TAKE OFF SHEET FOR ALPHA- IIT BHILAI

S.No. Particular No's Length


16 Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved desig
and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for
of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in r
accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge.

1 a) All works above upto plinth level


SW1 (10*4) 40 5.73
S2AND SW3 (10*32) 320 1
SW4 (10*4) 40 1.36
SW5 (10*4) 40 1.4
SW6(11*2) 22 3.57
SW7 (11*2) 22 4.32
SW8 11 11.89
SW9 11 8.87
TOTAL

11th FLOOR
SW1 2 5.73
SW2 AND SW3 22 1
SW4 2 1.36
SW5 2 1.4
MUMTY 4 0.25

TOTAL
All works above plinth level upto floor V level
2

SW1 (4*4) 16 5.73


SW2 AND SW3 (4*32) 128 1
SW4 (4*4) 16 1.36
SW5 (4*4) 16 1.4
SW6 (4*2) 8 3.57
SW7 (4*2) 8 4.32
SW8 (4*1) 4 11.07
SW9 (4*1) 4 8.87
TOTAL
RCC ABOVE FLOOR IX
SW1 6 5.73
SW2 AND SW3 (32+22) 54 1
SW4 6 1.36
SW5 6 1.4
SW6 4 3.57
SW7 4 4.32
SW8 2 11.07
SW9 2 8.87
MUMTY 4 1
TOTAL
Centring and shuttering including strutting, propping etc. and removal of form work for :
18
b) Walls (any thickness) including attached pilasters, butteresses,
plinth and string courses etc.

SW1(10*4)+2 42 5.98
SW4(10*4)+2 42 1.61
SW5(10*4)+2 42 1.65
SW6 (11*2) 22 3.82
SW7 (11*2) 22 4.57
SW8 11 21
SW9 11 17.74
TOTAL

Extra for R.C.C./ B.M.C/ R.M.C./PCC work above floor V level for each four floors (above floor
V level to floor IX)
21

Extra for R.C.C./ B.M.C/ R.M.C./PCC work above floor V level for each four floors (above floor
22 IX level to floor XIII)

18 Centring and shuttering including strutting, propping etc. and removal of form work for :
3 a) Foundations, footings, bases for columns
SW2 AND SW3 (10*32) +22 342 1.25
MUMTY 4 1.25

TOTAL

11TH FLOOR INCLUDING MUMTY


S1 2 2.3
S2 2 3.18
S3 37 2.5

Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for re
cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of
reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of con
impairing strength and durability as per direction of Engineer-in-charge.“
16

RCC Beam M.25


X1 to X2=(3.775X2)+0.8+(3.21X2) 1 14.85
X2 to X4 2 3.005
X2 to X7 1 9.52
X2 to X3 1 2.67
X3 to X5 1 4.28
X4 to X6 1 2.96
X5 to X7 1 4.07
X6 to X7 1 1.84
X1+X1'=6.63+2.98+3.045 1 12.65
X1" 1 5.14
X2 1 9.03
X3 1 4.34
X4 1 5.76
X5 1 6
X6 1 5.2
X7 1 8.42

4 102.74

X7 to X8 = 2.15X4 4 2.15
LIFT WALL=3.07+3.05+3.30+.27 1 9.69
Y8 to Y9 3 3.9

10 440.99
EXTRA BEAMS AT 7TH AND 9TH FLOOR
(3.90+7.21)=11.11*0.25*0.325*2 2 11.11

EXTRA BEAM AT X1 to X2
42*.3775*0.115*0.325 42 3.775

11th FLOOR
Beam length - 102.74*2 2 102.74
X7 to X8 = 2.15X4 4 2.15
LIFT 1 9.69
Y8 to Y9 =3.8*3 3 3.9
Y9 1 10.94
Y12 1 13.25
Y13 to Y14 2 6.33
Y15 2 2.96
Y9 to Y12 4 6
Y12 to Y16 4 5.2
Y12to Y14 2 2.62

