DOCUMENTATION LIST DATE

6/10/2020

DOCUMENTATION LIST SUBMIT IT BY CAPITAL GAS :

PIPE LINE DOCUMENTATION :

-1Engineering study :

1.1 -stress checking calculation /fluid and hydraulic calculation

1.2--cathodic protection system design package including pc station

1-3- internal corrosion study (corrosion mentoring system comply with


NACE MR175/ISO-15156.

2-QC DOCUMENTATION :

A-WPQT INCLUDING ( WPS /PQR/WLDER CERTIFICATE )

B-NONE DESCRUTIVE EXAMINATION REPORT (ULTRASONIC EXMINATION


REPORT).

C-ISOMETRIC LAYOUT INCLUDING (NUMBER OF SECTION /NUMBER OF


WELDIND JOINTS-COORDINATE OF JOINT WELDING )

d- .STRINGING PROCEDURE

E- TRENCHING PROCEDURE

F-COATING PROCEDURE

G-LOWERING PROCEDURE

H- ROAD CROSSING PROCEDURE

I- BACKFILLING PROCEDURE .

Ras Ghareb Gas treatment plant - project Design report-vessel specification