REPUBLIK INDONESIA

KEMENTERIAN PEKERJAAN UMUM


DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH III
PROPINSI JAWA BARAT
PEJABAT PEMBUAT KOMITMEN 3.4 PROPINSI JAWA BARAT

PAKET : PEMBANGUNAN JALAN LINGKAR TIMUR KUNINGAN ( SBSN )


NO. KONTRAK : HK0203/P JNWil.III-JBR/LTK/XII/2019/460
TANGGAL : 16 DESEMBER 2019
KONTRAKTOR : PT. SENECA INDONESIA
KONSULTAN : PT WAHANA MITRA AMERTA
PT. HI-WAY INDOTEK
PT. CIRIATAMA NUSAWIDYA CONSULT,
PT. GARIS PUTIH SEJAJAR, KSO

MIX DESIGN
AC BASE

PT. SENECA INDONESIA


2019 / 2020
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH III
PROPINSI JAWA BARAT
PEJABAT PEMBUAT KOMITMEN 3.4 PROPINSI JAWA BARAT

LEMBAR PENGESAHAN
MIX DESIGN
AC BASE

NO. JABATAN NAMA TANDA TANGAN

PEJABAT PEMBUAT KOMITMEN 3.4


1 PAKET PEMBANGUNAN JALAN Arief Budiman ST
LINGKAR TIMUR KUNINGAN NIP. 197306082008121001

KONSULTAN SUPERVISI Weimintoro. ST. MT


2 PT WAHANA MITRA AMERTA, PT. HI-WAY INDOTEK SITE ENGINEER
PT. CIRIATAMA NUSAWIDYA CONSULT,
PT. GARIS PUTIH SEJAJAR, KSO

PENYEDIA JASA Ir. Achmad Bustari


3 PT. SENECA INDONESIA GENERAL SUPERINTENDENT

Catatan :
MIX DESIGN
AC BASE
KONTRAKTOR PT. SENECA INDONESIA
KONSULTAN PT WAHANA MITRA AMERTA, PT. HI-WAY INDOTEK
PT. CIRIATAMA NUSAWIDYA CONSULT,
PT. GARIS PUTIH SEJAJAR, KSO
PROYEK PAKET PEMBANGUNAN JALAN
LINGKAR TIMUR KUNINGAN Tanggal : 24-Jun-20

KOMPOSISI CAMPURAN
COLD BIN HOT BIN

Abu Batu (0 - 5) mm Ex. STC Palimanan 52.0% thd. Agg Hot Bin I ( K4 ) 36.0% thd. Agg
Split (5 - 12) mm Ex. STC Palimanan 30.0% thd. Agg Hot Bin II ( K3 ) 30.5% thd. Agg
Err:509 Ex. STC Palimanan Err:509 thd. Agg Hot Bin III ( K2 ) 22.0% thd. Agg
Hot Bin IV ( K1 ) 8.0% thd. Agg
Filler Abu Batu 3.5% thd. Agg
Abu Batu (0 - 5) mm Ex. STC Palimanan 49.40% thd. Camp
Split (5 - 12) mm Ex. STC Palimanan 28.50% thd. Camp Hot Bin I ( K4 ) 34.2% thd. Camp
Err:509 Ex. STC Palimanan Err:509 thd. Camp Hot Bin II ( K3 ) 29.0% thd. Camp
Hot Bin III ( K2 ) 20.9% thd. Camp
Hot Bin IV ( K1 ) 7.6% thd. Camp
Filler Abu Batu 3.3% thd. Camp

Aspal Pen 60/70 5.0% thd. Camp Aspal Pen 60/70 5.0% thd. Camp

GRADASI CAMPURAN
Ukuran saringan 1 1/2" 1" 3/4 " 1/2." 3/8 " # 4 #8 # 16 # 30 # 50 # 100 # 200
37.5 25 19 12.5 9.5 4.75 2.36 1.18 0.6 0.3 0.15 0.075

Cold Bin Err:509 100.0 94.1 83.8 72.0 57.0 34.1 27.7 14.9 11.8 8.0 4.9
Hot Bin 100.0 93.8 82.5 72.5 63.0 44.9 29.8 20.7 12.5 9.4 6.0 4.9

Spesifikasi
Maks. 100 100 90 78 71 54 41 30 22 15 10 7
Min 100 90 76 60 52 35 23 13 10 6 4 3

MARSHALL PROPERTIES

TEST RESULT
DISCRIPTION UNIT SPESIFICATION
Grafik TRIAL MIX (Bina Marga 2018)
Density gr/cc 2.307 2.309 -
Stability kg 1955 1960 Min. 1800
VMA % 15.70 15.71 Min. 13
VFB % 71.60 72.95 Min. 65
VIM % 4.20 4.25 3.0 - 5.0
Void PRD % 2.55 2.64 Min. 2
Flow mm 3.75 4.17 3.0 - 6.0
Marshall Quotient kg/mm 520.0 470.5
Kadar aspal % 5.0 5.08 -
Stabilitas Marshall Sisa (%) setelah
% 90.91 Min. 90
perendaman selama 24 jam, 60ºC

Kontraktor Konsultan Bina Marga

Deniawan M Abidin Noor / Ir Sudarman Ketut Tri Yuhandono ST


Quality Quality Engineer NIP 19740322201412 1 001
KONTRAKTOR PT. SENECA INDONESIA
KONSULTAN PT WAHANA MITRA AMERTA, PT. HI-WAY INDOTEK
PT. CIRIATAMA NUSAWIDYA CONSULT,
PT. GARIS PUTIH SEJAJAR, KSO
PROYEK PAKET PEMBANGUNAN JALAN
LINGKAR TIMUR KUNINGAN Tanggal : 24-Jun-20

KOMPOSISI AMP
AC - Base

Kompisisi Campuran Hot Bin :

- Hot Bin I K4 36.0% ( thd total agregat ) 34.20% ( thd total Campuran )
- Hot Bin II K3 30.5% ( thd total agregat ) 28.98% ( thd total Campuran )
- Hot Bin III K2 22.0% ( thd total agregat ) 20.90% ( thd total Campuran )
- Hot Bin IV K1 8.0% ( thd total agregat ) 7.60% ( thd total Campuran )
- Filler Abu Batu 3.5% ( thd total agregat ) 3.33% ( thd total Campuran )

- Aspal 5.0% ( thd total Campuran ) 5.0% ( thd total Campuran )

( dari total Campuran )


TOTAL = 100.0% ( Total Campuran )

Kapasitas AMP 1250 kg / Bath

- Aspal 62.5 kg
- Material 1187.5 kg

Komulatif
a. Hot Bin 1 K4 34.20% x 1250 = 427.50 = 427.5 kg

b. Hot Bin 2 K3 28.98% x 1250 = 362.19 = 789.7 kg

c. Hot Bin 3 K2 20.90% x 1250 = 261.25 = 1050.9 kg

d. Hot Bin 4 K1 7.60% x 1250 = 95.00 = 1145.9 kg

e. Filler Abu Batu 3.33% x 1250 = 41.56 = 1187.5 kg

Kontraktor Konsultan Bina Marga


PERCOBAAN MARSHALL

Jenis Campuran : AC - BASE Aspalt Content 4.0 4.5 Bj. Bulk Agregat : 2.600

Aspal : Pen 60/70 (Tipe-1B) Absorption aspal 1.13 1.13 Bj. Aspal : 1.030

Tanggal 18-May-20 Bit. Film Thickness (micron) 6.55 7.73

Proving Ring 14.8509 Kg Bj. Eff. Agregat 2.676 2.676 Surface Area : 4.44

Aspal Kadar Berat (gr) Isi BD Rongga Rongga Rongga Stabilitas (kg) Kelelehan Hasil Kadar
No. Terh. Aspal DI Dalam Kering Benda Bulk GMM diantara Udara Ter isi Di Di Di Plastis Bagi Aspal
Batuan Udara Air Pemukaan Uji Campuran Aggregat Aspal Baca Sesuaikan Koreksi (mm) Marsall Efektiv
a b c d e f g h I j k l m n o p q

1 4.0 3741 2121 3756 1635 2.288 119 1767 1767 4.00 2.92
2 4.0 3746 2117 3757 1640 2.284 123 1827 1827 3.80 2.92
3 4.0 3735 2111 3744 1633 2.287 118 1752 1752 3.90 2.92

RATA - RATA 4.0 2.286 2.450 15.58 6.66 57.25 1782 3.90 456.9 2.92

1 4.5 3747 2123 3758 1635 2.292 128 1901 1901 4.00 3.43
2 4.5 3732 2116 3741 1625 2.297 123 1827 1827 3.75 3.43
3 4.5 3739 2123 3752 1629 2.295 124 1842 1842 3.85 3.43

RATA - RATA 4.5 2.295 2.432 15.72 5.66 63.99 1856 3.87 480.1 3.43

Keterangan :
a = % aspal terhadap batuan
b = % aspal terhadap campuran
c = berat kering (gr)
d = berat dalam keadaan jenuh (gr)
e = berat dalam air (gr)

Pb 5.9461

Kontraktor Konsultan Bina Marga


PERCOBAAN MARSHALL

Jenis Campuran : AC - BASE Kadar Aspal 5.0 5.5 Bj. Bulk Agregat : 2.600
ASPAL : Pen 60/70 (Tipe-1B) Absp aspal 1.13 1.13 Bj. Aspal : 1.030
Tanggal 18-May-20 Bit. Film Thickness (micron) 8.92 10.12

Proving Ring 14.8509 Kg Bj. Eff. Agregat 2.676 2.676 Surface Area : 4.44

Aspal Kadar Berat (gr) Isi BD Rongga Rongga Rongga Stabilitas (kg) Kelelehan Hasil Kadar
No. Terh. Aspal DI Dalam Kering Benda Bulk GMM diantara Udara Ter isi Di Di Di Plastis Bagi Aspal
Batuan Udara Air Pemukaan Uji Campuran Aggregat Aspal Baca Sesuaikan Koreksi (mm) Marsall Efektiv
a b c d e f g h I j k l m n o p q

1 5.0 3740 2128 3752 1624 2.303 130 1931 1931 4.00 3.93
2 5.0 3735 2129 3749 1620 2.306 137 2035 2035 3.70 3.93
3 5.0 3751 2141 3764 1623 2.311 133 1975 1975 3.80 3.93

RATA - RATA 5.0 2.307 2.411 15.72 4.34 72.39 1980 3.83 516.55 3.93

1 5.5 3755 2146 3767 1621 2.316 135 2005 2005 3.90 4.44
2 5.5 3732 2134 3741 1607 2.322 133 1975 1975 4.10 4.44
3 5.5 3772 2152 3783 1631 2.313 134 1990 1990 3.60 4.44