TOTAL 328.28

PERGOLA BEAMS AT 10TH FLOOR


7.21+(3.13*2)+19.26+(1.535*4) 38.87
(2.12*4*2)+1.535*4*2)+(4.03*2)+(3.13*5) 52.95

PERGOLA BEAMS AT 11TH FLOOR


1926+(1.534*4)+3.90 29.3
(2.12*4*2)+(1.535*4*2)+(3.82*5) 48.34

MUMTY
(6.50*2)+0.75+(3.07*2) 1 19.89
Additional beams at 7th and 9th floor 4 6.33

RCC SLAB M.25


Floor area as per autocad drawing=599.57
DEDUCTIONS
LIFT 1 2.25
LIFT 2 2.55
STAIRCASE 2 3.07
SHAFT 3.07
3.07
4 0.88

528.58*0.125*10 10 528.58

Additional slab at 6th and 8th floor roof 2 3.32


2 3.38
4 0.9
4 6.33

Additional slab at 10th floor roof 2 6.33

11th FLOOR ROOF


Roof as per autocad drawing=483.94SQM

DEDUCTIONS
Shaft 3.07
3.07
Staircase 3.07

445.56*0.125 445.57

MUMTY SLAB 3.57


LIFT SLAB
40 2.79
40 3.28
KITCHEN SLAB
40 2.825
40 1.9

LINTEL
FD 23 1.75
D1 42 1
D4 40 1.2
D4 40 1
D3 40 1.35

TOTAL

LANDING SLAB
42 1.5
21 0.3
TOTAL

5 SHUTTERING FOR SMALL LINTELS


Centring and shuttering including strutting, propping etc. and removal of form work for :
18
d) Lintels, beams, plinth beams, girders, bressumers and
cantilevers

FD 23 1.75
D1 42 1
D4 40 1.2
D4 40 1
D3 40 1.35

6 f) Weather shade, Chajjas, corbels etc., including edges 42 3.775


42 3.005
40 2.1
41 1.85
22 1.4

c) Suspended floors, roofs, landings, balconies, access platform and shelves

COFFER SLAB 40 2.79


40 3.28
KITCHEN 40 2.82
40 1.9

d) Lintels, beams, plinth beams, girders, bressumers and


7 cantilevers 10 440.99
1 11.11
42 3.775
11TH FLOOR 1 328.3
PERGOLA 38.87
52.95
29.3
48.34
MUMTY 19.89
ADDITIONAL BEAM AT 7TH AND 8TH FLOOR 4 6.3
BEAM SIDE WITH SLAB 10 230.61
11TH FLOOR ROOF 166.86
MUMTY ROOF 2 10.07
SHAFT 11 13.74
11 11.54
STAIRCASE 21 18.14
LIFT-1 10 10.6
LIFT-2 10 8.2

8 SHUTTERING FOR SLAB


10 528.5816
ADDITIONAL SLAB AT 6TH AND 8TH FLOOR
11TH FLOOR
MUMTY SLAB 3.57
LANDING SLAB 42 1.5
21 1.5

DEDUCTION FOR CHAJJAS

DEDUCTION FOR BEAMS


10 440.99
11.11
42 3.77
11TH FLOOR 328.3
MUMTY 19.89
ADDITIONAL FLOOR 4 6.33

16 Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved desig
and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for
Extra for R.C.C./ B.M.C/ R.M.C. work above floor V level .
9

6TH,7TH,8TH & 9TH FLOOR BEAMS 4 440.99


9TH & 8TH FLOOR EXTRA BEAM
16 3.775

RCC SLAB 6TH, 7TH, 8TH AND 9TH FLOOR 4 528.5816

ADDITIONAL SLAB AT 6TH , 7TH ,8th FLOOR ROOF (15.66-1.9)

LIFT SLAB AND KITCHEN


(30.40/40)*16
LINTELS
D5 (1.51/23)*8
D4 D1 AND D3 (3.95/40)*16
LANDING SLAB
(24.18/42)*16
(1.18/21)*8

STAIRCASE
(39.03/21)*8

10 RCC M.25 FOR STAIRCASE


(21*19)Nos 399 1.5
(21*21)Nos. 441 1.5
total
Extra for additional height in centering, shuttering where ever required with adequate bracing, propping etc., includi
decentering at all levels, over a height of 3.5 m, for every additional height of 1 metre or part thereof (Plan area to b

