Hydraulic Calculation for Bridge No.

:-38
MAHESANA-TARANGA GAUGE CONVERSION PROJECT

A.) Hydraulic Data

1 Bridge No. 38
2 Latitude 23°48'52.39"N
Longitude 72°37'44.40"E
3 No. of span 1 No.
4 Clear span 2.000 m
5 High Flood Level (Observed at site) HFL 158.67 m
6 Low Water Level LWL 158.329 m
7 Lowest Bed Level LBL 158.329 m
8 Dist in U/S 400 m
9 Level in U/S 158.729 m
10 Dist in D/S 400 m
11 Level in D/S 157.479 m
12 bed Slope 0.00156250
13 Cross-Section area of channel Ac 0.68 m2
14 Wetted perimeter of channel P 2.623 m
15 Rugosity Co-efficient N 0.035
16 Silt Factor f 3.30 As Per IRC:78
17 Bottom of super structure 159.620
18 50 year 24 Hrs. Rainfall R50(24) 28 Cm
19 Area Reduction Factor F 0.81
20 50 year 1 Hrs. Rainfall R50(1) 106.4 mm
Length of the stream from farthest point of the catchment to the
21 L 0.33 km
bridge
22 Area of the Catchment A 0.016 km2
Diff of elevation of bed at farthest point of catchment and the
23 H 0.125 met
bridge.
Hydraulic Calculation for Bridge No. :-38
MAHESANA-TARANGA GAUGE CONVERSION PROJECT

B.) Discharge Calculation by RDSO report RBF-16


0.345
[L^3/H]
Time of Concentration = tc = = 0.650 hrs

C = 0.332x (R50(24) x F)0.2 = 0.620


tc hr ratio R50(tc)/R50(24) From Graph Fig 4 = x = 0.295
1 hr ratio R50(1)/R50(24) From Graph Fig 4 = y = 0.380

x R50(tc) = k x R50(1) = 82.6 mm


Coefficient K = = 0.776
y
I50=R50(tc)/tc = 126.985 mm/hr
Q50=0.278*C*I50*A = 0.35 met3/sec

C.) Discharge Calculation by Area Velocity Method

Heighest flood Level = 158.67


2
Wetted Area = 0.68 met
Wetted Perimeter = 2.62 met
Increase Height = 0 met
Linear water way = 2.00 met

Ac 0.68
Hydraulic Mean Depth = R = = = 0.259 met
P 2.62
Mannings's Velocity = V = (1/N) x (R ) 2/3 x (S) 1/2 = 0.459 met/sec
Discharge Q = Ac x V = 0.680 x 0.459 = 0.31 met3/sec

HFL for Design Discharge = 158.670 + 0.000 = 158.670


Hydraulic Calculation for Bridge No. :-38
MAHESANA-TARANGA GAUGE CONVERSION PROJECT

D.) Calculation for Scour Depth

Discharge for Foundation = Discharge fromr RBF-16=> 0.35 Q= 0.35 met3/sec


Design Discharge for Foundation = Qd= 1.30 x Q = 0.46 met3/sec ( Sub. Str.- Cl. - 4.4 )

Total Clear Span = 1x2 0.46


Discharge per met width = Qf = = 0.228
= 2 met 2.00

Scour Depth = =0.335 met ( Sub. Str.- Cl. - 4.6.4 ) (From H.F.L.)

Maximum Scour Depth for Abutment = DA = ( 1.25 x D ) = 0.419 met ( Sub. Str.- Cl. - 4.6.6 )
Maximum Scour Depth for Pier = DP = ( 2.0 x D ) = Not Applicable ( Sub. Str.- Cl. - 4.6.6 )
Scour depth below bed level=> 0.419- (158.67-158.329) => 0.078 met Say ==> 0.078
For Abutment => Scour Depth-(HFL-Bed level)
(Return Wall,Drop wall &
Curtain Wall)
E.) Summary
3
1.) Design Discharge 0.46 met /sec
2.) Vertical Clearance 0.950 met
3.) Permissible Vertical Clearance 0.600 met
4.) Scour Depth below Bed Level 0.078 met