PACKAGE 4 500kV TRANSMISSION LINE XAYABURI

FOR 1DAY TRAINING PROGRAM


DESCRIPTION TIME
1. INTRODUCTION TO TRANSMISSION LINE DESIGN COMPONENTS 8.15 - 9.30
1.1 STEEL TOWERS
1.2 FOUNDATION
1.3 CONDUCTORS
1.4 SHIELD WIRE (SW)/OPGW
1.5 HARDWARE & LINE ACCESSORIES
1.6 TOWER GROUNDING MATERIALS
MR.CHANCHAI LAOPONGPAISAN
2. CONSTRUCTION OF TRANSMISSION LINE 9.45 -10.45
2.1 SURVEY
2.2 FOUNDATION
2.3 TOWER ERECTION
2.4 STRINGING OF CONDUCTOR/SW

3. FINAL INSPECTION & COMMISSIONING 11.00 - 12.00


3.1 STEEL TOWERS
3.2 CONDUCTORS/SW
3.3 SAG / GROUND CLEARANCE
3.4 INSULATOR CONDITIONS
3.5 INSULATOR ASSEMBLY CONDITIONS
3.6 GROUNDING RESISTANCE
3.7 CONDUCTOR/SW/OPGW SPLICING
MR.MATRI CHOTCHAISATIT
4. TRANSMISSION LINE MAINTENANCE 13.00 - 14.30
4.1 LINE MATERIAL MAINTENANCE
4.2 PREVENTIVE MAINTENANCE
4.3 CORRECTIVE MAINTENANCE
4.4 IMPROVEMENT MAINTENANCE

MR.MATRI CHOTCHAISATIT
5. TRANSMISSION LINE MAINTENANCE PLANNING & SCHEDULE 14.45 - 16.30
5.1 MAINTENANCE PLANNING FACTORS
5.2 MAJOR PLANNED MAINTENANCE
5.3 EMERGENCY CASES
5.4 IMPROVEMENT MAINTENANCE
5.5 OTHER
MR.MATRI CHOTCHAISATIT