Take Off Sheet For Alpha-Iit Bhilai S.No. Particular No's Length 16
Take Off Sheet For Alpha-Iit Bhilai S.No. Particular No's Length 16
11th FLOOR
SW1 2 5.73
SW2 AND SW3 22 1
SW4 2 1.36
SW5 2 1.4
MUMTY 4 0.25
TOTAL
All works above plinth level upto floor V level
2
SW1(10*4)+2 42 5.98
SW4(10*4)+2 42 1.61
SW5(10*4)+2 42 1.65
SW6 (11*2) 22 3.82
SW7 (11*2) 22 4.57
SW8 11 21
SW9 11 17.74
TOTAL
Extra for R.C.C./ B.M.C/ R.M.C./PCC work above floor V level for each four floors (above floor
V level to floor IX)
21
Extra for R.C.C./ B.M.C/ R.M.C./PCC work above floor V level for each four floors (above floor
22 IX level to floor XIII)
18 Centring and shuttering including strutting, propping etc. and removal of form work for :
3 a) Foundations, footings, bases for columns
SW2 AND SW3 (10*32) +22 342 1.25
MUMTY 4 1.25
TOTAL
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for re
cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of
reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of con
impairing strength and durability as per direction of Engineer-in-charge.“
16
4 102.74
X7 to X8 = 2.15X4 4 2.15
LIFT WALL=3.07+3.05+3.30+.27 1 9.69
Y8 to Y9 3 3.9
10 440.99
EXTRA BEAMS AT 7TH AND 9TH FLOOR
(3.90+7.21)=11.11*0.25*0.325*2 2 11.11
EXTRA BEAM AT X1 to X2
42*.3775*0.115*0.325 42 3.775
11th FLOOR
Beam length - 102.74*2 2 102.74
X7 to X8 = 2.15X4 4 2.15
LIFT 1 9.69
Y8 to Y9 =3.8*3 3 3.9
Y9 1 10.94
Y12 1 13.25
Y13 to Y14 2 6.33
Y15 2 2.96
Y9 to Y12 4 6
Y12 to Y16 4 5.2
Y12to Y14 2 2.62
TOTAL 328.28
MUMTY
(6.50*2)+0.75+(3.07*2) 1 19.89
Additional beams at 7th and 9th floor 4 6.33
528.58*0.125*10 10 528.58
DEDUCTIONS
Shaft 3.07
3.07
Staircase 3.07
445.56*0.125 445.57
LINTEL
FD 23 1.75
D1 42 1
D4 40 1.2
D4 40 1
D3 40 1.35
TOTAL
LANDING SLAB
42 1.5
21 0.3
TOTAL
FD 23 1.75
D1 42 1
D4 40 1.2
D4 40 1
D3 40 1.35
16 Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved desig
and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for
Extra for R.C.C./ B.M.C/ R.M.C. work above floor V level .
9
STAIRCASE
(39.03/21)*8
23
BALCONY HT. X4-X6 (6.30) 54 3.46
X2-X4 (16*3)Nos. 48 3.005
7TH FLOOR AREA 16 3.32
16 3.38
(2*16)Nos. 32 0.9
(2*16)Nos. 32 6.33
(2*3)Nos. 6 3.32
(2*3)Nos. 6 3.38
(2*2*3)Nos. 12 0.9
(2*2*3)Nos. 12 6.33
LIFT-1 35 2.25
LIFT-2 35 2.55
PERGOLA BEAM
Suspended floors, roofs, landing, beams and balconies, pergola etc. (Plan
area to be measured)
29 19.26
(2*29)Nos. 58 3.46
(2*29)Nos. 58 3.005
32 19.26
(2*32)Nos. 64 3.46
(2*32)Nos. 64 3.005
32 3.32
Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2
13 coarse sand(zone-III) : 4 graded stone aggregate 20mm nominal size).
12 LAYING DPC- 50MM
250 MM WIDE
FOR ONE FLOOR ( (.90*2)+3.73+1.20+1+.6+2.10+2.27+5.25+1.665)
3.775+3+2.96+1.84+2.17+2.32+1
DEDUCTION LIFT
230 MM WIDE
TOILET WALL- 2*[3.46+(.21*2)+3.21] 1 14.18
SHAFT 2 0.9
(1.36+.44+.65)*2 2 2.45
(2*4)Nos. 8 0.3
(2*1)Nos. 2 0.45
350MM WIDE
3.28 1 3.28
115MM WIDE
TOILET- (2*2.215)+.7 1 5.13
KITCHEN
BEDROOM
BEDROOM (1.5+.6+2.28)
LOBBY
(1.00-122-.05) M 111.77
24.18*.23 24.18
2 3.73
2 3.28
2 12.3
Providing & applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7kg per squ
course after cleaning the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil.
