JOB MIX FORMULA
AC BC
Catatan :
DESIGN MIX FORMULA
AC BC
KONTRAKTOR
KONSULTAN
PROYEK
Tanggal : 31-Dec-99
KOMPOSISI CAMPURAN
COLD BIN HOT BIN
Abu Batu (0 - 5) mm Ex. STC Palimanan thd. Agg Hot Bin I ( K4 ) thd. Agg
Split (5 - 12) mm Ex. STC Palimanan thd. Agg Hot Bin II ( K3 ) thd. Agg
Split (12 - 25) mm Ex. STC Palimanan thd. Agg Hot Bin III ( K2 ) thd. Agg
Hot Bin IV ( K1 ) thd. Agg
Filler Abu Batu thd. Agg
Abu Batu (0 - 5) mm Ex. STC Palimanan thd. Camp
Split (5 - 12) mm Ex. STC Palimanan thd. Camp Hot Bin I ( K4 ) thd. Camp
Split (12 - 25) mm Ex. STC Palimanan 0.00% thd. Camp Hot Bin II ( K3 ) thd. Camp
Hot Bin III ( K2 ) thd. Camp
Hot Bin IV ( K1 ) thd. Camp
Filler Abu Batu thd. Camp
Aspal Pen 60/70 5.3% thd. Camp Aspal Pen 60/70 thd. Camp
GRADASI CAMPURAN
Ukuran saringan 1 1/2" 1" 3/4 " 1/2." 3/8 " # 4 #8 # 16 # 30 # 50 # 100 # 200
37.5 25 19 12.5 9.5 4.75 2.36 1.18 0.6 0.3 0.15 0.075
Spesifikasi
Maks. 100 100 100 90 82 64 49 38 28 20 13 8
Min 100 100 90 75 66 46 30 18 12 7 5 4
MARSHALL PROPERTIES
KOMPOSISI AMP
AC - Base
- Hot Bin I K4 0.0% ( thd total agregat ) 0.00% ( thd total Campuran )
- Hot Bin II K3 0.0% ( thd total agregat ) 0.00% ( thd total Campuran )
- Hot Bin III K2 0.0% ( thd total agregat ) 0.00% ( thd total Campuran )
- Hot Bin IV K1 0.0% ( thd total agregat ) 0.00% ( thd total Campuran )
- Filler Abu Batu 0.0% ( thd total agregat ) 0.00% ( thd total Campuran )
- Aspal 0.0 kg
- Material 1250.0 kg
Komulatif
a. Hot Bin 1 K4 0.00% x 1250 = 0.00 = 0.0 kg
Aspal Kadar Berat (gr) Isi BD Rongga Rongga Rongga Stabilitas (kg) Kelelehan Hasil Kadar
No. Terh. Aspal DI Dalam Kering Benda Bulk GMM diantara Udara Ter isi Di Di Di Plastis Bagi Aspal
Batuan Udara Air Pemukaan Uji Campuran Aggregat Aspal Baca Sesuaikan Koreksi (mm) Marsall Efektiv
a b c d e f g h I j k l m n o p q
1
2
3
RATA - RATA
1
2
3
RATA - RATA
Keterangan :
a = % aspal terhadap batuan
b = % aspal terhadap campuran
c = berat kering (gr)
d = berat dalam keadaan jenuh (gr)
e = berat dalam air (gr)
Pb 4.5
Aspal Kadar Berat (gr) Isi BD Rongga Rongga Rongga Stabilitas (kg) Kelelehan Hasil Kadar
No. Terh. Aspal DI Dalam Kering Benda Bulk GMM diantara Udara Ter isi Di Di Di Plastis Bagi Aspal
Batuan Udara Air Pemukaan Uji Campuran Aggregat Aspal Baca Sesuaikan Koreksi (mm) Marsall Efektiv
a b c d e f g h I j k l m n o p q
1
2
3
RATA - RATA
1
2
3
RATA - RATA
Keterangan :
a = % aspal terhadap batuan
b = % aspal terhadap campuran
c = berat kering (gr)
d = berat dalam keadaan jenuh (gr)
e = berat dalam air (gr)
Aspal Kadar Berat (gr) Isi BD Rongga Rongga Rongga Stabilitas (kg) Kelelehan Hasil Kadar
No. Terh. Aspal DI Dalam Kering Benda Bulk GMM diantara Udara Ter isi Di Di Di Plastis Bagi Aspal