RATA - RATA 5.5 2.317 2.392 15.78 3.11 80.29 1990 3.87 514.66 4.44

Keterangan :
a = % aspal terhadap batuan
b = % aspal terhadap campuran
c = berat kering (gr)
d = berat dalam keadaan jenuh (gr)
e = berat dalam air (gr)

Kontraktor Konsultan Bina Marga


PERCOBAAN MARSHALL

Jenis Campuran : AC - BASE Kadar Aspal 6.0 Bj. Bulk Agregat : 2.600
ASPAL : Pen 60/70 (Tipe-1B) Absp aspal 1.13 Bj. Aspal : 1.030
Tanggal 18-May-20 Bit. Film Thickness (micron) 11.34

Proving Ring 14.8509 Kg Bj. Eff. Agregat 2.676 Surface Area : 4.44

Aspal Kadar Berat (gr) Isi BD Rongga Rongga Rongga Stabilitas (kg) Kelelehan Hasil Kadar
No. Terh. Aspal DI Dalam Kering Benda Bulk GMM diantara Udara Ter isi Di Di Di Plastis Bagi Aspal
Batuan Udara Air Pemukaan Uji Campuran Aggregat Aspal Baca Sesuaikan Koreksi (mm) Marsall Efektiv
a b c d e f g h I j k l m n o p q

1 6.0 3744 2147 3756 1609 2.327 130 1931 1931 4.00 4.94
2 6.0 3725 2128 3737 1609 2.315 135 2005 2005 3.90 4.94
3 6.0 3769 2159 3781 1622 2.324 133 1975 1975 4.10 4.94

RATA - RATA 6.0 2.322 2.376 16.05 2.28 85.79 1970 4.00 492.55 4.94

Keterangan :
a = % aspal terhadap batuan
b = % aspal terhadap campuran
c = berat kering (gr)
d = berat dalam keadaan jenuh (gr)
e = berat dalam air (gr)

Kontraktor Konsultan Bina Marga


PERCOBAAN MARSHALL PRD

Jenis Campuran : AC - BASE Kadar Aspal 5.08 Bj. Bulk Agregat 2.600
ASPAL : Pen 60/70 (Tipe-1B) Absp aspal 1.13 Bj. Aspal : 1.030
Tanggal 23-Jun-20 Bit. Film Thickness (micron) 9.11

Proving Ring 14.8509 Kg Bj. Eff. Agregat 2.676 Surface Area : 4.44

+
Aspal Kadar Berat (gr) Isi BD Rongga Rongga Rongga Stabilitas (kg) Kelelehan Hasil Kadar
No. Terh. Aspal DI Dalam Kering Benda Bulk GMM diantara Udara Ter isi Di Di Di Plastis Bagi Aspal
Batuan Udara Air Pemukaan Uji Campuran Aggregat Aspal Baca Sesuaikan Koreksi (mm) Marsall Efektiv
a b c d e f g h I j k l m n o p q

1 5.08 3713 2143 3726 1583 2.346


2 5.08 3743 2165 3758 1593 2.350

RATA - RATA 5.08 2.348 2.411 14.29 2.64 81.53

Keterangan :
a = % aspal terhadap batuan
b = % aspal terhadap campuran
c = berat kering (gr)
d = berat dalam keadaan jenuh (gr)
e = berat dalam air (gr)

Kontraktor Konsultan Bina Marga

PERCOBAAN MARSHALL

Jenis Campuran : AC - BASE Kadar Aspal 5.08 Bj. Bulk Agregat : 2.600

ASPAL : Pen 60/70 (Tipe-1B) Absp aspal 1.18 Bj. Aspal : 1.030
PERCOBAAN MARSHALL AC - BASE

Dens ity (gr/cc ) 18.0

VMA (%)
2.36 gr/cc 2.307 17.0
2.34
% 15.70
16.0
2.32
15.0
2.30
14.0
2.28
13.0
2.26
12.0
2.24
3.5 4.0 4.5 5.0 5.5 6.0 6.5
3.5 4.0 4.5 5.0 5.5 6.0 6.5
Kadar aspal (%) Kadar aspal (%)
`
VFB (% )

12.0

VIM (%)
100
10.0 % 4.20
90 % 71.50
8.0
80
6.0
70
60
4.0

50 2.0
40 0.0
3.5 4.0 4.5 5.0 5.5 6.0 6.5 3.5 4.0 4.5 5.0 5.5 6.0 6.5
Kadar aspal (%) Kadar aspal (%)
Stability (k g)

Flow (mm)
8.0
2200 kg 1955 mm 3.75
7.0
2100
6.0
2000
5.0
1900
4.0
1800
3.0
1700
M a r s h a ll q u o t ie n t ( k g / m m )

2.0
1600
3.5 4.0 4.5 5.0 5.5 6.0 6.5
3.5 4.0 4.5 5.0 5.5 6.0 6.5
Kadar aspal (%)
Kadar aspal (%)

kg/mm 520

600

550

500

450

400

350

300
3.5 4.0 4.5 5.0 5.5 6.0 6. 5
Kadar aspal (%)

VMA

Air void

Stability

Vfb

Flow

Density

Air void PRD

MQ T

Opt.Asp.Content

3.5 4.0 4.5 5.0 5.5 6.0 6.5

Asphalt Content (%)


Kadar asph. Optimum = 5.0 %

Kontraktor Konsultant Bina Marga


PENGUJIAN BERAT JENIS MAKSIMUM (GMM)
CAMPURAN BERASPAL
SNI 03-6893-2002

KONTRAKTOR PT. SENECA INDONESIA


KONSULTAN PT WAHANA MITRA AMERTA, PT. HI-WAY INDOTEK
PT. CIRIATAMA NUSAWIDYA CONSULT,
PT. GARIS PUTIH SEJAJAR, KSO Jenis Campur: AC - BASE
PROYEK PAKET PEMBANGUNAN JALAN Aspal : PEN 60/70
LINGKAR TIMUR KUNINGAN Tanggal 18-May-20

4.00% 4.00% 4.50% 4.50% 5.00% 5.00%


NO. JENIS PENGUJIAN KET
1 2 1 2 1 2

1 Berat Botol + Sampel (gr) A 2372 2355 2384 2377 2385 2411

2 Berat Botol (gr) B 1331 1331 1331 1331 1331 1331

3 Suhu Pengujian °C C 27.5 27.3 27.2 27.2 25.6 26.1

4 Berat Sampel (gr) D=A-B 1041 1024 1053 1046 1054 1080

5 Berat Botol + Air (gr) E 3571 3571 3571 3571 3571 3571

6 Berat Botol + Air + Sampel (gr) F 4186 4178 4192 4186 4187 4204

7 Koreksi Suhu Pengujian G 1.0 1.0 1.0 1.0 1.0 1.0

8 Berat Jenis Maksimum (gr/cc) H = [ D/(D+E-F) ] x G 2.444 2.456 2.438 2.427 2.406 2.416

9 Rata Rata I = H/2 2.450 2.432 2.411

Kontraktor Konsultan Bina Marga


PENGUJIAN BERAT JENIS MAKSIMUM (GMM)
CAMPURAN BERASPAL
SNI 03-6893-2002

KONTRAKTOR PT. SENECA INDONESIA


KONSULTAN PT WAHANA MITRA AMERTA, PT. HI-WAY INDOTEK
PT. CIRIATAMA NUSAWIDYA CONSULT,
PT. GARIS PUTIH SEJAJAR, KSO Jenis Campur: AC - BASE
PROYEK PAKET PEMBANGUNAN JALAN Aspal : PEN 60/70
LINGKAR TIMUR KUNINGAN Tanggal 18-May-20

5.50% 5.50% 6.00% 6.00%


NO. JENIS PENGUJIAN KET
1 2 1 2 I

1 Berat Botol + Sampel (gr) A 2368 2389 2377 2345

2 Berat Botol (gr) B 1331 1331 1331 1331

3 Suhu Pengujian °C C 27.3 27.4 26.9 26.5

4 Berat Sampel (gr) D=A-B 1037 1058 1046 1014

5 Berat Botol + Air (gr) E 3571 3571 3571 3571

6 Berat Botol + Air + Sampel (gr) F 4174 4187 4176 4159

7 Koreksi Suhu Pengujian G 1.0 1.0 1.0 1.0

8 Berat Jenis Maksimum (gr/cc) H = [ D/(D+E-F) ] x G 2.389 2.394 2.372 2.380

8 Berat Jenis Maksimum (gr/cc) I=H/2 2.392 2.376

Kontraktor Konsultan Bina Marga


ASPHALT EXTRACTION TEST SHEET
KONTRAKTOR PT. SENECA INDONESIA
KONSULTAN PT WAHANA MITRA AMERTA, PT. HI-WAY INDOTEK
PT. CIRIATAMA NUSAWIDYA CONSULT,
PT. GARIS PUTIH SEJAJAR, KSO
PROYEK PAKET PEMBANGUNAN JALAN Tanggal : 23-Jun-20
LINGKAR TIMUR KUNINGAN

Nomer tes I II Rata 2 JMF


1 Berat Sampel Sebelum (gr) 1490.2
2 Berat Sampel sesudah (gr) 1413.1
3 Berat Kertas Filter Sebelum (gr) 2.0
4 Berat Kertas Filter sesudah (gr) 2.4
5 Berat Filler di Filter 4-3 (gr) 0.4
6 Berat Pan Sebelum (gr) 241.0
7 Berat Pan sesudah (gr) 242.0
9 Berat Filler di Pan 7- 6 (gr) 1.0
10 Berat Total Filler 5+9 1.4
6 Weight of Extracted Total Agregate 2 + 10 (gr) 1414.5
7 Weight of Asphalt 1-6 (gr) 75.7
8 Percentage of Asphalt Content 7/1 x 100 (%) 5.08 5.08 5.00
Gradasi I II
Ukuran Saringan Tertahan Lolos Rata 2 Tertahan Lolos
jmf
Inch mm gr % % % %
2 50.8
1 1/2 38.1 100 100
1 25.4 113.5 8.0 92.0 91.4
3/4 19.1 268.2 19.0 81.0 82.7
1/2 12.7 422.0 29.8 70.2 75.6
3/8 9.520 467.4 33.0 67.0 66.5
No. 4 4.760 725.0 51.3 48.7 48.4
No. 8 2.380 1006.1 71.1 28.9 32.6
No. 16 1.190 1146.0 81.0 19.0 22.5
No. 30 0.595 1248.5 88.3 11.7 13.4
No. 50 0.300 1281.1 90.6 9.4 9.9
No. 100 0.149 1333.0 94.2 5.8 6.2
No. 200 0.074 1370.3 96.9 3.1 5.0
Berat Sampel 1414.5
Persentase Lolos (m m )