23
BALCONY HT. X4-X6 (6.30) 54 3.46
X2-X4 (16*3)Nos. 48 3.005
7TH FLOOR AREA 16 3.32
16 3.38
(2*16)Nos. 32 0.9
(2*16)Nos. 32 6.33
(2*3)Nos. 6 3.32
(2*3)Nos. 6 3.38
(2*2*3)Nos. 12 0.9
(2*2*3)Nos. 12 6.33
LIFT-1 35 2.25
LIFT-2 35 2.55
PERGOLA BEAM
Suspended floors, roofs, landing, beams and balconies, pergola etc. (Plan
area to be measured)

29 19.26
(2*29)Nos. 58 3.46
(2*29)Nos. 58 3.005
32 19.26
(2*32)Nos. 64 3.46
(2*32)Nos. 64 3.005
32 3.32

Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2
13 coarse sand(zone-III) : 4 graded stone aggregate 20mm nominal size).
12 LAYING DPC- 50MM
250 MM WIDE
FOR ONE FLOOR ( (.90*2)+3.73+1.20+1+.6+2.10+2.27+5.25+1.665)
3.775+3+2.96+1.84+2.17+2.32+1

DEDUCTION LIFT

FOR TWO FLOORS 2 34.39


STAIRCASE (2.32*3)+(6*2) 1 18.96
ELECTRICAL PANEL (.52*2)+1.10 1 2.14
LIFT(2.25+2.55)-(1.20+.90) 1 2.7
SHAFT PARAPET WALL 1 2.7

ELECTRICAL ROOM 5.257+(3.28*2)+360 1 15.41


SHAFT (.57+2.92) 1 3.49
PARAPET (2.32+1.95) 1 4.27
PROJECTION 1 3.6
DEDUCTION COLUMN AT STAIR 2.32

230 MM WIDE
TOILET WALL- 2*[3.46+(.21*2)+3.21] 1 14.18
SHAFT 2 0.9
(1.36+.44+.65)*2 2 2.45
(2*4)Nos. 8 0.3
(2*1)Nos. 2 0.45

350MM WIDE
3.28 1 3.28
115MM WIDE
TOILET- (2*2.215)+.7 1 5.13
KITCHEN
BEDROOM
BEDROOM (1.5+.6+2.28)
LOBBY

(1.00-122-.05) M 111.77
24.18*.23 24.18
2 3.73
2 3.28
2 12.3

Providing & applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7kg per squ
course after cleaning the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil.

15
PRETOLEUM BITUMEN
14 WPC 39.75
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in
on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engi
1
1066.38

1146.91

TOTAL
Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or
stacked materials all kinds of soil

7
a) depth 1.5m to 3.0m

1066.38

1146.91
TOTAL
b) depth 3.0m to 4.5m 1066.38
Providing and laying in position cement concrete of 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggreg
cost of centring and shuttering
11
AREA AS PER CAD (964.68*.10)
PCC SUB FLOOR As per CAD (575.68*.10)
TOTAL
DEDUCTION
SW1 4 5.73
SW2 AND SW3 32 1
SW4 4 1.36
SW5 4 1.4
SW6 2 3.57
SW7 2 4.32
SW8 1 11.07
SW9 1 8.87

SHEAR WALL 1 2.25


1 2.25

SIDE OF PB 2 175.02

BELOW ENTRANCE STEP


2 2.85
4.6

18 RCC M 25 BELOW GROUND LEVEL


Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for re
work, using cement content as per approved design mix, including pumping of concrete to site of laying but excludin
shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to acceler
improve workability without impairing strength and durability as per direction of Engineer-in-charge.“

16
a) All works above upto plinth level

RAFT 949.34
RCC COLUMN UPTO PLINTH LEVEL
SW1 4 5.73
SW2 AND SW3 32 1
SW4 4 1.36
SW5 4 1.4
SW6 2 3.57
SW7 2 4.32
SW8 1 11.07
SW9 1 8.87

