PLATFORM CHECKLIST

Jenis Pekerjaan :

Pemilik :

Lokasi :

NO. DESCRIPTION ACTIVITY REFERENCE ACCEPTANCE CRITERIA

A. PREPARATION
A. 1 PRE-INSPECTION MEETING - INFORMATION FOR CLIENT, - Client Specification - Client Specification
CONTRACTOR REGARDING - Applicable Code/Stan- - Applicable Code/Stan-
THIRD PARTY SCOPE OF WORK dard dard
AND ACTIVITIES FOR MIGAS - Gov't Regulation - Gov't Regulation
SKKP CERTIFICATION PURPOSE

A. 2 3rd Party Appointment Letter - LEGAL LETTER TO BE ISSUED - Request Letter fr. Client
BY MIGAS TO APPOINT THIRD to Appoint Third Party
PARTY - Approved ITP
- Overall Schedule
- Mandays Allocation
- Qualified Personnel
B INDEPENDENT ANALYSIS
B I. Supplied Document
Client supplied document Contract document relevant article and Contract document relevant article and Contract document relevant article and
attachment attachment attachment
-. Structural Analysis Report
-. Initial Design Report
-. Design Criteria/Environmental Data
-. Last inspection Report
-. Soil data report/Investigation Soil Data
-. As Built Drawing
B II. Independent Analysis
II.1 Modelling
2.1. Structure Modelling Structural Analysis Report -. Initial Design Drawing
-. Last Modification drawing (if any)
-. Last Inspection report at site
2.2. Pile Modelling Structural Analysis Report -. Initial Design Drawing
-. Last Inspection report at site
-. Initial Design Drawing
2.3. Material Properties Structural Analysis Report -. Last Modification drawing (if any)
-. Last Inspection report at site
2.4. Equipment Lay out Structural Analysis Report -. Initial Design Drawing
-. Last Modification drawing (if any)
-. Last Inspection report at site
II.2. In-Place Analysis
2.1. Operation Condition
2.1.1. Dead Load In-Place Analysis Report (Opr) -. Structural data API RP 2A WSD item 2.1.2.b
-. Design Criteria
2.1.2. Live Load In-Place Analysis Report (Opr) -. Design Criteria API RP 2A WSD item 2.1.2.c
2.1.3. Equipment Loads In-Place Analysis Report (Opr) -. Structural data
-. Design Criteria
-. Equipment lay out/ Weight Control Report
2.1.4. Wave Load In-Place Analysis Report (Opr) -. Design Criteria API RP 2A WSD item 2.3.1
2.1.5. Wind Load In-Place Analysis Report (Opr) -. Design Criteria API RP 2A WSD item 2.3.2
2.1.6. Marine Growth In-Place Analysis Report (Opr) -. Design Criteria API RP 2A WSD item 2.3.1.6
-. Last Inspection Reports
2.1.7. Current Load In-Place Analysis Report (Opr) -. Design Criteria API RP 2A WSD item 2.3.3
2.1.8. Soil Data & Pile Analysis In-Place Analysis Report (Opr) -. Design Criteria API RP 2A WSD/LRFD
-. Soil Investigation Reports Soil Investigation Report
2.1.9. WOR Load (If Any) In-Place Analysis Report (Opr) -. Design Criteria
2.1.10. Output/Results of Analysis
- Member Unity Checks Output of In-Place Analysis Report (Opr) API RP 2A WSD item 3.3 API RP 2A WSD item 3,3
- Pile Unity Check Output of In-Place Analysis Report (Opr) API RP 2A WSD item 3.3.1.b API RP 2A WSD item 3.3.1.b
- Joint Punching Shear Output of In-Place Analysis Report (Opr) API RP 2A WSD item 4.3.1.a API RP 2A WSD item 4.3.1.a
2.2. Storm Condition
2.2.1. Dead Load In-Place Analysis Report (Strm) -. Structural data API RP 2A WSD item 2.1.2.b
-. Design Criteria
2.2.2. Live Load In-Place Analysis Report (Strm) -. Design Criteria API RP 2A WSD item 2.1.2.c
2.2.3. Equipment Loads In-Place Analysis Report (Strm) -. Structural data
-. Design Criteria