Batuan Udara Air Pemukaan Uji Campuran Aggregat Aspal Baca Sesuaikan Koreksi (mm) Marsall Efektiv
a b c d e f g h I j k l m n o p q
1
2
3
RATA - RATA
Keterangan :
a = % aspal terhadap batuan
b = % aspal terhadap campuran
c = berat kering (gr)
d = berat dalam keadaan jenuh (gr)
e = berat dalam air (gr)
+
Aspal Kadar Berat (gr) Isi BD Rongga Rongga Rongga Stabilitas (kg) Kelelehan Hasil Kadar
No. Terh. Aspal DI Dalam Kering Benda Bulk GMM diantara Udara Ter isi Di Di Di Plastis Bagi Aspal
Batuan Udara Air Pemukaan Uji Campuran Aggregat Aspal Baca Sesuaikan Koreksi (mm) Marsall Efektiv
a b c d e f g h I j k l m n o p q
1
2
RATA - RATA
Keterangan :
a = % aspal terhadap batuan
b = % aspal terhadap campuran
c = berat kering (gr)
d = berat dalam keadaan jenuh (gr)
e = berat dalam air (gr)
+
Aspal Kadar Berat (gr) Isi BD Rongga Rongga Rongga Stabilitas (kg) Kelelehan Hasil Kadar
No. Terh. Aspal DI Dalam Kering Benda Bulk GMM diantara Udara Ter isi Di Di Di Plastis Bagi Aspal
Batuan Udara Air Pemukaan Uji Campuran Aggregat Aspal Baca Sesuaikan Koreksi (mm) Marsall Efektiv
a b c d e f g h I j k l m n o p q
1
2
3
4
5
6
7
8
9
10
11
12
RATA - RATA
Keterangan :
a = % aspal terhadap batuan
b = % aspal terhadap campuran
c = berat kering (gr)
d = berat dalam keadaan jenuh (gr)
e = berat dalam air (gr)
+
Aspal Kadar Berat (gr) Isi BD Rongga Rongga Rongga Stabilitas (kg) Kelelehan Hasil Kadar
No. Terh. Aspal DI Dalam Kering Benda Bulk GMM diantara Udara Ter isi Di Di Di Plastis Bagi Aspal
Batuan Udara Air Pemukaan Uji Campuran Aggregat Aspal Baca Sesuaikan Koreksi (mm) Marsall Efektiv
a b c d e f g h I j k l m n o p q
1
2
3
RATA - RATA
1
2
3
RATA - RATA
Keterangan :
a = % aspal terhadap batuan
b = % aspal terhadap campuran
c = berat kering (gr)
d = berat dalam keadaan jenuh (gr)
e = berat dalam air (gr)
VMA (%)
2.34 gr/cc 2.280 17.0
2.32
% 15.80
16.0
2.30
15.0
2.28
14.0
2.26
13.0
2.24
12.0
2.22
3.5 4.0 4.5 5.0 5.5 6.0 6.5
3.5 4.0 4.5 5.0 5.5 6.0 6.5
Kadar aspal (%) Kadar aspal (%)
`
VFB (% )
12.0
VIM (%)
100
10.0 % 4.10
90 % 72.00
8.0
80
6.0
70
60
4.0
50 2.0
40 0.0
3.5 4.0 4.5 5.0 5.5 6.0 6.5 3.5 4.0 4.5 5.0 5.5 6.0 6.5
Kadar aspal (%) Kadar aspal (%)
Stability (k g)
Flow (mm)
8.0
1300 kg 1035 mm 3.75
7.0
1200
6.0
1100
5.0
1000
4.0
900
3.0
800
M a r s h a ll q u o t ie n t ( k g / m m )
2.0
700
3.5 4.0 4.5 5.0 5.5 6.0 6.5
3.5 4.0 4.5 5.0 5.5 6.0 6.5
Kadar aspal (%)
Kadar aspal (%)
kg/mm 278
400
350
300
250
200
3.5 4.0 4.5 5.0 5.5 6.0 6. 5
Kadar aspal (%)
VMA
Air void
Stability
Vfb
Flow
Density
MQT
Opt.Asp.Content
KONTRAKTOR 0
KONSULTAN 0
0
0 Jenis Campuran : AC - BC
PROYEK 0 Aspal : PEN 60/70
0
2 Berat Botol gr B 0 0
KONTRAKTOR 0
KONSULTAN 0
0
0 Jenis Campuran : AC - BC
PROYEK 0 Aspal : PEN 60/70
0
