NO URAIAN PEKERJAAN SAT.

PERHITUNGAN VOLUM
P L T n
1 Pondasi m³ 86.95 0.50 0.60
2 Sloof 15/20 m³ 86.95 0.15 0.20
3 Kolom 15/15 bh 0.15 0.15 3.60 35.00
4 Dinding 1/2 bata m² 81.95 3.60
5 Plesteran m² 279.90 2.00
6 Lantai Keramik 30/30 m² 106.75
7 Batu lokal dinding depan m² 14.00 3.00
8 Kosen pintu aluminium m 5.10 8.00
9 Daun pintu unit 8.00
10 Kloset duduk unit 6.00
11 Westafel unit 6.00
12 Kran bh 2.00
13 Ring balk 15/20 m³ 81.95 0.15 0.20
14 Plat Beton m³ 14.00 7.63 0.12
PERHITUNGAN VOLUME VOLUME

26.09
2.61
2.84
0.90 2.10 8.00 15.12 279.90
559.80
106.75
42.00
40.80
8.00
6.00
6.00
2.00
2.46
43.25 0.12 0.65 3.37 16.18