-. Equipment lay out/ Weight Control Report
2.2.4. Wave Load In-Place Analysis Report (Strm) -. Design Criteria API RP 2A WSD item 2.3.1
2.2.5. Wind Load In-Place Analysis Report (Strm) -. Design Criteria API RP 2A WSD item 2.3.2
2.2.6. Marine Growth In-Place Analysis Report (Strm) -. Design Criteria API RP 2A WSD item 2.3.1.6
-. Last Inspection Reports
2.2.7. Current Load In-Place Analysis Report (Strm) -. Design Criteria API RP 2A WSD item 2.3.3
2.2.8. Soil Data & Pile Analysis In-Place Analysis Report (Strm) -. Design Criteria API RP 2A WSD/LRFD
-. Soil Investigation Reports Soil Investigation Report
2.2.9. WOR Load (If Any) In-Place Analysis Report (Strm) -. Design Criteria
2.2.10 Output/Results of Analysis
- Member Unity Checks Output of In-Place Analysis Report (Strm) API RP 2A WSD item 3.3 API RP 2A WSD item 3,3
- Pile Unity Check Output of In-Place Analysis Report (Strm) API RP 2A WSD item 3.3.1.b API RP 2A WSD item 3.3.1.b
- Joint Punching Shear Output of In-Place Analysis Report (Strm) API RP 2A WSD item 4.3.1.a API RP 2A WSD item 4.3.1.a
II.3. Seismic Analysis
2.1 Strength Analysis Seismic Analysis Report -. Design Criteria API RP 2A WSD item C2.36c
-. API RP 2A WSD item C2.36c
2.2 Ductility Analysis Seismic Analysis Report -. Design Criteria API RP 2A WSD item C2.36d
-. API RP 2A WSD item C2.36d
2.3. Soil Data & Pile Analysis Seismic Analysis Report -. Design Criteria API RP 2A WSD/LRFD
-. Soil Investigation Reports Soil Investigation Report
2.4. Output
-. Member Unity Check Output of Seismic Analysis Report API RP 2A WSD item 3.2 API RP 2A WSD item 3.2
API RP 2A WSD item C2.3.6c.4 API RP 2A WSD item C2.3.6c.4
API RP 2A WSD item 2.3.6c.4 API RP 2A WSD item 2.3.6c.4
-. Pile Unity Check Output of Seismic Analysis Report API RP 2A WSD item 3.2 API RP 2A WSD item 3.2
API RP 2A WSD item C2.3.6c.4 API RP 2A WSD item C2.3.6c.4
API RP 2A WSD item 2.3.6c.4 API RP 2A WSD item 2.3.6c.4
-. Joint Punching Shear Output of Seismic Analysis Report API RP 2A WSD item 3.2 API RP 2A WSD item 3.2
API RP 2A WSD item C2.3.6c.4 API RP 2A WSD item C2.3.6c.4
API RP 2A WSD item 2.3.6c.4 API RP 2A WSD item 2.3.6c.4
II.4. Fatigue Analysis
2.1. Wave Distributio data Fatigue Analysis Report -. Design Criteria Owner Spec.
2.2. Stress Concentration factor Fatigue Analysis Report -. Design Criteria SCF Formula/API RP 2A WSD
2.3. S-N Curve Fatigue Analysis Report -. API RP 2A WSD/LRFD API RP 2A WSD item 5.4
2.4. Safety Factor Fatigue Analysis Report -. Design Criteria API RP 2A WSD item 5.2.5
2.5. Output Output of Fatigue Analysis Report -. API RP 2A WSD item 5.2.5 API RP 2A WSD item 5.2.5
-. Fatigue Life
II.5. PushOver Analysis (If Any)
2.1 Modelling Element Type PushOver Analysis Report -. Design Criteria API RP 2A WSD item 17.7.3.c
2.2 Environmental Loading PushOver Analysis Report -. Design Criteria API RP 2A WSD item 17.7.3.c
2.3 Soil Data & Foundation Model PushOver Analysis Report -. Design Criteria API RP 2A WSD item 17.7.3.c
B III Reporting (Independent Analysis)
3.1. Draft Report Independent review report Independent review report API RP 2A LRFD/WSD
3.2. Final Report Independent review report Independent review report API RP 2A LRFD/WSD

B IV. Field/Site Inspection Check Equipment lay out on structure/material - Structural Report Owner Spec
- As build drawing As Build Drawing
B V. Final Report Inspection Report & Independent Analysis Inspection Report API RP 2A LRFD/WSD