TRIAL MIX
NO. JENIS PENGUJIAN Sat KET
5.30%
2 Berat Botol gr B
3 Suhu Pengujian °C C
PROYEK
Tanggal : 5-Jul-20
Inc. 1 1/2" 1" 3/4 " 1/2 " 3/8 " #4 #8 # 16 # 30 # 50 # 100 # 200
mm 37.5 25 19 12.7 9.5 4.75 2.36 1.18 0.6 0.3 0.15 0.075
Spesifikasi gradasi
Max 100 100 100 90 82 64 49 38 28 20 13 8
Min 100 100 90 75 66 46 30 18 12 7 5 4
Data Material
Hot Bin I (K4) 100.0
Hot Bin II (K3) 100.0
Hot Bin III (K2) 100.0
Hot Bin IV (K1) 100.0
Filler Abu Batu 100.0
Komposisi Campuran
Hot Bin I (K4) -
Hot Bin II (K3) -
Hot Bin III (K2) -
Hot Bin IV (K1) -
Filler Abu Batu -
1 1/2"
Gradasi Gabungan Agregat Hot Bin
#200 #100 #50 #30 #16 #8 #4 "3/8 "1/2 "3/4 ''1
100.0
90.0
80.0
70.0
Gradasi Gabungan
60.0
50.0
40.0
30.0
20.0
10.0
0.0
0.01 0.1 1 10 100
No. Saringan (mm)
3/4" 19.0
1/2" 12.5
3/8" 9.5
#4 4.75
#8 2.36
# 16 1.15
# 30 0.60
# 50 0.300
# 100 0.150
# 200 0.075
KIND OF MATERIAL HOT BIN III (K-2) AVERAGE HOT BIN III (K-2)
RETAINED PASSING RETAINED PASSING
SIEVE SIZE
%
gr % % gr % %
inch mm
1" 25
3/4" 19.0
1/2" 12.5
3/8" 9.5
#4 4.75
#8 2.36
# 16 1.15
# 30 0.60
# 50 0.300
# 100 0.150
# 200 0.075
ASTM Faktor
GRADASI AGGREGAT GRADASI AGGREGAT
SIEVE Luas
SIZE Permukaan
Cold Bin Hot Bin Spesifikasi III IV V VI VII VIII IX
Aggregat
1" 100
3/4 90 - 100
1/2" 75 - 90 1 x 0.41
3/8" 66 - 82
#4 46 - 64 x 0.41
#8 30 - 49 x 0.82
#16 18 - 38 x 1.64
#30 12 - 28 x 2.87
#50 7 - 20 x 6.14
#100 5 - 13 x 12.29
#200 4-8 x 32.77
(% terhadap Berat
AC BC
Perbandingan
Campuran
Aggregate
Total Agg.
A B AVERAGE
A B AVERAGE
A B AVERAGE
AVERAGE
ABSORPTION W2 - W1
X 100 %
W1
A B AVERAGE
AVERAGE
ABSORPTION W2 - W1
X 100 %
W1
A B AVERAGE
A B AVERAGE
ABSORPTION W2 - W1
X 100 1.390 1.429 1.410 %
W1
A B AVERAGE
A B AVERAGE
BERAT JENIS
MATERIAL Komposisi Penyerapan
Bulk SSD Apparent
Hot Bin I
Hot Bin II
Hot Bin III
Hot Bin IV
Filler Abu Batu
100
Bj Bulk = % HB 1 % HB 2 % HB 3 % HB 4 % Filler
+ + + +
Bj Bulk Bj Bulk Bj Bulk Bj Bulk Bj Bulk
100
Bj Bulk =
+ + + +
Bj Bulk =
PROYEK
Tanggal : 30-Jun-20
Inc. 1" 3/4 " 1/2 " 3/8 " #4 #8 # 16 # 30 # 50 # 100 # 200
mm 25 19 12.7 9.5 4.75 2.36 1.18 0.6 0.3 0.15 0.075
Spesifikasi gradasi
Max 100 100 90 82 64 49 38 28 20 13 8
Min. 100 90 75 66 46 30 18 12 7 5 4
Data Material
Abu Batu (0 - 5) mm
Split (5 - 12) mm
Split (12 - 25) mm
Komposisi Campuran
Abu Batu (0 - 5) mm 50.0%
Split (5 - 12) mm 30.0%
Split (12 - 25) mm 20.0%
#200 #100 #50 #30 #16 #8 #4 "3/8 "1/2 "3/4 ''1 1 1/2"
100.0
90.0
80.0
70.0
Gradasi Gabungan
60.0
50.0
40.0
30.0
20.0
10.0
0.0
0.01 0.1 1 10 100
No. Saringan (mm)
1 1/2" 37.5
1" 25.0 - #DIV/0! 100.0 100.0 - #DIV/0! 100.0
3/4" 19.0 - #DIV/0! 100.0 100.0 - #DIV/0! 100.0
1/2" 12.5 - #DIV/0! 100.0 100.0 - #DIV/0! 100.0
3/8" 9.5 - #DIV/0! #DIV/0! #DIV/0! - #DIV/0! #DIV/0!
