Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 50

You have reached the cached page

for https://www.scribd.com/document/232762586/Dry-Wall-Putty
Below is a snapshot of the Web page as it appeared on 9/27/2020 (the last time our
crawler visited it). This is the version of the page that was used for ranking your search
results. The page may have changed since we last cached it. To see what might have
changed (without the highlights), go to the current page.
You searched for: document/232762586/Dry-Wall-Putty pdf We have highlighted
matching words that appear in the page below.
Bing is not responsible for the content of this page.

SearchSearch

Upload

ENChange Language

Sign InJoin

Learn more about Scribd Membership

Home

Saved

Bestsellers

Books

Audiobooks

Snapshots

Magazines

Documents

Sheet Music

126 views
11 upvote00 downvotes
Dry Wall Putty
Uploaded by
Anurag Agrawal
Description:
Copyright:
© All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online from Scribd
Flag for Inappropriate Content
SaveSave Dry Wall Putty For Later
11 upvote, Mark this document as useful00 downvotes, Mark this document as not
usefulEmbed
Share
Print
RELATED TITLES

Paint, Varnish, Solvent, Thinner, Coating and Lacquers Technology-books

che-phy

BIRLA

Fundamentals of Concrete2010


MARKET POSITIONING OF WHITE CEMENT AND WALL PUTTY

Fairmate Wall Putty

Consumer Behaviour of Jk White Cement & Wall Care Putty


4th Year Project Report Shubhs2003

Catalogo Perfiles y Accesorios

Kaz Report

Himanshu Summer Training Report

The Child labour act

Vezbanja Sa Devetog Dvocasa


Dry Wall Putty White Cement Based

Wall Putty Compartive Chart


AAC Dry Ready Mix

Σχεδιασμός Ενεμάτων Βιζηλαίουarchitectural Heritage[1]

PWL5419


3AFP9060836_ZD2_000_A_1

xextvezsv

Download Now
Jump to Page
You are on page 1of 4
Search inside document

Project Report
On
1. DRY WALL PUTTY (WHITE CEMENT BASED)

INTRODUCTION

White cement based Wall Putty a plastering material to fill the holes and patches before
paint
primer or distemper. In general, fillers & stoppers are paste-like materials, highly
pigmented,
used to fill surface imperfections (fillers) and to make good gross surface defects prior
to
painting operations (stoppers). Caulking compounds, putties and same cements have a
boiled
drying oil, usually combine with resins that act as the binder putty is the thick mixture of
finally
powdered calcium carbonate (whiting) and acid refined linseed oil which imparts good
wetting
and grinding characteristics. There are variegated types of putties for wood too. For
glazing
wood & filling holes and cracks on the surface, of timber or metal, a stiff paste of linseed
oil and
whiting is used. This composition is the traditional putty. It is sometimes modified by the
addition of small amounts of white lead in oil. So called commercial putty contains more
or less
mineral or other oil instead of linseed oil.

MARKET POTENTIAL

The demand for wall putty is always on the higher side due to its heavy consumption.
As the
construction work and industrialization is our country is being done in rapid strides, this
eventually leads to higher consumption of putty. In future, the constructions and
industrial
buildings, etc. are likely to increase tremendously as a result the demand will increase
simultaneously. One of the world largest and fastest growing cement industries, the
Indian
cement industry has been expanding significantly on back of rising infrastructure
activities,
increasing demand from housing sector, and construction recovery. According to our
latest
research report, the recent developments in the industry along with the strong support
of
government are attracting the global cement giants. We have estimated that the total
cement
installed capacity of India is to increase with a CAGR of around 7% during 2012 to 13 to
2014 to
15.

BASIS & PRESUMPTIONS

(i) The output capacity is taken as 4000 Kgs/day. The unit will work at 8 hrs. per day for
25
working days in a month and 300 days in a year. The output capacity may vary from
machinery
to machinery and the cost of machinery may also vary from supplier to supplier.
(ii) The time period for achieving the full envisaged capacity utilisation is six months
(iii) The labour wages are as per the prevailing rates in the market
(iv) The rate of interest for fixed and working capital is taken as 12 per cent
(v) The margin money requirement for this project is 30 percent
(viii) The present profile has to be updated taking into prevailing cost of land, building,
machinery etc. at the time of implementation of the project

IMPLEMENTATION SCHEDULE

One year
i. Project report preparation, registration, local application, etc. - 2 months.
ii. Placing of order for machinery and equipments, delivery, erection, etc. - 6 months.
iii. Electrification, procurement of raw-materials, trial production - 3 months.
iv. Commercial production - 1 month.

TECHNICAL ASPECT

i. Manufacturing Process :
White Cement, Dolomite or Calcite Powder, Hydrated Lime, Cellulose Powder and
Polymer
powder. The whole material is fed from the top into ball mill and allowed the material for
1 hrs
Dry grinding. The unloaded material through belt conveyor is collected and make
packaging.

ii. Quality Standards :


The product will be manufactured as per buyers specification.

FINANCIAL ASPECT

A. Fixed Capital
(i) Land and Building (Rs.)
Land 400 sq. mts. 2,00,000
Built-up area: office, store etc. 2,50,000
500 sq. ft.
Total 4,50,000

(ii) Plant and Machinery (Rs.)


a. Mild steel ball mill of 1 ton capacity. 4,00,000
b Belt conveyor 1,00,000
Total 5,00,000
Fixed Capital = 450000+500000 = 9,50,000

B. Working Capital
(i) Staff and Labour (per month) (Rs.)
a. Skilled workers-2 Nos. 12,000
b. Unskilled workers-5 Nos. 20000
c. Sales representative-1 No. 10,000
Total 42,000

(ii) Raw Materials (per month) Kg. (Rs.)


a. White Cement 20000 3,20,000
b. Dolomite or Calcite Powder 77000 2,54,000
c. Hydrated Lime 1000 7,000
d. Cellulose powder 400 1,80,000
e. R.D. Powder 1600 2,88,000
Total 1,049,000

(iii) Utilities (per month) (Rs.)


Power 10,000
Water 1,000
Total 11,000

(iv) Other Contingent Expenses (per month) (Rs.)


a. Postage and Stationery 1,000
b. Telephone 700
c. Taxes 2,000
d. Repair and Maintenance 6,000
e. Travelling and Transport 10,000
f. Advertising and publicity 5,000
g. Miscellaneous Expenses 2,000
Total 26,700

Total recurring expenses 11,28,700


Working Capitals For 3 months 33,86,100

C. Total Capital Investment (Rs.)


Fixed Capital 9,50,000
Working Capital for 3 months 33,86,100
Total 43,36,100

D. Financial Analysis
(i) Cost of Production and Profitability (Rs.)
i. Total Recurring Cost 1,35,44,400
ii. Depreciation on Building @ 5% 12,500
iii. Depreciation on machinery & equipment @ 10% 50,000
iv. Interest on total capital investment @ 12% 5,20,332
Total 1,41,27,232

E. Receipt by sale of 1200MT of Wall putty per year 1,59,00,000

F. Net Profit (per year)


Sales(Rs.) - Cost of Production (Rs.) = Profit (Rs.)
1,59,00,000 - 1,41,27,232 = 17,72,768

G. Net Profit Ratio = Net Profit 100


Sales

= 17,72,768 100 = 11.14%


1,59,00,000

Break-even Point

Fixed Cost (per year) (Rs.)


Depreciation on Building @ 5% 12,500
Depreciation on machinery & equipment @ 10% 50,000
Interest on total capital investment @ 12% 5,20,332
40% Salary and Wages 2,01,600
40% other contingent expenses 1,28,160
Total 9,12,592

B.E.P. % = Fixed Cost 100


Fixed Cost + Net Profit

= 9,12,592100
9,12,592+17,72,768

= 33.98 %

Related Interests
 Cement
 Manmade Materials
 Industries
 Nature
 Business

Documents Similar To Dry Wall Putty



Paint, Varnish, Solvent, Thinner, Coating and Lacquers Technology-books
UPLOADED BY

Komal Srivastava

che-phy
UPLOADED BY

fazil77


BIRLA
UPLOADED BY

shikhar_verma

Fundamentals of Concrete2010
UPLOADED BY

daku.18


MARKET POSITIONING OF WHITE CEMENT AND WALL PUTTY
UPLOADED BY

Kunal Kore

Fairmate Wall Putty


UPLOADED BY

fairmatechemical


Consumer Behaviour of Jk White Cement & Wall Care Putty
UPLOADED BY

shamshad60964

4th Year Project Report Shubhs2003


UPLOADED BY

Kushagra Kapoor


Catalogo Perfiles y Accesorios
UPLOADED BY

maxtoja

Kaz Report
UPLOADED BY

yash77111


Himanshu Summer Training Report
UPLOADED BY

Pulkit Badaya

The Child labour act


UPLOADED BY

sreenath


Vezbanja Sa Devetog Dvocasa
UPLOADED BY

mMadMadamMimm

Dry Wall Putty White Cement Based


UPLOADED BY

Anurag Agrawal


Wall Putty Compartive Chart
UPLOADED BY

blitzkrig

AAC Dry Ready Mix


UPLOADED BY

D S Venkatesh


Σχεδιασμός Ενεμάτων Βιζηλαίουarchitectural Heritage[1]
UPLOADED BY

Τακης Αμανιτης

PWL5419
UPLOADED BY

vivek agarwal


3AFP9060836_ZD2_000_A_1
UPLOADED BY

Arjun Prajapati

xextvezsv
UPLOADED BY

BALACHANDAR S


Processes 08Bagging
UPLOADED BY

trucnguyenvan2012

WD1
UPLOADED BY

Vijay Rajaindran


45-Vibrating Screens.pdf
UPLOADED BY

Anonymous NxpnI6jC

11.Initial and Final Setting Time


UPLOADED BY

Rahul Sharma


Hydration Model
UPLOADED BY

Myname At

1.BCL Profile.pdf
UPLOADED BY

Mukesh Agarwal


aashto
UPLOADED BY

Gelli baluis

ROSRB PS BOM.xlsx
UPLOADED BY

lawrenz tamayo


Editorial December 201941ca45d9-8225-4cec-a561-09ff2ef8b375
UPLOADED BY

NE Engineering Services

paper2col
UPLOADED BY

hamed

More From Anurag Agrawal



2050_Maciel_8
UPLOADED BY

Anurag Agrawal

PaintsindustryRawmaterialsunitoperationsEquipmentManufacturingQualitytest
s.pdf
UPLOADED BY

Anurag Agrawal


Project Profile on HDPE Buckets 5-20 Ltrs
UPLOADED BY

Anurag Agrawal

Dry Wall Putty White Cement Based


UPLOADED BY

Anurag Agrawal


Solar Powered Borehole Pumps
UPLOADED BY

Oxfam

hdpe
UPLOADED BY

Anurag Agrawal


Analyis of Solar Pump
UPLOADED BY

Basnet Bidur

Solar Water Pumping


UPLOADED BY

Anurag Agrawal

Popular in Science

algebra 2 syllabus 2016-2017
UPLOADED BY

api-287003627

1979 Feb
UPLOADED BY

Hinko Lukšić


Kabir doha
UPLOADED BY

Shrinivas A B

Adoption of Strategic Network


UPLOADED BY

欣憓


Sample Ccie Voice Technology Lab
UPLOADED BY

vitajelazelenbor

Robert Wagoner
UPLOADED BY

Anonymous AnQvu46


igcse_accounting_stock_control_and_nrv_f.pdf
UPLOADED BY

Siddarth

BEEE Lab Manual


UPLOADED BY

Yašh Jaín


case study- micahel morton 1
UPLOADED BY

api-296906278

CIEM.SPAGNA."Papeles de Masonería"
UPLOADED BY

Roberto Amato


Hanging of Saddam Hussain 250 word essay
UPLOADED BY

theseawolf

Rhino Faring It Is
UPLOADED BY

hikariii


Abdul Shafique CVw
UPLOADED BY

abdulshafique

QC Inspector (Offshore Pipeline Installation) Jobs in Propel Consult in UAE -


United Arab Emirates - Naukrigulf
UPLOADED BY

Ashif Iqubal


Nadi
UPLOADED BY

e05dinuka

NGNL V8
UPLOADED BY

Zhao Xian


Annex 1 - Ecological Plant.pdf
UPLOADED BY

anlekgen

standard bolt list Pablo.docx


UPLOADED BY

Pablo Galindos


The Wedding Gone Bad_Triflying Cakes_Management Concepts and
Approaches in the Hospitality Industry_Week 5_HM370_Rachel Sakhi
UPLOADED BY

Rachel Lynne Sakhi

ALL ABOUT HINDUISM.doc


UPLOADED BY

Nawaz


1MRG014136 B en IET600 Integrated Engineering Tool - Introduction
UPLOADED BY

kass_ecs

Basic Chemical Segregation


UPLOADED BY

vpnrraja


Annotated Bib FINAL
UPLOADED BY

kbeggs07

ponti termici therm


UPLOADED BY

Massimiliano Orsini Baldi


Tutorial Database SQLite
UPLOADED BY

Wahyu Srimulyaniw

NES 729 Part 5 Requirements for Non-Destructive Examination Methods


UPLOADED BY

JEORJE


red5
UPLOADED BY

Nilesh Jadhav

Fernwood Gardens Venue Rental Quotation 2019


UPLOADED BY

Alicia Servino


Spartan 6 Pin Out
UPLOADED BY

palagani muralibabu

MILL PA FD Sec Air Burner Tilt Fuel Air


UPLOADED BY

RajeevAgrawal

Footer Menu
Back To Top
ABOUT

 About Scribd

 Press

 Our blog

 Join our team!

 Contact Us

 Join today

 Invite Friends

 Gifts

 Scribd for Enterprise

SUPPORT

 Help / FAQ

 Accessibility

 Purchase help

 AdChoices

 Publishers

LEGAL

 Terms

 Privacy

 Copyright

Social Media

o
o
o
o

 Copyright © 2020 Scribd Inc.


 Browse Books
 Site Directory
 Site Language:

EnglishChange Language

You might also like