PLINTH BEAM -
(3.775*2)+(3.005*2)+2.96+3.21+2.69+3.28+3.077+1.84+.88+6.13+4.30+4.
07+6.63+3.04+2.78+4.89+9.03+4.60+5.76+6.00+5.20+8.42= 102.345 102.345
FOR 4 QUARTERS 4*102.345 409.38

DEDUCTION LIFT WALL - 3.30+1.07+1.15+(.25*2)+2.20+1.15+.77=10.77 10.14


ADD - (6*2.15)+.52+.85+.26=14.53 14.53
413.77
1 413.77
RCC WALL FOR LIFT (2.25+2.55)M 1 2.25
1 2.55
GRADE SLAB 575.68
DED- RCC COLUMN

Centring and shuttering including strutting, propping etc. and removal of form work for :
18
19 a) Foundations, footings, bases for columns
PCC 153.86
RCC RAFT 153.06
PCC BELOW STEP 2 4.25
6.44

PCC FOR PB SIDE 175.02

20 a) Foundations, footings, bases for columns

SW2 AND SW3 32 1.25


b) Walls (any thickness) including attached pilasters, butteresses,
21 plinth and string courses etc.

SW1 4 5.98
SW4 4 1.61
SW5 4 1.65
SW6 2 3.82
SW7 2 4.57
SW8 1 21
SW9 1 17.74
SHEAR WALL 2 2.25
2 2.55

d) Lintels, beams, plinth beams, girders, bressumers and


cantilevers 1 238.75
22 EXTERNAL

Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over


areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting
out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by
Engineer-in-charge, in all kinds of soil
2
23 REMOVAL OF EARTH

TOTAL EXCAVATION
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also inc
earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.

REFILLING 1146.91
1066.38
TOTAL

24 EXTRA FILLING
TOTAL EXCAVATION

FILLING 33.79

PB-(413.77-238.75)/2=87.51 87.51*.25*.25
PLINTH FILLING 0.5*(57.67-2.67)/.10*.35

TOTAL

DEDUCTIONS
AVAILABLE EARTH
PCC FOUNDATION
DEDUCTION RCC RAFT AND PB
BRICK WORK
TOTAL DEDUCTION

TOTAL
25 BRICK WORK BELOW GL
3.77+3.73+3+.6+(1.145*2)+2.96+2.47+1.84+3.73+(2*.46)+2.10+2.57+2.57
+2.47+2.17+1.85+3.28+5.25+2.32=31.07
FOR 4 QUARTERS
(3.90+2.15)*2

136.38
Providing and laying autoclaved aerated cement blocks masonry with AAC blocks in super structure above plinth leve
band at sill level and lintel level with approved block laying polymer modified adhesive mortar all complete as per dir
(The payment of RCC band and reinforcement shall be made for separately).

28
AAC BLOCK BRICK WORK
QTY AS PER 25MM WIDE DPC (34.39*4) 137.56
DEDUCTION 2.20*1 -2.2
STAIRCASE (2.32+6)*2 16.64
ELECTRICAL PANEL (.52*2)+1.10 2.14
LIFT 2.7
SHAFT (.82+2.7) 3.52
DEDUCTION STAIR WALL AS PER DPC PAGE -9.28
151.08
9 FLOORS 9 151.08
GROUND FLOOR LENGTH (112.77-(4.27+2.7)) 105.8

11TH FLOOR
DPC (34.39*2)-2.20 66.58
STAIRCASE (2.32*3)+(6*2)+5.25 24.21
LIFT 2.7
ELV & ELECTRICAL SHAFT (.52*2)+1.10+.82 2.96
SHAFT AND TERRACE (3.05+2.32+(2.0*2)+(1.0*2) 11.37
DEDUCTION STAIR WALL -9.28
98.54
98.54
MUMTY (5.25+6+(2.32*2) 15.89

DEDUCTION
DW2 -40 0.9
-40 0.48
DW5 -2 1
-2 1.15
DW1 -40 0.9
-40 1.3
DW4 -1 1.2
-1 2.7
DW3 -1 2
-1 1.9
W4 -23 1.255
W3 -41 1.33
W2 -40 2
W1 -40 2.2
D1 -40 1
D5 -23 1.5
ELECTRICAL ROOM 1.8

EXTERNAL WALL WITH BALCONY


(5*4*(1.145+.56)*.25*2.7)
(8*4*(1.145+.56)*.25*2.7)
WALL
CAVITY WALL 40*(3.28)*.20*2.7
DEDUCTION FOR RCC WALL (64.99-4.67)

Brick work with non modular fly ash bricks conforming to IS:12894, class designation 10 average compressive strengt
plinth level up to floor V level in : Cement mortar 1:6 (1 cement : 6 coarse sand)

27
230 MM THICK FLYASH BRICK WORK 24.18
DEDUCTION 80 0.6

LENGTH FOR DPC 2 15.98


2ND TO 10TH FLOOR 9 31.96
11TH FLOOR 15.98
TOTAL

28 115MM THICK FLYASH BRICK WORK 40 12.295


ABOVE DOOR
D4 (2*40) 80 0.8
D3 40 0.985
D1 40 1

Extra for forming cavity 5 cm to 11.5 cm wide in cavity walls with necessary weep and vent holes including use of cor
bitumastic coated M .S. ties 300 mm long of 25x3 mm section at not less than 3 ties per sqm as per approved design

30
40 3.73
40 3.28

Providing and fixing thermal insulation with Resin Bonded rock wool conforming to IS: 8183,
having density 48 kg/m3, 50 mm thick, wrapped in 200 G Virgin Polythene Bags fixed to wall
with screws, rawel plug & washers and held and in position by criss cossing GI wire etc.
complete as per directions of Engineer-in-Charge.
128
Providing and laying in position ready mixed M-25 grade concrete for reinforced cement
concrete work, using cement content as per approved design mix, manufactured in fully
automatic batching plant and transported to site of work in transit mixer for all leads, having
continuous agitated mixer, manufactured as per mix design of specified grade for reinforced
cement concrete work, including pumping of R.M.C. from transit mixer to site of laying ,
excluding the cost of centering, shuttering finishing and reinforcement, including cost of
admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of
concrete, improve workability without impairing strength and durability as per direction of the
Engineer-in-charge.

16
31 RCC LINTEL M 25
DW2 40 1.665
DW5 2 2.15
DW1 40 2.45
DW3&DW4 2 3.9
W4 41 1.5
W3 40 1.83
W2 40 2.5
W1 40 2.7

V1 (2*40) 80 1
ELECTRIC ROOM 2.3

Centring and shuttering including strutting, propping etc. and removal of form work for :
18
h) Small lintels not exceeding 1.5 m clear span, moulding as in cornices, window sills, string
32 courses, bands, copings, bed plates, anchor blocks and the like

DW2 40 1.615
W4 41 1.5
W3 40 1.83
V1 80 1

d) Lintels, beams, plinth beams, girders, bressumers and


33 cantilevers

DW5 2 2.15
DW1 40 2.45
DW4&3 2 3.9
W3 40 2.5
W1 40 2.7
ELECTRIC ROOM 2.3
Extra for providing and placing in position 2 Nos 6mm dia. M.S. bars at
every third course of half brick masonry.

33
QTY AS PER HALF BRICK
Extra for half brick masonry in superstructure, above floor V level for
every four floorS from 6th to upto 9th floor.

6TH TO 9TH FLOOR 4 151.08


6TH AND 8TH FLOOR (2*4)NOS. 8 1.705

7TH AND 9TH FLOOR (2*2*8)NOS. 32 1.145


DEDUCTIONS (DOORS/WINDOWS)
DW2 16 0.9
16 0.48
DW1 16 0.9
16 1.3
W4 8 1.255
W3 16 1.33
W3 16 2
W4 16 2.2
V1 16 0.6
D1 16 1
FD 8 1.5

FLYASH BRICK WORK


6TH AND 9TH FLOOR 4 31.96

31 Extra for half brick masonry in superstructure, above floor V level.


16 12.3
D4 32 0.8
D3 16 0.985
D1 16 1

CAVITY WALL 16 7.78

89 Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc., including weldin
and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts comp
36 STAINLESS STEEL RAILING

OUTTER DIA 48.26MM , 3.68MM THICKNESS 42 3.55


2 1.7

152.5
37 OUTTER DIA 33.401MM , 3.378MM THICKNESS (21*21)NOS. 441 1

OUTTER DIA 33.401MM , 3.378MM THICKNESS (21*21)NOS. 2 152.5


COVER PLATE 441

b) 30mm thick kiln seasoned and chemically treated hollock wood


shutters with ISI marked stainless steel butt hinges of required size

HOLLOCK WOOD FRAMES


DW2 40 8.3
DW5 2 10.4
DW1 40 10.6
DW4 1 16.3
Width Height Co eff. Quantity Remarks
ent content as per approved design mix, manufactured in fully automatic batching plant
mix design of specified grade for reinforced cement concrete work, including pumping
, including cost of admixtures in recommended proportions as per IS : 9103 to
of the Engineer-in-charge.

0.25 2.7 154.71


0.25 2.7 216.00
0.25 2.7 36.72
0.25 2.7 37.80
0.25 2.7 53.01
0.25 2.7 64.15
0.25 2.7 88.28
0.25 2.7 65.86
716.54 CUM.

0.25 2.7 7.74


0.25 2.7 14.85
0.25 2.7 1.84
0.25 2.7 1.89
1 2.7 2.70
29.01 CUM.
745.55 CUM.

0.25 2.7 61.88


0.25 2.7 86.40
0.25 2.7 14.69
0.25 2.7 15.12
0.25 2.7 19.28
0.25 2.7 23.33
0.25 2.7 29.89
0.25 2.7 23.95
274.54 CUM.

0.25 2.7 23.21


0.25 2.7 36.45
0.25 2.7 5.51
0.25 2.7 5.67
0.25 2.7 9.64
0.25 2.7 11.66
0.25 2.7 14.94
0.25 2.7 11.97
0.25 2.7 2.70
121.76

2 2.7 1356.26
2 2.7 365.15
2 2.7 374.22
2 2.7 453.82
2 2.7 542.92
SQM 2.7 623.70
SQM 2.7 526.88
4242.94 SQM

68.53 CUM

25.70 CUM

2 SQM 2.7 2308.50


2 SQM 2.7 27.00

2335.50 SQM

2.7 12.42
2.7 17.172
2.7 249.75
279.34 SQM.

de cement concrete for reinforced cement concrete work, using


g but excluding the cost of centring, shuttering, finishing and
erate, retard setting of concrete, improve workability without

14.85
6.01
9.52
2.67
4.28
2.96
4.07
1.84
12.65
5.14
9.03
4.34
5.76
6
5.2
8.42
102.74
410.96

8.6
9.69
11.7
440.95

0.25 0.325 358.30

0.25 0.325 1.81

0.115 0.325 5.93

205.48
8.6
9.69
11.7
10.94
13.25
12.66
5.92
24
20.8
5.24
328.28

0.25 0.325 26.67

0.25 0.45 4.37


0.15 0.45 3.57

0.25 0.45 3.30


0.15 0.45 3.26
14.51

0.25 0.325 1.62


0.25 0.325 2.06

599.57

3.05 6.86
1.95 4.97
6 36.84
3.8 11.67
2.7 8.29
0.67 2.36
70.99
528.58
Sq.m. 0.125 660.727

3.9 0.125 3.24


7.21 0.125 6.09
1.4 0.125 0.63
1.2 0.125 3.80

1.2 0.125 1.90


15.66

483.94 SQM.

3.8 11.67
2.7 8.29
6 18.42
38.38
445.57
Sq.m 0.125 55.70

6.5 0.125 2.90

0.715 0.1 7.98


0.715 0.1 9.38

0.85 0.1 9.61


0.715 0.1 5.43

0.25 0.15 1.51


0.25 0.15 1.58
0.115 0.15 0.83
0.115 0.15 0.69
0.115 0.15 0.93

3.07 0.125 24.18


25.36
1.5 0.125 1.18
1209.16 CUM

0.55 22.14
0.55 23.10
0.415 19.92
0.415 16.60
0.415 22.41
104.17 SQM

0.75 118.91
0.6 75.73
0.48 40.32
0.75 56.89
0.75 23.10
314.95 SQM

0.8 89.28
0.8 104.96
0.8 90.24
0.8 60.8
345.28
660.23 SQM

0.9 3968.91
0.9 10.00
0.765 121.29
0.9 295.47
1.15 44.70
1.05 55.60
1.15 33.70
1.05 50.76
0.9 17.90
0.9 22.68
4621.00

0.125 288.26
0.125 20.86
0.125 2.52
0.125 18.89
0.125 15.87
0.125 47.62
0.125 13.25
0.125 10.25
5038.52 SQM

5285.82
125.28
445.56
6.5 23.21
3.07 193.41
0.3 9.45
6082.72

314.95
5767.78 SQM

0.25 1102.48
0.25 2.78
0.115 18.21
0.25 82.08
0.25 4.97
0.25 6.33
1216.84
4550.94
ent content as per approved design mix, manufactured in fully automatic batching plant
mix design of specified grade for reinforced cement concrete work, including pumping

0.25 0.325 143.32


1.81
0.115 0.325 2.26
2.06
0.125 264.29
413.73

13.76

12.96

0.53
1.58
9.21
0.45
24.73

14.87
467.09 CUM

0.3 0.14 25.137


0.15 0.14 13.8915
39.0285 CUM
cing, propping etc., including cost of de-shuttering and
art thereof (Plan area to be measured).

1.145 213.9318
1.33 191.8392
3.9 207.168
7.21 389.9168
1.405 40.464
1.2 243.072
3.9 77.688
7.21 146.2188
1.405 15.174
1.2 91.152
3.05 240.1875
1.95 174.0375

0.25 139.635
1.535 308.0438
2.12 369.4948
0.25 154.08
1.53 338.8032
2.12 407.7184
3.9 414.336
4162.9608 SQM

19.52
17.07
36.59
2.2
34.39
68.78
18.96
2.14
2.7
2.7

15.41
3.49
4.27
3.6
4 -9.28
112.77 M

14.18
1.8
4.9
2.4
0.9
24.18 M

3.28

5.13
1.235
0.83
4.38
0.72
12.295 M
0.25 27.9425
0.23 5.5614
0.15 1.119
0.35 2.296
0.115 2.829
39.7479 SQM
quality using 1.7kg per square metre on damp proof
ed in kerosene oil.

39.7479 SQM
0.05 6.4 12.72 BAGS
areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm
1.5 m, as directed by Engineer-in-charge, in all kinds of soil

SQM 1.1 1173.018 CUM

SQM 2 2293.82 CUM

3466.838 CUM
SQM 1 1066.38 CUM

SQM 0.5 573.455 CUM


1639.835 CUM
SQM 0.1 106.638 CUM
III) : 8 graded stone aggregate 40 mm nominal size) excluding the

96.47
57.67
154.14

0.25 0.1 0.57


0.25 0.1 0.80
0.25 0.1 0.14
0.25 0.1 0.14
0.25 0.1 0.18
0.25 0.1 0.22
0.25 0.1 0.28
0.25 0.1 0.22

0.25 0.1 0.06


0.25 0.1 0.06
-2.65

0.175 0.35 21.44

0.7 0.1 0.40


0.7 0.1 0.32
176.30
173.65 CUM

de cement concrete for reinforced cement concrete


site of laying but excluding the cost of centring,
s as per IS: 9103 to accelerate, retard setting of concrete,
-in-charge.“
SQM 0.75 712.00 CUM

0.25 2.425 13.90


0.25 2.425 19.40
0.25 2.425 3.30
0.25 2.425 3.40
0.25 2.425 4.33
0.25 2.425 5.24
0.25 2.875 7.96
0.25 2.875 6.38

