Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

The Contractor shall check & verify all dimensions on site shall be responsible for the same

before commencement of work.


Any discrepancy should be reported immediately to the architect & all relevant consultants
All shop drawings submitted shall be based on exact site demensions.
All half-brick walls shall be provided with RC Stiffeners (To Engineers Design) at every
BLOCK 4000 mm in length. Where the half-brick wall does not end at any RC structure

LOCATION PLAN
horizontal-wise, RC Stiffener shall be provided accordingly.
210 Contractor is hereby reminded that he has a 'Duty of Care' in the construction of the project
& that he shall obtain Professional Advice from his own PE for all temporary works,
protection of neighbouring properties or any other works that he is unsure of &/or unable to
KOVAN perform or for any other reasons.

HOUGANG
EE
T 21 Scale 1:1000 All fire doors to be provided with self closing devics and PSB label
All riser depths shall be less than 750mm and shall be effectively fire stopped
Concrete drain within accessway/ service drive ways shall be provided

TR
with heavy duty grating to withstand loading of fire fighting appliances
MARKET S Emergency lights and exit signs to be provided at all staircase

NG
doors and landings
& FC A
BLOCK UG
HO
208 BLOCK
231

INE
RL
FFE
BU
E INE

N
LIN KL

EE
VE AC
ER
RES TB
SE

GR
AD
RO ING
LIN
E ILD

0m
BU
FFER m

2.0
N BU 7 .50
REE
mG
2.00

E NE
K LI

MK22-09237M
LIN
TBAC

BLOCK
VE
ER SE
RES LIN
E ING
RO
AD ILD
FFER m BU
N BU 7.50
REE
mG OF
RO AB
2.00 SL ER

229
OV ASE
RC
STAI 2

1 2 3 4 5 6 7 8 9 10 11 12
C K
DE
LINE OFPL =131.80

E
BACK
RO

LIN
NG SET
BUILDI
7.50m

K
AC
T2

B
ET
GS
LL
IR WE
EA

DIN
E 3m
WID

UIL
RE

mB 0
ST

6.0
INE
RL
FFE
CK
G 9470 64575 5615
py below

BU
cano

DE
RC tion
irriga
over
trellis tank
RC

AN
OFPL =131.80

EN
RO
fall

E
GR
fall

OF

0m
UG
RO AB
SL

2.0
OF ER
RO AB OV T
SL ER LIF
SL=
137.94

OV ASE

6750 2475 5500 5200 7850 7550 7550 7850 5200 5500 3150
fall

LL

O
RC
STAI 1 5
WE
IR
135.97
SL=
fall

EA

H MK22-Exisitng
05090A RC
cano
py belo
w 3m
WID

D EC
K
E

OF
LIN

hard RO .70
K

6
AC

L0
=128
PL
VE
ETB

E
LIN
LE

Construction Drawing
K
courts BAC
GS

SET INE
IN

D ING E RL
ILD

UIL UFF
mB B
BU

7.50 EEN
GR
0m

SLAB 0m
3.0
6.0

OF
RO OVER E 3
RCAS
STAI

PAYA
LEBAR
KOVAN UE
CC E N ROAD RESERVE LINE ROAD RESERVE LINE
V
RI NA
SU 2.00m GREEN BUFFER LINE 2.00m GREEN BUFFER LINE

15140

2.00m GREEN BUFFER LINE


7.50m
BUILD
ING S
ETBA E
CK LIN ACK LIN
E 7.50m BUILDING SETBACK LINE UILDIN G SETB
7.50m B

FAP

A
1100

Fall
4800

4800
FAP Convex mirror

4800
SHRUBS
HEIGHT SPREAD SPACING QTY 127 150
SYMBOL DESCRIPTION
LEVEL 03A
425 2700 2400 2700 800
(mm) (mm) (mm) (nos)

12400
Phanera kockiana FFL=18.950 (n/v)
300 400 300 90

6000
6600

6600
6600
(Kock's Bauhinia)
P KOC FFL=18.950 [ 38 Carparks ]
2700 2400 2400 2400 2700
Phyllanthus myrtifolius
(Mousetail Plant) 200 300 200 180 2700 2700
FFL=18.950 FFL=18.980 151 162 FFL=18.950 FFL=18.980
fe
P MYR 126 125