#4 4.75
#8 2.36
# 16 1.15
# 30 0.60
# 50 0.300
# 100 0.150
# 200 0.075
1 1/2" 37.5
1" 25.0 - #DIV/0! 100.0 100.0 - #DIV/0! 100.0
3/4" 19.0 - #DIV/0! 100.0 100.0 - #DIV/0! 100.0
1/2" 12.5
3/8" 9.5
#4 4.75
#8 2.36
# 16 1.15
# 30 0.60
# 50 0.300
# 100 0.150
# 200 0.075
PROYEK
- Aspal 0 ton
- Material 0 ton
KONTRAKTOR
KONSULTAN
PROYEK
Berat (Ton/Jam )
Kalibrasi Cold Bin 4 ( Agregat Kasar )
Berat (Ton/Jam )
50.0 40.0
40.0
30.0
30.0
20.0
20.0
10.0
10.0
0.0 0.0
0 5 10 15 20 25 30 35 40 45 50 0 5 10 15 20 25 30 35 40 45 50
KONTRAKTOR
KONSULTAN
PROYEK
Berat (Ton/Jam )
Kalibrasi Cold Bin 2 ( Agregat Sedang ) Kalibrasi Cold Bin 1 ( Abu Batu )
Berat (Ton/Jam )
30.0 50.0
25.0 40.0
20.0
30.0
15.0
20.0
10.0
10.0
5.0
0.0 0.0
0 5 10 15 20 25 30 35 40 45 50 10 15 20 25 30 35 40 45 50 55 60
A B AVERAGE
AVERAGE
A B AVERAGE
A B AVERAGE
ABSORPTION W2 - W1
X 100 %
W1
A B AVERAGE
A B AVERAGE
ABSORPTION W2 - W1
X 100 %
W1
1 1/2"
Gradasi EXTRAKSI
#200 #100 #50 #30 #16 #8 #4 "3/8 "1/2 "3/4 ''1
100.0
90.0
80.0
70.0
Gradasi Gabungan
60.0
50.0
40.0
30.0
20.0
10.0
0.0
0.01 0.1 1 10 100
No. Saringan (mm)
PROYEK
A B
A Berat contoh material sebelum GR
B Berat contoh material Tertahan 3/8 " GR
C Berat contoh material Pipih GR
D Berat contoh material lonjong GR
E Persentase kepipihan GR ( C / B ) X 100
F Persentase Lonjong % ( D / B ) X 100
G Persentase Kepipihan + Lonjong % E+F
RATA - RATA %
SPECIFIKASI MAX 10
A B
A Berat contoh material sebelum GR 1052.3 1155.8
B Berat contoh material Tertahan 3/8 " GR 1052.3 1155.8
C Berat contoh material Pipih GR 49.1 56.3
D Berat contoh material lonjong GR 20.4 21.5
E Persentase Kepipihan % ( C / B ) X 100 4.67 4.87
F Persentase Lonjong % ( D / B ) X 100 1.94 1.86
G Persentase Kepipihan + Lonjong % E+F 6.60 6.73
RATA - RATA % 6.67
SPECIFIKASI MAX 10%
KONTRAKTOR 0
KONSULTAN 0
0 Sample : Abu Batu ( 0 - 5 mm )
0 Lokasi : STC Palimanan
PROYEK 0 Date Test 17-Apr-20
0
NO. CONTOH
NO. URAIAN
I II III
TERA TINGGI TANGKAI PENUNJUK
BEBAN KEDALAM GELAS UKUR
1 10.00 10.00
(GELAS DALAM KEADAAN KOSONG)
Lab Teknisi
LABORATORIUM PENGUJIAN BAHAN DAN KONSTRUKSI
MEKANIKA TANAH - BETON - ASPAL
JALAN CAGAK