1 1/2"
Gradasi EXTRAKSI
#200 #100 #50 #30 #16 #8 #4 "3/8 "1/2 "3/4 ''1
100.0
90.0
80.0
70.0
Gradasi Gabungan
60.0
50.0
40.0
30.0
20.0
10.0
0.0
0.01 0.1 1 10 100
No. Saringan (mm)

Kontraktor Konsultant Bina Marga


PERENCANAAN GRADASI CAMPURAN HOT BIN AC - BASE

KONTRAKTOR PT. SENECA INDONESIA


KONSULTAN PT WAHANA MITRA AMERTA, PT. HI-WAY INDOTEK
PT. CIRIATAMA NUSAWIDYA CONSULT,
PT. GARIS PUTIH SEJAJAR, KSO
PROYEK PAKET PEMBANGUNAN JALAN
LINGKAR TIMUR KUNINGAN Tanggal : 12-May-20

Uraian Ukuran Saringan

Inc. 1 1/2" 1" 3/4 " 1/2 " 3/8 " #4 #8 # 16 # 30 # 50 # 100 # 200
mm 37.5 25 19 12.7 9.5 4.75 2.36 1.18 0.6 0.3 0.15 0.075

Spesifikasi gradasi
Max 100 100 90 78 71 54 41 30 22 15 10 7
Min 100 90 76 60 52 35 23 13 10 6 4 3

Data Material
Hot Bin I (K4) 100.0 100.0 100.0 100.0 99.8 97.0 70.5 46.3 23.6 15.2 6.6 4.6
Hot Bin II (K3) 100.0 100.0 99.0 98.4 72.1 17.1 2.2 1.1 0.9 0.9 0.8 0.7
Hot Bin III (K2) 100.0 100.0 56.8 13.5 7.0 5.5 1.2 1.0 0.9 0.9 0.8 0.7
Hot Bin IV (K1) 100.0 22.1 4.4 0.3 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
Filler Abu Batu 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 99.9 98.7 90.7 80.4

Komposisi Campuran
Hot Bin I (K4) 36.0% 36.0 36.0 36.0 36.0 35.9 34.9 25.4 16.7 8.5 5.5 2.4 1.7
Hot Bin II (K3) 30.5% 30.5 30.5 30.2 30.0 22.0 5.2 0.7 0.3 0.3 0.3 0.2 0.2
Hot Bin III (K2) 22.0% 22.0 22.0 12.5 3.0 1.6 1.2 0.3 0.2 0.2 0.2 0.2 0.2
Hot Bin IV (K1) 8.0% 8.0 1.8 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Filler Abu Batu 3.5% 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.2 2.8

Total Campuran 100% 100.0 93.8 82.5 72.5 63.0 44.9 29.8 20.7 12.5 9.4 6.0 4.9
Persentase Lolos (m m)

1 1/2"
Gradasi Gabungan Agregat Hot Bin
#200 #100 #50 #30 #16 #8 #4 "3/8 "1/2 "3/4 ''1
100.0
90.0
80.0
70.0
Gradasi Gabungan
60.0
50.0
40.0
30.0
20.0
10.0
0.0
0.01 0.1 1 10 100
No. Saringan (mm)

Kontraktor Konsultant Bina Marga


SIEVE
ANALISYS
KONTRAKTOR PT. SENECA INDONESIA
AGGREG
KONSULTAN PT WAHANA MITRA AMERTA, PT. HI-WAY INDOTEK ATE
FINE AGGREGATE
PT. CIRIATAMA NUSAWIDYA CONSULT,
PT. GARIS PUTIH SEJAJAR, KSO SAMPLE HOT BIN I (K-4)
PROYEK PAKET PEMBANGUNAN JALAN TEST DATE 12-May-20
LINGKAR TIMUR KUNINGAN LOCATION AMP Palimanan

KIND OF MATERIAL HOT BIN I (K-4) AVERAGE HOT BIN I (K-4)


RETAINED PASSING RETAINED PASSING
SIEVE SIZE
%
gr % % gr % %
inch mm

3/4" 19.0 - - 100.00 100.00 - - 100.0


1/2" 12.5 - - 100.0 100.0 - - 100.0
3/8" 9.5 6.4 0.4 99.6 99.8 1.1 0.1 99.9
#4 4.75 46.2 3.0 97.0 97.0 45.5 3.0 97.0
#8 2.36 462.9 30.2 69.8 70.5 435.2 28.7 71.3
# 16 1.15 827.2 54.0 46.0 46.3 809.1 53.4 46.6
# 30 0.60 1,170.6 76.5 23.5 23.6 1,156.5 76.4 23.6
# 50 0.300 1,298.0 84.8 15.2 15.2 1,285.1 84.9 15.1
# 100 0.150 1,429.9 93.4 6.6 6.6 1,413.1 93.3 6.7
# 200 0.075 1,459.7 95.3 4.7 4.6 1,443.5 95.4 4.6

Weight Of Sample (gr) 1530.9 1513.8

Kontraktor Konsultant Bina Marga


SIEVE
ANALISYS
KONTRAKTOR PT. SENECA INDONESIA
AGGREG
KONSULTAN PT WAHANA MITRA AMERTA, PT. HI-WAY INDOTEK MEDIUM ATE
AGGREGATE
PT. CIRIATAMA NUSAWIDYA CONSULT,
PT. GARIS PUTIH SEJAJAR, KSO SAMPLE HOT BIN II (K-3)
PROYEK PAKET PEMBANGUNAN JALAN TEST DATE 12-May-20
LINGKAR TIMUR KUNINGAN LOCATION AMP Palimanan

KIND OF MATERIAL HOT BIN II (K-3) AVERAGE HOT BIN II (K-3)


RETAINED PASSING RETAINED PASSING
SIEVE SIZE
%
gr % % gr % %
inch mm
1" 25.0 100.0 100.0 100.0
3/4" 19.0 19.0 1.0 99.0 99.0 18.4 1.0 99.0
1/2" 12.5 24.1 1.3 98.7 98.4 37.2 1.9 98.1
3/8" 9.5 501.4 27.0 73.0 72.1 550.0 28.7 71.3
#4 4.75 1,539.8 83.0 17.0 17.1 1,583.4 82.7 17.3
#8 2.36 1,815.2 97.8 2.2 2.2 1,871.8 97.8 2.2
# 16 1.15 1,833.8 98.8 1.2 1.1 1,893.1 98.9 1.1
# 30 0.60 1,838.1 99.1 0.9 0.9 1,897.4 99.1 0.9
# 50 0.300 1,838.8 99.1 0.9 0.9 1,898.1 99.2 0.8
# 100 0.150 1,840.4 99.2 0.8 0.8 1,900.1 99.3 0.7
# 200 0.075 1,841.6 99.3 0.7 0.7 1,902.1 99.4 0.6

Weight Of Sample (gr) 1855.4 1914.1

Kontraktor Konsultant Bina Marga


SIEVE
ANALISYS
KONTRAKTOR PT. SENECA INDONESIA
AGGREG
KONSULTAN PT WAHANA MITRA AMERTA, PT. HI-WAY INDOTEK COARSEATE
AGGREGATE
PT. CIRIATAMA NUSAWIDYA CONSULT,
PT. GARIS PUTIH SEJAJAR, KSO SAMPLE HOT BIN III (K-2)
PROYEK PAKET PEMBANGUNAN JALAN TEST DATE 12-May-20
LINGKAR TIMUR KUNINGAN LOCATION AMP Palimanan

KIND OF MATERIAL HOT BIN III (K-2) AVERAGE HOT BIN III (K-2)
RETAINED PASSING RETAINED PASSING
SIEVE SIZE
%
gr % % gr % %
inch mm
1" 25 100.0 100.0 100.0
3/4" 19.0 1,277.2 42.8 57.2 56.8 1,280.0 43.6 56.4
1/2" 12.5 2,576.0 86.3 13.7 13.5 2,546.0 86.8 13.2
3/8" 9.5 2,756.0 92.4 7.6 7.0 2,745.0 93.5 6.5
#4 4.75 2,796.7 93.7 6.3 5.5 2,795.7 95.3 4.7
#8 2.36 2,938.8 98.5 1.5 1.2 2,907.6 99.1 0.9
# 16 1.15 2,947.4 98.8 1.2 1.0 2,911.5 99.2 0.8
# 30 0.60 2,952.2 98.9 1.1 0.9 2,912.1 99.2 0.8
# 50 0.300 2,953.7 99.0 1.0 0.9 2,912.6 99.2 0.8
# 100 0.150 2,956.7 99.1 0.9 0.8 2,913.8 99.3 0.7
# 200 0.075 2,959.2 99.2 0.8 0.7 2,915.9 99.4 0.6

Weight Of Sample (gr) 2983.6 2934.8

Kontraktor Konsultant Bina Marga


SIEVE
ANALISYS
KONTRAKTOR PT. SENECA INDONESIA
AGGREG
KONSULTAN PT WAHANA MITRA AMERTA, PT. HI-WAY INDOTEK COARSEATE
AGGREGATE
PT. CIRIATAMA NUSAWIDYA CONSULT,
PT. GARIS PUTIH SEJAJAR, KSO SAMPLE HOT BIN IV (K-1)
PROYEK PAKET PEMBANGUNAN JALAN TEST DATE 12-May-20
LINGKAR TIMUR KUNINGAN LOCATION AMP Palimanan

KIND OF MATERIAL HOT BIN IV (K-1) AVERAGE HOT BIN IV (K-1)


RETAINED PASSING RETAINED PASSING
SIEVE SIZE
%
gr % % gr % %
inch mm
1 1/2" 37.5 - 100.0 100.0 - - 100.0
1" 25 3158 77.1 22.9 22.1 3,417.0 78.7 21.3
3/4" 19.0 3,934.0 96.0 4.0 4.4 4,130.0 95.2 4.8
1/2" 12.5 4,087.0 99.8 0.2 0.3 4,326.0 99.7 0.3
3/8" 9.5 4,090.0 99.8 0.2 0.2 4,333.0 99.8 0.2
#4 4.75 4,091.0 99.9 0.1 0.2 4,333.0 99.8 0.2
#8 2.36 4,091.0 99.9 0.1 0.2 4,333.0 99.8 0.2
# 16 1.15 4,091.0 99.9 0.1 0.2 4,333.0 99.8 0.2
# 30 0.60 4,091.0 99.9 0.1 0.2 4,333.0 99.8 0.2
# 50 0.300 4,091.0 99.9 0.1 0.2 4,333.0 99.8 0.2
# 100 0.150 4,091.0 99.9 0.1 0.2 4,333.0 99.8 0.2
# 200 0.075 4,091.0 99.9 0.1 0.2 4,333.0 99.8 0.2