B HR
fe

4800
EXIT

( 1 : 8.3 )

( 1 : 8.3 )

( 1 : 8.3 )

( 1 : 8.3 )
FFL=
Sphagneticola trilobata HR

4800

4800

4800
19.000

Fall
150 200 200 150

0.5 hr FD
DR2-3

4800
ELEC
(Yellow Creeping Daisy) EXIT FFL=
19.000
S TRI

0.5 hr FD
DR1-3

300
DR 2-1
STAIRCASE 1

300
(n/v)

12200
10000

12200

12345

12350
UP UP
DN DN

3m WIDE AIR WELL

LIFT
LIFT PL1

300
LOBBY (n/v)
(n/v) HDB Hub 480 Lorong 6 Toa Payoh

( 1 : 8.3 )

( 1 : 8.3 )

( 1 : 8.3 )

( 1 : 8.3 )
STAIRCASE 2

LIFT
Width : 1250mm (clear) Width : 1250mm (clear) Singapore 310480

0.5 hr FD

0.5 hr FD
Thread: 275mm FFL= Thread: 275mm
PL2

4800
Riser: 175mm 20.575 Riser: 175mm

Fall
4800

4800

4800
HR EXIT EXIT HR Owner Signature:
C
6.00m BUILDING SETBACK LINE

1050 1250 1050 1250 1050 1050


FFL=
20.575
Drawing No.: Revision:
174 163 HB-N1901-AR-203 A A
4000

FFL=20.467 FFL=20.437 FFL=20.437 FFL=20.437


49400

2700 2400 2400 2400 2700


Precinct Name:
FFL=20.437

E
4550 600 350 4250 600 600 4250 350 600 4550

LEVEL 03B

6.00m BUILDING SETBACK LIN


10350 10350

D 6600 Project Title:

6600
6000
FFL=20.437 (n/v)
Building works at Hougang
1225 2700 [ 53 Carparks ] 2400 2700 275
Town
8400

194 192 191 176 175

100ht RC kerb

4800
Fall

4800

4800
Convex mirror

300
3500

3m WIDE AIR WELL 5150


4000
F

2.00m GREEN BUFFER LINE


Lot No.: Mukim No.:

LOT 04560T-PT MK 22

6700
6600

6000
LEVEL 03B Job Title:
FFL=20.437 (n/v)
11100

425 2700 2700 100 Building works at Hougang


Town
200
215 209 208 195
EXIT FFL=20.575
Drawing Title:

4800
0.5 hr FD

HR

4800
1100

Fall
FAP (n/v) UP
Convex mirror
3RD STOREY SHRUB PLANTING PLAN
STAIRCASE 3
G
Width : 1250mm (clear)

300
DN Thread: 275mm
DR3-3 Riser: 175mm

FAP

7.50m BUILDING SETBACK LINE


8565

Scale: Date:
1 : 200 22-05- 2020
3.00m GREEN BUFFER LINE Drawn by: Checked by:
PDAA EDDIE YEO
Consultant:

151, CHIN SWEE ROAD # 14-08 / 10


MANHATTAN HOUSE, SINGAPORE 169876
TEL : 6235 9500 FAX : 6235 0307
Email: admin@APG-LLP.sg

1 3RD STOREY - SHRUB PLANTING PLAN Drawing No.: 1817-FP01-SP 102 A


EM / YR
Design Architect
EDDIE YEO
Revision: A

Qualified Person (Architect)


SP-102 Scale: 1:200 C Copyright Reserved.
No Part of this Drawing may be reproduced without our
permission under the Architect's Act and the Copyright Act.

You might also like