Fronthaul
20 4
5
0
4G 5G
10~25 Gbps
eCPRI Split Point
50~130 us
Scenario3: PON
5G CU/DU
CPRI&eCPRI Scenario4: Microwave
E-band
RAN Requirements
• Joint effort with CPRI Cooperation • Already demo for CPRI over Eth
• Joint effort with IETF DetNet WG • Define new Eth Type for Fronthaul
Eth
CPRI MAC
Shim PHY
Eth MAC
Channelized
3 × CPRI 7
encapsulation IF 40GE(NNI)
(9.8304Gbps)
2016 – Lab POC, CPRI over Eth via PW(same as E1 PW), FlexEth;
No bandwidth saving, device needed when CPRI and eCPRI at the same site
passive
AAU Shared laser (10 directions)
2x50G multiple wavelengths
Map/ OTN
Demap OH oDSP E/O
15*Any Port O/E BiDi
GE~10G …
Colorful IF AAU
Cloud BB
Optical distribution GC Site
box
Colorless SFP+
SR-DBA
Periodic Control New Periodic SR-DBA
SR-DBA
windowing Allocation plane Periodic
NSR- windowing NSR-
DBA windowing NSR-
DBA logic Mechanism DBA
DBA
Date plane DBA logic
LL-DBA
SR T-CONT
DBA logic
Time slot
Scheduler NSR T-CONT • LL-DBA, low latency DBA in future, delay will be about 50us~100us.
• Periodic windowing should have new mechanism to eliminate latency to
• Assured-DBA/Max DBA, status report before bandwidth allocation : 1-2ms. 0.
• Fixed-DBA, no need status report, delay will be 100-200us
Notes: chipset and hardware must be changed to
• Periodic windowing, add delay 200-300us
support 50us~100us low latency DBA
1 2 3 4
WDM - Colorless Eth – RoE IP/Eth – eCPRI PON