Lamp. Surat/No :
Pekerjaan : AC - Wearing Course
Matrial : Course Agg. ( 12 - 19 mm ) Tgl.Pemeriksaan : 01 Juli 2020
Nomor Contoh
Gradasi Saringan
I II
Lolos Tertahan Course Agg. ( 12 - 19 mm ) Course Agg. ( 12 - 19 mm )
A B AVERAGE
A B AVERAGE
PU Bina Marga PT. Seecons - PT. Adhiyasa Desicon, KSO Seneca - Lie Jasin, KSO
A B AVERAGE
A B AVERAGE
ABSORPTION W2 - W1
X 100 1.746 1.721 1.734 %
W1
PU Bina Marga PT. Seecons - PT. Adhiyasa Desicon, KSO Seneca - Lie Jasin, KSO
A B AVERAGE
A B AVERAGE
ABSORPTION W2 - W1
X 100 1.469 1.519 1.494 %
W1
A B AVERAGE
A B AVERAGE
ABSORPTION W2 - W1
X 100 1.533 1.517 1.525 %
W1
A B AVERAGE
A B AVERAGE
PU Bina Marga PT. Seecons - PT. Adhiyasa Desicon, KSO Seneca - Lie Jasin, KSO
PERSIAPAN
Contoh di panaskan Mulai jam : 14.30 Suhu aspal : 25° C
Selesai jam : 15.00
Contoh di diamkan Mulai jam : 15.00 Suhu ruang :………… ° C
pada suuhu ruang Selesai jam : 15.30
Contoh di rendam Mulai jam : 15.30
pada Temp 25° C Selesai jam : 16.30
Pemeriksaan penetrasi Mulai jam : 16.30
Selesai jam : 16.40
PEMERIKSAAN
Penetrasi pada suhu 25° C I II
Beban 100 gram selama 5 detik
Pengamatan 1 62 64
2 64 67
3 67 63
4 63 65
5 65 62
Rata - rata 64.2 64.2 64.2
Pada hari ini Selasa tanggal 07 Juli tahun 2020 kami telah melaksanakan Tial Mix AC BC
di AMP PT Seneca Indonesia Palimanan, untuk Pekerjaan Paket Pembangunan
Jalan Lingkar Timur Kuningan,
1 Density gr/cc
3 VMA % Min 14
4 VFB % Min 65
5 VIM % 3-5
7 Flow mm 2-4
9 Kadar aspal %
Demikian berita acara TRIAL MIX ini di buat sebagai acuan untuk pekerjaan AC BC
4.0
1123.4 636.4 1132.5 496.1 2.264
1109.7 628 1119.4 491.4 2.258
1134.2 642.7 1144.3 501.6 2.261 2.261
4.5
1 1106.0 632 1120.3 488.3 2.265 14.3
2 1163.6 665 1177.9 512.9 2.269 14.3
3 1173.3 670.1 1187.5 517.4 2.268 2.267 14.2
5.0
1 1115.3 635.8 1126.1 490.3 2.275 10.8
2 1114.7 639.8 1129.4 489.6 2.277 14.7
3 1108.3 634.4 1122.0 487.6 2.273 2.275 13.7
5.5
1 1096.1 628.1 1108.6 480.5 2.281 12.5
2 1101.4 629.2 1113.1 483.9 2.276 11.7
3 1131.9 647.4 1142.9 495.5 2.284 2.281 11.0
6.0
1 1070.7 610.4 1078.4 468.0 2.288 7.7
2 1064.9 610.0 1069.7 459.7 2.317 4.8
3 1101.1 625.3 1106.2 480.9 2.290 2.298 5.1