Professional Documents
Culture Documents
Annex E: Box 1 (To Be Accomplished in Print by The Applicant)
Annex E: Box 1 (To Be Accomplished in Print by The Applicant)
APPLICATION NO.
BOX 1 (TO BE ACCOMPLISHED IN PRINT BY THE APPLICANT)
OWNER/ APPLICANT NAME For Building Official use
DATE OF APPLICATION
Commercial Hotel
Commercial Office Building REVISED GROSS FLR. AREA
Commercial Mall/ market
Institutional School
Institutional Gov't Building DIFFERENCE IN TAX CREDIT
Institutional Hospital
Industrial Factory
Industrial Warehouse
BOX 2
STATEMENT
1 That the building project has been granted Preliminary Certificate for Green Building with
Certificate Number. __________ dated (mm/dd/yyyy) __________ and which is located in
Quezon City;
2 That the changes of the building project which is at the time of the application are
subject to verification upon submission of revised documents (check each applicable):
Building Plans
Specifications
Calculations
Detailed Drawings
3 That the changes fall under (state whether mandatory, elective or combined)
___________________________________ requirement, specifically for:
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
4 That documentary evidences covering all requirements that are applicable in Item 3
are submitted in compliance with the definition of Green Building and the
requirements of the IRR for the purpose of the application due to changes;
5 That the changes in this application are (state whether new, addition or deletion)
_________________ and have not been duplicated in previous amendments of the
Preliminary Certificate for Green Building, and
6 That as applicant, (state I or we) _____ shall comply with the terms and conditions
of the Preliminary Certification for Green Building and its Amendments
including, but not limited to, requirements of the Building Permit.
7 In case of applying for exemptions, I/ we shall comply with the requirements of Section 10 of
the IRR.