g Nuovo Pignone No.

STD-ET-114
PRE-COMMISSIONING sheet 1 of 1
FIRENZE FORM date:
CHECKS ON THE
LIGHTING AND M.P. SYSTEMS

Installation Item:..................................................................

Service:............................................................................................................................................................
INSTRUMENTS FOR TEST

- Tester - 500 V Megger

POS. ACTIVITY CHECK DATE NOTE


3.1 Preliminary checks
1 Power cables disconnected and tested
2 Control cables connected to temporary terminal
boards
3 Accessories
4 Grounding system tightened and tested
5 Verify of installation accessories
6 Check the power supply panel
7 Check the transformer (if any)
8 Checkings according to schematic
4.0 Final setup
All power cables, side board, disconnected and tested

The control cables, connected to the temporary


terminal boards and tested
The mechanical operations of the switches tested

The grounding connections tested and tightened

The panel and the individual components cleaned

The room in which the system is installed clean and


free from foreign materials
The cable channels, cleaned and closed

Contractor: Nuovo Pignone Final Client:

.......................................................... .......................................................... ..........................................................

STD-ET-114 Page 1 of 1