775.89 CUM

0.25 0.45 46.55


0.25 2.425 1.36
0.25 2.425 1.56
SQM 0.1 57.56
-2.67
880.25 CUM

SQM 0.1 15.386


SQM 0.752 115.10112
SQM 0.1 0.85
SQM 0.1 0.644
131.98112 SQM
2 0.35 122.514 SQM
254.49512 SQM

2 2.425 194 SQM

2 2.425 116.012
2 2.425 31.234
2 2.425 32.01
2 2.425 37.054
2 2.425 44.329
2.875 60.375
2.875 51.0025
SQM 2.425 10.9125
SQM 2.425 12.3675
395.2965 SQM

1.15 274.5625

3466.86
upto a lead of 5km also including ramming and watering of the

SQM 0.5 573.455


SQM 1.1 1173.018
1746.473

3466.86

36.44 0.485 597.184186

5.46
96.25

4165.754186

1746.48
96.47
880.36
18.82
2742.13

1423.62

31.07
124.28
12.1
136.38
0.23 0.6 18.82044 CUM
structure above plinth level up to floor V level with RCC
rtar all complete as per direction of Engineering-Charge.

M
0.25 2.7 917.81 Cum
0.25 2.7 71.42
0.25 2.7 66.51 CUM
0.25 2.7 10.73 CUM
1066.47

0.25 2.25 -20.25


0.25 1.3 -6.24
0.25 2.2 -1.10
0.25 1.3 -0.75
0.25 2.25 -20.25
0.25 1.3 -16.90
0.25 2.2 -0.66
0.25 1.3 -0.88
0.25 2.2 -1.10
0.25 1.3 -0.62
0.25 1.3 -9.38
0.25 1.3 -17.72
0.25 1.3 -26.00
0.25 1.3 -28.60
0.25 2.25 -22.50
0.25 2.25 -19.41
0.23 2.2 0.91

23.02
24.73
0.76
70.848
-60.32

934.06 CUM
erage compressive strength in super structure above

0.23 2.7 15.02


0.23 0.6 6.62
8.39
31.96
0.23 2.7 178.62
0.23 2.7 9.92
196.94

2.7 1327.86 SQM

0.3 19.2
0.3 11.82
0.3 12
1370.88 SQM
t holes including use of cores and cost of providing and fixing
m as per approved design.

2.7 402.84
2.7 354.24
757.08 SQM

757.08 SQM

0.25 0.15 2.4975


0.25 0.25 0.26875
0.25 0.25 6.125
0.25 0.3 0.585
0.25 0.15 2.30625
0.25 0.15 2.745
0.25 0.2 5
0.25 0.25 6.75
26.2775 SQM
0.23 0.15 2.76
0.25 0.2 0.115
29.1525 SQM

0.55 35.53
0.55 33.825
0.55 40.26
0.55 44
153.615 SQM

0.75 3.23
0.75 73.50
0.85 6.63
0.65 65.00
0.75 81.00
0.65 1.50
230.85 SQM
1370.88

0.25 2.7 407.916


0.25 2.7 9.207

0.25 2.7 24.732

0.25 2.25 -8.1


0.25 1.3 -2.496
0.25 2.25 -8.1
0.25 1.3 -6.76
0.25 1.3 -3.263
0.25 1.3 -6.916
0.25 1.3 -10.4
0.25 1.3 -11.44
0.23 0.6 -1.3248
0.25 2.25 -9
0.25 2.25 -6.75
367.3052 CUM

0.23 2.7 79.38864


446.69384 CUM

2.7 531.36
0.3 7.68
0.3 4.728
0.3 4.8
548.568 CUM
2.875 357.88
906.45
lates etc., including welding, grinding, buffing, polishing
steel nuts and bolts complete, i/c fixing the railing with

149.1 SQM
3.4
152.5 SQM
4.05 617.625
2.5 1102.5

1.683 513.315
0.1 44.1
2277.54

KG

332
20.8
424 KG
16.3