15
PRETOLEUM BITUMEN
14 WPC 39.75
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in
on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engi
1
1066.38
1146.91
TOTAL
Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or
stacked materials all kinds of soil
7
a) depth 1.5m to 3.0m
1066.38
1146.91
TOTAL
b) depth 3.0m to 4.5m 1066.38
Providing and laying in position cement concrete of 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggreg
cost of centring and shuttering
11
AREA AS PER CAD (964.68*.10)
PCC SUB FLOOR As per CAD (575.68*.10)
TOTAL
DEDUCTION
SW1 4 5.73
SW2 AND SW3 32 1
SW4 4 1.36
SW5 4 1.4
SW6 2 3.57
SW7 2 4.32
SW8 1 11.07
SW9 1 8.87
SIDE OF PB 2 175.02
16
a) All works above upto plinth level
RAFT 949.34
RCC COLUMN UPTO PLINTH LEVEL
SW1 4 5.73
SW2 AND SW3 32 1
SW4 4 1.36
SW5 4 1.4
SW6 2 3.57
SW7 2 4.32
SW8 1 11.07
SW9 1 8.87
PLINTH BEAM -
(3.775*2)+(3.005*2)+2.96+3.21+2.69+3.28+3.077+1.84+.88+6.13+4.30+4.
07+6.63+3.04+2.78+4.89+9.03+4.60+5.76+6.00+5.20+8.42= 102.345 102.345
FOR 4 QUARTERS 4*102.345 409.38
Centring and shuttering including strutting, propping etc. and removal of form work for :
18
19 a) Foundations, footings, bases for columns
PCC 153.86
RCC RAFT 153.06
PCC BELOW STEP 2 4.25
6.44
SW1 4 5.98
SW4 4 1.61
SW5 4 1.65
SW6 2 3.82
SW7 2 4.57
SW8 1 21
SW9 1 17.74
SHEAR WALL 2 2.25
2 2.55
TOTAL EXCAVATION
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also inc
earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.
REFILLING 1146.91
1066.38
TOTAL
24 EXTRA FILLING
TOTAL EXCAVATION
FILLING 33.79
PB-(413.77-238.75)/2=87.51 87.51*.25*.25
PLINTH FILLING 0.5*(57.67-2.67)/.10*.35
TOTAL
DEDUCTIONS
AVAILABLE EARTH
PCC FOUNDATION
DEDUCTION RCC RAFT AND PB
BRICK WORK
TOTAL DEDUCTION
TOTAL
25 BRICK WORK BELOW GL
3.77+3.73+3+.6+(1.145*2)+2.96+2.47+1.84+3.73+(2*.46)+2.10+2.57+2.57
+2.47+2.17+1.85+3.28+5.25+2.32=31.07
FOR 4 QUARTERS
(3.90+2.15)*2
136.38
Providing and laying autoclaved aerated cement blocks masonry with AAC blocks in super structure above plinth leve
band at sill level and lintel level with approved block laying polymer modified adhesive mortar all complete as per dir
(The payment of RCC band and reinforcement shall be made for separately).