Weight Of Sample (gr) 4097.0 4340.0

Kontraktor Konsultant Bina Marga


SIEVE
ANALISYS
KONTRAKTOR PT. SENECA INDONESIA
AGGREG
KONSULTAN PT WAHANA MITRA AMERTA, PT. HI-WAY INDOTEK ATE
FINE AGGREGATE
PT. CIRIATAMA NUSAWIDYA CONSULT,
PT. GARIS PUTIH SEJAJAR, KSO SAMPLE Filler Abu Batu
PROYEK PAKET PEMBANGUNAN JALAN TEST DATE 12-May-20
LINGKAR TIMUR KUNINGAN LOCATION AMP Palimanan

KIND OF MATERIAL Filler Abu Batu AVERAGE Filler Abu Batu


RETAINED PASSING RETAINED PASSING
SIEVE SIZE
%
gr % % gr % %
inch mm

3/4" 19.0 - - 100.0 100.0 - - 100.0


1/2" 12.5 - - 100.0 100.0 - - 100.0
3/8" 9.5 - - 100.0 100.0 - - 100.0
#4 4.75 - - 100.0 100.0 - - 100.0
#8 2.36 - - 100.0 100.0 - - 100.0
# 16 1.15 - - 100.0 100.0 - - 100.0
# 30 0.60 0.4 0.1 99.9 99.9 0.4 0.1 99.9
# 50 0.300 7.4 1.4 98.6 98.7 6.1 1.3 98.7
# 100 0.150 50.4 9.4 90.6 90.7 44.2 9.1 90.9
# 200 0.075 105.6 19.7 80.3 80.4 94.4 19.5 80.5

Weight Of Sample (gr) 534.7 483.6

Kontraktor Konsultant Bina Marga


SURFACE AREA

ASTM Faktor
GRADASI AGGREGAT GRADASI AGGREGAT
SIEVE Luas
SIZE Permukaan
Cold Bin Hot Bin Spesifikasi III IV V VI VII VIII IX
Aggregat
1 1/2" Err:509 100 100
1" 100.0 93.8 90 - 100
3/4 94.1 82.5 76 - 90
1/2" 83.8 72.5 60 - 78 1 x 0.41
3/8" 72.0 63.0 52 - 71
#4 57.0 44.9 35 - 54 x 0.41
#8 34.1 29.8 23 - 41 x 0.82
#16 27.7 20.7 13 - 30 x 1.64
#30 14.9 12.5 10 - 22 x 2.87
#50 11.8 9.4 6 - 15 x 6.14
#100 8.0 6.0 4 - 10 x 12.29
#200 4.9 4.9 3-7 x 32.77
(% terhadap Berat

AC Base
Perbandingan

Campuran

Aggregate

Total Agg.

Jumlah luas permukaan aggregate (m2/kg)

5.11 4.44

Kontraktor Konsultan Bina Marga


SPECIFIC GRAVITY AND ABSORPTION OF
KONTRAKTOR PT. SENECA INDONESIA FINE AGGREGATE
KONSULTAN PT WAHANA MITRA AMERTA, PT. HI-WAY INDOTEK AASTHO T 84 - 74
PT. CIRIATAMA NUSAWIDYA CONSULT, ASTM C 120 - 68
PT. GARIS PUTIH SEJAJAR, KSO
PROYEK PAKET PEMBANGUNAN JALAN Material Hotbin 1 ( K4)
LINGKAR TIMUR KUNINGAN Tanggal 15-May-20
Lokasi Ex AMP Palimanan

A B AVERAGE

MASS OF SATURATED SURFACE DRY SAMPLE IN AIR 500 gr 500 500 gr


MASS OVEN DRY SAMPLE IN AIR W1 489.0 488.2 gr
MASS OF PICNOMETER FILLED WITH WATER W2 658.7 658.7 gr
MASS OF PICNOMETER WITH SAMPLE AND
WATER TO CALIBRATION MARK W3 968.4 969.3 gr

A B AVERAGE

BULK SPECIFIC GRAVITY W1


2.570 2.578 2.574 gr/cc
W2 + 500 - W3

BULK SPECIFIC GRAVITY 500


2.627 2.640 2.634 gr/cc
(SATURATED SURFACE DRY BASIS) W2 + 500 - W3

APPARENT SPECIFIC GRAVITY W1


2.727 2.749 2.738 gr/cc
W2 + W1 - W3

ABSORPTION (500 - W1)


x 100 2.249 2.417 2.333 %
W1

Kontraktor Konsultan Bina Marga


SPECIFIC GRAVITY AND ABSORPTION OF
KONTRAKTOR PT. SENECA INDONESIA COARSE AGGREGATE
KONSULTAN PT WAHANA MITRA AMERTA, PT. HI-WAY INDOTEK AASTHO T 85 - 74
PT. CIRIATAMA NUSAWIDYA CONSULT, ASTM C 127 - 68
PT. GARIS PUTIH SEJAJAR, KSO
PROYEK PAKET PEMBANGUNAN JALAN Material Hot bin 2 (K3)
LINGKAR TIMUR KUNINGAN Tanggal 15-May-20
Lokasi Ex AMP Palimanan

A B AVERAGE

MASS OF OVEN DRY SAMPLE IN AIR W1 1064.0 1038.0 gr


MASS SATURATED SURFACE DRY SAMPLE IN AIR W2 1086.0 1059.0 gr
MASS OF SATURATED SAMPLE IN WATER W3 685.0 665.0 gr

A B AVERAGE

BULK SPECIFIC GRAVITY W1


2.653 2.635 2.644 gr/cc
W2 - W3

BULK SPECIFIC GRAVITY W2


2.708 2.688 2.698 gr/cc
(SATURATED SURFACE DRY BASIS) W2 - W3

APPARENT SPECIFIC GRAVITY W1


2.807 2.783 2.795 gr/cc
W1 - W3

ABSORPTION W2 - W1
X 100 2.068 2.023 2.046 %
W1

Kontraktor Konsultan Bina Marga


SPECIFIC GRAVITY AND ABSORPTION OF
KONTRAKTOR PT. SENECA INDONESIA COARSE AGGREGATE
KONSULTAN PT WAHANA MITRA AMERTA, PT. HI-WAY INDOTEK AASTHO T 85 - 74
PT. CIRIATAMA NUSAWIDYA CONSULT, ASTM C 127 - 68
PT. GARIS PUTIH SEJAJAR, KSO
PROYEK PAKET PEMBANGUNAN JALAN Material Hot bin 3 (K2)
LINGKAR TIMUR KUNINGAN Tanggal 15-May-20
Lokasi Ex AMP Palimanan

A B AVERAGE

MASS OF OVEN DRY SAMPLE IN AIR W1 1003.0 1007.0 gr


MASS SATURATED SURFACE DRY SAMPLE IN AIR W2 1020.0 1024.0 gr
MASS OF SATURATED SAMPLE IN WATER W3 634.0 636.0 gr

A B AVERAGE

BULK SPECIFIC GRAVITY W1


2.598 2.595 2.597 gr/cc
W2 - W3

BULK SPECIFIC GRAVITY W2


2.642 2.639 2.641 gr/cc
(SATURATED SURFACE DRY BASIS) W2 - W3

APPARENT SPECIFIC GRAVITY W1


2.718 2.714 2.716 gr/cc
W1 - W3

ABSORPTION W2 - W1
X 100 1.695 1.688 1.692 %
W1

Kontraktor Konsultan Bina Marga


SPECIFIC GRAVITY AND ABSORPTION OF
KONTRAKTOR PT. SENECA INDONESIA COARSE AGGREGATE
KONSULTAN PT WAHANA MITRA AMERTA, PT. HI-WAY INDOTEK AASTHO T 85 - 74
PT. CIRIATAMA NUSAWIDYA CONSULT, ASTM C 127 - 68
PT. GARIS PUTIH SEJAJAR, KSO
PROYEK PAKET PEMBANGUNAN JALAN Material Hot bin 4 (K1)
LINGKAR TIMUR KUNINGAN Tanggal 15-May-20
Lokasi Ex AMP Palimanan

A B AVERAGE

MASS OF OVEN DRY SAMPLE IN AIR W1 1433.0 1490.0 gr


MASS SATURATED SURFACE DRY SAMPLE IN AIR W2 1502.0 1503.0 gr
MASS OF SATURATED SAMPLE IN WATER W3 913.0 949.0 gr

A B AVERAGE

BULK SPECIFIC GRAVITY W1


2.433 2.690 2.562 gr/cc
W2 - W3

BULK SPECIFIC GRAVITY W2


2.550 2.713 2.632 gr/cc
(SATURATED SURFACE DRY BASIS) W2 - W3

APPARENT SPECIFIC GRAVITY W1


2.756 2.754 2.755 gr/cc
W1 - W3

ABSORPTION W2 - W1
X 100 4.815 0.872 2.844 %
W1

Kontraktor Konsultan Bina Marga


SPECIFIC GRAVITY AND ABSORPTION OF
KONTRAKTOR PT. SENECA INDONESIA FINE AGGREGATE
KONSULTAN PT WAHANA MITRA AMERTA, PT. HI-WAY INDOTEK AASTHO T 84 - 74
PT. CIRIATAMA NUSAWIDYA CONSULT, ASTM C 120 - 68
PT. GARIS PUTIH SEJAJAR, KSO
PROYEK PAKET PEMBANGUNAN JALAN Material Filler
LINGKAR TIMUR KUNINGAN Tanggal 15-May-20
Lokasi Ex AMP Palimanan

A B AVERAGE

MASS OF SATURATED SURFACE DRY SAMPLE IN AIR 500 gr 500 500 gr


MASS OVEN DRY SAMPLE IN AIR W1 490.0 489.9 gr
MASS OF PICNOMETER FILLED WITH WATER W2 658.7 658.7 gr
MASS OF PICNOMETER WITH SAMPLE AND
WATER TO CALIBRATION MARK W3 971.2 971.9 gr

A B AVERAGE

BULK SPECIFIC GRAVITY W1


2.613 2.623 2.618 gr/cc
W2 + 500 - W3

BULK SPECIFIC GRAVITY 500


2.667 2.677 2.672 gr/cc
(SATURATED SURFACE DRY BASIS) W2 + 500 - W3

APPARENT SPECIFIC GRAVITY W1


2.761 2.772 2.767 gr/cc
W2 + W1 - W3

ABSORPTION (500 - W1)


x 100 2.041 2.062 2.051 %
W1

Kontraktor Konsultan Bina Marga


PERENCANAAN GRADASI CAMPURAN COLD BIN AC - BASE

KONTRAKTOR PT. SENECA INDONESIA


KONSULTAN PT WAHANA MITRA AMERTA, PT. HI-WAY INDOTEK
PT. CIRIATAMA NUSAWIDYA CONSULT,
PT. GARIS PUTIH SEJAJAR, KSO
PROYEK PAKET PEMBANGUNAN JALAN
LINGKAR TIMUR KUNINGAN Tanggal : 10-Apr-16

Uraian Ukuran Saringan

Inc. 1" 3/4 " 1/2 " 3/8 " #4 #8 # 16 # 30 # 50 # 100 # 200
mm 25 19 12.7 9.5 4.75 2.36 1.18 0.6 0.3 0.15 0.075

Spesifikasi gradasi
Max 100 100 90 82 64 49 38 28 20 13 8
Min. 100 90 75 66 46 30 18 12 7 5 4

Data Material
Abu Batu (0 - 5) mm 100.0 100.0 100.0 100.0 100.0 64.15 51.99 27.56 21.72 14.61 8.76
Split (5 - 12) mm 100.0 100.0 100.0 65.88 16.22 2.37 2.08 1.75 1.60 1.22 0.92
Split (12 - 25.4) mm 100.0 67.43 9.81 1.40 0.42 0.40 0.38 0.35 0.33 0.29 0.19

Komposisi Campuran
Abu Batu (0 - 5) mm 52.0% 52.00 52.00 52.00 52.00 52.00 33.36 27.04 14.33 11.29 7.60 4.56
Split (5 - 12) mm 30.0% 30.00 30.00 30.00 19.76 4.87 0.71 0.63 0.53 0.48 0.37 0.28
Split (12 - 25.4) mm 18.0% 18.00 12.14 1.77 0.25 0.08 0.07 0.07 0.06 0.06 0.05 0.03

Total Campuran 100% 100.0 94.1 83.8 72.0 57.0 34.1 27.7 14.9 11.8 8.0 4.9
Persentase Lolos (mm )

#200 #100 #50 #30 #16 #8 #4 "3/8 "1/2 "3/4 ''1 1 1/2"

100.0
90.0
80.0
70.0
Gradasi Gabungan
60.0
50.0
40.0
30.0
20.0
10.0
0.0
0.01 0.1 1 10 100
No. Saringan (mm)

Kontraktor Konsultan Bina Marga


KONTRAKTOR PT. SENECA INDONESIA GRADASI AGREGAT
KONSULTAN PT WAHANA MITRA AMERTA, PT. HI-WAY INDOTEK HALUS
PT. CIRIATAMA NUSAWIDYA CONSULT,
PT. GARIS PUTIH SEJAJAR, KSO Material Abu Batu (0 - 5) mm
PROYEK PAKET PEMBANGUNAN JALAN Tanggal 10-Apr-16
LINGKAR TIMUR KUNINGAN Lokasi Ex STC Palimanan

KIND OF MATERIAL Abu Batu (0 - 5) mm AVERAGE Abu Batu (0 - 5) mm


RETAINED PASSING RETAINED PASSING
SIEVE SIZE
%
gr % % gr % %
inch mm

1 1/2" 37.5
1" 25.0 - - 100.0 100.0 - - 100.0
3/4" 19.0 - - 100.0 100.0 - - 100.0
1/2" 12.5 - - 100.0 100.0 - - 100.0
3/8" 9.5 - - 100.00 100.00 - - 100.00
#4 4.75 - - 100.0 100.0 - - 100.0
#8 2.36 366.0 36.7 63.3 64.2 348.0 35.0 65.0
# 16 1.15 358.7 36.0 64.0 52.0 597.3 60.0 40.0
# 30 0.60 726.4 72.9 27.1 27.6 716.4 72.0 28.0
# 50 0.300 782.7 78.5 21.5 21.7 776.5 78.0 22.0
# 100 0.150 853.4 85.6 14.4 14.6 847.4 85.2 14.8
# 200 0.075 913.6 91.7 8.3 8.8 903.6 90.8 9.2

Weight Of Sample (gr) 996.6 995.1

Kontraktor Konsultan Bina Marga


KONTRAKTOR PT. SENECA INDONESIA GRADASI AGREGAT
KONSULTAN PT WAHANA MITRA AMERTA, PT. HI-WAY INDOTEK KASAR
PT. CIRIATAMA NUSAWIDYA CONSULT,
PT. GARIS PUTIH SEJAJAR, KSO Material Split (5 - 12) mm
PROYEK PAKET PEMBANGUNAN JALAN Tanggal 10-Apr-16
LINGKAR TIMUR KUNINGAN Lokasi Ex STC Palimanan

KIND OF MATERIAL Split (5 - 12) mm AVERAGE Split (5 - 12) mm


RETAINED PASSING RETAINED PASSING
SIEVE SIZE
%
gr % % gr % %
inch mm

1 1/2" 37.5
1" 25.0 - - 100.0 100.0 - - 100.0
3/4" 19.0 - - 100.0 100.0 - - 100.0
1/2" 12.5 - - 100.0 100.0 - - 100.0
3/8" 9.5 456.8 33.4 66.6 65.9 475.3 34.9 65.1
#4 4.75 1,153.4 84.2 15.8 16.2 1,135.6 83.3 16.7
#8 2.36 1,339.9 97.8 2.2 2.4 1,327.5 97.4 2.6
# 16 1.15 1,344.7 98.2 1.8 2.1 1,330.5 97.6 2.4
# 30 0.60 1,350.2 98.6 1.4 1.8 1,334.1 97.9 2.1
# 50 0.300 1,352.2 98.7 1.3 1.6 1,336.1 98.1 1.9
# 100 0.150 1,357.8 99.1 0.9 1.2 1,340.9 98.4 1.6
# 200 0.075 1,362.1 99.5 0.5 0.9 1,344.9 98.7 1.3

Weight Of Sample (gr) 1369.5 1362.6

Kontraktor Konsultan Bina Marga


KONTRAKTOR PT. SENECA INDONESIA GRADASI AGREGAT
KONSULTAN PT WAHANA MITRA AMERTA, PT. HI-WAY INDOTEK KASAR
PT. CIRIATAMA NUSAWIDYA CONSULT,
PT. GARIS PUTIH SEJAJAR, KSO Material Split (12 - 37.5) mm
PROYEK PAKET PEMBANGUNAN JALAN Tanggal 10-Apr-16
LINGKAR TIMUR KUNINGAN Lokasi Ex STC Palimanan

KIND OF MATERIAL Split (12 - 37.5) mm AVERAGE Split (12 - 37.5) mm


RETAINED PASSING RETAINED PASSING
SIEVE SIZE
%
gr % % gr % %
inch mm
- - 100.00 100.00
1 1/2" 37.5 - 100.00 100.00 - - 100.00
1" 25.0 655.3 27.21 72.79 71.97 660.0 28.86 71.14
3/4" 19.0 1,655.0 68.72 31.28 31.84 1,546.2 67.61 32.39
1/2" 12.5 2,401.1 99.70 0.30 0.48 2,272.0 99.34 0.66
3/8" 9.5 2,403.0 99.78 0.22 0.42 2,272.7 99.37 0.63
#4 4.75 2,403.1 99.78 0.22 0.38 2,274.8 99.47 0.53
#8 2.36 2,403.5 99.80 0.20 0.37 2,274.9 99.47 0.53
# 16 1.15 2,403.7 99.80 0.20 0.35 2,275.5 99.50 0.50
# 30 0.60 2,404.0 99.82 0.18 0.33 2,276.2 99.53 0.47
# 50 0.300 2,404.2 99.83 0.17 0.31 2,276.7 99.55 0.45
# 100 0.150 2,404.7 99.85 0.15 0.26 2,278.4 99.62 0.38
# 200 0.075 2,405.8 99.89 0.11 0.19 2,281.0 99.74 0.26

Weight Of Sample (gr) 2408.4 2287.0

Kontraktor Konsultan Bina Marga


KONTRAKTOR PT. SENECA INDONESIA GRADASI AGREGAT
KONSULTAN PT WAHANA MITRA AMERTA, PT. HI-WAY INDOTEK KASAR
PT. CIRIATAMA NUSAWIDYA CONSULT,
PT. GARIS PUTIH SEJAJAR, KSO Material Split (12 - 25) mm
PROYEK PAKET PEMBANGUNAN JALAN Tanggal 7-Jan-20
LINGKAR TIMUR KUNINGAN Lokasi Ex STC Palimanan

KIND OF MATERIAL Split (12 - 25) mm AVERAGE Split (12 - 25) mm


RETAINED PASSING RETAINED PASSING
SIEVE SIZE
%
gr % % gr % %
inch mm
- - 100.00 100.00
1 1/2" 37.5 - 100.00 100.00 - - 100.00
1" 25.0 - - 100.00 100.00 660.0 28.86 71.14
3/4" 19.0 1,560.0 32.57 67.43 67.43 1,546.2 67.61 32.39
1/2" 12.5 4,319.0 90.19 9.81 9.81 2,272.0 99.34 0.66
3/8" 9.5 4,722.0 98.60 1.40 1.40 2,272.7 99.37 0.63
#4 4.75 4,769.0 99.58 0.42 0.42 2,274.8 99.47 0.53
#8 2.36 4,770.0 99.60 0.40 0.40 2,274.9 99.47 0.53
# 16 1.15 4,771.0 99.62 0.38 0.38 2,275.5 99.50 0.50
# 30 0.60 4,772.0 99.65 0.35 0.35 2,276.2 99.53 0.47
# 50 0.300 4,773.0 99.67 0.33 0.33 2,276.7 99.55 0.45
# 100 0.150 4,775.0 99.71 0.29 0.29 2,278.4 99.62 0.38
# 200 0.075 4,780.0 99.81 0.19 0.19 2,281.0 99.74 0.26

Weight Of Sample (gr) 4789.0 2287.0

Kontraktor Konsultan Bina Marga


KONTRAKTOR PT. SENECA INDONESIA
KONSULTAN PT WAHANA MITRA AMERTA, PT. HI-WAY INDOTEK
PT. CIRIATAMA NUSAWIDYA CONSULT,
PT. GARIS PUTIH SEJAJAR, KSO
PROYEK PAKET PEMBANGUNAN JALAN
LINGKAR TIMUR KUNINGAN

KALIBRASI BUKAAN COLD BIN


AC Base

Kompisisi Campuran Cold Bin :


- Cold Bin 1 : Abu Batu (0 - 5) mm 52.0% ( Thd total aggregat )
- Cold Bin 2 : Agregat Sedang (5 - 12) mm 30.0% ( Thd total aggregat )
- Cold Bin 4 : Agregat Kasar (12 - 37.5) mm Err:509 ( Thd total aggregat )

- Cold Bin 4 : Agregat Kasar ( Thd total aggregat )

Kadar aspal 5.0% ( Thd total Campuran )

Kapasitas Produksi A M P 60 ton/jam

Kebutuhan Material / jam

- Aspal 3 ton
- Material 57 ton

a. Abu Batu 52.0% x 57 = 29.64 ton RPM 33.0 %

b. Agregat Sedang 30.0% x 57 = 17.10 ton RPM 24.5 %

c. Agregat Kasar Err:509 x 57 = Err:509 ton RPM 13.0 %

Kontraktor Konsultan Bina Marga


KALIBARASI BUKAAN COLD BIN
AC Base

KONTRAKTOR PT. SENECA INDONESIA


KONSULTAN PT WAHANA MITRA AMERTA, PT. HI-WAY INDOTEK
PT. CIRIATAMA NUSAWIDYA CONSULT,
PT. GARIS PUTIH SEJAJAR, KSO
PROYEK PAKET PEMBANGUNAN JALAN
LINGKAR TIMUR KUNINGAN

COLD BIN IV ( CA 12-37.5 mm ) COLD BIN III ( C A )


RPM % 13 % RPM % %
Kebutuhan material per jam Err:509 Ton Kebutuhan material per jam Ton
SPEED Waktu Berat Kapasitas Ton/Jam SPEED Waktu Berat Kapasitas Ton/Jam
RPM % Detik Kg Kg/Detik RPM % Detik Kg Kg/Detik
10.0 3 10.20 3.40 12.24 5.1 12.30
20.0 3 16.98 5.66 20.38 8.49 23.85
30.0 3 31.79 10.60 38.15 15.895 29.77
0 43.25

Kalibrasi Cold Bin 3 ( Agregat Kasar )

Berat (Ton/Jam )
Kalibrasi Cold Bin 4 ( Agregat Kasar )
Berat (Ton/Jam )

50.0 40.0

40.0
30.0

30.0
20.0
20.0
10.0
10.0

0.0 0.0
0 5 10 15 20 25 30 35 40 45 50 0 5 10 15 20 25 30 35 40 45 50

SPEED RPM % SPEED RPM %

Kontraktor Konsultan Bina Marga


KALIBARASI BUKAAN COLD BIN
AC Base

KONTRAKTOR PT. SENECA INDONESIA


KONSULTAN PT WAHANA MITRA AMERTA, PT. HI-WAY INDOTEK
PT. CIRIATAMA NUSAWIDYA CONSULT,
PT. GARIS PUTIH SEJAJAR, KSO
PROYEK PAKET PEMBANGUNAN JALAN
LINGKAR TIMUR KUNINGAN

COLD BIN 2 ( Medium Agg 05-12 mm ) COLD BIN 1 ( Abu Batu )


RPM % 24.5 % RPM % 33 %
Kebutuhan material per jam 17.10 Ton Kebutuhan material per jam 29.64 Ton
SPEED Waktu Berat Kapasitas Ton/Jam SPEED Waktu Berat Kapasitas Ton/Jam
RPM % Detik Kg Kg/Detik RPM % Detik Kg Kg/Detik
10.0 3 5.92 1.97 7.10 30.0 3 17.42 5.81 20.90
20.0 3 13.61 4.54 16.33 40.0 3 21.52 7.17 25.82
30.0 3 20.48 6.83 24.58 50.0 3 26.56 8.85 31.87

Berat (Ton/Jam )
Kalibrasi Cold Bin 2 ( Agregat Sedang ) Kalibrasi Cold Bin 1 ( Abu Batu )
Berat (Ton/Jam )

30.0 50.0

25.0 40.0
20.0
30.0
15.0
20.0
10.0
10.0
5.0

0.0 0.0
0 5 10 15 20 25 30 35 40 45 50 10 15 20 25 30 35 40 45 50 55 60

SPEED RPM % SPEED RPM %

Kontraktor Konsultan Bina Marga


SPECIFIC GRAVITY AND ABSORPTION OF
KONTRAKTOR PT. SENECA INDONESIA FINE AGGREGATE
KONSULTAN PT WAHANA MITRA AMERTA, PT. HI-WAY INDOTEK AASTHO T 84 - 74
PT. CIRIATAMA NUSAWIDYA CONSULT, ASTM C 120 - 68
PT. GARIS PUTIH SEJAJAR, KSO
PROYEK PAKET PEMBANGUNAN JALAN Material Abu Batu (0 - 5) mm
LINGKAR TIMUR KUNINGAN Tanggal 10-Apr-16
Lokasi Ex STC Palimanan

A B AVERAGE

MASS OF SATURATED SURFACE DRY SAMPLE IN AIR 500 gr 500 500 gr


MASS OVEN DRY SAMPLE IN AIR W1 487.1 487.6 gr
MASS OF PICNOMETER FILLED WITH WATER W2 676.0 688.6 gr
MASS OF PICNOMETER WITH SAMPLE AND
WATER TO CALIBRATION MARK W3 987.2 999.5 gr

A B AVERAGE

BULK SPECIFIC GRAVITY W1


2.580 2.579 2.579 gr/cc
W2 + 500 - W3

BULK SPECIFIC GRAVITY 500


2.648 2.644 2.646 gr/cc
(SATURATED SURFACE DRY BASIS) W2 + 500 - W3

APPARENT SPECIFIC GRAVITY W1


2.769 2.759 2.764 gr/cc
W2 + W1 - W3

ABSORPTION (500 - W1)


x 100 2.648 2.543 2.596 %
W1

Kontraktor Konsultan Bina Marga


SPECIFIC GRAVITY AND ABSORPTION OF
KONTRAKTOR PT. SENECA INDONESIA COARSE AGGREGATE
KONSULTAN PT WAHANA MITRA AMERTA, PT. HI-WAY INDOTEK AASTHO T 85 - 74
PT. CIRIATAMA NUSAWIDYA CONSULT, ASTM C 127 - 68
PT. GARIS PUTIH SEJAJAR, KSO
PROYEK PAKET PEMBANGUNAN JALAN Material Split (5 - 12) mm
LINGKAR TIMUR KUNINGAN Tanggal 10-Apr-16
Lokasi Ex STC Palimanan

A B AVERAGE

MASS OF OVEN DRY SAMPLE IN AIR W1 1516.0 1429.0 gr


MASS SATURATED SURFACE DRY SAMPLE IN AIR W2 1548.0 1458.0 gr
MASS OF SATURATED SAMPLE IN WATER W3 971.0 912.0 gr

A B AVERAGE

BULK SPECIFIC GRAVITY W1


2.627 2.617 2.622 gr/cc
W2 - W3

BULK SPECIFIC GRAVITY W2


2.683 2.670 2.677 gr/cc
(SATURATED SURFACE DRY BASIS) W2 - W3

APPARENT SPECIFIC GRAVITY W1


2.782 2.764 2.773 gr/cc
W1 - W3

ABSORPTION W2 - W1
X 100 2.111 2.029 2.070 %
W1

Kontraktor Konsultan Bina Marga


SPECIFIC GRAVITY AND ABSORPTION OF
KONTRAKTOR PT. SENECA INDONESIA COARSE AGGREGATE
KONSULTAN PT WAHANA MITRA AMERTA, PT. HI-WAY INDOTEK AASTHO T 85 - 74
PT. CIRIATAMA NUSAWIDYA CONSULT, ASTM C 127 - 68
PT. GARIS PUTIH SEJAJAR, KSO
PROYEK PAKET PEMBANGUNAN JALAN Material Split (12 - 37.5) mm
LINGKAR TIMUR KUNINGAN Tanggal 10-Apr-16
Lokasi Ex STC Palimanan

A B AVERAGE

MASS OF OVEN DRY SAMPLE IN AIR W1 2134.0 2236.0 gr


MASS SATURATED SURFACE DRY SAMPLE IN AIR W2 2157.0 2257.0 gr
MASS OF SATURATED SAMPLE IN WATER W3 1342.0 1405.0 gr

A B AVERAGE

BULK SPECIFIC GRAVITY W1


2.618 2.624 2.621 gr/cc
W2 - W3

BULK SPECIFIC GRAVITY W2


2.647 2.649 2.648 gr/cc
(SATURATED SURFACE DRY BASIS) W2 - W3

APPARENT SPECIFIC GRAVITY W1


2.694 2.691 2.693 gr/cc
W1 - W3

ABSORPTION W2 - W1
X 100 1.078 0.939 1.009 %
W1

Kontraktor Konsultan Bina Marga


KONTRAKTOR PT. SENECA INDONESIA
KONSULTAN PT WAHANA MITRA AMERTA, PT. HI-WAY INDOTEK
PT. CIRIATAMA NUSAWIDYA CONSULT,
PT. GARIS PUTIH SEJAJAR, KSO
PROYEK PAKET PEMBANGUNAN JALAN
LINGKAR TIMUR KUNINGAN

TEST KEPIPIHAN AGGREGAT


ASTM D-4791

Jenis material : Agregat Kasar ( 12 - 37.5 mm ) Tanggal : 10-Apr-16


Lokasi Ex STC Palimanan

A B
A Berat contoh material sebelum GR 1792.4 1665.8
B Berat contoh material Tertahan 3/8 " GR 1792.4 1665.8
C Berat contoh material Pipih GR 108.3 106.2
D Berat contoh material lonjong GR 28.5 26.7
E Persentase kepipihan GR ( C / B ) X 100 6.04 6.38
F Persentase Lonjong % ( D / B ) X 100 1.59 1.60
RATA - RATA % 6.21
SPECIFIKASI MAX 10

Kontraktor Konsultan PU Bina Marga


KONTRAKTOR PT. SENECA INDONESIA
KONSULTAN PT WAHANA MITRA AMERTA, PT. HI-WAY INDOTEK
PT. CIRIATAMA NUSAWIDYA CONSULT,
PT. GARIS PUTIH SEJAJAR, KSO
PROYEK PAKET PEMBANGUNAN JALAN
LINGKAR TIMUR KUNINGAN

TEST KEPIPIHAN AGGREGAT


ASTM D-4791

Jenis material : Agregat Sedang ( 5 - 12 mm ) Tanggal 10-Apr-16


Lokasi Ex STC Palimanan

A B
A Berat contoh material sebelum GR 942.5 1238.4
B Berat contoh material Tertahan 3/8 " GR 933.6 1226.2
C Berat contoh material Pipih GR 48.2 71.3
D Berat contoh material lonjong GR 19.3 24.7
E Persentase Kepipihan % ( C / B ) X 100 5.11 5.76
F Persentase Lonjong % ( D / B ) X 100 2.07 2.01
G Persentase Kepipihan + Lonjong % E+F 7.18 7.77
RATA - RATA % 7.48
SPECIFIKASI MAX 10%

Kontraktor Konsultan PU Bina Marga


PEMERIKSAAN SAND EQUIVALENT
SNI 03-4428-1997

KONTRAKTOR PT. SENECA INDONESIA


KONSULTAN PT WAHANA MITRA AMERTA, PT. HI-WAY INDOTEK
PT. CIRIATAMA NUSAWIDYA CONSULT, Sample : Abu Batu ( 0 - 5 mm )
PT. GARIS PUTIH SEJAJAR, KSO Lokasi : STC Palimanan
PROYEK PAKET PEMBANGUNAN JALAN Date Test 17-Apr-20
LINGKAR TIMUR KUNINGAN

NO. CONTOH
NO. URAIAN
I II III
TERA TINGGI TANGKAI PENUNJUK
BEBAN KEDALAM GELAS UKUR
1 10.00 10.00
(GELAS DALAM KEADAAN KOSONG)

BACA SKALA LUMPUR.


(PEMBACAAN SKALA PERMUKAAN
2 3.90 4.10
LUMPUR LIHAT PADA DINDING
GELAS UKUR).

MASUKAN BEBAN, BACA SKALA


3 12.30 12.60
BEBAN PADA TANGKAI PENUNJUK

BACA SKALA PASIR


4 2.30 2.60
(3) - (1)

NILAI SAND EQUIVALENT

5 SKALA PASIR (4) 58.97 63.41


X 100 (%)
SKALA LUMPUR (2)

6 NILAI RATA-RATA SAND EQUIVALENT 61.19 (%)

Spec Sand Equivalent Min - 60 %

Kontraktor konsultan Bina Marga


Dikerjakan Oleh,

Lab Teknisi
LABORATORIUM PENGUJIAN BAHAN DAN KONSTRUKSI
MEKANIKA TANAH - BETON - ASPAL
JALAN CAGAK

Lamp. Surat/No :
Pekerjaan : AC - Wearing Course
Matrial : Course Agg. ( 12 - 19 mm ) Tgl.Pemeriksaan : 11 April 2016

PEMERIKSAAN KEAUSAN AGREGAT


DENGAN MESIN LOS ANGELES

Nomor Contoh
Gradasi Saringan
I II
Lolos Tertahan Course Agg. ( 12 - 19 mm ) Course Agg. ( 12 - 19 mm )

1 1/2 " 3/4"


3/4 " 1/2" 2500 2500
1/2 " 3/8" 2500 2500
3/8 " 1/4 "
1/4 " No.4
Total 5000 5000

Ukuran Saringan Berat Agregat


Lolos Tertahan A B C D

1 1/2 " 1" 1250


1" 3/4 " 1250
3/4 " 1/2 " 1250 2500
1/2 " 3/8 " 1250 2500
3/8 " 1/4 " 2500
1/4 " No.4 2500
No.4 No.8 5000
Total 5000 5000 5000 5000
Jml. Bola Baja 12 11 8 6

Metode Pengetesan Metode-B Metode-B


Berat sebelum (A) 5000 5000
Berat sesudah diayak
3902 3913
Saringan No. 12 (B)
( A) - (B) 1098 1087
(A) - (B)
Keausan X 100% 21.96 21.74
(A)
Keausan Rata-Rata 21.85
SPECIFIC GRAVITY AND ABSORPTION OF
FINE AGGREGATE
Kontraktor : Seneca - Lie Jasin, KSO AASTHO T 84 - 74
Konsultan : PT. Seecons - PT. Adhiyasa Desicon, KSO ASTM C 120 - 68
Proyek : Preservasi Rehabilitasi Jalan Mayor
Pamanukan - Lohbener - Palimanan Sample : Hot Bin 1 ( K4 )
Location : Ex. Cagak

Test Date 15-May-20

A B AVERAGE

MASS OF SATURATED SURFACE DRY SAMPLE IN AIR 500 gr 500 500 gr


MASS OVEN DRY SAMPLE IN AIR W1 489.6 490.4 gr
MASS OF PICNOMETER FILLED WITH WATER W2 677.2 686.7 gr
MASS OF PICNOMETER WITH SAMPLE AND
WATER TO CALIBRATION MARK W3 988.5 996.6 gr

A B AVERAGE

BULK SPECIFIC GRAVITY W1


2.595 2.580 2.587 gr/cc
W2 + 500 - W3

BULK SPECIFIC GRAVITY 500


2.650 2.630 2.640 gr/cc
(SATURATED SURFACE DRY BASIS) W2 + 500 - W3

APPARENT SPECIFIC GRAVITY W1


2.746 2.717 2.731 gr/cc
W2 + W1 - W3

ABSORPTION (500 - W1)


x 100 2.124 1.958 2.041 %
W1

Disetujui oleh, Diperiksa oleh, Dikerjakan oleh,

Pengawas Lapangan Konsultan Supervisi Kontraktor Pelaksana

PU Bina Marga PT. Seecons - PT. Adhiyasa Desicon, KSO Seneca - Lie Jasin, KSO

Sapto F M. Yusuf S Yopie Ruhiyat, ST


Lab. Tech Lab.tech Quality Control
SPECIFIC GRAVITY AND ABSORPTION OF
COARSE AGGREGATE
Kontraktor : Seneca - Lie Jasin, KSO AASTHO T 85 - 74
Konsultan : PT. Seecons - PT. Adhiyasa Desicon, KSO ASTM C 127 - 68
Proyek : Preservasi Rehabilitasi Jalan Mayor
Pamanukan - Lohbener - Palimanan Sample : Hot Bin 2 ( K3 )
Location : Ex. Cagak

Test Date 15-May-20

A B AVERAGE

MASS OF OVEN DRY SAMPLE IN AIR W1 2176 2150 gr


MASS SATURATED SURFACE DRY SAMPLE IN AIR W2 2214 2187 gr
MASS OF SATURATED SAMPLE IN WATER W3 1373 1361 gr

A B AVERAGE

BULK SPECIFIC GRAVITY W1


2.587 2.603 2.595 gr/cc
W2 - W3

BULK SPECIFIC GRAVITY W2


2.633 2.648 2.641 gr/cc
(SATURATED SURFACE DRY BASIS) W2 - W3

APPARENT SPECIFIC GRAVITY W1


2.710 2.725 2.718 gr/cc
W1 - W3

ABSORPTION W2 - W1
X 100 1.746 1.721 1.734 %
W1

Disetujui oleh, Diperiksa oleh, Dikerjakan oleh,


Pengawas Lapangan Konsultan Supervisi Kontraktor Pelaksana

PU Bina Marga PT. Seecons - PT. Adhiyasa Desicon, KSO Seneca - Lie Jasin, KSO

Sapto F M. Yusuf S Yopie Ruhiyat, ST


Lab. Tech Lab.tech Quality Control
SPECIFIC GRAVITY AND ABSORPTION OF
COARSE AGGREGATE
Kontraktor : Seneca - Lie Jasin, KSO AASTHO T 85 - 74
Konsultan : PT. Seecons - PT. Adhiyasa Desicon, KSO ASTM C 127 - 68
Proyek : Preservasi Rehabilitasi Jalan Mayor
Pamanukan - Lohbener - Palimanan Sample : Hot Bin 3 ( K2 )
Location : Ex. Cagak

Test Date 15-May-20

A B AVERAGE

MASS OF OVEN DRY SAMPLE IN AIR W1 2314 2238 gr


MASS SATURATED SURFACE DRY SAMPLE IN AIR W2 2348 2272 gr
MASS OF SATURATED SAMPLE IN WATER W3 1459 1418 gr

A B AVERAGE

BULK SPECIFIC GRAVITY W1


2.603 2.621 2.612 gr/cc
W2 - W3

BULK SPECIFIC GRAVITY W2


2.641 2.660 2.651 gr/cc
(SATURATED SURFACE DRY BASIS) W2 - W3

APPARENT SPECIFIC GRAVITY W1


2.706 2.729 2.718 gr/cc
W1 - W3

ABSORPTION W2 - W1
X 100 1.469 1.519 1.494 %
W1

Disetujui oleh, Diperiksa oleh, Dikerjakan oleh,

Pengawas Lapangan Konsultan Supervisi Kontraktor Pelaksana


PU Bina Marga PT. Seecons - PT. Adhiyasa Desicon, KSO Seneca - Lie Jasin, KSO

Sapto F M. Yusuf S Yopie Ruhiyat, ST


Lab. Tech Lab.tech Quality Control
SPECIFIC GRAVITY AND ABSORPTION OF
COARSE AGGREGATE
Kontraktor : Seneca - Lie Jasin, KSO AASTHO T 85 - 74
Konsultan : PT. Seecons - PT. Adhiyasa Desicon, KSO ASTM C 127 - 68
Proyek : Preservasi Rehabilitasi Jalan Mayor
Pamanukan - Lohbener - Palimanan Sample : Hot Bin 4 ( K1 )
Location : Ex. Cagak
Contract Item
Test Date 15-May-20

