Inspection Measurement: Reference Drawings:-Drawing Description Drawing Number Trade

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

REFERENCE DRAWINGS:-

Trade Drawing Description Drawing Number

REFERENCE DOCUMENTS:-
Trade Type Document No.

Abbreviations/ Symbols:

TOC = TOP OF CONCRETE


NTS = NOT TO SCALE
TOS = TOP TO STEEL
= DENOTES MEMBER ORIENTATION MARK & ASSEMBLY MARK LOCATION.

NOTES :

INSPECTION MEASUREMENT
ALL BUTT WELD REINFORCEMENT HIGHEST BETWEEN 3-5 MM

ENGINEER ACTION:
(A ) Proceed
(B ) Proceed with comments
(C ) Do not proceed, Revise & Resubmit
(D ) Rejected
(E ) Information only

CLIENT:

GAMBIA GROUNDNUT CORPORATION - GAMBIA

STRUCTURAL CONSULTANT :
315
PROF. DR.
35 270 10 NOUR EL - DIN M. ABD ALLAH
L2-1
10 40 40 10

L80*8 CONTRACTOR:
40 40

1*D22
G2-1
100
80

CTR'D 1*D22

Drawing Title:-

REHABILITION OF THE MAIN DEPOT IN GAMBIA

CRANE ANGLE
AN-2000
DATE SCALE
GENERAL NOTES:
t2

tp = MIN. (t1,t2)

1- ALL FILLET WELD SIZE EQUAL TO :.


ts=tp for tp< or = 6mm 11.05.2020 N.T.S
ts=tp-2 for tp>6mm U.N.O t1 ts

MATERIAL LIST FOR ASSEMBLY MK'D AN-2000 52 No. Required IH PROJOECT NO. DRAWING NUMBER SH.NO. REV.
52XAN-2000
Tekla structures

Mark Profile No. Length DRAWING PROJECT PHASE


305 TYPE MARK NO.
L2-1 L80*8 1 00
00 INSPECTION 11.05.2020 I.S S.A.INTER O.M 100 IH19-14 GA ALL
Rev. DESCRIBTION OF JOB DATE PREP. CHECK APP.
G2-1 PL10*100 1 AD
Total
REFERENCE DRAWINGS:-
Trade Drawing Description Drawing Number

REFERENCE DOCUMENTS:-
Trade Type Document No.

Abbreviations/ Symbols:

TOC = TOP OF CONCRETE


NTS = NOT TO SCALE
TOS = TOP TO STEEL
= DENOTES MEMBER ORIENTATION MARK & ASSEMBLY MARK LOCATION.

NOTES :

INSPECTION MEASUREMENT
ALL BUTT WELD REINFORCEMENT HIGHEST BETWEEN 3-5 MM

ENGINEER ACTION:
(A ) Proceed
(B ) Proceed with comments
(C ) Do not proceed, Revise & Resubmit
(D ) Rejected
(E ) Information only

CLIENT:

GAMBIA GROUNDNUT CORPORATION - GAMBIA

STRUCTURAL CONSULTANT :

315
PROF. DR.
10 270 35 NOUR EL - DIN M. ABD ALLAH
L2-2
10 40 40 10

L80*8 CONTRACTOR:

1*D22
40 40

G2-1
100

80

1*D22 CTR'D

Drawing Title:-

REHABILITION OF THE MAIN DEPOT IN GAMBIA

CRANE ANGLE
AN-2001
DATE SCALE
GENERAL NOTES:
t2

tp = MIN. (t1,t2)

1- ALL FILLET WELD SIZE EQUAL TO :.


ts=tp for tp< or = 6mm 11.05.2020 N.T.S
ts=tp-2 for tp>6mm U.N.O t1 ts

MATERIAL LIST FOR ASSEMBLY MK'D AN-2001 52 No. Required IH PROJOECT NO. DRAWING NUMBER SH.NO. REV.
52XAN-2001
Tekla structures

Mark Profile No. Length DRAWING PROJECT PHASE


305 TYPE MARK NO.
L2-1 L80*8 1 00
00 INSPECTION 11.05.2020 I.S S.A.INTER O.M 100 IH19-14 GA ALL
Rev. DESCRIBTION OF JOB DATE PREP. CHECK APP.
G2-1 PL10*100 1 AD
Total
REFERENCE DRAWINGS:-
Trade Drawing Description Drawing Number

REFERENCE DOCUMENTS:-
Trade Type Document No.

