PIPELINE CONSTRUCTION
Client Project Location Pipeline Length - Km Diameter - Inch Contract Period Completion Date
NAWARA (CPF) -
OMV Gas Pipelinefor the interconnection of Nawara CPF to the GTP Gabes 370 24" 24 Months In progress
GABES (GTP)
95 20"
STEG Gas Pipeline Feriana-Gafsa (Turn Key Contract) FERIANA / GAFSA 24 Months 2016
75 8"
GABES - ZARZIS -
STEG Gas Pipeline Gabés to Zarzis : (EPC Contract) 150 12" 24 Months 2016
DJERBA
Hasdrubal Project : LPG Pipeline 2x6"From hanibal Gas plant to Gabes 260 6" 12 Months
Multiphase and Gas Pipelines From hanibal Gas plant to Ben Sahloul 20 18" 2009
BG TUNISIA SFAX / GABES 12 Months
Condensate pipeline and associated works from Hannibal plant (Sfax) to Trapsa
58 8"
Terminal (Skhira)
Pipeline Construction From Oued Zar to Trapsa OUED ZAR 9 12" 03 Months
ENI 2008
Pipeline Interconnection from Djebel Grouz to pipeline 10" STEG 4 6"
Pipeline Construction Oued Zar El Borma including EPC manifold & related piping
EL BORMA 13 8" 03 Months
HP at Oued Zar.
________________________________________________________________________________________________________
BOUCHAMAOUI INDUSTRIES
55, Rue 8600 ZI. Charguia I, 2035 Tunis Aéroport.
REFERENCES & ACHIEVEMENTS
PIPELINE CONSTRUCTION
Client Project Location Pipeline Length - Km Diameter - Inch Contract Period Completion Date
PERENCO Gas Pipeline from Oum Chiah gas plant to LPG Gas Plant. GABES 70 10" 09 Months 2006
Gas Pipeline construction and related civil works at El Mourouj Mornag 12 20"
Gas Pipeline construction and related civil works at Jbel El Oust 14 8"
Gas Pipeline construction and related civil works at Rades TUNIS 13 20"
STEG 18 Month 2004
Gas Pipeline construction from La Goulette to Radès, including 500 m HDD 4 12"
Gas Pipeline construction and related civil works at Denden city including HDD 5 4"
SOTRAPIL Pipeline Maintenance and Renovation TUNIS / BIZERTE 55 10" 08 Months 2004
ATHANOR Fiber glass pipeline Construction & hook-up. KAIROUAN 14 12" 03 Months 2002
STEG HDD crossing 2 x 1100 m of 24'' Pipeline under the canal of Bizerte BIZERTE 2,2 24" 04 Months 2002
________________________________________________________________________________________________________
BOUCHAMAOUI INDUSTRIES
55, Rue 8600 ZI. Charguia I, 2035 Tunis Aéroport.
REFERENCES & ACHIEVEMENTS
PIPELINE CONSTRUCTION
Client Project Location Pipeline Length - Km Diameter - Inch Contract Period Completion Date
116 10"
El Franig / Baguel
CMS NOMECO Gas Pipeline El Franig / Baguel and related facilities. 06 Months 1998
(DOUZ TUNISIA)
40 6"
MARETAP Flowline Construction For Ez Zaouia field ZARZIS 13 4" 03 Months 1996
Gas Pipeline & related Facilities: Rades power plant TUNIS (Radés) 6 20"
08 Months 1986
Gas Pipeline Construction for Hammamet touristic area HAMMAMET 15 4"
STEG LPG Pipeline from El Borma field to Gabes fractionating plant. 300 6"
EL BORMA 18 Month 1985
Flowline Construction 50 6"
Gas Pipeline Construction for for Djebel West industrial zone DJEBEL OUEST 12 8" 08 Months 1984