Professional Documents
Culture Documents
Location Plan Scale 1:1000: 3Rd Storey - Shrub Planting Plan
Location Plan Scale 1:1000: 3Rd Storey - Shrub Planting Plan
LOCATION PLAN
horizontal-wise, RC Stiffener shall be provided accordingly.
210 Contractor is hereby reminded that he has a 'Duty of Care' in the construction of the project
& that he shall obtain Professional Advice from his own PE for all temporary works,
protection of neighbouring properties or any other works that he is unsure of &/or unable to
KOVAN perform or for any other reasons.
HOUGANG
EE
T 21 Scale 1:1000 All fire doors to be provided with self closing devics and PSB label
All riser depths shall be less than 750mm and shall be effectively fire stopped
Concrete drain within accessway/ service drive ways shall be provided
TR
with heavy duty grating to withstand loading of fire fighting appliances
MARKET S Emergency lights and exit signs to be provided at all staircase
NG
doors and landings
& FC A
BLOCK UG
HO
208 BLOCK
231
INE
RL
FFE
BU
E INE
N
LIN KL
EE
VE AC
ER
RES TB
SE
GR
AD
RO ING
LIN
E ILD
0m
BU
FFER m
2.0
N BU 7 .50
REE
mG
2.00
E NE
K LI
MK22-09237M
LIN
TBAC
BLOCK
VE
ER SE
RES LIN
E ING
RO
AD ILD
FFER m BU
N BU 7.50
REE
mG OF
RO AB
2.00 SL ER
229
OV ASE
RC
STAI 2
1 2 3 4 5 6 7 8 9 10 11 12
C K
DE
LINE OFPL =131.80
E
BACK
RO
LIN
NG SET
BUILDI
7.50m
K
AC
T2
B
ET
GS
LL
IR WE
EA
DIN
E 3m
WID
UIL
RE
mB 0
ST
6.0
INE
RL
FFE
CK
G 9470 64575 5615
py below
BU
cano
DE
RC tion
irriga
over
trellis tank
RC
AN
OFPL =131.80
EN
RO
fall
E
GR
fall
OF
0m
UG
RO AB
SL
2.0
OF ER
RO AB OV T
SL ER LIF
SL=
137.94
OV ASE
6750 2475 5500 5200 7850 7550 7550 7850 5200 5500 3150
fall
LL
O
RC
STAI 1 5
WE
IR
135.97
SL=
fall
EA
H MK22-Exisitng
05090A RC
cano
py belo
w 3m
WID
D EC
K
E
OF
LIN
hard RO .70
K
6
AC
L0
=128
PL
VE
ETB
E
LIN
LE
Construction Drawing
K
courts BAC
GS
SET INE
IN
D ING E RL
ILD
UIL UFF
mB B
BU
7.50 EEN
GR
0m
SLAB 0m
3.0
6.0
OF
RO OVER E 3
RCAS
STAI
PAYA
LEBAR
KOVAN UE
CC E N ROAD RESERVE LINE ROAD RESERVE LINE
V
RI NA
SU 2.00m GREEN BUFFER LINE 2.00m GREEN BUFFER LINE
15140
FAP
A
1100
Fall
4800
4800
FAP Convex mirror
4800
SHRUBS
HEIGHT SPREAD SPACING QTY 127 150
SYMBOL DESCRIPTION
LEVEL 03A
425 2700 2400 2700 800
(mm) (mm) (mm) (nos)
12400
Phanera kockiana FFL=18.950 (n/v)
300 400 300 90
6000
6600
6600
6600
(Kock's Bauhinia)
P KOC FFL=18.950 [ 38 Carparks ]
2700 2400 2400 2400 2700
Phyllanthus myrtifolius
(Mousetail Plant) 200 300 200 180 2700 2700
FFL=18.950 FFL=18.980 151 162 FFL=18.950 FFL=18.980
fe
P MYR 126 125
B HR
fe
4800
EXIT
( 1 : 8.3 )
( 1 : 8.3 )
( 1 : 8.3 )
( 1 : 8.3 )
FFL=
Sphagneticola trilobata HR
4800
4800
4800
19.000
Fall
150 200 200 150
0.5 hr FD
DR2-3
4800
ELEC
(Yellow Creeping Daisy) EXIT FFL=
19.000
S TRI
0.5 hr FD
DR1-3
300
DR 2-1
STAIRCASE 1
300
(n/v)
12200
10000
12200
12345
12350
UP UP
DN DN
LIFT
LIFT PL1
300
LOBBY (n/v)
(n/v) HDB Hub 480 Lorong 6 Toa Payoh
( 1 : 8.3 )
( 1 : 8.3 )
( 1 : 8.3 )
( 1 : 8.3 )
STAIRCASE 2
LIFT
Width : 1250mm (clear) Width : 1250mm (clear) Singapore 310480
0.5 hr FD
0.5 hr FD
Thread: 275mm FFL= Thread: 275mm
PL2
4800
Riser: 175mm 20.575 Riser: 175mm
Fall
4800
4800
4800
HR EXIT EXIT HR Owner Signature:
C
6.00m BUILDING SETBACK LINE
E
4550 600 350 4250 600 600 4250 350 600 4550
LEVEL 03B
6600
6000
FFL=20.437 (n/v)
Building works at Hougang
1225 2700 [ 53 Carparks ] 2400 2700 275
Town
8400
100ht RC kerb
4800
Fall
4800
4800
Convex mirror
300
3500
LOT 04560T-PT MK 22
6700
6600
6000
LEVEL 03B Job Title:
FFL=20.437 (n/v)
11100
4800
0.5 hr FD
HR
4800
1100
Fall
FAP (n/v) UP
Convex mirror
3RD STOREY SHRUB PLANTING PLAN
STAIRCASE 3
G
Width : 1250mm (clear)
300
DN Thread: 275mm
DR3-3 Riser: 175mm
FAP
Scale: Date:
1 : 200 22-05- 2020
3.00m GREEN BUFFER LINE Drawn by: Checked by:
PDAA EDDIE YEO
Consultant: