21.004.104,57
4.128.095,51
6.946.388,92
3.899.700,11
1.101.659,78
1.185.006,12
3.743.254,13
100.230.084,47
8.983.258,67
2.579.266,17
1.494.920,26
150.723,38
1.221.555,23
1.154.802,40
2.381.991,23
27.176.873,20
6.684.737,72
6.077.406,75
2.461.202,51
3.068.785,09
2.900.880,70
5.983.860,43
12.548.817,43
2.743.982,08
3.691.544,99
1.354.941,50
1.221.555,23
1.154.802,40
2.381.991,23
30.517.030,60
5.487.964,16
8.999.245,00
6.513.453,52
2.443.110,46
2.309.494,96
4.763.762,50
21.004.104,57
4.128.095,51
6.946.388,92
3.899.700,11
1.101.659,78
1.185.006,12
3.743.254,13
96.620.130,74
3.943.824,30
1.132.345,93
656.292,67
66.171,24
536.292,54
507.017,96
1.045.703,96
13.984.366,99
3.439.719,41
3.127.225,95
1.266.444,01

RTIAL AMOUNTS TOTAL AMOUNTS

1.579.083,59
1.492.766,83
3.079.127,20
21.730.843,21
4.751.773,85
6.392.957,01
2.346.262,86
2.115.376,13
1.999.642,19
4.124.831,17
35.956.991,67
6.471.802,39
10.581.785,92
7.681.115,11
2.881.105,20
2.723.401,09
5.617.781,96
21.004.104,57
4.128.095,51
6.946.388,92
3.899.700,11
1.101.659,78
1.185.006,12
3.743.254,13
37.644.703,55
22.870.110,54
3.753.010,56
7.266.175,07
2.920.320,00
250.482,08
8.680.122,83
1.433.597,88
200.441,51
488.885,06
197.820,00
11.420,49
535.030,82
13.340.995,13
2.436.296,27
4.975.417,07
925.020,00
75.770,56
4.928.491,23
928.318.891,2
2
6.162.042,91
400.823,18
400.823,18
570.968,53
570.968,53
508.800,04
508.800,04
1.182.837,39
1.182.837,39
711.120,31
711.120,31
955.158,91
955.158,91
604.506,80
604.506,80
675.128,03
675.128,03

RTIAL AMOUNTS TOTAL AMOUNTS

552.699,72
552.699,72
59.975.388,31
1.040.853,80
7.566,94
1.033.286,86
2.137.047,95
16.685,01
2.120.362,94
19.285.069,62
57.714,72
19.227.354,90
37.512.416,94
303.157,38
37.209.259,56
723.175.479,44
8.078.985,31
8.078.985,31
21.590.408,04
4.064.108,14
17.526.299,90
6.652.095,08
6.652.095,08
418.743.167,36
103.034.177,11
139.257.861,62
71.630.164,44
104.820.964,19
40.991.587,06
40.991.587,06
227.119.236,59
227.119.236,59
89.703.564,90
89.703.564,90
89.703.564,90
49.302.415,66
49.302.415,66
49.302.415,66
516.094.456,2
6
28.566.828,53
27.617.242,75
1.621.468,58
292.141,27
2.695.000,00
23.008.632,90
949.585,78
949.585,78
37.735.451,50
37.735.451,50
37.735.451,50
407.919.515,90
319.510.515,90
319.510.515,90
88.409.000,00
88.409.000,00
7.957.147,38
1.885.194,96
9.563,22
5.031,01
1.870.600,73

RTIAL AMOUNTS TOTAL AMOUNTS

539.316,91
7.861,41
11.696,45
519.759,05
2.648.943,97
37.492,52
11.791,31
2.599.660,14
584.693,80
8.746,49
12.608,52
563.338,79
575.047,34
8.563,00
12.969,71
553.514,63
1.723.950,40
21.158,05
21.867,91
1.680.924,44
33.915.512,95
16.835.877,15
224.513,64
16.611.363,51
4.099.628,75
23.282,90
4.076.345,85
1.923.566,90
11.641,45
1.911.925,45
1.923.566,90
11.641,45
1.911.925,45
1.043.666,69
11.641,45
1.032.025,24
2.101.833,39
23.282,90
2.078.550,49
2.101.833,39
23.282,90
2.078.550,49
3.885.539,78
23.282,90
3.862.256,88
11.655.853,73
630.418.800,0
0
132.000.000,00
57.288.000,00
74.712.000,00
182.292.000,00
103.356.000,00
78.936.000,00
304.378.800,00
30.360.000,00
32.604.000,00
17.278.800,00
15.180.000,00

RTIAL AMOUNTS TOTAL AMOUNTS

63.624.000,00
33.792.000,00
33.396.000,00
78.144.000,00
11.748.000,00
11.748.000,00

6.591.723.388,48

6.591.723.388,48