Abbreviations/ Symbols:

TOC = TOP OF CONCRETE


NTS = NOT TO SCALE
TOS = TOP TO STEEL
= DENOTES MEMBER ORIENTATION MARK & ASSEMBLY MARK LOCATION.

NOTES :

INSPECTION MEASUREMENT
ALL BUTT WELD REINFORCEMENT HIGHEST BETWEEN 3-5 MM

ENGINEER ACTION:
(A ) Proceed
(B ) Proceed with comments
(C ) Do not proceed, Revise & Resubmit
(D ) Rejected
(E ) Information only

1543

6 1531 6
CLIENT:
10

10
1*D14 1*D14 GAMBIA GROUNDNUT CORPORATION - GAMBIA
25 25

25
G2-2 L2-3 G2-2
70

50

70
CTR'D L50*5 CTR'D

25
10

10
STRUCTURAL CONSULTANT :

PROF. DR.
NOUR EL - DIN M. ABD ALLAH
CONTRACTOR:

Drawing Title:-

REHABILITION OF THE MAIN DEPOT IN GAMBIA

SAG ANGLE
AN-2002
DATE SCALE
GENERAL NOTES:
t2

tp = MIN. (t1,t2)

1- ALL FILLET WELD SIZE EQUAL TO :.


ts=tp for tp< or = 6mm 12.05.2020 N.T.S
ts=tp-2 for tp>6mm U.N.O t1 ts

MATERIAL LIST FOR ASSEMBLY MK'D AN-2002 24 No. Required IH PROJOECT NO. DRAWING NUMBER SH.NO. REV.
24XAN-2002
Tekla structures

Mark Profile No. Length DRAWING PROJECT PHASE


1531 TYPE MARK NO.
L2-3 L50*5 1 00
00 INSPECTION 12.05.2020 I.S S.A.INTER O.M 70 IH19-14 GA ALL
Rev. DESCRIBTION OF JOB DATE PREP. CHECK APP.
G2-2 PL6*70 2 AD
Total
REFERENCE DRAWINGS:-
Trade Drawing Description Drawing Number

REFERENCE DOCUMENTS:-
Trade Type Document No.

Abbreviations/ Symbols:

TOC = TOP OF CONCRETE


NTS = NOT TO SCALE
TOS = TOP TO STEEL
= DENOTES MEMBER ORIENTATION MARK & ASSEMBLY MARK LOCATION.

NOTES :

INSPECTION MEASUREMENT
ALL BUTT WELD REINFORCEMENT HIGHEST BETWEEN 3-5 MM

ENGINEER ACTION:
(A ) Proceed
(B ) Proceed with comments
(C ) Do not proceed, Revise & Resubmit
(D ) Rejected
(E ) Information only

1311

6 1299 6
CLIENT:
10

10
1*D14 1*D14 GAMBIA GROUNDNUT CORPORATION - GAMBIA
25 25

25 25
G2-2 L2-4 G2-2
70

50

70
CTR'D L50*5 CTR'D
10

10
STRUCTURAL CONSULTANT :

PROF. DR.
NOUR EL - DIN M. ABD ALLAH
CONTRACTOR:

Drawing Title:-

REHABILITION OF THE MAIN DEPOT IN GAMBIA

SAG ANGLE
AN-2003
DATE SCALE
GENERAL NOTES:
t2

tp = MIN. (t1,t2)

1- ALL FILLET WELD SIZE EQUAL TO :.


ts=tp for tp< or = 6mm 12.05.2020 N.T.S
ts=tp-2 for tp>6mm U.N.O t1 ts

MATERIAL LIST FOR ASSEMBLY MK'D AN-2003 12 No. Required IH PROJOECT NO. DRAWING NUMBER SH.NO. REV.
12XAN-2003
Tekla structures

Mark Profile No. Length DRAWING PROJECT PHASE


1299 TYPE MARK NO.
L2-4 L50*5 1 00
00 INSPECTION 12.05.2020 I.S S.A.INTER O.M 70 IH19-14 GA ALL
Rev. DESCRIBTION OF JOB DATE PREP. CHECK APP.
G2-2 PL6*70 2 AD
Total

You might also like