28
AAC BLOCK BRICK WORK
QTY AS PER 25MM WIDE DPC (34.39*4) 137.56
DEDUCTION 2.20*1 -2.2
STAIRCASE (2.32+6)*2 16.64
ELECTRICAL PANEL (.52*2)+1.10 2.14
LIFT 2.7
SHAFT (.82+2.7) 3.52
DEDUCTION STAIR WALL AS PER DPC PAGE -9.28
151.08
9 FLOORS 9 151.08
GROUND FLOOR LENGTH (112.77-(4.27+2.7)) 105.8
11TH FLOOR
DPC (34.39*2)-2.20 66.58
STAIRCASE (2.32*3)+(6*2)+5.25 24.21
LIFT 2.7
ELV & ELECTRICAL SHAFT (.52*2)+1.10+.82 2.96
SHAFT AND TERRACE (3.05+2.32+(2.0*2)+(1.0*2) 11.37
DEDUCTION STAIR WALL -9.28
98.54
98.54
MUMTY (5.25+6+(2.32*2) 15.89
DEDUCTION
DW2 -40 0.9
-40 0.48
DW5 -2 1
-2 1.15
DW1 -40 0.9
-40 1.3
DW4 -1 1.2
-1 2.7
DW3 -1 2
-1 1.9
W4 -23 1.255
W3 -41 1.33
W2 -40 2
W1 -40 2.2
D1 -40 1
D5 -23 1.5
ELECTRICAL ROOM 1.8
Brick work with non modular fly ash bricks conforming to IS:12894, class designation 10 average compressive strengt
plinth level up to floor V level in : Cement mortar 1:6 (1 cement : 6 coarse sand)
27
230 MM THICK FLYASH BRICK WORK 24.18
DEDUCTION 80 0.6
Extra for forming cavity 5 cm to 11.5 cm wide in cavity walls with necessary weep and vent holes including use of cor
bitumastic coated M .S. ties 300 mm long of 25x3 mm section at not less than 3 ties per sqm as per approved design
30
40 3.73
40 3.28
Providing and fixing thermal insulation with Resin Bonded rock wool conforming to IS: 8183,
having density 48 kg/m3, 50 mm thick, wrapped in 200 G Virgin Polythene Bags fixed to wall
with screws, rawel plug & washers and held and in position by criss cossing GI wire etc.
complete as per directions of Engineer-in-Charge.
128
Providing and laying in position ready mixed M-25 grade concrete for reinforced cement
concrete work, using cement content as per approved design mix, manufactured in fully
automatic batching plant and transported to site of work in transit mixer for all leads, having
continuous agitated mixer, manufactured as per mix design of specified grade for reinforced
cement concrete work, including pumping of R.M.C. from transit mixer to site of laying ,
excluding the cost of centering, shuttering finishing and reinforcement, including cost of
admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of
concrete, improve workability without impairing strength and durability as per direction of the
Engineer-in-charge.
16
31 RCC LINTEL M 25
DW2 40 1.665
DW5 2 2.15
DW1 40 2.45
DW3&DW4 2 3.9
W4 41 1.5
W3 40 1.83
W2 40 2.5
W1 40 2.7
V1 (2*40) 80 1
ELECTRIC ROOM 2.3
Centring and shuttering including strutting, propping etc. and removal of form work for :
18
h) Small lintels not exceeding 1.5 m clear span, moulding as in cornices, window sills, string
32 courses, bands, copings, bed plates, anchor blocks and the like
DW2 40 1.615
W4 41 1.5
W3 40 1.83
V1 80 1
DW5 2 2.15
DW1 40 2.45
DW4&3 2 3.9
W3 40 2.5
W1 40 2.7
ELECTRIC ROOM 2.3
Extra for providing and placing in position 2 Nos 6mm dia. M.S. bars at
every third course of half brick masonry.
33
QTY AS PER HALF BRICK
Extra for half brick masonry in superstructure, above floor V level for
every four floorS from 6th to upto 9th floor.