A B AVERAGE

MASS OF OVEN DRY SAMPLE IN AIR W1 2218 2044 gr


MASS SATURATED SURFACE DRY SAMPLE IN AIR W2 2252 2075 gr
MASS OF SATURATED SAMPLE IN WATER W3 1407 1313 gr

A B AVERAGE

BULK SPECIFIC GRAVITY W1


2.625 2.682 2.654 gr/cc
W2 - W3

BULK SPECIFIC GRAVITY W2


2.665 2.723 2.694 gr/cc
(SATURATED SURFACE DRY BASIS) W2 - W3

APPARENT SPECIFIC GRAVITY W1


2.735 2.796 2.766 gr/cc
W1 - W3

ABSORPTION W2 - W1
X 100 1.533 1.517 1.525 %
W1

Disetujui oleh, Diperiksa oleh, Dikerjakan oleh,

Pengawas Lapangan Konsultan Supervisi Kontraktor Pelaksana


PU Bina Marga PT. Seecons - PT. Adhiyasa Desicon, KSO Seneca - Lie Jasin, KSO

Sapto F M. Yusuf S Yopie Ruhiyat, ST


Lab. Tech Lab.tech Quality Control
SPECIFIC GRAVITY AND ABSORPTION OF
FINE AGGREGATE
Kontraktor : Seneca - Lie Jasin, KSO AASTHO T 84 - 74
Konsultan : PT. Seecons - PT. Adhiyasa Desicon, KSO ASTM C 120 - 68
Proyek : Preservasi Rehabilitasi Jalan Mayor
Pamanukan - Lohbener - Palimanan Sample : Filler Abu
Location : Ex. Cagak

Test Date 15-May-20

A B AVERAGE

MASS OF SATURATED SURFACE DRY SAMPLE IN AIR 500 gr 500 500 gr


MASS OVEN DRY SAMPLE IN AIR W1 489.3 488.5 gr
MASS OF PICNOMETER FILLED WITH WATER W2 678.6 679.2 gr
MASS OF PICNOMETER WITH SAMPLE AND
WATER TO CALIBRATION MARK W3 991.8 993.6 gr

A B AVERAGE

BULK SPECIFIC GRAVITY W1


2.619 2.632 2.626 gr/cc
W2 + 500 - W3

BULK SPECIFIC GRAVITY 500


2.677 2.694 2.685 gr/cc
(SATURATED SURFACE DRY BASIS) W2 + 500 - W3

APPARENT SPECIFIC GRAVITY W1


2.779 2.806 2.792 gr/cc
W2 + W1 - W3

ABSORPTION (500 - W1)


x 100 2.187 2.354 2.270 %
W1

Disetujui oleh, Diperiksa oleh, Dikerjakan oleh,

Pengawas Lapangan Konsultan Supervisi Kontraktor Pelaksana

PU Bina Marga PT. Seecons - PT. Adhiyasa Desicon, KSO Seneca - Lie Jasin, KSO

Sapto F M. Yusuf S Yopie Ruhiyat, ST


Lab. Tech Lab.tech Quality Control
PENGUJIAN KADAR LUMPUR DAN GUMPALAN LEMPUNG
DIDALAM AGGREGAT
( SNI 3-4141-1966 )

Kontraktor Seneca - Lie Jasin, KSO Tanggal Test 12-Apr-16


Konsultan PT. Seecons - PT. Adhiyasa Desicon, KSO Material Abu Batu ( 0 - 5 mm )

Proyek Preservasi Rehabilitasi Jalan Mayor Pamanukan - Lohbener - Palimanan

No Saringan Berat Material Berat Material Persentase


Tertahan
No Jenis Material Lolos Tertahan Sebelum Sesudah Kadar Lumpur Spec
Setelah
Perendaman ( gr ) ( gr ) (%)
( inc ) ( inc )
( inc ) A A C = ( A - B / A ) x 100

1 Abu Batu ( 0 - 5 mm ) #4 # 16 # 30 500 495.8 0.840 Max 1 %

Disetujui oleh, Diperiksa oleh, Dikerjakan oleh,


Pengawas Lapangan Konsultan Supervisi Kontraktor Pelaksana
PU Bina Marga PT. Seecons - PT. Adhiyasa Desicon, KSO Seneca - Lie Jasin, KSO

Sapto F M. Yusuf S Yopie Ruhiyat, ST


Lab. Tech Lab.tech Quality Control
PENGUJIAN KADAR LUMPUR DAN GUMPALAN LEMPUNG
DIDALAM AGGREGAT
( SNI 3-4141-1966 )

Kontraktor Seneca - Lie Jasin, KSO Tanggal Test 12-Apr-16


Konsultan PT. Seecons - PT. Adhiyasa Desicon, KSO Material Agregat Sedang ( 5 - 12 ) mm

Proyek Preservasi Rehabilitasi Jalan Mayor Pamanukan - Lohbener - Palimanan

No Saringan Berat Material Berat Material Persentase


Tertahan
No Jenis Material Lolos Tertahan Sebelum Sesudah Kadar Lumpur Spec
Setelah
Perendaman ( gr ) ( gr ) (%)
( inc ) ( inc )
( inc ) A A C = ( A - B / A ) x 100

1 Agregat Sedang ( 5 - 12 ) mm 3/4" 3/8" #4 2000 1990.7 0.465 Max 1 %

Disetujui oleh, Diperiksa oleh, Dikerjakan oleh,


Pengawas Lapangan Konsultan Supervisi Kontraktor Pelaksana
PU Bina Marga PT. Seecons - PT. Adhiyasa Desicon, KSO Seneca - Lie Jasin, KSO

Sapto F M. Yusuf S Yopie Ruhiyat, ST


Lab. Tech Lab.tech Quality Control
PENGUJIAN KADAR LUMPUR DAN GUMPALAN LEMPUNG
DIDALAM AGGREGAT
( SNI 3-4141-1966 )

Kontraktor Seneca - Lie Jasin, KSO Tanggal Test 12-Apr-16


Konsultan PT. Seecons - PT. Adhiyasa Desicon, KSO Material Agregat Kasar ( 12 - 19 ) mm

Proyek Preservasi Rehabilitasi Jalan Mayor Pamanukan - Lohbener - Palimanan

No Saringan Berat Material Berat Material Persentase


Tertahan
No Jenis Material Lolos Tertahan Sebelum Sesudah Kadar Lumpur Spec
Setelah
Perendaman ( gr ) ( gr ) (%)
( inc ) ( inc )
( inc ) A A C = ( A - B / A ) x 100

1 Agregat Kasar ( 12 - 19 ) mm 1" 3/4" #4 3000 2990.5 0.317 Max 1 %

Disetujui oleh, Diperiksa oleh, Dikerjakan oleh,


Pengawas Lapangan Konsultan Supervisi Kontraktor Pelaksana
PU Bina Marga PT. Seecons - PT. Adhiyasa Desicon, KSO Seneca - Lie Jasin, KSO

Sapto F M. Yusuf S Yopie Ruhiyat, ST


Lab. Tech Lab.tech Quality Control
LABORATORIUM PENGUJIAN BAHAN DAN KONTRUKSI
MEKANIKA TANAH - BETON - ASPAL
JALAN CAGAK SUBANG
Kontraktor : Seneca - Lie Jasin, KSO
Konsultan : PT. Seecons - PT. Adhiyasa Desicon, KSO
Paket : Preservasi Rehabilitasi Jalan Mayor Pamanukan - Lohbener - Palimanan

Tanggal 22 Maret 2016


Nomor contoh :1
Contoh dari : Cirebon
Jenis contoh : Pen 60/70 (Tipe-1B)
Pekerjaan : AC Wearing Course

PENGUJIAN PENETRASI ASPAL


SNI 06 - 2456 - 1991

PERSIAPAN
Contoh di panaskan Mulai jam : 14.30 Suhu aspal : 25° C
Selesai jam : 15.00
Contoh di diamkan Mulai jam : 15.00 Suhu ruang :………… ° C
pada suuhu ruang Selesai jam : 15.30
Contoh di rendam Mulai jam : 15.30
pada Temp 25° C Selesai jam : 16.30
Pemeriksaan penetrasi Mulai jam : 16.30
Selesai jam : 16.40

PEMERIKSAAN
Penetrasi pada suhu 25° C I II
Beban 100 gram selama 5 detik
Pengamatan 1 62 64
2 64 67
3 67 63
4 63 65
5 65 62
Rata - rata 64.2 64.2 64.2

Jenis aspal Pen 60/70 (Tipe 1B)


Persaratan umum
Min. 60 Max. 70

Disetujui oleh, Diperiksa oleh, Dikerjakan oleh,


Pengawas Lapangan Konsultan Supervisi Kontraktor Pelaksana
PU Bina Marga PT. Seecons - PT. Adhiyasa Desicon, KSO Seneca - Lie Jasin, KSO

Sapto F M. Yusuf S Yopie Ruhiyat, ST


Lab. Tech Lab.tech Quality Control
LABORATORIUM PENGUJIAN BAHAN DAN KONTRUKSI
MEKANIKA TANAH - BETON - ASPAL
JALAN CAGAK SUBANG

Kontraktor : Seneca - Lie Jasin, KSO


Konsultan : PT. Seecons - PT. Adhiyasa Desicon, KSO
Paket : Preservasi Rehabilitasi Jalan Mayor Pamanukan - Lohbener - Palimanan

Tanggal 22 Maret 2016


Nomor contoh :1
Contoh dari : Cirebon
Jenis contoh : Pen 60/70 (Tipe-1B)
Pekerjaan : AC Wearing Course

PENGUJIAN TITIK LEMBEK


SNI 06 - 2434 - 1991

Pembukaan Contoh di panaskan Pembacaan waktu Suhu


Contoh Mulai Jam 14.30 Oven
Selesai Jam 15.00 Temp

Mendinginkan Didiamkan pada suhu


Contoh Mulai Jam : 15.00
Selesai Jam : 16.00

Mencapai suhu direndam pada suhu 16.00


5°C 16.15

Pemeriksaan Mulai Jam : 16.15


Selesai Jam : 16.20

Pemeriksaan Titik lrmbek


Mulai Jam : 16.20
Selesai Jam : 16.31

Suhu yang diamati Waktu Titik lembek ° C


No
°C °F I II I II
1 5 0
2 10 71
3 15 129
4 20 184
5 25 237
6 30 288
7 35 340
8 40 397
9 45 451
10 50 507
11 55 562
12 60 619 51.0 54.0
SPESIFIKASI ≥ 50 Rata-rata 52.5

Disetujui oleh, Diperiksa oleh, Dikerjakan oleh,


Pengawas Lapangan Konsultan Supervisi Kontraktor Pelaksana
PU Bina Marga PT. Seecons - PT. Adhiyasa Desicon, KSO Seneca - Lie Jasin, KSO

Sapto F M. Yusuf S Yopie Ruhiyat, ST


Lab. Tech Lab.tech Quality Control
TRIAL MIX
Komposisi AMP

hb 1 K4 40.0 38.00 38
hb 2 k3 29.0 27.55 27.6
hb 3 k2 18.5 17.58 17.6
hb 4 k1 9.0 8.55 8.5
filler 3.5 3.33 3.3
aspal 5.0 5 5
100.0 100.0