89 Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc., including weldin
and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts comp
36 STAINLESS STEEL RAILING
152.5
37 OUTTER DIA 33.401MM , 3.378MM THICKNESS (21*21)NOS. 441 1
2 2.7 1356.26
2 2.7 365.15
2 2.7 374.22
2 2.7 453.82
2 2.7 542.92
SQM 2.7 623.70
SQM 2.7 526.88
4242.94 SQM
68.53 CUM
25.70 CUM
2335.50 SQM
2.7 12.42
2.7 17.172
2.7 249.75
279.34 SQM.
14.85
6.01
9.52
2.67
4.28
2.96
4.07
1.84
12.65
5.14
9.03
4.34
5.76
6
5.2
8.42
102.74
410.96
8.6
9.69
11.7
440.95
205.48
8.6
9.69
11.7
10.94
13.25
12.66
5.92
24
20.8
5.24
328.28
599.57
3.05 6.86
1.95 4.97
6 36.84
3.8 11.67
2.7 8.29
0.67 2.36
70.99
528.58
Sq.m. 0.125 660.727
483.94 SQM.
3.8 11.67
2.7 8.29
6 18.42
38.38
445.57
Sq.m 0.125 55.70
0.55 22.14
0.55 23.10
0.415 19.92
0.415 16.60
0.415 22.41
104.17 SQM
0.75 118.91
0.6 75.73
0.48 40.32
0.75 56.89
0.75 23.10
314.95 SQM
0.8 89.28
0.8 104.96
0.8 90.24
0.8 60.8
345.28
660.23 SQM
0.9 3968.91
0.9 10.00
0.765 121.29
0.9 295.47
1.15 44.70
1.05 55.60
1.15 33.70
1.05 50.76
0.9 17.90
0.9 22.68
4621.00
0.125 288.26
0.125 20.86
0.125 2.52
0.125 18.89
0.125 15.87
0.125 47.62
0.125 13.25
0.125 10.25
5038.52 SQM
5285.82
125.28
445.56
6.5 23.21
3.07 193.41
0.3 9.45
6082.72
314.95
5767.78 SQM
0.25 1102.48
0.25 2.78
0.115 18.21
0.25 82.08
0.25 4.97
0.25 6.33
1216.84
4550.94
ent content as per approved design mix, manufactured in fully automatic batching plant
mix design of specified grade for reinforced cement concrete work, including pumping
13.76
12.96
0.53
1.58
9.21
0.45
24.73
14.87
467.09 CUM
1.145 213.9318
1.33 191.8392
3.9 207.168
7.21 389.9168
1.405 40.464
1.2 243.072
3.9 77.688
7.21 146.2188
1.405 15.174
1.2 91.152
3.05 240.1875
1.95 174.0375
0.25 139.635
1.535 308.0438
2.12 369.4948
0.25 154.08
1.53 338.8032
2.12 407.7184
3.9 414.336
4162.9608 SQM
19.52
17.07
36.59
2.2
34.39
68.78
18.96
2.14
2.7
2.7
15.41
3.49
4.27
3.6
4 -9.28
112.77 M
14.18
1.8
4.9
2.4
0.9
24.18 M
3.28
5.13
1.235
0.83
4.38
0.72
12.295 M
0.25 27.9425
0.23 5.5614
0.15 1.119
0.35 2.296
0.115 2.829
39.7479 SQM
quality using 1.7kg per square metre on damp proof
ed in kerosene oil.
39.7479 SQM
0.05 6.4 12.72 BAGS
areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm
1.5 m, as directed by Engineer-in-charge, in all kinds of soil
3466.838 CUM
SQM 1 1066.38 CUM
96.47
57.67
154.14
775.89 CUM
2 2.425 116.012
2 2.425 31.234
2 2.425 32.01
2 2.425 37.054
2 2.425 44.329
2.875 60.375
2.875 51.0025
SQM 2.425 10.9125
SQM 2.425 12.3675
395.2965 SQM
1.15 274.5625
3466.86
upto a lead of 5km also including ramming and watering of the
3466.86
5.46
96.25
4165.754186
1746.48
96.47
880.36
18.82
2742.13
1423.62
31.07
124.28
12.1
136.38
0.23 0.6 18.82044 CUM
structure above plinth level up to floor V level with RCC
rtar all complete as per direction of Engineering-Charge.
M
0.25 2.7 917.81 Cum
0.25 2.7 71.42
0.25 2.7 66.51 CUM
0.25 2.7 10.73 CUM
1066.47
23.02
24.73
0.76
70.848
-60.32
934.06 CUM
erage compressive strength in super structure above
0.3 19.2
0.3 11.82
0.3 12
1370.88 SQM
t holes including use of cores and cost of providing and fixing
m as per approved design.
2.7 402.84
2.7 354.24
757.08 SQM
757.08 SQM
0.55 35.53
0.55 33.825
0.55 40.26
0.55 44
153.615 SQM
0.75 3.23
0.75 73.50
0.85 6.63
0.65 65.00
0.75 81.00
0.65 1.50
230.85 SQM
1370.88
2.7 531.36
0.3 7.68
0.3 4.728
0.3 4.8
548.568 CUM
2.875 357.88
906.45
lates etc., including welding, grinding, buffing, polishing
steel nuts and bolts complete, i/c fixing the railing with
149.1 SQM
3.4
152.5 SQM
4.05 617.625
2.5 1102.5
1.683 513.315
0.1 44.1
2277.54
KG
332
20.8
424 KG
16.3